HomeMy WebLinkAboutSP-22-004 - Supplemental - 0510 Shelburne Road (14)COCO: 1540-00510; Bacon St.: 0090-00017
COCO: v. 126 p. 1-3; Bacon St.: v. 1613 p. 150-151
Champlain Oil Company, LLC & Bacon St Properties, 45 San Remo Drive, South Burlington
VT 05403 p. 802.864.5380
Champlain Oil Company, LLC c/o Bryan Cairns
45 San Remo Drive, South Burlington VT 05403 802.864.5380
Lucy Thayer, PLA & Jennifer Desautels, PE, TCE &
478 Blair Park Road, Williston VT 05495 p. 802.879.6331
Lucy.Thayer@tcevt.com; Jennifer.Desautels@tcevt.com
510 Shelburne Road
The project proposes development of a new mixed use four story building. The building have
a foot print of 4,972 square foot and a gross floor area of 19,168 square feet. The building
includes two commercial spaces on the first floor, one commercial space on the second floor
and 9 residential units on the upper (3rd - 4th) floors. Site improvements include sidewalks,
stormwater collection and treatment, plantings, and parking.
2 Site Plan Application Form. Rev. 01-2020
1,981 SF automotive care and service center and gas station (not currently in use)
1st Floor: Commercial Area 1 - 1,570 SF, Commercial Area 2 - 1,665 SF;
2nd Floor: Commercial Area - 3,900 SF; The applicant is requesting an Umbrella Approval
(309.B) for the Permitted Uses in the district for the commercial uses.
3rd & 4th Floors: Residential Units consisting of one and two-bedrooms.
Existing: No existing buildings to remain
Proposed: 4,972 SF (footprint) / 19,168 SF (gross floor area)
Height: 53'-4"
4 floors
9 new residential units
Existing: 0.
Proposed Non-Office: ±5 employees; Proposed Office: ±15-25
The project parcel is located in 1) a Primary Node within the Urban Design Overlay (UDO);
2)Transit District; and 3) Traffic District Zone 1
3 Site Plan Application Form. Rev. 01-2020
Shelburne Road:Existing: 69.7% / 2,644 sq. ft.
Proposed: 67.9% / 2,580 sq. ft.Shelburne Road:
Bacon Street:
Bacon Street:
29,700
6.67 1,981
16.7 4972
89.5 26,576
78.1 23,200
98.6 2,995
28.9 865
29,700
3,500,000
43,957
Estimated costs of ~$1M for site work including earthwork, hardscape and paving,
stormwater improvements, utilities.
112 maximum trips
A.M. 7:00-9:00; P.M. 4:00-6:00 P.M.
Monday-Friday
Fall/Winter 2022