Loading...
HomeMy WebLinkAboutSP-22-004 - Supplemental - 0510 Shelburne Road (14)COCO: 1540-00510; Bacon St.: 0090-00017 COCO: v. 126 p. 1-3; Bacon St.: v. 1613 p. 150-151 Champlain Oil Company, LLC & Bacon St Properties, 45 San Remo Drive, South Burlington VT 05403 p. 802.864.5380 Champlain Oil Company, LLC c/o Bryan Cairns 45 San Remo Drive, South Burlington VT 05403 802.864.5380 Lucy Thayer, PLA & Jennifer Desautels, PE, TCE & 478 Blair Park Road, Williston VT 05495 p. 802.879.6331 Lucy.Thayer@tcevt.com; Jennifer.Desautels@tcevt.com 510 Shelburne Road The project proposes development of a new mixed use four story building. The building have a foot print of 4,972 square foot and a gross floor area of 19,168 square feet. The building includes two commercial spaces on the first floor, one commercial space on the second floor and 9 residential units on the upper (3rd - 4th) floors. Site improvements include sidewalks, stormwater collection and treatment, plantings, and parking. 2 Site Plan Application Form. Rev. 01-2020 1,981 SF automotive care and service center and gas station (not currently in use) 1st Floor: Commercial Area 1 - 1,570 SF, Commercial Area 2 - 1,665 SF; 2nd Floor: Commercial Area - 3,900 SF; The applicant is requesting an Umbrella Approval (309.B) for the Permitted Uses in the district for the commercial uses. 3rd & 4th Floors: Residential Units consisting of one and two-bedrooms. Existing: No existing buildings to remain Proposed: 4,972 SF (footprint) / 19,168 SF (gross floor area) Height: 53'-4" 4 floors 9 new residential units Existing: 0. Proposed Non-Office: ±5 employees; Proposed Office: ±15-25 The project parcel is located in 1) a Primary Node within the Urban Design Overlay (UDO); 2)Transit District; and 3) Traffic District Zone 1 3 Site Plan Application Form. Rev. 01-2020 Shelburne Road:Existing: 69.7% / 2,644 sq. ft. Proposed: 67.9% / 2,580 sq. ft.Shelburne Road: Bacon Street: Bacon Street: 29,700 6.67 1,981 16.7 4972 89.5 26,576 78.1 23,200 98.6 2,995 28.9 865 29,700 3,500,000 43,957 Estimated costs of ~$1M for site work including earthwork, hardscape and paving, stormwater improvements, utilities. 112 maximum trips A.M. 7:00-9:00; P.M. 4:00-6:00 P.M. Monday-Friday Fall/Winter 2022