TRAFFIC SUMMARY
510 SHELBURNE ROAD
SOUTH BURLINGTON, VERMONT
January 12, 2022
Prepared For:
Champlain Company Inc, LLC
510 Shelburne Road
South Burlington, VT
Prepared By:
Colen Johnson, P.E.
Trudell Consulting Engineers (TCE)
478 Blair Park Road
Williston, VT 05495
802-879-6331
PROJECT
LOCATION
2
1.0 INTRODUCTION
This traffic report is intended to provide an overview of the vehicle access and project-
generated traffic associated with the proposed development of the 0.68 acre property
located at 510 Shelburne Road in South Burlington, Vermont. The property, owned by
Champlain Oil Company, Inc., is located on the southeast corner of the Bacon Street
and Shelburne Road (U.S. Route 7) intersection, with direct frontage on both Bacon
Street and Shelburne Road. The property is located approximately 0.2 miles north of the
major intersection of Interstate I-189 and Shelburne Road (U.S. Route 7). In accordance
with the South Burlington Land Development Regulations (dated 11/29/2019), the
property is located within a Zone 1 Traffic Overlay District – Major Intersections.
↑ Project Location ↑
The existing site contains a gas/service station which is proposed to be removed with a
new three story mixed use commercial building (herein called the project) to be
constructed in its place. This report is meant to summarize the traffic impacts of the
proposed project and show compliance with the requirements of the Traffic Overlay
District in accordance with Section 10.02 of the South Burlington Land Development
Regulations.
↑Exhibit 1:Existing Gas/Service Station On-Site ↑
3
2.0 EXISTING ACCESS
The existing gas/service station on site has multiple curb cuts and access points on both
Shelburne Road (U.S. Route 7) and the Class 3 designated Bacon Street. The existing
gas station parking lot contains two wide curb cuts on Shelburne Road (U.S. Route 7),
allowing for left and right turn entrance and egress from each access location. The
northern property boundary directly abuts Bacon Street with no curbing or divide
between the gravel/pavement on site and the roadway surfacing. With no defined
access or change in grade between the roadway and on-site surfacing, two-way
entrance and egress can occur at almost any location along the boundary line
between the project property and Bacon Street. The property also contains no defined
division between the on site pavement and the neighboring Walgreen’s parking lot,
allowing for unimpeded traffic flow between the properties in multiple locations along
the southern property boundary.
↑Exhibit 3: Curb Cuts on Shelburne Road (Looking Southeast)
Exhibit 4:Boundary Between On-Site Surfacing and Bacon Street (Looking East) ↑
↑Exhibit 2:Curb Cut Illustration ↑
4
3.0 PROPOSED ACCESS
The gas/service station is proposed to be removed and a new four-story mixed-use
building is proposed to be constructed. The new building is proposed to be positioned
along the western portion of the site with frontage along Shelburne Road, while
meeting the setback requirements outlined in the South Burlington Regulations. A
parking lot is proposed to be located behind the new building on the eastern portion of
the site.
One curb cut is proposed on Shelburne Road (U.S. Route 7) at the southwest corner of
the site. This curb cut will allow only right turn entrance from Shelburne Road into the
property via a new 18-foot wide one-way slip lane on the southern portion of the site,
providing access from Shelburne Road to the rear parking lot. This slip lane will be for
one-way ingress only traffic.
One curb cut is proposed on Bacon Street, at the center of the site’s northern property
line. This curb cut will allow for right and left turn entrance and egress, providing access
from Bacon Street to the rear parking lot.
One curb cut is also proposed on the southeast corner of the site allowing for two-way
entrance and egress from the neighboring Walgreen’s parking lot to the project’s new
rear parking lot.
↑Exhibit 5:Proposed Site Layout With Access Locations ↑
Proposed 2-way Access
on Bacon Street
Proposed 2-way Access to
Neighboring Walgreen's
Parking Lot
Proposed 1-way Right
Turn Only Access From
Shelburne Road
5
4.0 TRIP GENERATION
TRAFFIC BUDGET:
In accordance with the South Burlington Land Development Regulations, the maximum
allowable trip generation for a lot’s use within a Traffic Overlay Zone is known as the
Traffic Budget. In accordance with Section 10.02.F and 10.02.G, the Traffic Budget or
maximum number of vehicle trip ends during the PM peak hour for the project property
is calculated based on lot size as follows:
Property Lot Size = 0.48 acres + 0.20 acres = 0.68 acres = 29,620.8 SF
Max Peak Hour Volume for Zone 1 (per Table 10-1) = 15 Trips / 40,000 SF of Lot Area
Project Max Peak Hour Volume = (15 Trips / 40,000 SF) * 29,620.8 SF = 11.1 Trips
15% Bonus for Right Turn Only from U.S. Route 7 (per 10.02.G) = 11.1 x 1.15 = 12.77 Trips
Project Maximum Peak Hour Traffic Budget = 13 Trips
EXISTING SITE:
The existing site contains a gas/service station with eight gas pumps/fueling locations.
In accordance with the 10th Edition of the ITE Trip Generation Manual, a gas/service
station (land use #944) with 8 fueling positions, will generate 112 vehicle trips during a
weekday peak hour occurring during a one-hour period between 4:00 and 6:00 pm.
In accordance with Section 10.02.H.2 of the Land Development Regulations, as the
existing peak hour volume for the site (112 trips) exceeds the maximum traffic budget
(13 trips), the existing peak hour volume of 112 peak hour trips will be the maximum
allowable volume for the site with no additional credits.
Project Allowable Peak Hour Traffic Volume = 112 Trip Ends
PROPOSED SITE:
The proposed four-story mixed-use building is assumed to consist of the following uses:
•Commercial Space (1,665 SF) on 1st Floor → Assumed Use = Office Space
•Commercial Space (1,570 SF) on 1st Floor → Assumed Use = Coffee/Donut Shop
•Commercial Space (3,900 SF) on 2nd Floor → Assumed Use = Walk-In Bank
•1 Bedroom Residential Units on 3rd and 4th Floors = Seven 1 Bedroom Units
•2 Bedroom Residential Units on 4th Floor = Two 2 Bedroom Units
It should be noted, that the commercial uses of the building are not final and may
change later during final occupation of the space. The commercial uses listed are
assumed. In accordance with the 10th Edition of the ITE Trip Generation Manual, the
proposed site will generate the following pm peak hour traffic volumes:
6
Coffee/Donut Shop Without Drive Through (Land Use #936) with 1,570 SF = 57 Trips
Walk-In Bank (Land Use #911) with 3,900 SF = 47 Trips
Small Office (Land Use #712) with 1,665 SF = 4 Trips
Third & Fourth Floor Multi-Family Housing Mid Rise (Land Use #221) with 9 DU’s = 4 Trips
Total Peak Hour Traffic Volume for Proposed Site = 112 Trips
The proposed site conditions will not result in an increase in existing peak hour trips.
5.0 CONCLUSIONS
The proposed development of the project site, removing the existing gas/service station
and constructing a new mixed-use building with layout as noted, will meet the traffic
regulations applicable to the Traffic Overlay District - Zone 1 within the South Burlington
Land Development Regulations and reduce the property’s overall existing traffic
impacts. The traffic related compliance and impacts for the proposed project, outlined
in this report, are summarized as follows:
1.The proposed project will reduce the number of curb cuts on Shelburne Road
(U.S. Route 7) from two to one with only right-turn ingress allowed from Shelburne
Road. Reducing the number of curb cuts and restricting entrance to right-turn
only from Shelburne Road will reduce the potential conflict points associated
with this parcel.
2.The proposed project will result in 112 vehicle trip ends during the PM Peak Hour,
which equals the existing PM Peak trips for this site. This proposed peak hour
volume will not exceed the peak hour volume for the existing site, thus meeting
the traffic volume requirements for the Traffic Overlay District outlined in Section
10.02.H.2 of the South Burlington Land Development Regulations.
478 Blair Park Road Williston, VT 05495 802 879 6331www.tcevt.com42 Mapleville Depot Road St. Albans, VT 05478 802 528 5116
Civil Engineering Environmental Services Land Surveying Landscape Architecture
TRAFFIC IMPACT STUDY
510 SHELBURNE ROADSOUTHBURLINGTON,VERMONT
APPENDIX
TRIP GENERATION CALCULATIONS
TCE: 19-202 510 Shelburne Road South Burlington, Vermont
Trip Generation and Traffic Calculations
Budget Calculation -->15 trips per 40,000 SF 1,570 SF Coffee/Donut
1,665 SF Office Space
Lot Size AC SF Total SF 3,900 SF Walk-In Bank
0.68 29700 29700
Traffic Budget:11 Trip Ends
+15% for no direct lefts 13 Trip Ends
onto adjacent arterial
PM Peak
Trips Enter Exit
Existing (Alt. Traffic Budget)8 Fueling Pos.112 56 56
Proposed 9 DU 4 2 2
1665 SF 4 1 3
3900 SF 47 21 26
1570 SF 57 28 29
112
0
<---------**EXISTING MAX. PEAK HOUR EXCEED ZONE BUDGET
USE EXISTING AS BUDGET**
Floor 1 Commercial#1
9 DU Multi-Family Housing
(Mid-Rise)
712: Small Office Building
Floor 2 Commercial
South Burlington Traffic Overlay District Zone 1: Major Intersections
PROJECT TRIP GENERATION
944: Gasoline/Service Station
Distribution
VariableLand Use
10.02.H.2 - In the event the existing peak hour trip gen exceeds max. allowable budge for the site including credits, the
existing peak hour trip gen shall be the max allowable for the site, and no additional credits shall be provided for site
improvements or any other cause. The provision shall not alleviate the responsibility of the applicant to make traffic and
other site improvements required by the DRB.
Floor 1 Commercial #2
911: Walk-In Bank
936: Coffee/Donut w/o DT
Subtotal
Net Increase
Floors 3-4 (9 Residential
Dwelling Units)
Note: The proposed commercial uses shown are assumed and
exact commercial uses are to be finalized prior to building
occupation.
221: Multi-Family Housing (Mid Rise)
Gasoline/Service Station
(944)
Vehicle Trip Ends vs: Vehicle Fueling Positions
On a: Weekday,
Peak Hour of Adjacent Street Traffic,
One Hour Between 4 and 6 p.m.
Setting/Location: General Urban/Suburban
Number of Studies: 66
Avg. Num. of Vehicle Fueling Positions:9
Directional Distribution: 50% entering, 50% exiting
Vehicle Trip Generation per Vehicle Fueling Position
Average Rate Range of Rates Standard Deviation
14.03 4.25 -75.50 6.96
Data Plot and Equation
X = Number of Vehicle Fueling Positions
Study Site Average Rate
Fitted Curve Equation: Not Given R²= ****
Trip Gen Manual,10th Edition Institute of Transportation Engineers
0 5 10 15 200
100
200
300
8
112
Page 1 of 2
4/7/2020https://itetripgen.org/PrintGraph.htm?code=944&ivlabel=UNITS944&timeperiod=TPSIDE&x=8&e...