Loading...
HomeMy WebLinkAboutCU-18-12 - Supplemental - 0030 Myers Court (9)_, arr.: No Text Project Number: Time Arrived Site: TCE Staff: Others Present on Site: Weather: Submitted to: Comments: 11:45 AM Nicole Snow, Heath Butler Susan Cuchural Cloudy, rainy, 55 degrees Gary Cuchural Date: 10/01/2018 Departed: 12:30 PM Date: 10/01/18 Heath and I arrived on site at around 11:45 am today. Susan Cuchural met us outside and brought us into the backyard to show us what we would be doing today. She showed us the building that has been built on 30 Meyer Court and explained that we needed to measure height of the peak of the roof and halfway down the slope of said roof. She also stated that the section of the building that comes out toward her property should be 5 feet from the fence and asked us to locate that also. Heath and I were able to locate the fence and the bump out on the building and the northwest corner of that bump out is 5.0' from the fence and the southwest corner is 5.1' from the fence. When it comes to the height of the building we measured 21.2' at the top/peak and 18.2' halfway down the slope of the roof. We also located the bottom of the roof overhangs and discovered it is about 15.2' on both sides of the building. We finished locating the requested items and left the residence. End of report Nicole Snow TCE Survey