HomeMy WebLinkAboutSP-08-31 - Decision - 0034 Commerce AvenueC t
#S P-08-31
CITY OF SOUTH BURLINGTON
DEPARTMENT OF PLANNING AND ZONING
PLUMBING INVESTMENT, LLC - 34 COMMERCE AVENUE
SITE PLAN APPLICATION #SP-08-31
FINDINGS OF FACT AND DECISION
Plumbing Investment, LLC, hereinafter referred to as the applicant, is seeking site plan
approval to amend a previously approved plan for a 13,600 sq. ft. warehouse/storage
building. The amendment consists of: 1) converting 6800 sq. ft. to contractor or building
trade facility use, and 2) constructing an 800 sq. ft. second story addition for contractor
or building trade facility use.
The Development Review Board held a public hearing on Tuesday, May 20, 2008. Brad
Benoure represented the applicant.
Based on testimony provided at the above mentioned public hearing and the plans and
supporting materials contained in the document file for this application, the Development
Review Board finds, concludes, and decides the following:
FINDINGS OF FACT
1. The applicant is seeking site plan approval to amend a previously approved plan
for a 13,600 sq. ft. warehouse/storage building. The amendment consists of: 1)
converting 6800 sq. ft. to contractor or building trade facility use, and 2)
constructing an 800 sq. ft. second story addition for contractor or building trade
facility use.
2. The owners of record of the subject property are Plumbing Investment, LLC and
Bouchard -Lacroix, Inc.
3. The subject property is located in the Mixed Industrial & Commercial (Mixed IC)
Zoning District.
4. The plan submitted is entitled, "Benoure Plumbing & Heating, Inc 34 Commerce
Ave & 83 Ethan Allen Dr., South Burlington", prepared by Lamoureux &
Dickinson Consulting Engineers, Inc., dated 2/3/05, last revised on 4/14/08.
-1-
#SP-08-31
Zoning District & Dimensional Requirements:
Mixed IC Zoning District
Re uired
Pro sed
4 Min. Lot Size
40,000 S.F.
41,370S.F
q Max. Building Coverage
40%
19%
�l Max. Overall Coverage
70%
56%
Max. Front Yard Coverage E.A. Drive
30%
30%
�l Max. Front Yard Coverage Commerce Ave
30%
26%
�l Min. Front Setback
30 ft
110 ft
�l Min. Side Setback
10 ft.
>10 ft.
�l Min. Rear Setback
30 ft.
n/a
Builling Height
40 ft.
27ft.
q Zoning Compliance
SITE PLAN REVIEW STANDARDS
Section 14.06 of the South Burlington Land Development Regulations establishes the
following general review standards for all site plan applications:
(a) The site shall be planned to accomplish a desirable transition from structure
to site, from structure to structure, and to provide for adequate planting, safe
pedestrian movement, and adequate parking areas.
Access to 34 Commerce Avenue is provided via a curb -cut off Commerce Avenue. The 2nd
story addition will not impede on this access. No changes to the access are proposed.
Based on 7600 square feet of contractor or building trade facility use and 6800 sq. ft. of
warehouse/storage use, the site requires 8 parking spaces. The site plan includes parking
for 24 vehicles. One handicapped parking space is required; one is provided on the 34
Commerce Avenue side of the property.
Pursuant to Section 13.01(G)(5), a bicycle rack must be provided on the property. The plan
indicates the existence of a bicycle rack.
(b) Parking shall be located to the rear or sides of buildings to the greatest extent
practicable.
All parking is existing and is located in the front of each side of the building.
(c) Without restricting the permissible limits of the applicable zoning district, the
height and scale of each building shall be compatible with its site and
existing or adjoining buildings.
The applicant is proposing an 800 square foot second story addition. The applicant has
provided an elevation and states that the total height of the building including the addition
will be 27 feet. This falls well within the height restriction requirement.
-2-
#S P-08-31
(d) Newly installed utility services and service modifications necessitated by
exterior alterations or building expansions shall, to the extent feasible, be
underground.
Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines,
services, and service modifications shall be underground.
The applicant shall obtain additional wastewater allocation approval from the Director of
Planning and Zoning or designee prior to permit issuance if necessary.
(e) The DRB shall encourage the use of a combination of common materials and
architectural characteristics, landscaping, buffers, screens and visual
interruptions to create attractive transitions between buildings of different
architectural styles.
The applicant has submitted elevations of the proposed building addition. The proposed
addition is harmoniously related to the existing structure.
(fl Proposed structures shall be related harmoniously to themselves, the terrain,
and to existing buildings and roads in the vicinity that have a visual
relationship to the proposed structures.
The proposed project does not fall within a design review district. The proposed building
elevations relate harmoniously to the terrain and existing buildings in the vicinity.
Site plan applications shall meet the following specific standards as set forth in Section
14.07 of the South Burlington Land Development Regulations:
(a) The reservation of land may be required on any lot for provision of access to
abutting properties whenever such access is deemed necessary to reduce
curb cuts onto an arterial of collector street, to provide additional access for
emergency or other purposes, or to improve general access and circulation
in the area.
Access to the lot will not be changing as a result of this application.
(b) Electric, telephone and other wire -served utility lines and service connections
shall be underground. Any utility installations remaining above ground shall
be located so as to have a harmonious relation to neighboring properties and
to the site.
Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines,
services, and service modifications shall be underground.
(c) All dumpsters and other facilities to handle solid waste, including compliance
with any recycling or other requirements, shall be accessible, secure and
properly screened with opaque fencing to ensure that trash and debris do not
escape the enclosure(s).
-3-
I
#S P-08-31
The plan shows an enclosed & screened dumpster storage area in the eastern parking
area.
(d) Landscaping and Screening Requirements
Based on submitted building costs of $90,000, the minimum landscaping budget should be
$2700. The applicant is proposing $2,840 in new landscaping. The applicant shall post a
landscaping bond in the amount of $2700 to assure that the landscaping has taken root
and will survive.
The City Arborist has reviewed the plans and has no issues.
Pursuant to Section 13.06(B) of the Land Development Regulations, the plans shall
depict snow storage areas that will minimize the potential for run-off. Adequate snow
storage areas are shown on the plans.
As noted above, a bicycle rack is depicted on the plans.
Lighting
Pursuant to Section 13.07(A) of the Land Development Regulations, all exterior lighting
shall be shielded and downcasting to prevent light from spilling onto adjacent properties
and rights -of -way.
No new lighting is proposed.
Traffic
The current 13,600 sq. ft. of warehouse/storage use is estimated to generate 6.39
vehicle trip ends (vte's) during the p.m. peak hour. Using the ITE Trip Generation
Manual, 7th Edition, the proposed uses are estimated to generate 10.64 vte's during the
p.m. peak hour. Thus, this project is estimated to generate 4.25 additional vte's.
Airport Approach Cones Overlay District
The subject property is located within the Airport Approach Cone and shall be subject to
the standards set forth in Section 13.03 of the South Burlington Land Development
Regulations.
DECISION
Motion by G� L� ��l�l� , seconded by q It4A(—C
to approve Site Plan Applicatio #SP-08-31 of Plumbing Investment, LLC, ubject to the
following conditions:
1. All previous approvals and stipulations which are not superseded by this
approval shall remain in effect.
#S P-08-31
2. This project shall be completed as shown on the plan submitted by the applicant
and on file in the South Burlington Department of Planning and Zoning.
3. Pursuant to Section 15.13(E) of the Land Development Regulations, any new
utility lines, services, and service modifications shall be underground.
4. The applicant shall obtain additional wastewater allocation approval from the
Director of Planning and Zoning or designee prior to permit issuance if necessary.
5. The applicant shall post a landscaping bond in the amount of $2700 prior to
permit issuance. This bond shall remain in full effect for three (3) years to assure
that the landscaping has taken root and has a good chance of survival.
6. For the purpose of calculating road impact fees under the South Burlington
Impact Fee Ordinance, the Development Review Board estimates that this
project will generate 4.25 additional vehicle trip ends during the p.m. peak hour.
7. Any new exterior lighting shall consist of downcasting fixtures. Any change to
approved lights shall require approval of the Administrative Officer prior to
installation.
8. The applicant shall obtain a zoning permit within six (6) months pursuant to
Section 17.04 of the Land Development Regulations or this approval is null and
void.
9. The applicant shall obtain a Certificate of Occupancy/Compliance from the
Administrative Officer prior to using the 800 sq. ft. addition.
10. Any change to the site plan shall require approval by the South Burlington
Development Review Board or the South Burlington Administrative Officer.
Mark Behr — yea/nay/abstai not e
pa
Matthew Birmingham—
yea/na
John Dinklage —teay/abstain/not
ay/abstain/not present
Roger Farley —y/abstain/not
present
Eric Knudsen —y/abstain/not
present
Peter Plumeau
nay/abstain/not present
Gayle Quimby —
present
Motion carried by a vote of �-- 6 - d
Signed this ;� D day of h 2008, by
John Dinklage, Chair
-5-
#SP-08-31
Please note: You have the right to appeal this decision to the Vermont Environmental
Court, pursuant to 24 VSA 4471 and VRCP 76 in writing, within 30 days of the date this
decision is issued. The fee is $225.00. If you fail to appeal this decision, your right to
challenge this decision at some future time may be lost because you waited too long.
You will be bound by the decision, pursuant to 24 VSA 4472 (d) (exclusivity of remedy;
finality).
M