HomeMy WebLinkAboutSP-07-69 - Decision - 0035 Thompson Street#S P-07-69
CITY OF SOUTH BURLINGTON
DEPARTMENT OF PLANNING AND ZONING
LOGIC SUPPLY - 35 THOMPSON STREET
SITE PLAN APPLICATION #SP-07-69
FINDINGS OF FACT AND DECISION
Logic Supply, hereinafter referred to as the applicant, is seeking to amend a previously
approved plan for a 30,000 sq. ft. light manufacturing facility. The amendment consists
of: 1) raising the building elevation by two (2) feet, 2) adding a sidewalk and curb, 3)
revising landscaping to screen proposed transformer, and 4) revising light pole locations,
35 Thompson Street.
The Development Review Board held a public hearing on Tuesday, October 2, 2007.
Chip Dillon represented the applicant.
Based on testimony provided at the above mentioned public hearing and the plans and
supporting materials contained in the document file for this application, the Development
Review Board finds, concludes, and decides the following:
FINDINGS OF FACT
The applicant is seeking to amend a previously approved plan for a 30,000 sq. ft.
light manufacturing facility. The amendment consists of: 1) raising the building
elevation by two (2) feet, 2) adding a sidewalk and curb, 3) revising landscaping
to screen proposed transformer, and 4) revising light pole locations, 35
Thompson Street.
2. The owner of record of the subject property is Greenfield Capital, LLC.
3. The subject property is located in the Industrial & Open Space (10) Zoning
District.
4. The plans submitted consist of a three (3) page set of plans, page one (1)
entitled, "Logic Supply Corporation Lot 10 Meadowland Business Park South
Burlington Vermont Landscape Plan", prepared by Michael Lawrence & Assoc.,
dated Sept. 11, 2007.
- 1 -
#SP-07-69
Zoning District & Dimensional Requirements
Table 1. Dimensional Requirements
10 Zoning District
Re uired
Pro osed **
�l Min. Lot Size
3 acres
3.22 acres
�l Max. Density
n/a
n/a
�l Max. Building Coverage
30%
7%
Max. Overall Coverage
50%
25%
Min. Front Setback
50 ft.
>50 ft.
�l Min. Side Setback
35 ft.
>35 ft.
Min. Rear Setback
50 ft.
Corner lot- no rear setback
* Max. Building Height
35 ft.
36 ft 2"
�l Front Yard Coverage
30%
11.5%
�l zoning compliance
n/a no residential units proposed
** Phase 1
* Waiver requested
The applicant is proposing an additional transformer pad which is small enough to not
affect the overall coverage.
SITE PLAN REVIEW STANDARDS
Pursuant to Section 14.03(A)(6) of the Land Development Regulations, any PUD shall
require site plan approval. Section 14.06 establishes the following general review standards
for all site plan applications:
The site shall be planned to accomplish a desirable transition from structure to site,
from structure to structure, and to provide for adequate planting, safe pedestrian
movement, and adequate parking areas.
The applicant is proposing a sidewalk and a curb. This is acceptable.
The applicant has provided for adequate pedestrian movement to and within the subject lot.
The parking requirements are being met.
Section 13.01(G)(5) requires that bicycle parking or storage facilities are provided for
employees, residents, and visitors to the site. A bicycle rack is depicted on the plans.
Parking shall be located to the rear or sides of buildings to the greatest extent
practicable.
Some of the proposed parking is located in front of the building with respect to Thompson
Street. While this is not in conformance with the regulations, staff finds the parking layout
-2-
#SP-07-69
to be acceptable in that the parking will largely be shielded from the more heavily traveled
Meadowland Drive.
Without restricting the permissible limits of the applicable zoning district, the height
and scale of each building shall be compatible with its site and existing or adjoining
buildings.
The height of the proposed building with rooftop apparatus is stated be 36 feet, 2 inches
which is compatible with the neighboring properties.
Newly installed utility services and service modifications necessitated by exterior
alterations or building expansions shall, to the extent feasible, be underground.
Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines,
services, and service modifications shall be underground.
The DRB shall encourage the use of a combination of common materials and
architectural characteristics, landscaping, buffers, screens and visual interruptions
to create attractive transitions between buildings of different architectural styles.
This requirement is being met
Proposed structures shall be related harmoniously to themselves, the terrain and to
existing buildings and roads in the vicinity that have a visual relationship to the
proposed structures.
This requirement is being met.
In addition to the above general review standards, site plan applications shall meet the
following specific standards as set forth in Section 14.07 of the Land Development
Regulations:
The reservation of land may be required on any lot for provision of access to
abutting properties whenever such access is deemed necessary to reduce curb cuts
onto an arterial of collector street, to provide additional access for emergency or
other purposes, or to improve general access and circulation in the area.
The Board does not foresee the need to provide additional access to abutting properties.
The layout of the area is such that all adjacent properties already have sufficient access.
Electric, telephone and other wire -served utility lines and service connections shall
be underground. Any utility installations remaining above ground shall be located so
as to have a harmonious relation to neighboring properties and to the site.
Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines,
services, and service modifications shall be underground.
All dumpsters and other facilities to handle solid waste, including compliance with
any recycling or other requirements, shall be accessible, secure and properly
screened with opaque fencing to ensure that trash and debris do not escape the
enclosure(s).
-3-
#SP-07-69
The plans depict a dumpster which is noted to be enclosed. The applicant has stated, in a
memo to staff dated September 6, 2006, that the dumpster will be screened via a chain link
fence with interwoven screening material. Staff finds this sufficient.
Landscaping and Screening Requirements
The applicant is proposing changes to the originally approved landscaping plan. The
applicant has submitted a landscaping budget meeting the minimum requirement. Based
on submitted costs of $800,000 (per the final plat approval), the landscaping budget shall
be a minimum of $10,500.
Pursuant to Section 13.06(C)(1) of the South Burlington Land Development Regulations,
any utility cabinets on the site shall be effectively screened to the approval of the
Development Review Board. The proposed electrical transformer on site has been
screened by landscaping on all sides.
The plans indicate the snow storage areas.
View Protection Zone
The subject property is located within the Hinesburg Road -North Scenic View Protection
Overlay District and thus subject to Section 10.03(H) of the SBLDR. Specifically, no part
of any structure within the zone shall exceed an elevation of 393.5 feet above mean sea
level plus 5.8 feet for each 1000 feet that said part of said structure is horizontally distant
from the Hinesburg Road -North View Protection Zone Base Line shown on the Scenic
View Protections Overlay District Map.
The applicant has provided information on
sufficiently demonstrated that the elevation
10.03(H) of the SBLDR.
Height
the building elevation of the building, and
is below the threshold described in Section
During pre -construction review, the applicant has determined the need to raise the
bottom floor of the building by two (2) feet, bringing the total building height (including
the HVAC units on the roof) to 36' 2", thereby needing a 1' 2" height waiver.
Other
The subject property is located within the Industrial Open Space District and as such
shall be subject to Section 6.04(F) and 6.05 of the South Burlington Land Development
Regulations.
The subject property is located within the Airport Approach Cone and as such shall be
subject to Section 13.03 of the South Burlington Land Development Regulations.
#SP-07-69
DECISION
Motion by seconded by ��� ���1 LF Y to
approve Site Plarl Application #SP- 7-69 of Logic Supply, subject to the folio ing
conditions:
1. All previous approvals and stipulations, which are not superseded by this
approval, shall remain in effect.
2. This project shall be completed as shown on the plans submitted by the
applicant, and on file in the South Burlington Department of Planning and Zoning.
3. The applicant shall obtain a zoning permit within six (6) months pursuant to
Section 17.04 of the Land Development Regulations or this approval is null and
void.
4. The applicant shall obtain a Certificate of Occupancy/Compliance from the
Administrative Officer prior to the occupancy of the building.
5. Any change to the site plan shall require approval of the South Burlington
Development Review Board or the Administrative Officer.
Mark Behr —Ce)/nay/abst in/not present
Matthew Birmingham — yea nay/abstain/not present
John Dinklage — y a/nay abstain not present
Roger Farley — ye nay/abstain/not present
Eric Knudsen — e nay/abstain/not rent
sainPeter Plumeau — y /nay/abtof en
aGayle Quimby —Lea present
Motion carried by a vote of !;—_ C) - 0
Signed this � day of CT°a E K— _ 2007, by
Mark Behr, Vice Chairman
Please note: You have the right to appeal this decision to the Vermont Environmental
Court, pursuant to 24 VSA 4471 and VRCP 76 in writing, within 30 days of the date this
decision is issued. The fee is $225.00. If you fail to appeal this decision, your right to
challenge this decision at some future time may be lost because you waited too long.
You will be bound by the decision, pursuant to 24 VSA 4472 (d) (exclusivity of remedy;
finality).
-5-