Loading...
HomeMy WebLinkAboutSP-94-0000 - Decision - 0015 Commerce AvenueFINDINGS OF FACT & DECISION STATE OF VERMONT s p, "' 06 COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of Jeff Nick to consruct a 3,150 square foot office building for a pest exterminating business, 15 Commerce Avenue. On the 29th of March, 1994 the South Burlington Planning Commission approved the request of Jeff Nick for site plan review under Section 19.10 of the South Burlington Zoning Regulations based on the following findings: 1. This project consists of constructing a 3,150 square foot office building for a pest exterminating business. 2. This property located at 15 Commerce Avenue (lot #33) lies within the I-C District. It is bounded on the north by Commerce Avenue, on the west by an auto repair business, and on the east and south by vacant lots. 3. Access/circulation: Access will be provided by a 20 foot curb cut on Commerce Avenue. Circulation is adequate. 4. Coverage/setbacks: Building coverage is 7.8% (maximum allowed is 30%). Overall coverage is 37.6% (maximum allowed is 70%). Front yard coverage is 16.7% (maximum allowed is 30%). Setback requirements will be met. 5. Parking: This project requires a total of 13 parking spaces and 27 spaces including one (1) handicapped space will be provided. The additional spaces are needed for the company vehicles. 6. Landscaping: The minimum landscaping requirement, based on building costs, is $3,780 which is being met. Plantings will include White Pine, Yew, Juniper, Crabapple and Burning Bush. The site plan should be revised to indicate the correct number of White Pine trees proposed. 7. Traffic: The applicant will be required to contribute $880 for improvements to the Ethan Allen Drive/Shamrock Road intersection. This was a requirement of the subdivision approval. 8. Sidewalk: The subdivision approval required that the applicant either contribute $15 per linear frontage foot or construct the sidewalk. The plan should be revised to show the sidewalk. 1 9. Lighting: Exterior lighting consists of five (5) 150 watt wall mounted high pressure sodium lamps with cut-off luminaries. 10. Dumpster: The dumpster will be screened with mesh or a stockade fence. 11. Sewer: A sewer allocation of 270 gpd is required based on a maximum of 18 employees. The applicant will be required to pay the per gallon fee prior to permit. 12. Other: The developer, John Belter, has not met his obligations to post a bond for the road construction and street trees, the road does not meet City standards and the street trees have not been planted. Staff recommended that the zoning/building permit for this building not be issued until the Administrative Officer is satisfied that the developer has met his obligations for final plat approval. DECISION & CONDITIONS Based on the above Findings of Fact, the South Burlington Planning Commission approves the site plan application of Jeff Nick to construct a 3,150 square foot office building for a pest exterminating business, 15 Commerce Avenue, as depicted on a plan entitled "Ethan Allen Farms Industrial Park, Lot 33 - South Burlington, VT, Proposed Orkin Pest Control" with a last revision date of 3/15/94, with the following stipulations: 1) All previous approval and stipulations which are not superseded by this approval shall remain in effect. 2) The plan shall be revised prior to issuance of a zoning/building permit to show the changes listed below and shall require approval of the City Planner. Three (3) copies of the approved revised plan shall be submitted to the City Planner prior to permit issuance. a) The plan shall be revised to of White Pine trees proposed. b) The plan shall be revised acceptable to the City Engineer. indicate the correct number to include a drainage plan 3) A sewer allocation of 270 gpd is approved. The applicant shall pay the per gallon fee prior to permit. 4) The applicant shall contribute $880 for improvements to the Ethan Allen Drive/Shamrock Road intersection prior to permit. 5) Any new exterior lighting shall consist of downcasting shielded fixtures so as not to cast light beyond the property line. Any change in lighting shall be approved by the City Planner prior to 2 installation. 6) The zoning/building permit for this building shall not be issued until the Administrative Officer is satisfied that the subdivision developer, John Belter, has met his obligations for final plat approval. 7) The applicant shall post a landscape bond in the amount of $3,780 for the new landscaping. This bond shall be posted prior to issuance of a zoning/building permit. The bond shall remain in effect for three (3) years to assure that the landscaping has taken root and has a good chance of surviving. 8) The applicant shall obtain a zoning/building permit within six (6) months or this approval is null and void. 9) The applicant shall obtain a Certificate of Occupancy from the Administrative Officer prior to use of the office building. 10) Any change of the site plan shall require approval by the South Burlington Planning Commission. 11) Prior to issuance of a zoning/building permit, the applicant shall pay the $15 per linear foot of frontage sidewalk fee which was required as a condition of subdivision approval. Chairme(n"or Clerk South Burlington Planning Commission D to 3