HomeMy WebLinkAboutSD-04-65 - Decision - 0009 Tabor PlaceCITY of SOUTH BURLINGTON
DEPARTMENT of PLANNING & ZONING
VERONIQUE DOBSON AND DANIEL & ELSPETH TOLAN - 2 LOT MINOR
SUBDIVISION
FINAL PLAT APPLICATION #SD-04-65
FINDINGS of FACT AND DECISION
Veronique Dobson and Daniel and Elspeth Tolan, hereafter referred to as the applicants,
are seeking final plat approval of a project to resubdivide two (2) lots developed with
single-family dwellings. The resubdivision consists of transferring approximately 0.04
acres from the lot at 165 Holbrook Road (Lot 58) to the lot at 9 Tabor Place (lot 59). The
subject property is located in the Southeast Quadrant (SEQ) Zoning District. The
Development Review Board reviewed the sketch plan for the proposed project on
August 17, 2004. A public hearing was held on October 5, 2004. Elspeth Tolan was
present at the meeting.
Based on testimony provided at the above mentioned public hearing and the plans and
supporting materials contained in the document file for this application, the Development
Review Board finds, concludes, and decides the following:
FINDINGS of FACT
1. The applicants are seeking final plat approval of a project to resubdivide two (2) lots
developed with single-family dwellings. The resubdivision consists of transferring
approximately 0.04 acres from the lot at 165 Holbrook Road (Lot 58) to the lot at 9 Tabor
Place (lot 59).
2. The owners of record are Veronique Dobson (Lot 58) and Daniel & Elspeth Tolan (lot
59).
3. The subject properties are located in the Southeast Quadrant (SEQ) Zoning District.
4. The plans consist of a survey plat entitled "Plan of Lands of Daniel C. + Elspeth Tolan
+ Santiago P. Miro + Veronique Dobson Tabor Place South Burlington, VT Boundary
Line Adjustment Plat", prepared by Lamoureux & Dickinson Consulting Engineers, Inc.,
dated 8/5/04.
Zoning District & Dimensional Requirements
Table 1. Dimensional Requirements
SEQ Zoning District
Required
Proposed
Min. Lot Size
12,000 SF
20,909 SF
Max. Density
1.2 units/acre
n/a
Max. Building Coverage
20%
n/a
Max. Overall Coverage
40%
n/a
Min. Front Setback
30 ft.
>30 ft.
Min. Side Setback
10 ft.
>10 ft.
Min. Rear Setback
30 ft.
>30 ft.
zoning compliance
Some of the dimensional standards related to these two (2) lots are not applicable to the
proposed project. These two (2) lots are part of overall PUD, so density and coverage
calculations were determined for the entire project, not on a lot by lot basis.
SUBDIVISION CRITERIA
Pursuant to Section 15.18 of the South Burlington Land Development Regulations
subdivisions shall comply with the following standards and conditions:
Sufficient water supply and wastewater disposal capacity is available to meet the
needs of the project
According to Section 15.13 of the South Burlington Land Development Regulations, the
existing public water system shall be extended so as to provide the necessary quantity of
water, at an acceptable pressure.
The two (2) subject lots are currently developed with single-family homes, which are
adequately connected to the public water system. The proposed project will not affect the
water connection or supply of these dwelling units.
According to Section 15.13 of the South Burlington Land Development Regulations, the
subdivider or developer shall connect to the public sewer system or provide a community
wastewater system approved by the City and the State in any subdivision where off -lot
wastewater is proposed.
The two (2) subject lots are currently developed with single-family homes, which are
adequately connected to the public sewer system. The proposed project will not affect the
sewer connection or demand of these dwelling units.
Sufficient grading and erosion controls will be utilized during and after construction
to prevent soil erosion and runoff from creating unhealthy or dangerous conditions
on the subject property and adjacent properties.
There is no construction or earthwork proposed through this project.
The project incorporates access, circulation, and traffic management strategies
sufficient to prevent unreasonable congestion of adjacent roads.
Lot 58 is currently accessed by a private driveway off of Holbrook Road. Lot 59 is currently
accessed by a private driveway off of Tabor Place. No changes are proposed.
The project's design respects and will provide suitable protection to wetlands,
streams, wildlife habitat as identified in the Open Space Strategy, and any unique
natural features on the site.
There are no wetlands on the subject property
The project is designed to be visually compatible with the planned development
patterns in the area, as specified in the Comprehensive Plan and the purpose of the
zoning district(s) in which it is located.
Both structures are currently in existence, so this criterion is not applicable to the proposed
project.
Open space areas on the site have been located in such a way as to maximize
opportunities for creating contiguous open spaces between adjoining parcels and/or
stream buffer areas.
This criterion is not applicable to the proposed project.
The layout of a subdivision or PUD has been reviewed by the Fire Chief or (designee)
to ensure that adequate fire protection can be provided.
This project does not warrant review by the South Burlington Fire Chief.
Roads, recreation paths, stormwater facilities, sidewalks, landscaping, utility lines
and lighting have been designed in a manner that is compatible with the extension of
such services and infrastructure to adjacent landowners.
This criterion is not applicable to the proposed project.
Roads, utilities, sidewalks, recreation paths, and lighting are designed in a manner
that is consistent with City utility and roadway plans and maintenance standards.
This criterion is not applicable to the proposed project.
The project is consistent with the goals and objectives of the Comprehensive Plan
for the affected district(s).
The proposed boundary line adjustment on this property is in conformance with the South
Burlington Comprehensive Plan.
Lot Layout.
According to Section 15.10 of the South Burlington Land Development Regulations, a
minimum width to length ratio of one to five (1:5) shall be used as a guideline by the
Development Review Board in evaluating lot proportions. Square or roughly square lots
shall not be approved.
The two lots proposed through this project are in compliance with this criterion.
DECISION
Motion by &A OL �QI416V seconded by GYM u
to approve Final Plat Application SD-04-65 of Veronique Dobson and Dank I & Elspeth
Tolan, subject to the following conditions:
1. All previous approvals and stipulations shall remain in full effect, except as amended
herein.
2. This project shall be completed as shown on the plat submitted by the applicant, and
on file in the South Burlington Department of Planning & Zoning.
3. Any changes to the final plat plan shall require approval of the South Burlington
Development Review Board.
4. The final plat plan (survey plat) shall be recorded in the land records within 90 days
or this approval is null and void. The plan shall be signed by the Board Chair or Clerk
prior to recording. Prior to recording the final plat plan, the applicant shall submit a copy
of the survey plat in digital format. The format of the digital information shall require
approval of the Director of Planning and Zoning.
Chuck Bolton — yea/nay/abstain not resen
Mark Boucher — ye nay/abstain/not present
John Dinklage — ea/nay/abstain not presen
Roger Farley —bnay/abstain/not present
Michele Kupersmith — e nay/abstain/not present
Larry Kupferman — e nay/abstain/not present
Gayle Quimby — e nay/abstain/not present
Motion carried by a vote of:
Tti
Signed this J day of October, 2004 by
L z�'
Gayle uimby, Clerk
Please note: You have the right to appeal this decision to the Vermont Environmental
Court, pursuant to 24 VSA 4471 and VRCP 76 in writing, within 30 days of the date this
decision is issued. The fee is $225.00. If you fail to appeal this decision, your right to
challenge this decision at some future time may be lost because you waited too long.
You will be bound by the decision, pursuant to 24 VSA 4472 (d) (exclusivity of remedy;
finality).