HomeMy WebLinkAboutCU-01-14 SP-01-24 - Decision - 0003 Commerce Avenue#CU-0I-14 & #SP-01-24 FINDINGS OF FACT AND DECISION STATE OF VERMONT COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, conditional use application #CU-01-14 and site plan application #SP- 01-24 of William and Linda Hanf to amend a previously approved site plan for a 10,625 square foot building used for automobile repair and service. The amendment consists of site modifications to the landscaping and to add a ground -mounted transformer, 3 Commerce Avenue. On the 1 9th of Jung, 2000, the South Burlington Development Review Board approved the conditional use application under Section 26.05 and site plan application under Section 26.10 of the South Burlington Zoning Regulations of Riverside Auto Body based on the following findings: This project consists of amending a previously approved site plan for a 10,625 square foot building used for automobile repair and service. The amendment consists of site modifications to the landscaping and to add a ground -mounted transformer, 3 Commerce Ave. 2. The owners of record are William and Linda Hanf. Site Plan Criteria: 3. Coverage/setbacks: The proposed building coverage will remain 26.1 percent (30% maximum). Overall lot coverage will increase slightly from 61 percent to 61.4 percent (70% maximum). The proposed front yard coverage will remain the maximum of 30 percent (30% maximum). All setbacks are being met. 4. Landscapina: The minimum landscaping requirement based on building costs of $8,000 is being met. The applicant proposed decreasing the number of maple trees and cranberry bushes in favor of arborvitae bushes around the proposed transformer. The Board has typically required that transformers be well screened from view by evergreen plants. The plans should be revised to note the size of the landscaping. 5. Conditional Use Criteria: The proposed property complies with the stated purpose of the Mixed Industrial/Commercial District to encourage "a range of individual commercial uses... that will serve adjacent area and/or the traveling public and that will be mutually compatible with industrial activity". The proposed use will not adversely affect: a) the capacity of existing or planned community facilities. No affect expected. b) the character of the area affected. The proposed changes will not adversely affect the character of the area. c) traffic on roads or highways in the vicinity. The proposed changes are not expected to impact traffic. d) bylaws in effect. The proposal is in conformance with the zoning regulations. e) utilization of renewable energy resources. There is no utilization of renewable energy resources to be affected. f) general public health and welfare. No adverse affect expected. DECISION AND CONDITIONS Based on the above Findings of Fact, the South Burlington Development Review Board approves conditional use application #CU-01-14 and site plan application #SP-01-24 of William and Linda Hanf to amend a previously approved site plan for a 10,625 square foot building used for automobile repair and service. The amendment consists of site modifications to the landscaping and to add a ground -mounted transformer, 3 Commerce Avenue, as depicted on a two (2) page set of plans, page one (1) entitled, "Riverside Auto Body Lot 36", prepared by Lamoureux & Dickinson Consulting Engineers, Inc., dated 2/16/00, last revised on 12/27/00, with a stamped received date of 4/25/01 with the following stipulations: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. The plat plans shall be revised to show the changes listed below and shall require approval of the Director of Planning & Zoning (hereinafter Director). Three (3) copies of the approved revised plat plans shall be submitted to the Director prior to permit issuance. a) The site plan shall be revised to move the Red Maple tree off of the sewer service line at least 8 feet away. 3. The applicant shall obtain a zoning permit within six (6) months pursuant to Section 27.302 of the zoning regulations or this approval is null and void. 4. The applicant shall obtain a Certificate of Occupancy/Compliance from the Administrative Officer prior to use of the new transformer. 5. Any change to the site plan shall require approval by the South Burlington Development Review Board. Chair or Clerk Date South Burlington. Development Review Board Please Note: You have the right to appeal this decision to the Vermont Environmental Court, pursuant to 24 V.S.A. § 4471 and V.R.C.P. 76, in writing, within 30 days of the date this decision is issued. The fee is $150.00. If you fail to appeal this decision, your right to challenge this decision at some future time may be lost because you waited too long. You will be bound by the decision, pursuant to 24 V.S.A. § 4472(d) (exclusivity of remedy; finality). #CU-00-04 & #SP-00-06 FINDINGS OF FACT AND DECISION STATE OF VERMONT COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, conditional use application under Section 26.05, Conditional Uses of the South Burlington Zoning Regulations and a site plan application to construct a 10,625 square foot building to be used for automobile repair and service. On the 4th of April, 2000, the South Burlington Development Review Board approved the conditional use application under Section 26.05 and site plan application under Section 26.10 of the South Burlington Zoning Regulations of Riverside Auto Body based on the following findings: 1. The owners of record are John and Joyce Better. Site Plan Criteria: 2. Access/circulation: Access is to be provided via a 20 foot curb cut on Commerce Avenue and a 15 foot wide access drive. Circulation on the site is adequate. 3. Coveraize/setbacks: The proposed building coverage will be 26.1 percent (30% maximum). Overall lot coverage will be 61 percent (70% maximum). The proposed front yard coverage will be the maximum of 30 percent (30% maximum). All setbacks are being met. 4. Landscg&m The minimum landscaping requirement is $8,000 based on building costs. The applicant, according to staff calculations, has proposed landscaping valued at $6,307. The applicant submitted a contractor estimate for comparison with staff s estimate. It was staff s recommendation that the applicant should submit plans which include $1,693 of additional landscaping. This additional landscaping should include street trees and an evergreen buffer along eastern side of the parking lot which borders the C.O. District. 5. Lighting: Cut sheets have been submitted. All lights must be downwardly shielded and approved by the Director of Planning and Zoning. Proposed lighting consists of -four (4) 175-watt building mounted lights with downcasting shielded fixtures -two (2) 100 watt metal halide round Bollard fixture with clean lens & louvers -one (1) 175 watt metal halide cutoff fixture tube ground mounted 6. Parking: The required number of parking spaces is two per service bay. This is a policy that has developed from other municipal zoning ordinances. The applicant has proposed 15 bays and therefore should provide 30 parking spaces. The applicant wished to provide 15 parking spaces and request a waiver for 15 of the required parking spaces. A bike rack is being provided. 7. Sewer: The sewer allocation requested for this development is 230 gpd. The applicant will be required to pay the per gallon fee prior to permit issuance. 8. Traffic: The subdivision of which this lot was a part, required that each lot contribute towards the improvements of the Ethan Allen Drive / Shamrock Road / Airport Parkway intersection. This impact fee is $880 per lot. 9. C.O. District: The C.O. District and the floodplain have been delineated and avoided. 10. Sidewalk: The subdivision approval, which included this lot, required that the developer either contribute $15 per linear frontage foot or build the sidewalk along the frontage. Staff recommended that the developer pay the fee. All other developed lots in this subdivision have paid the fees. 11. Dumpsters: The dumpster should be screened from lot #35. 12. Conditional Use Criteria: The proposed use complies with the stated purpose of the Mixed Industrial/Commercial District to encourage "a range of individual commercial uses ... that will serve adjacent area and/or the traveling public and that will be mutually compatible with industrial activity". The proposed use will not adversely affect: a) the capacity of existing or planned community facilities. No affect expected. b) the character of the area affected. The proposed structure will be located outside of the C.O. District. c) traffic on roads or highways in the vicinity. The proposed use is not expected to impact traffic. d) bylaws in effect. The proposal is in conformance with the zoning regulations. e) utilization of renewable energy resources. There is no utilization of renewable energy resources to be affected. f) general public health and welfare. No adverse affect expected. DECISION AND CONDITIONS Based on the above Findings of Fact, the South Burlington Development Review Board approves conditional use application #CU-00-04 and the site plan application #SP-00-06 of Riverside Auto Body to construct a 10,625 square foot building to be used for automobile repair and service, 3 Commerce Avenue, as depicted on a two (2) page set of plans, page one (1) entitled, "Riverside Auto Body Lot 36", prepared by Lamoureux & Dickinson Consulting Engineers, Inc., dated 2/16/00, last revised on 3/27/00, with the following stipulations: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. The plat plans shall be revised to show the changes listed below and shall require approval of the Director of Planning & Zoning (hereinafter Director). Three (3) copies of the approved revised plat plans shall be submitted to the Director prior to permit issuance. a) The site plan shall be revised to show the dumpster screened from lot #35. b) The site plan shall be revised to show additional landscaping in the form of an evergreen buffer along the eastern side of the parking lot which borders the C.O. District and several street trees along the property's frontage with a minimum caliper of 2.5" - 3". c) The site plan details (sheet 2) shall be revised to include a depressed curb detail. 3. The Development Review Board approves a sewer allocation of 230 gpd. The applicant shall pay the per gallon fee prior to permit issuance. 4. Any new exterior lighting shall consist of downcasting shielded fixtures so as not to cast light beyond the property line. Any change in lighting shall be approved by the Director prior to installation. 5. The applicant shall post a $8000 landscape bond prior to issuance of a zoning permit. The bond shall remain in effect for three (3) years to assure that the landscaping takes root and has a good chance of surviving. 6. The applicant shall pay the sidewalk fee of $15 per linear foot of frontage as required by the original subdivision approval prior to issuance of a zoning permit. 7. Pursuant to Section 26.256(b) of the zoning regulations, the Development Review Board approves a total of 15 parking spaces, which is a 15 space or 50% waiver. All vehicles parked outside the building shall be parked in the designated parking spaces or in the temporary outside storage area as shown on the plan. 8. The applicant shall pay a traffic impact fee of $880 required by the original subdivision approval prior to issuance of a zoning permit. 9. Removed curb at entrance drive shall be replaced with a concrete depressed curb. 10. Water shutoff valve shall be placed six (6) inches from the property line. 11. Sanitary sewer pipe shall be bedded in 3/4-inch crushed stone only. 12. The building shall be sprinklered. 13. The applicant shall obtain a zoning permit within six (6) months pursuant to Section 27.302 of the zoning regulations or this approval is null and void. 14. The applicant shall obtain a Certificate of Occupancy/Compliance from the Administrative Officer prior to occupancy of the building. 15. Any change to the site plan shall require approval by the South Burlington Development Review Board. f Chair or Clerk South Burlington Development Review Board Date