CITY OF SOUTH BURLINGTON
DEPARTMENT OF PLANNING AND ZONING
VERMONT GAS SYSTEMS, INC. — 85 SWIFT STREET
SITE PLAN APPLICATION #SP-17-47
FINDINGS OF FACT AND DECISION
Vermont Gas Systems, Inc., hereinafter referred to as the applicant, is seeking approval
to amend a previously approved plan for a 27,000 sq. ft. general office building. The
amendment consists of installing an approximately 800 sq. ft. patio, 85 Swift Street.
Based on the plans and materials contained in the document file for this application, the
Administrative Officer finds, concludes, and decides the following:
FINDINGS OF FACT
1. The applicant is seeking approval to amend a previously approved plan for a 16,665
sq. ft. general office building. The amendment consists of installing an approximately
800 sq. ft. patio, 85 Swift Street.
2. The owner of record of the subject property is Vermont Gas Systems, Inc.
3. The subject property is located in the Swift Street Zoning District.
4. The application was received on June 30, 2017.
5. The plan submitted is entitled, "South Burlington, Vermont Vermont Gas Site Map
Sheet 01", prepared by the applicant, and last revised on 7/07/17.
DIMENSIONAL REQUIREMENTS
6. Building coverage is 9.62% (maximum allowed is 40%). Overall coverage is 57.8%
(maximum allowed is 70%). Front yard coverage along is not changing.
7. The setback requirements will continue to be met.
SITE PLAN REVIEW STANDARDS
None the Site Plan Review standards will be affected by this application.
BICYCLE PARKING
8. The plan complies with Section 13.14 of the LDRs to include the new type and
location standards for bicycle racks, to accommodate a minimum of six (6) short-term
bicycle parking spaces.
- 1 —
#SP-17-47
DECISION
Based on the above Findings of Fact, the Administrative Officer hereby approves site
plan application #SP-17-47 of Vermont Gas Systems, Inc., subject to the following
conditions:
1. All previous approvals and stipulations which are not superseded by this approval
will remain in effect.
2. This project must be completed as shown on the plan and shall be on file in the
South Burlington Department of Planning and Zoning.
3. The applicant must obtain a zoning permit within six (6) months pursuant to
Section 17.04 of the Land Development Regulations or this approval is null and
void.
4. The applicant must obtain a Certificate of Occupancy from the Administrative
Officer prior to occupancy or use of the new patio.
5. Any change to the site plan will require approval by the South Burlington
Development Review Board or the Administrative Officer.
Signed on this day of t% , 2017 by
i
Ra and J. Belair, Ad strative Officer
PLEASE NOTE: Pursuant to 24 VSA §4465, an interested person may appeal this decision
by filing a Notice of Appeal with the secretary of the Development Review Board. This
Notice of Appeal must be accompanied with a $233 filing fee and be filed within 15 days
of the date of this decision.
The applicant or permittee retains the obligation to identify, apply for, and obtain
relevant state permits for this project. Call 802.477.2241 to speak with the regional
Permit Specialist.