Traffic: Mrs. Lafleur said Williston Rd. falls in overlay
zone 1 and White Street in overlay zone 5. This gives a
range of 9 to 27 trip ends allowed in peak hours. The bakery
would generate 30-70 trip ends during the peak hour based on
counts at the Winooski location. The Commission would have
to decide if changes made compensate for the excessive number
of trip ends. Mr. Trono noted Rt. 15 is the most heavily
traveled state highway in this area, and be did not antici-
pate this volume of traffic here. Mrs. Maher said with those
figures she could not, in good conscience, vote for the
project. Mrs. Lafleur said they Commission could require a
traffic study at the intersection. Other members agreed and
felt a traffic study should be done.
Mrs. Maher moved to continue the application until a traffic
study is done which will not be longer than 60 days from
tonight. Ms. Pugh seconded. Motion passed unanimously.
7. Site plan application of Robert Kelly and Charles Jennings
for conversion of existing building to warehouse, wholesale
and retail florist supplies Green Mountain Florist Supply)
and provessional office use at the former New England Tele-
phone building, 45 Swift St.
Mr. Kelly explained this is the 3rd building up from Rt. 7 on
the right. The building is 1201x120', most of which will be
wholesale florist. Mr. Jennings said they will close 2
driveways to the overhead doors and will grass this area
over. Most of their customers are in and out very early in
the morning, so traffic would not conflict with peak hours.
The said the back yard would be cleaned up.
Mrs. Hurd moved the Planning Commission approve the site plan
application of Robert Kelly and Charles Jennings for conver-
sion of the existing building to a wholesale florist and
office with limited storage as depicted on a plan entitled
"Green Mountain Florist Supply, Swift Street, South
Burlington" prepared by Freeman, French, Freeman, dated
August 26, 1987 with the following stipulations:
1. The rear of the building shall be cleaned up and
landscaped.
2. A 225 gpd sewer allocation is granted and the $2.50 per
gallon fee shall be paid prior to permit.
PLANNING COMMISSION
8 SEPTEMBER 1987
PAGE 10,
3. A storm drainage plan shall be submitted to the City
Engineer for approval prior to permit.
4. The plan shall note what will be done with the front over-
_
head doors.
5. The frontage shall include curbs and sidewalk. Sidewalk
shall be continuous across the drive and 8 inches thick.
6. The building permit shall be obtained within 6 months or
this approval is null and void.
Ms. Peacock seconded. Motion passed unanimously.'
8. Site plan application of K_�:p Matthews for construction of
5 mini -warehouse storage buildings at 1900 Williston Rd. Ap-
proval expired 6/9/87.
Ms. Lafleur noted landscaping must still be worked out.
There has to be $3350 in landscaping. Also, the Fire Chief
wants a hydrant, and the Dept. of Labor and Industry has
backed him up on this. Mr. Matthews noted they got a Labor
and Industry permit.
Mrs. Hurd moved that the Planning Commission approve the site
plan application of Robert Audette for Kip Matthews for con-
struction of 5 mini -storage buildings at 1900 Williston Road
as depicted on a plan entitled "Proposed Mini -Storage Facil-
ity, 1900 Williston Road, South Burlington, Vermont: Plot
Plan" prepared �2y Graphic/Construction Management Services,
Inc, last revised 11/19/86 with the following stipulations:
1. A $3350 landscaping bond shall be posted prior to permit.
Prior to permit the plans shall be revised to reflect this
value and shall be submitted to the City Planner for approval
2. The applicant shall pay a $79.00 contribution to Williston
Rd. intersection improvement fund based on 4 trip ends gen-
erated 12y this project.
3. The building permit shall be obtained within 6 months or
this approval is null and void.
Mr. Burgess seconded. Motion passed 6-0 with Ms. Pugh ab-
staining.
As there was no further business to come before the Com-
mission, the meeting adjourned at 11:45 pm.
PLANNER
658-7955
r]
City of South Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT 05401
September 23, 1987
0
Robert Kelly
39 Brewer Parkway
South Burlington, Vermont 05403
Dear Mr. Kelly:
Enclosed please find your copy of Findings of Fact
any questions please call me.
Sincerely,
Jane B . Lafleur,
City Planner
JBL/mcp
1 Encl
ZONING ADMINISTRATOR
658-7958
If you have
City of South Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT 05403
PLANNER
658-7955
September 17, 1987
Robert Kelly
39 Brewer Parkway
South Burlington, Vermont 05403
Re: Green Mt. Florist Supply, 45 Swift Street
Dear Mr. Kelly:
ZONING ADMINISTRATOR
658-7958
Enclosed are the minutes of the September 8, 1987 Planning
Commission meeting. Please be sure to meet the stipulations
contained in the motion. Please call me if you have any
questions.
Sincerely,
Jane B. Lafleur,
City Planner
JBL/mcp
1 Encl
cc: Charles Jennings
KEl LA Vv,P-N'\\ (I s
LiG 3-` - -
i
RVA
// -- -------------
Rouc-w 09F,-mit-4CI
76 Y, P16
9/8/87
JBL
MOTION OF APPROVAL
That the South Burlington Planning Commission approve the site
plan application of Robert Kelly and Charles Jennings for
conversion of the existing building to a wholesale florist and
office with limited storage as depicted on a plan entitled "Green
Mountain Florist Supply, Swift Street, South Burlington" prepared
by Freeman, French, Freeman, dated August 26, 1987 with the
following stipulations:
,landscaping
by bond Cahyllbe_posted prior to permit in an
amountthe Planner.
The rear of the building
shall be cleaned up and landscaped.
2. A 225 gallon per day sewer allocation is granted and the
$2.50 per gallon fee shall be paid prior to permit.
3. A storm drainage plan shall be submitted to the City Engineer
for approval prior to permit.
4. The plan shall note what will be done with the front overhead
doors.
5. The frontage shall include curbs and sidewalk. Sidewalk
shall be continuous across the drive and 8 inches thick.
6. The building permit shall be obtained within 6 months or this
approval is null and void
A
Memorandum - City Manager
September 4, 1987
Page 2
3. Site drainage shall be toward the inlet in the center of the
parking lot. (not shown on the plan) This inlet shall be
cleaned.
4. The pointed island should be rounded.
5. The Williston Road opening should be eliminated and a single
curb cut opposite the Post Office curb cut would be a big
improvement in the area.
7) KELLY AND JENNINGS, GREEN MOUNTAIN FLORIST, SWIFT STREET
1. Large truck use at this location should be discouraged.
2. A storm drainage plan shall be submitted.
3. The back area should be cleaned up and landscaped.
4. Plan should note what will be done with the front overhead
doors.
5. Frontage should include curbs and sidewalk. Sidewalk across
drives shall be 8 inches thick.
8) KIP MATHEWS, MINI -STORAGE FACILITY, 1900 WILLISTON ROAD
1. Developer should anticipate problems with using an existing
concrete slab, that was formerly used for an enclosed building
for a foundation for two smaller exposed buildings. Excessive
frost movement and cracking may result.
I
Memorandum - Planning
August 8, 1987
Page 5
ends to 27 trip ends during the peak hour. The bakery will
generate 30-70 trip ends during the peak hour based on counts at
the Winooski bagel business. Mr. Trono is not able to close the
Williston Road driveway as a condition of his lease with Mr.
Chastenay. One small curb cut will be closed. As an alternative
to closing the Williston Road entrance, the Planning Commission
might consider making the Williston Road driveway an entrance
only. Left turing vehicals from the west are likely to turn at
the new signallized intersection at White Street/Midas Road
rather than in the middle of Williston Road.
A contribution to the Williston Road intersection improvement
fund is required based on the proposed trip ends.
Other: See Bill Szymanski's and Chief Goddette's comments.
A 1080 gpd sewer allocation is needed. The $2.50/gallon charge
must be paid prior to permit. No permits will be issued until
capacity is available.
7) KELLEY AND JENNINGS,w 45 SWIFT STREET
Mr. Kelley and Mr. Jennings propose to convert the former NET to
a mixed use building with a wholesale florist, offices and
warehouse use. This received ZBA approval for multiple uses.
Access: Access is shown from two
curb radii on these cuts will be
trucks. Two cuts in the front
and grassed.
curb cuts on Swift Street. The
increased to accommodate turning
of the building will be closed
Circulation: Circulation is shown as a one way circulation
pattern in a clockwise direction.
Parking: The plans show 28_parking spaces; This is sufficient.
The rear of the building is graveled and there is no change to
this area.
Landscaping: The plan requires $225. in new landscaping. The
applicant requests credit for the existing landscaping.
Traffic: The applicant projects 5 ends during the peak hour.
This is riot in an overlay zone.
Other: See Bill Szymanski's and Chief Goddet.te's comments.
The project requires a sewer allocation of 225 gallons per day.
The $2.50 per gallon fee is required prior to permit. The lot
coverage is 85%; the maximum allov,abl.e is 70% however, several
paved areas in front are being rem(:)-,.ed and grassed.
I
PLANNER
658-7955
City of South Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT 05403
September 4, 1987
Robert Kelly
39 Brewer Parkway
South Burlington, Vermont 05403
Re: Florist Supply, 46 Swift Street
Dear Mr. Kelly:
ZONING ADMINISTRATOR
658-7958
Enclosed are the agenda and my comments to the Planning
Commission. Also enclosed are Bill Szymanski's comments. Please
be sure someone is present on Tuesday, September 8, 1987 to
represent your request.
Sincerely,
Jane B. Lafleur,
City Planner
JBL/mcp
Encls
cc: Charles Jennings
�§nuttj Surtingtvn .f ire Department
575 Dnrtiet street
fount Nurtingtun, Ifermnnt 05401
r
MEMORANDUM
-----------------
TO: SO. BURLINGTON PLANNING COMMISSION
FROM: CHIEF GODDETTE
RE: TUESDAY SEPTENBER 8,1987 AGAEDA ITEMS
DATE: SEPTEMBER 3,1987
#1.
# 2 .
#3.
SOUTHSETT AT SWIFT. A $ G INVESTMENTS
•
OFFICE OF
JAMES W. GODDETTE, SR.
CHIEF
(802) 658-7960
PLANS HAVE BEEN REVIEWED BY THE FIRE DEPARTMENT
AND AT THIS TIME I DO NOT SEE A PROBLEM FOR
THE FIRE DEPARTMENT IN GIVING EMERGENCY SERVICE.
NEW BAGEL BAKERY 35 WHITE STREET
PLANS REVIEWED BY THE FIRE DEPARTMENT AND AT
THIS TIME I DO NOT SEE A PROBLEM FOR THE
DEPARTMENT FIRE PROTECTION.
GREEN MT. FLORIST SUPPLY SWIFT STREET
PLANS REVIEWED AND AT THIS TIME THE ONLY PROBLEM
I SEE IS THE TWO DRIVES FROM SWIFT STREET TO THE
BACK OF THE BUILDINGS SHOULD BE NO LESS THEN 18"
WIDE.
CITY OF SOUT11 BURL I NGTON
SITE'PLAN APPLICATION
Bus. Phone 658-0043
1) OWNER OIL RECORD (name, address, phone #) --Robert_ C-.. _.Kelly__-_.__
Charles E. Jennings 39 Brewer Parkway
_fox 737 Bus. Phone 223-7600 South Burlington,._VT 05401
Waitsfield, VT 05673
2) APPLICANT (name, address, phone #) Same as above
3) CONTACT PERSON (name, address, phone #)--Same as above _
4) PROJECT STREET ADDRESS:_
5) LOT NUMBER (if applicable)
6) PROPOSED USE(S). PyiMary._Uge is wholesale__f.lorist
_--S-e-condarly,_use_15--otfices w/limited storage.
7) SIZE OF PROJECT (i.e. total building square foota-ae, # units,
maximum height and # floors, square feet per floor)___
Existing Building 18,732 sq,ft.; one unit, 12' clear C.H., one floor
8) NUMBER OF EMPLOYEES Projected at 12-15
9) LOT COVERAGE: building _1_&%; landscaped areas 137
building, parking, outside storage85 %
10) COST ESTIMATES: Buildings $ 7500. t__, Landscaping $ 2,000. ± est.
Other Site Improvements (please list with cost)
Heating; $2-3,000 Electrical; $5,000 Misc.; All estimates
11 ) ESTIMATED PROJl:C'r COMPLETION DATE: November 15, 1987
1 2) ESTIMATED AVERAGE DA CLY TRAFFIC (in and out.) 25-40 cars
Est.iwited trip ends (i.n and out-.) during the following hours:
Mond,iy throutrh Fri day
11-12 noon. _..5. 12-1p.m ---- 1-2 p.m.--5 -- ' 2-: p.m. 3
3-I p.rn....-.._.3..__.; :1-5 p.m. 3 5 6 rn 2 ; 6- p.m. 0
t 3 ) PEAK 1101-JR.S OF OPHRAT I:ON . _.. _...6_- 3_0... _AM _ to 3,;.30_..pm
14) Pl-"AK DAYS OF 011ERATION _.Monday.,_._Wednes ay & Friday
_..Au.gust.__27-,..__.1.9.87.... _.
[)A'1'1? OF SUBMISSION SIGN: "I' J?.E O
-...September. _.8., ._ 1.-9 8 7 C.
DATL: OF 11 F;AR 1 NG �v, ,�-