HomeMy WebLinkAboutZP-17-002 - 0050 Baldwin Avenue 1/3/2018I
CITY OF SOUTH BURLINGTON
ZONING PERMIT APPLICATION
Martha L. Reid — �0
gpp�icant: Application No:
Applicant Mailing Address:
50 Baldwin Avenue, Southg
Burlington, VT 05403 [office use only]
marf68@myfairpoint. net 802-863-9538
Applicant Email: Daytime phone:
Property Street Address: 50 Baldwin Avenue, South Burlington
Property Owner:
Martha L. Reid
Parcel Size: • 17 acres
VT 05403
Property Owner Mailing Address: 50 Baldwin Ave. South Burlington 05403 Tax Parcel ID No. Old 1! —000 i
7. PROPOSED project including building dimensions (describe):
Kitchen renovation, including
replacement of kitchen window, new cabinets, countertops, flooring, and some new appliances.
Natural gas line will be extended to kitchen for gas range. Kitchen dimensions: 8'8" x 10'6"
Renovation includes removal of window in garage (and installation of siding over window area.)
2. Present USE(S) of the property:
ED Single family home on its own parcel
❑ Other (please state the USE per Land Development Regulations- retail, general office, multifamily residential, etc.):
3. List all present structure(s) on property (describe including dimensions or square footage of each): House with
attached single bay garage (266 sq ft). Gross living area: 1,492 sq ft; Basement: 1,026 sq ft.
4. Does the project include a proposed change of USE?
0✓ No (the property will still be used for the same purpose)
QYes (please state proposed changed or added USES per Land Development Regulations- retail, general
office, multifamily residential, etc.):
5. ESTIMATED total cost of improvements (materials and labor): $ 20,000.00
6. Building footprint— i.e. size in sq.ft of main floor of house and all attached and detached structures including enclosed
breezeways, garages, and sheds (describe): Existing: 1,758 sq ft Proposed: Same
7. Total square feet of other impervious surfaces on site (i.e. driveways, patios, decks)
Existing:
Proposed:
8. ATTACH SKETCH PLAN OR SITE PLAN (not required if project consists ONLY of interior renovations or replacement of
kisting roof, siding, etc. in the exact same size)
13
9. APPLICANT/OWNER CERTIFICATION
The undersigned property owner hereby consents to submit this application and understands that if the application is approved, the
Zoning Permit and any attached conditions will be binding on the property.
Property Owner Signature PRINT NAME Date
The undersigned applicant hereby affirms that the information presented in this application is true, accurate and complete.
Applicant Signature
-A--1,4a %
PRINT NAME
1-3 2olS
Date
OFFICE USE ONLY — ADMINISTRATIVE OFFICER ACTION — OFFICE USE ONLY
D
DATE Received: I / FEE Received: $ 407a 7( � Identification of zoning district:
Identification of proposed use:Z4 /✓ A/o
PROPOSED USE TYPE: Permitted Conditional
Date of SITE PLAN approval/denial
Approval Date
Denial Date
Date of SUBDIVISION approval/ denial
Approval Date
Denial Date
Date of CONDITIONAL USE approval/ denial
Approval Date
Denial Date
Date of appeal VARIANCE approval/ denial
Approval Date
Denial Date
Date MISCELLANEOUS approval/ denial
Approval Date
Denial Date
Provided applicant copy of URBEC or VCBE Standards Handbook orE]Not
Applicable
APPROVED I
Approval Date j
Permit EFFECTIVE date J
DENIED
Denial Date
FINAL ADMINISTRATIVE OFFICER ACTION
Z O N G; P E I- T
jtive yrtraOfficer's'Signature�/j Permit EXPIRATION date
REASON for DENIAL
Administrative Officer's
Notice of Appeal Rights: Any interested person may appeal this decision by filing a written Notice of Appeal with the clerk of the
Development Review Board within fifteen [15] days of the date of this decision. The notice of appeal must be accompanied by a filing
fee of $223.00.
This permit does NOT authorize commencement of any development activity approved by the permit until the permit takes
,t as set forth above. Site modifications and improvements made prior to this permit becoming effective may be subject to removal
and site restoration if a timely appeal is commenced.
NOTE: The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state permits for this project. Call (802)
879-5676 to speak with the regional Permit Specialist.