HomeMy WebLinkAboutZP-18-047 - 0068 Laurentide Lane 3/6/2018CITY OF SOUTH BURLINGTON
Z O N I N G P E R M I T A P P L I C A T I O N
Applicant: O'Brien Farm Road, LLC
Applicant Mailing Address: 1855 Williston Road
Applicant Email: andrew@obrienbrothersagency.com
Property Street Address: 68 Laurentide Lane South Burlington
Property Owner: O'Brien Farm Road, LLC
Property Owner Mailing Address: Same As Above
-
Application No: Zf-/Ai�j
[office use only]
Daytime phone: 802 658 5000
VT 05403
Parcel Size: Total 39.16 acres
Tax Parcel ID No.
1. PROPOSED project including building dimensions (describe): Construction of a 2,488 square foot single
family home on Lot 05-05 of the O'Brien Farm Road subdivision, approved by Final Plat
SD-17-17, including construction of a 6'x18' front porch, as well as a 10' x 22' 10" rear deck. Th
will be a Spec home for the development. See attached floor plan and elevation.
2. Present USE(S) of the property:
✓❑ Single family home on its own parcel
[]Other (please state the USE per Land Development Regulations- retail, general office, multifamily residential, etc.):
3. List all resent structures on property describe including dimensions or square footage of each): None
P () P p Y( g q g )
4. Does the project include a proposed change of USE?
❑No (the property will still be used for the same purpose)
❑✓ Yes (please state proposed changed or added USES per Land Development Regulations- retail, general
office, multifamily residential, etc.): Residential Development Per Final Plat Approval SD-17-17
5. ESTIMATED total cost of improvements (materials and labor): $ Approx. $250,000 Direct Cos
6. Building footprint — i.e. size in sq.ft of main floor of house and all attached and detached structures including enclosed
breezeways, garages, and sheds (describe): Existing: Proposed:
7. Total square feet of other impervious surfaces on site (i.e. driveways, patios, decks)
Existing: Proposed:
8. ATTACH SKETCH PLAN OR SITE PLAN (not required if project consists ONLY of interior renovations or replacement of
existing roof, siding, etc. in the exact same size)
9. APPLICANT/OWNER CERTIFICATION
The under 'gned
Zoning er it and
!i
Property Owner Si
The d signe
Applicant Signa ur
hereby consents to submit this application and understands that if the application is approved, the
ditions will be binding on the property.
Evan Langfeldt CEO
PRINT NAME
-31
/ g
Date
hereby affirms that the information presented in this application is true, accurate and complete.
Evan Langfeldt CEO l
PRINT NAME Da
�OFFICE 4SErONLY —ADMINISTRATIVE OFFICER ACTION —OFFICE USE ONLY
DATE Received: / FEE Received: /Id
entification
�/ $ of zoning district:
Identification of proposed use: �l/' %v G,g J r ` �j`� 'Wa4ll 6
h/2
PROPOSED USE TYPE: dPermitted Conditional
Date of SITE PLAN approval/denial
Approval Date Denial Date
Date of SUBDIVISION approval/ denial
Approval Date Denial Date
Date of CONDITIONAL USE approval/ denial
Approval Date Denial Date
Date of appeal VARIANCE approval/ denial
Approval Date Denial Date
Date MISCELLANEOUS approval/ denial
Approval Date Denial Date
Provided applicant copy of URBEC or VCBE Standards Handbook orE]Not Applicable
FINAL ADMINISTRATIVE OFFICER ACTION
APPROVED
3� /� Z O N I E I T,
4provAl Date �j A i istr ve Officer's Signature /
Permit EFFECTIVE date % . Permit EXPIRATION date /
DENIED REASON for DENIAL
Denial Date
Administrative Officer's_ Signature._____
Notice of Appeal Rights: Any interested person may appeal this decision by filing a written Notice of Appeal with the clerk of the
Development Review Board within fifteen [15] days of the date of this decision. The notice of appeal must be accompanied by a filing
fee of $223.00.
This permit does NOT authorize commencement of any development activity approved by the permit until the permit takes
effect as set forth above. Site modifications and improvements made prior to this permit becoming effective may be subject to removal
and site restoration if a timely appeal is commenced.
NOTE: The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state permits for this project. Call (802)
879-5676 to speak with the regional Permit Specialist.
SOUTH BURLINGTON PERMIT FEE SCHEDULE (FILL IN YELLOW BOXES- PERMIT FEE CACULATED BELOW)
HOUSE SQUARE FOOTAGEFFA=
UNFINISHED BASEMENT/HOUSE SQ. FT
# OF GARAGE BAYS
ZONING PERMIT HOUSE
ZONING PERMIT UNFINISHED BASEMENT
ZONING PERMIT GARAGE BAYS
SEWER ALLOCATION FEE
RECREATION IMPACT FEE (Waiver by DRB)
ROAD IMPACT FEE
POLICE IMPACT FEE
SEWER CONNECTION INSPECTION
Recording Fee
TOTAL PERMIT FEE
DUPLEX (EACH UNIT)
HOUSESQUAREFOOTAGE=
UNFINISHED BASEMENT SQ FT. _
# OF GARAGE BAYS =
ZONING PERMIT HOUSE
ZONING PERMIT UNFINISHED BASEMENT
ZONING PERMIT GARAGE BAYS
SEWER ALLOCATION FEE
RECREATION IMPACT FEE
ROAD IMPACT FEE
POLICE IMPACT FEE
SEWER CONNECTION INSPECTION
TOTAL PERMIT FEE
2488
958
2
Units
Unit Price
Extended Price
2488
0.45
1119.6
958
0.2
191.6
2
50
100
242.95
11.52
2798.784
0
1665.08
0
1
890.24
890.24
1
461.74
461.74
1
63
63
1
13
13
0
0
0
210
1
1
1
1
0.45
0
0.2
0
50
0
11.52
2419.2
1665.08
1665.08
594.79
594.79
461.74
461.74
63
63
S203.81
Cost Code
Total for Code
205-12
1411.2
205-07
2798.784
205-04
0
205-03
890.24
205-06
461.74
205-07
63
205-09
13
Unit Number
E911 Address
Gallons Per
Day For Unit
Final Allocation Expires
(date)
Permit # (Final Allocation)
Zoning Permit
Issued (date)
Zoning Permit #
Associated WW
Connection Permit #
1
30 Laurentide Lane, South Burlington, VT 05403
242.95
11/6/2018
ZP-17-408
11/22/2017
ZP-17-408
17-4507
2
Laurentide Lane
242.95
3
Laurentide Lane
242.95
4
Laurentide Lane
242.95
5
68 Laurentide Lane
242.95
6
Laurentide Lane
242.95
7
Laurentide Lane
242.95
8
Laurentide Lane
242.95
9
9 Laurentide Lane
242.95
12/7/2018
ZP-17-434
12/7/2017
ZP-17-434
10
Laurentide Lane
242.95
11
Ledge Way
242.95
12
Ledge Way
242.95
13
Ledge Way
242.95
14
Ledge Way
242.95
15
Ledge Way
242.95
16
Ledge Way
242.95
17
Ledge Way
242.95
18
Ledge Way
242.95
19
Ledge Way
242.95
20
Ledge Way
242.95
21
Ledge Way
242.95
22
Ledge Way
242.95
23
Ledge Way
242.95
24
Ledge Way
242.95
25
Ledge Way
242.95
26
Ledge Way
242.95
27
Ledge Way
242.95
28
Ledge Way
242.95
29
Split Rock Court
242.95
30
Split Rock Court
242.95
31
Split Rock Court
242.95
32
Split Rock Court
242.95
33
Split Rock Court
242.95
34
Split Rock Court
242.95
35
Split Rock Court
242.95
36
Split Rock Court
242.95
37
Split Rock Court
242.95
38
Split Rock Court
242.95
39
Two Brothers Drive
242.95
40
Two Brothers Drive
242.95
41
Two Brothers Drive
242.95
42
Two Brothers Drive
242.95
43
Two Brothers Drive
242.95
44
Two Brothers Drive
242.95
45
Two Brothers Drive
242.95
46
Two Brothers Drive
242.95
47
Two Brothers Drive
242.95
48
Two Brothers Drive
242.95
49
Two Brothers Drive
242.95
50
Two Brothers Drive
242.95
51
Two Brothers Drive
242.95
52
Two Brothers Drive
242.95
53
Two Brothers Drive
242.95
54
Two Brothers Drive
242.95
55
Two Brothers Drive
242.95
56
Two Brothers Drive
242.95
57
Two Brothers Drive
242.95
58
Two Brothers Drive
242.95
59
Two Brothers Drive
242.95
60
Two Brothers Drive
242.95
61
Two Brothers Drive
242.95
62
Two Brothers Drive
242.95
63
Two Brothers Drive
242.95
64
Two Brothers Drive
242.95
65
Two Brothers Drive
242.95
66
Two Brothers Drive
242.95
67
Two Brothers Drive
242.95
68
Two Brothers Drive
242.95
69
Two Brothers Drive
242.95
70
Two Brothers Drive
242.95
71
Two Brothers Drive
242.95
72
Two Brothers Drive
242.95
73
Two Brothers Drive
242.95
74
Two Brothers Drive
242.95
75
O'Brien Farm Road
242.95
76
O'Brien Farm Road
242.95
77
O'Brien Farm Road
242.95
78
O'Brien Farm Road
242.95
79
O'Brien Farm Road
242.95
80
O'Brien Farm Road
242.95
81
O'Brien Farm Road
242.95
82
O'Brien Farm Road
242.95
83
O'Brien Farm Road
242.95
84
O'Brien Farm Road
242.95
85
O'Brien Farm Road
242.95
86
O'Brien Farm Road
242.95
87
O'Brien Farm Road
242.95
88
O'Brien Farm Road
242.95
89
O'Brien Farm Road
242.95
90
O'Brien Farm Road
242.95
91
O'Brien Farm Road
242.95
92
O'Brien Farm Road
242.95
93
O'Brien Farm Road
242.95
94
O'Brien Farm Road
242.95
95
O'Brien Farm Road
242.95
96
O'Brien Farm Road
242.95
97
O'Brien Farm Road
242.95
98
O'Brien Farm Road
242.95
99
O'Brien Farm Road
242.95
100
O'Brien Farm Road
242.95
101
O'Brien Farm Road
242.95
102
O'Brien Farm Road
242.95
103
O'Brien Farm Road
242.95
104
O'Brien Farm Road
242.95
105
O'Brien Farm Road
242.95
106
O'Brien Farm Road
242,95
107
O'Brien Farm Road
242.95
108
O'Brien Farm Road
242.95
109
O'Brien Farm Road
242.95
110
O'Brien Farm Road
242.95
111
O'Brien Farm Road
242.95
112
O'Brien Farm Road
242.95
113
O'Brien Farm Road
242.95
114
O'Brien Farm Road
242.95
115
O'Brien Farm Road
242.95
116
O'Brien Farm Road
242.95
117
O'Brien Farm Road
242.95
118
O'Brien Farm Road
242.95
Total Gallons Per Day Project 1 28,668.10
• , eW( REAL ESTATE DEVELOPMENT AND MANAGEMENT
VIA HAND -DELIVERY
17 bruary 281h, 2018
Mr. Raymond Belair, Administrative Officer
South Burlington Planning and Zoning
575 Dorset Street
South Burlington, VT 05403
Re: Zoning Permit Application 68 Laurentide Lane, South Burlington VT 05403
Ray,
Further to Final Plat Permit SD-17-17, enclosed please find a zoning permit application for 68
Laurentide Lane, South Burlington, Vermont 05403, Unit 005 on the Final Plat/Site Plan submitted as part of
SD-17-17.
This zoning permit request is for a unit which X IS inside a phase that has submitted the required
infrastructure letter of credit and three -party agreement. If not, the required letter of credit and three -party
agreement are attached to this application.
This zoning permit request is for a unit which X IS inside a phase that has submitted the required
landscaping letter of credit and three -party agreement. If not, the required letter of credit and three -party
agreement are attached to this application in triplicate. Please sign all three copies and return two to our office.
approved landscape bonding scheme plan, as well as the approved bonding spreadsheet are also attached for
reference.
Attached please find a worksheet which is programmed with figures provided by the City, to determine
the exact fee owed for this zoning permit. Per that spreadsheet, the requisite fee for this application is $5,637.96
A check for the requisite fee is enclosed.
This application requires a sewer connection and allocation. Attached to this letter please find the sewer
allocation tracking spreadsheet for the Hillside project. This includes information on the current allocation and
connection request as well as information on previous requests. This spreadsheet also has the address of the unit
seeking connection. Historical data and requests are filled in for reference in issuing this new letter.
A Wastewater Connection application is also attached.
Lastly, a copy of Sheet C-2 from the approved project plans is attached. The current plan is to construct
Unit 005. A detail sheet of Unit 005 is provided. As shown, the blue box represents the foundation of the home
proposed, the green box shows the boundaries of the approved footprint lot.
Please contact us with any questions or concerns.
Sincerely,
Andrew Gill, Director of Development
Enclosures
New6"PVC
foundation drain
to doWigh t. Typ.
' i
110
i
/ A ` /\
SC
New CB#3
Rim 351.21
\ N CY1 \ /\ Inv. 346.50 \
Inv. fd 347.75 \ \
Inv.ud 347.21 \\ \
\
347 /� \
New SMH#4
\ Rim 351.90
\ Inv, in 345.25
Inv. out 345.15
00
s \ /w
N hydront \ \
' ssembly 00 Wi '
i
to
ew \
under ain _
dean utCIA
N 5 \
Vj
\ \ o
Krebs Lansing Consulting E HILLSIDE AT
Engineers, Inc.
164 Main street, 2
°'
Colchester, 054 UNIT 5 Plan
r: ceoa 87fi375
O' B R I E N FARM
Fa 878-961819Lemai@krebsandlansing,com SOUTH BURLINGTON, VERMONT
0' 10' 20 40' Drawn by: SWH
Date: Jan. 4, 2018
Project #: 13187
GRAPHIC SCALE f" = 20' Scale: 1" = 20'
Deck
IIOEM,
��
1=159
11
oil
�o1
lrm m
'-
® ME
1
oil
T Main Floor Plan
INTERIOR FINISH SCHEDULE
YY.Y.Y.
M�MInWa�xWIYa
GENERALFLOOR
PLAN NOTES:
i�E- wa�°,wPum�s
• a�irouw�a �°�'
s
CONSTRUCTION
ASSEMBLIES:
2e
r n `��ae'�moa�ar'nc
FLOOR PLAN
KEYNOTES:
0
J
t
C
O
�. ��
LL
u�oi
is avwr Ortnn�a
Q J
C
�amY.'
wwE
O
m
.� m.�.
_
val1Y ♦mo w
i� Fw.uO�+f. wwno
m J
O .0 ID
(n
iM iw.s pYcv�rsFnRenmwi
Y_
x:
S2C—CLOVER
A1.1A2
__%% rN
GENERALFLOOR CONSTRUCTION
PLAN NOTES: ASSEMBLIES:
%ua�s�arwmt°»s E, eN
uyu;ss »orrn O°ema'E"vi �
_____
--/ 1
i +
ymeo u SOY a4.n
°aaYaae vreea ceunY.er owaw ost
�a ,e. ro vEwrr.r ws��v�EaaT^w"a"vi^'
�wm °narwtooww.0
-
1 ;
a�i at NA,rroxN
O
1 I
I
S
3 �
� ;
1 i
aYarnum aex�m
�
w.»unua�mw m�ios.xi4n
� �Y
_
jI
I I
I I
ear. ro wnu�e � aowo wm
Ef�r�s NAaalvs wnaw awriyo ne
NN�0.1wf. Kz¢6 mxc91N0 t?owsvY
O
J
I
.ymyuy cywu,.wa °�
INTERIOR FINISH SCHEDULE FLOOR PLAN
3
KEYNOTES:
O
i
I
luem�,
I
I
w.s vs��"`r..�wv'�..e �rcli aeax..x e... Y,am,q waw�°Ea soft
7.
1
LL
pd
R
-
�
tlW^� M-1_YL+'�Wf+4lk
�
�
EuvtlM
ara.Tm,, yw. ywmn e.rt
hxnYr oven-awwevnwe - sRw.EA°vxEipM� ILDER sa[c.
u
b
I
Oey1�.KNs �ER aanaau
Bedroom 4
�
M
R
Yd.
1
y
wb�
C
T J
1
4eaxor•�ur- vw�.wo yyw t
HfV4k Gn5
oeuxwi�l.a
= C
o-aa. zd»co.sua n.. cyww 1��v� s+=ciAan ev
1
awes aa+vff r
enamo�n. n,.e y
�V �J
•_• •r7� J J
-
, w.uev,?.aaw
0 .0
f
r' I
+ll
_ ,.t vwLL q.S.FFwwXp
Bedroom 3
""" `
I
n.
rwely.�vr.. e�c»v.. tv rova m»cnx,aa
I
� .
I
uses �
s
upwftMftm
S2C-CLOVER
Upper Floor Plan
_.. =b
A2.1A2
GENERAL BASEMENT CONSTRUCTION
PLAN NOTES: ASSEMBLIES:
_ rnl» Riese"�Rorm'I I [ a axE.E
INTERIOR FINISH SCHEDULE ROIe,o.E
MSfNrF➢�e�caRCRE,E aLEe 0.x
rwMai4 sonar: FL0.N. �illEa"tµ c. 91 We
-
ire""sar<,eee. aesx ocrna•em (I-�Ymtl)AT
XnueL
4.anrw.m( 11 :T— W1111 c0.RC ETE Na44fuq W'm
Grot-smaY�GeY r ____________� _______________ mm ____ ________________ _ ROG Kw nnAWUFMa I"Buu REHABwE.
C+rM Bulrplon-olnu•n 98rr
uv,nngevu,a-smokeuvrn PMTc8Vos2uu arammt -- t ni�cramlxueu&EomNas
u"eERFgeuINC PEA"!IG BMW9i E72-WWL
um 9wxa,tls NueW PoMaonYhB r
WALLe. Xtrn'➢Ea'M[E
SIvcB x 0.GOR
r^'a oova srU�3,G'IO.C. WIXeuu,glX
"iu�m cm senenv,.I acov,Enm A
Xw __—.—TO
Norm ARBr"su® �10.V61
wrFwuav "T '"8I'muoq x4c.
smn taw.e®gaen�a•r .epe - NECxwsC, Erc ��
,aa,a _ _ED Ro°xX� vr�Raat
_cC ryupm,n,. em u•Xe - — "MwmFLoo'aR Mu M. t2 m
R R.—r PEOR—N. C
R
cwermV uvpr _ la acER c J% J
_ eom a..e-Rev.ryrr , uWMuu aswuuRfxr_
RE—
.orpann-em ups o mQOIRtI�"alT
-- = F.aoor,lol.,� 'ff,'�R,EE FLOOR PLAN 3
eX.c.R..nrvrrA16a RmEs aR°
KEYNOTES:
N11
mew�oER som.
Mechandal �- d
7I..„e sea X,oWmc�xE alg E.c----
Racasl
t
II:x c_Fd i ss lxzvfm unol.
Ix2
•nlc nccE
,xa wwgUa.
up
LXEOEwmRLL
E.w onRwE°ooRw L
I owww marm O
_________________________ t awu,E ,r�R
__ t _ MOPE E1 Vl'BaBT. C S
FOOTING SCHEDULE Aa
R.n EoolXnwlE,+oo z - - - - 13 ' m J co
-- _ �SMrage kz UnezcevateE MIGIII—Fff 0 $ n
AFF
FOUNDATION WALL
SCHEDULE
FWilxc e X
eYHett
Twclr—
WAU NEINrt ReN7- • ' r r -
� r
r r r r r m
x IX1IXUWe � o
F EIRcIa.E.RX°° ERR X,°faro ERA n
EREREAR°°°EZPe.�°Q R a. "o
x ----------- -r--- '
a
•
` ------------------- ' au.X oleo
AHa®xulrmurau+
Foundation/ Walkout Plan CLOVER
A0.lA2
Roof Plan
m
ED
EM
Left Elevation
Right Elevation
._._._._._._........---
----------
EH
_ _ EXT. FINISH SCHEDULE
i
Jwnaaa+
9. e.
Rear Elevation
Front Elevation Elevation - Farmhouse
sew .d�mr�
-mmuppm.am ......................... _ _ _ _ _ - _ _ _._ _._._._._._._._._._._
CONSTRUCTION
ASSEMBLIES:
N
GENERAL EXTERIOR
ELEVATION NOTES.
EXTERIOR ELEVATION
KEYNOTES: `
0
J
L
C
3
O
0
E
m
ILL
_N
in
E
U
d
E s
O
Q
r�
•� m
m�=
o 2
-;u--
A
ORB.OR HEVAnQVS n
ROOF R.WiARtgoUSE
S2C - CLOVER
AMA2