HomeMy WebLinkAboutZP-18-120 - 0232-0236 O'Brien Farm Road 4/16/2018CITY OF SOUTH BURLINGTON X
ZONING PERMIT APPLI C A T I O N
Applicant: O'Brien Farm Road, LLC
Applicant Mailing Address: 1855 Williston Road
Applicant Email: andrew@obrienbrothersagency.com
Application No: Z P g zp
[office use only]
Daytime phone: 802 658 5000
Property Street Address: 232-236 O'Brien Farm Road, South Burlington
Property Owner: O'Brien Farm Road, LLC
Property Owner Mailing Address: Same As Above
VT 05403
Parcel size: Total 39.16 acres
Tax Parcel ID No.
1. PROPOSED project including building dimensions (describe): Construction of a 3,624 square foot duplex
on Lot 09-75 and 09-77 of the O'Brien Farm Road subdivision, approved by Final Plat
SD-17-17, including construction of a 6'x7' front porch, as well as a 13' x 8' rear deck on one uni
and a 4'x6'8" front porch and a 22' x 8' back patio on the second unit.
2. Present USE(S) of the property:
❑ Single family home on its own parcel
❑� Other (please state the USE per Land Development Regulations- retail, general office, multifamily residential, etc.):
Undeveloped Land
3. List all resent structures on property describe including dimensions or square footage of each): None
P O p P Y( 9 q 9 )
4. Does the project include a proposed change of USE?
❑No (the property will still be used for the same purpose)
❑✓ Yes (please state proposed changed or added USES per Land Development Regulations- retail, general
office, multifamily residential, etc.): Residential Development Per Final Plat Approval SD-17-17
5. ESTIMATED total cost of improvements (materials and labor): $ Approx. $450,000 Direct Cos
6. Building footprint — i.e. size in sq.ft of main floor of house and all attached and detached structures including enclosed
breezeways, garages, and sheds (describe): Existing: Proposed:
7. Total square feet of other impervious surfaces on site (i.e. driveways, patios, decks)
Existing: Proposed:
8. ATTACH SKETCH PLAN OR SITE PLAN (not required if project consists ONLY of interior renovations or replacement of
existing roof, siding, etc. in the exact same size)
9. APPLICANT/OWNER CERTIFICATION
The undersigned property owner hereby consents to submit this application and understands that if the application is approved, the
Zoning it and any ttg�ch conditions will be binding on the property.
I / /. /I /7-21�
�.(�� _ C Evan Langfeldt CEO
Prove Owner S�ia ure T PRINT NAME
Applicant Signat
0 Z) Z�
Dat
affirms that the information presented in this application is true, accurate and complete.
Evan Langfeldt CEO
L,lOFFICE USE ONLY — ADMINISTRATIVE OFFICER
/ACTION — OFFICE USE ONLY
Received: r ' r" /v FEE Received: $ / Identification of zonin district:
Identification of proposed use: ;�!L( )�
PROPOSED USE TYPE: Permitted Conditional
Date of SITE PLAN approval/denial
Approval Date Denial Date
Date of SUBDIVISION approval/ denial
Approval Date Denial Date
Date of CONDITIONAL USE approval/ denial
Approval Date Denial Date
[
Date of appeal VARIANCE approval/ denial
Approval Date Denial Date
Date of MISCELLANEOUS approval/ denial
Approval Date Denial Date
Provided applicant copy of URBEC or VCBE Standards Handbook orl:]Not Applicable
APPROVED
A0proval Date
Permit EFFECTIVE date
DENIED
Denial Date
FINAL ADMINISTRATIVE OFFICER ACTION
/�Z O N G P M I, T
mi irA ujtrative Offid2f's Signature
Permit EXPIRATION date
i
REASON for DENIAL
Administrative Officer's Signature
Notice of Appeal Rights: Any interested person may appeal this decision by filing a written Notice of Appeal with the clerk of the
Development Review Board within fifteen [15] days of the date of this decision. The notice of appeal must be accompanied by a filing
fee of $223.00.
This permit does NOT authorize commencement of any development activity approved by the permit until the permit takes
effect as set forth above. Site modifications and improvements made prior to this permit becoming effective may be subject to removal
p nd site restoration if a timely appeal is commenced.
NOTE: The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state permits for this project. Call (802)
879-5676 to speak with the regional Permit Specialist.
Planning and Zoning Invoice
Residential Impact & Permit Fees
Property Owners Name: D /014Fllim
p Y
Property Location:
Amount: i Gt l✓' Payment Type: 12 Date: VO
Zoning Permit (New Residential)
I� . r, Code
ZP- (/� zp
Pricing
$13.00
pluplu ft. building @ $0.45 per sq. ft. $ I
plusl
_sq. ft. unfinished basement @ $0.20 per sq. ft. $ / r
plus
o garage bays at $5o per bay $ 670
plus W
After -the -fact of (_) 5o% [no NOV] or (_)100% [NOV] $
Sewer Allocation Fee
(_) Bartlett Bay
( Airport Parkway
Recreation Impact Fee
South Village Recreation Impact Fee
Road Impact Fee
Fire Impact Fee
Police Impact Fee
Dorset Street Waterline Fee
Sewer Connect Inspection
Zoning Permit Total
LIu1ViTL•!
WW-� 1 f JSi
/ G/
#204 �g.p.d x $11.52
#220
#243
#221
Ul
#203
#222
#230
ww $63 �� —
Amount Due
$
Total $�
)N-
C:)
� I
♦ �1 x
�\ ♦ \\� \\ \ ► i ROAD ' J+,00-
\ c +3�16� , z jE FARM -
rl New P
g51.46
New I'i —G
street \ \ G \ G
\ light 362
— UE&
\ — E& U— 1 — x351.8
\ � I — —
x353
FF 35203
co
00
— l p CD I+I
�\ \ N New C8#44
FF 353.33 Rim 350.95
IInv. out 346.20 O O
Inv fd. 347.45
Inv.ud 346.95
— —1
_ I
I I
- rI
l ---- \---------- x361.7
x362.9
New
underdrjairt
' cleondut��—
X361.7 X361.3---------
—N
----__ _ -— ---- _
—z3N
'- z3�VG
I I
�M
Krebs & Lansing Consulting
Engineers, Inc.
164 Main so-aal, sutra 201
Colchester,
r: (aoa 87 e7&03 oa75
F: (802) 878-9618
m Qkrabsandla..mg.com
l �'
Grid Nor(5'ne
UNIT 75-76 Plan
0' 10' 20' 40'
GRAPHIC SCALE 1" = 20'
HILLSIDE AT
O'BRIEN FARM
SOUTH BURLINGTON, VERMONT
Drawn by: SWH
Date: April 5, 2018
Project #: 13187
Scale: 1" = 20'
zz
__ __-c
_-- h
ru. � _
.+wo �
m II
_ n �
w/- .. _�C-___ h �I. _ r��-11-�Et iR� �i.. "mow• '_
Sly' --- �- --"'E^��- r•_ p°
-- �• '� - I-e
\`���'1 t•I
�N
i171
Proposed 0.0 P}I- Tpo.�"
--wx. Agee - \ / 11 � •' ,cy�n-!$ �
�_-...ery
\\\ '\ �._ 1. _��II �' — ':_- - ' - • �lr���a�i�3y�DpMl1 oca __
- r
�O
v -
�n
-
- - --�--- u - -
lk
• ,,, � ,-�..-�--- �
dlv,. -- - ----- ---v
EF
� -------------
______
K
_.
--------------
---------------
See Notes sheet C-1
-—
Site P/on
See Legend sheet C-1 � •8 a a
0;9rien Home Form
v.. •� w ,w• A•nrnsar e.;.e sa.m e"mszw, r -1
6w Scde /' • m .PRfBS t L.INS/NC ConerslHng 6nginoers, M,
/Bi v r smsr, c weer >, v > °, or osiis C-7
O'Brien Home Farm
232-236 O'Brien Farm Road
Building 1 Reversed (Birch & Maple)
South Burlington, Vermont
Maple Birch
Elevation - C1 Elevation - C1
(Shingle) (Shingle)
SHEET INDEXL7
M]
d0.• -.. oErnis _-
y
J
t
SquareFooftea�1
a
-;�
x
m
4—Square Footapes-Maple-C1
j
r
Q c
0
m.
CID
.r * m
N
O N 0
W
A�
�
r1�
VJ�
J
BUILDING 1 REV
AGN0.1C1
}I f
MAPLE BIRCH
ELEVATION C1 ELEVATION C1
Foundation/Lower Level Plan
Fi
O
J
L
a
x
m
E
css
LL o
E €�
o
_
c 00 =
� o
N
O NN
Q4
vJW
......_..._
FOINiDArMOWER LEVEL
PU ,
BUILDING 1 REV
A0.1C1
�l
C
I
ED
EO
imlo..rw.
Rear Elevation
,1 I
Left Elevation
4 caro«ou
--JI- LJ -
4 cowon....
Front Elevation
MR.
c
GENERAL EXTERIOR
ELEVATION NOTES:
o
�,s
J
�usPE�.�cA.
L
EX RIOR ELEVATION
C_
KEYNOTES
_.. .....,,,,ec.
X
_d
C_
�r wAe
Q
16 .-
LL o
d �
2 �
m
iu
•ML m
W L
O (n
EX%RIM ELEVATIONS CI
BIRCH
A-A3.1 C 1
------------------
Foundation/Lower Level Plan
GENERALSASEMENT
CONSTRUCTION
PLAN NOTES*
ASSEMBLIES:
F
�TT--
T.
ZT
F
—===R
Z,21=71
FLOOR PLAN
KEYNOTESw
•
wwu
CL
x
E
u-
0
0-
Z:
c
(D
cn
F F
0 o
BIRCH
A-A0.1C1
F -
FWAY
Foyer
L_J
�I
Main Floor Plan
GENERALFLOOR
CONSTRUCTION
PLAN NOTES.
ASSEMBLIEST.
5 ,T
."oen wmT
_
"_ c
a
r" ra I
per«
FLOOR PLAN "
KEYNOTES:
Q
x
m
E
:3
E
O 7
.rra run",wre
i nuu wirii ,Au�rvi.e
= o
m
_
T"�rroFuvr+wc�onr
Tr „
»eus¢o
� a7
m L
iia weuue�rn"s
(R
"FLOMF�"l
BIRCH
A-AIAC1
GENERAL FLOOR CONSTRUCTION
PLAN NOTES: ASSEMBLIES:
12L
_=
FLOOR PLAN f�
KEYNOTES:
, w,ui0 zeff wwoop
.� urt aoaa NaEertrs e
tgrta wr,a r ear f
Upper Floor Plan
O
J
t
IZ
x
_N
Q.
3
0
E
w
LL co
d E
E >
O c
= o
o�
C
d `
ML m
W L_.
N
tpvEP NOON RMI.C1
BIRCH
A-A2.1 C 1
4odrorw.
f
i 1
I
I
Unfinished Lower Level
..P�� M;O.E. -�
2 Car Garage
-----------------
i
� -- -1
Eoarww,uL
Foundation/Lower Level Plan
GENERAL BASEMENT CONSTRUCTION
PLAN NOTES: ASSEMBLIES:
.ec�.evrm taoeaw�
a cFN*eAEo oc w. raunnoww
3
'LE.I�Tl III AT
cof-
FLOOR PLANFc
KEYNOTES: +-
d
_ E
' cwuc.E.s aacwr�n ` ~
R
LL o
�s w O
o,
_ CO
FOUNDA'KK4lOWEN LEVFt
vw,c�
MAPLF
B-A0.1 C 1
4cw,omrou
13, WE
Q COIYp-WML
Main Floor Plan
GENERAL BASEMENT CONSTRUCTION
PLAN NOTES: ASSEMBLIES.
,oxsc , K
.u-o.ra oEn wnN
ss rureo EN `�� oc. wrrasw,.oxw 3
s .u,an
FLOOR PLAN u
KEYNOTES: +-
s......�.Qr.�..,�-o, J
«..« t
a
x
cc
s �,+wrc�w vct Q
oaI LL
CD
ID ITILII
O >
r .L m
r11 v � L r rup.r��rV.+a6 O h
w Cuwvu KfKCIIILU nr — -
WM LOM%A"I
MAPt k-
B-A1.1C1
Upper Floor Plan
GENERAL BASEMENT
CONSTRUCTION
PLAN NOTES:
ASSEMBLIES:
=21
u »o�
FLOOR PLAN
KEYNOTES:
..
ww.w:..wow""o'u« Ms
o�..
J
rin. wc�
acvwowcai :w. �w.c
d
wwcn
Q
�n uea wu.aorc
�
��,varura.
0
m ncro[ooawewvnna.
�n aew°fio�nor�i owua eoorw
`
m niwm[xmmexcrrw
16
nVm o«w,rws�,,.®w
LL
o
" ro1p°rir orwroROptoo��aww.`oOOT
d
131 wrwrrwnrr ra
co
az uco�rrxu.n.evs.
_
'�
v ue orrw.woennw.
C
c_
�� aawwmnOwn.or�i "rc".cr m
wM�091
_d
•L
t
03
' .SHNxFtiWM
a� iwwwuuw�w,iiaKirww''�
P
L
—Gs As. w wvoo
«ortur
O
(„
MAPLE
Elevation - C1 g-A2.1C1
I C-1-
Rear Elevation
Right Elevation
Front Elevation
CONSTRUCTION
ASSEM13LIES:
�II
o<. w,.�..�.�oxw
IR.
EXTERIOR ELEVATION
KEYNOTES
-�A
CL
x
W
CL
E
E
0
0
o
u)
Elevation - C1
EVE" RWAT*Wl
MAPL F
B-AVC1
REAL ESTATE DEVELOPMENT AND M A N A G E M E N T
i
VIA HAND -DELIVERY
)kpril 5, 2018
Mr. Raymond Belair, Administrative Officer
South Burlington Planning and Zoning
575 Dorset Street
South Burlington, VT 05403
Re: Zoning Permit Application 232-236 Laurentide Lane, South Burlington, VT 05403
Ray,
Further to Final Plat Permit SD-17-17, enclosed please find a zoning permit application for 232-236
O'Brien Farm Road, South Burlington, Vermont 05403, Unit 75 and 76 on the Final Plat/Site Plan submitted as
part of SD-17-17.
This zoning permit request is for a unit which IS inside a phase that has submitted the required
infrastructure letter of credit and three -party agreement. If not, the required letter of credit and three -party
agreement are attached to this application.
This zoning permit request is for a unit which IS NOT inside a phase that has submitted the required
landscaping letter of credit and three -party agreement. If not, the required letter of credit and three -party
agreement are attached to this application in triplicate. Please sign all three copies and return two to our office.
)The approved landscape bonding scheme plan, as well as the approved bonding spreadsheet are also attached for
reference.
Attached please find a worksheet which is programmed with figures provided by the City, to determine
the exact fee owed for this zoning permit. Per that spreadsheet, the requisite fee for this application is $9,649.03
A check for the requisite fee is enclosed.
This application requires a sewer connection and allocation. Attached to this letter please find the sewer
allocation tracking spreadsheet for the Hillside project. This includes information on the current allocation and
connection request as well as information on previous requests. This spreadsheet also has the address of the unit
seeking connection. Historical data and requests are filled in for reference in issuing this new letter.
A Wastewater Connection application is also attached.
Lastly, a copy of Sheet C-7 from the approved project plans is attached. The current plan is to construct
Unit 75-76. A detail sheet of Unit 75/76 is provided. As shown, the green box shows the boundaries of the
approved footprint lot.
Please contact us with any questions or concerns.
Sincerely,
�_zll lve
Andrew Gill, Director of Development
Enclosures
DUPLEX (EACH UNIT
HOUSE SQUARE FOOTAGE = 3624
UNFINISHED BASEMENT SQ FT. = 473
# OF GARAGE BAYS = 3
ZONING PERMIT HOUSE 3624 0.45 1630.8
ZONING PERMIT UNFINISHED BASEMENT 473 0.2 94.6
ZONING PERMIT GARAGE BAYS 3 50 150
SEWER ALLOCATION FEE 485.9 11.52 5597.568
RECREATION IMPACT FEE 0 1665.08 0
ROAD IMPACT FEE 2 594.79 1189.58
POLICE IMPACT FEE 2 461.74 923.48
SEWER CONNECTION INSPECTION 1 63 63
TOTAL PERMIT FEE 1 9649.028