HomeMy WebLinkAboutZP-18-137 - 0058 Laurentide Lane 4/26/2018CITY OF SOUTH BURLINGTON
ZONING PERMIT APPLICATION
Applicant: O'Brien Farm Road, LLC
Applicant Mailing Address: 1855 Williston Road
Applicant Email: andrew@obrienbrothersagency.com
Property Street Address: 58 Laurentide Lane South Burlington
Property Owner: O'Brien Farm Road, LLC
Property Owner Mailing Address:
Same As Above
Application No: _ /� 3
2
[office use only]
Daytime phone: 802 658 5000
VT 05403
Parcel Size: Total 39.16 acres
Tax Parcel ID No.
1. PROPOSED project including building dimensions (describe): Construction of a 2,479 square foot single
family home on Lot 05-04 of the O'Brien Farm Road subdivision, approved by Final Plat
SD-17-17, including construction of a 6'x20' front porch, as well as a 8'x14' rear deck.
See attached floor plan and elevation.
2. Present USE(S) of the property:
✓❑Single family home on its own parcel
❑ Other (please state the USE per Land Development Regulations- retail, general office, multifamily residential, etc.):
3. List all resent structures on roe describe including dimensions or square footage of each): None
P () property 9 q 9 )
4. Does the project include a proposed change of USE?
❑No (the property will still be used for the same purpose)
❑✓ Yes (please state proposed changed or added USES per Land Development Regulations- retail, general
office, multifamily residential, etc.): Residential Development Per Final Plat Approval SD-17-17
5. ESTIMATED total cost of improvements (materials and labor): $ Approx. $250,000 Direct Cos
6. Building footprint — i.e. size in sq.ft of main floor of house and all attached and detached structures including enclosed
breezeways, garages, and sheds (describe): Existing: Proposed:
7. Total square feet of other impervious surfaces on site (i.e. driveways, patios, decks)
Existing:
Proposed:
8. ATTACH SKETCH PLAN OR SITE PLAN (not required if project consists ONLY of interior renovations or replacement of
existing roof, siding, etc. in the exact same size)
9. APPLICANT/OWNER CERTIFICATION
The and gned
j Zoninerit and
Property Owner Sh
The rSdersigned
/VZ.-
owner hereby consents to submit this application and understands that if the application is approved, the
)edcoacAkms.will be binding on the property.
Evan Langfeldt CEO
PRINT NAME
l 5"
Date
affirms that the information presented in this application is true, accurate and complete.
Evan Langfeldt CEO `1 d
� // �-
PRINT NAME Da
OF ICE USE QNLY — ADMINISTRATIVE OFFICER ACTION — OFFICE USE ONLY
DATE Received: FEE Received: $ / v 1 ' / 7 Identification of zoning district.
Identification of proposed use: bL y /✓G,h'/�
PROPOSED USE TYPE: Permitted Conditional
Date of SITE PLAN approval/denial
Approval Date Denial Date
Date of SUBDIVISION approval/ denial
Approval Date Denial Date
Date of CONDITIONAL USE approval/ denial
Approval Date Denial Date
Date of appeal VARIANCE approval/ denial
Approval Date Denial Date
Date a MISCELLANEOUS approval/ denial
Approval Date Denial Date
Provided applicant copy of URBEC or VCBE Standards Handbook orF—]Not Applicable
PROVED
Permit EFFECTIVE date
DENIED
Denial Date
FINAL ADMINISTRATIVE OFFICER ACTION
Z O N I y E T
native Officer's gignature
[yl Permit EXPIRATION date / v
REASON for DENIAL
wAdministrative Officer's Signatu
Notice of Appeal Rights: Any interested person may appeal this decision by filing a written Notice of Appeal with the clerk of the
Development Review Board within fifteen [15] days of the date of this decision. The notice of appeal must be accompanied by a filing
fee of $223.00.
This permit does NOT authorize commencement of any development activity approved by the permit until the permit takes
effect as set forth above. Site modifications and improvements made prior to this permit becoming effective may be subject to removal
and site restoration if a timely appeal is commenced.
NOTE: The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state permits for this project. Call (802)
879-5676 to speak with the regional Permit Specialist.
CONSTRUCTION
ASSEMBLIES:
os� „-
oM �
�� 1 I T e .�
U�Ee
N�
Left Elevation Right Elevation
w
0
GENERAL EXTERIOR
ELEVATION NOTES:
0
® , ® eAse.co®n �
EXTERIOR ELEVATION ed
® ' ® KEYNOTES: LL aT
C
Rear Elevation oh,A i E
E
d €
E > a
0
0
c o
m m
La -3 14 1 1 1 4111 4
M m
L
® U m
FX1 M. E-An-I
gOCf RANA
Front Elevation
TRILLIUM
Elevation - Farmhouse AMA
CONSTRUCTION
ASSEMBLIES:
— a _ � ❑* ne m�O1E8ene�e
o.wvr
�z
Bedroom 3 a
5
uswna,.ao.F.
s�v�nac°Xon�'�`�uoa ",r on a
ae s,wc yacwwxumr� r
'y � �.c. �wu vrorrwr eawoer
___________
�,o`arser �
------------
oa
w+
BASEMENT PLAN�P O1a'
NOTES:
FLOOR PLAN NOTES: O
❑ ELEVATION NOTES
----------- E
ELECTRICAL NOTES: cz
�. LL.
�
CIO
C
--- fn
x_
LLL. c
F0 U
a) C C
O
Staepe . E > H O
Unexuvehd = t
C � o
m m
m
O �n o
J
J-
Finished Basement Plan =
TRILLIUM
A4.1.1
Olin
z Deck
D rang e
r.rnr Owners Suds
_I p
FvcN '
..rne Mae
iaes�
Beh2 "ru
i a�
------— % Foyer v
erne i ` i
2 Car Garage
Bedroom 2
.nwww. ---------------
Porch .,w.
i
Main Floor Plan
GENERAL FLOOR CONSTRUCTION
PLAN NOTES: ASSEMBLIES:
�ruoe'o®rwmw ❑.
a.w
`a''''w"w" xoc wuwmwi.
uoeErnri S
caowwrew mwgn wnmuF °� wet
m"aew`�o� � vM�`ia�� wnwm r�Fu�o s
""�wEs�'woreoa �. mogv am'�'� u: ac
rrnerx��wmu� rn�oP. �vorva�wwmwa�
wnnuc vwa �wmua
c asw,whooirm� O
ein ns.`�a eameOAi""'
FLOOR PLAN a
KEYNOTES:
n C
0
Aw,e�a� T
I1
C
w —.U-1 co
ow.oE oo�w E
cc
U-Tz—
O U
rn
o1"�woN i C c Q
_ o
= 7T t
Aeoe. C — o
G1 � m`
a.�55 Eiv®� M L N
i vwu Ow vT.eew 0 O m
U) o
Cn W
zV
NNN PL" PI
TRILLIUM
A1.1A
m
(� f ? - e^'- � ill i ~—`--* -''—�• < <^ F
FF--.0
�aS'9?�,�a � V
\ � J�'i qqEE //1 I c �I1�1j1 I-•��`K' �- C � �°n \ O
L1-J-C. ............... h
/ \\ / yya91 , /% � ♦/� // �i} / i1 \11 , // `\` 1 1 fir`' v ��}p1t� y � � I � � � h tl
,
Fit c \ 1 \ ` -- ---------- —
/ ate'``
Jil
t / µ Yam, ♦ yyy � � \1 I1 ,1 \\ 1 \ 1 , tR3R
/' i�� d{'/; './/� ��� -\�i- •.4„`\ - - \y -- -1 i.l•f_.�- V.1' 1`� \II \ E�! I' 6 � !!S� a
---
/
/� /, /• / ! i�'f % ° ` !1 \ ` `, , I-l.LY ' \ 1 1 \ Jill m
/EP ///yyy/'� .,'��a _+I"•if ,'-' ''�1 'r ��sq 1 \� � O l �,�� 1, 111\ I� t" m
-c \
\\ \
h
C
q,p
14
New 6"PVC \—
\ foundation droin �\
_ = = B \ to daylight.
♦ ✓
4p000► \ \ ,� OecK \', e� i/\ New 4"PVC
sanitary service.
OeoK — / S=1/4 %ft, min.
\ ` A / Typ. ol/ units.
\ O
�\ \ New #3 —
\ _ Rim 351.21
Inv. 346.50 —
\� — Inv. I'd 347.75
O / Inv.ud 347.21
J47
New SMH#4
\ Rim 351.90 \ pP \
Inv. in 345.25
Inv. out 345.15 \ V: 3633—�
Ln \
1 \ ♦W�
N hydront
ssembly ♦
♦ ♦
under of
clean ut
3+5
\ I
\ _ x
— r36.3 — O
go
Krebs Lansing Consulting E HILLSIDE AT
Engineers, Inc.
164 lche Street, Suite 20' UNIT 4 Plan
L : (804,�8-9618O'BRIEN FARM
05446
T: cfi°a 676-°37s
a"' flCkrebsa^dlansing m SOUTH BURLINGTON, VERMONT
0' 10' 20' 40'
GRAPHIC SCALE 7" = 20'
Drawn by: SWH
Date: April 5, 2018
Project #: 13187
Scale: 1" = 20'
SOUTH BURLINGTON PERMIT FEE SCHEDULE (FILL IN YELLOW BOXES -PERMIT FEE CACULATED BELOW)
SINGLE FAMILY
HOUSE SQUARE FOOTAGE FFA= 2479
UNFINISHED BASEMENT/HOUSE SQ. FT. 777
# OF GARAGE BAYS 2
Units
Unit Price
Extended Price
ZONING PERMIT HOUSE
2479
0.45
1115.55
ZONING PERMIT UNFINISHED BASEMENT
777
0.2
155.4
ZONING PERMIT GARAGE BAYS
2
50
100
SEWER ALLOCATION FEE
242.95
11.52
2798.784
RECREATION IMPACT FEE (Waiver by DRB)
1
1665.08
166S.08
ROAD IMPACT FEE
1
902.12
902.12
POLICE IMPACT FEE
1
468.89
468.89
SEWER CONNECTION INSPECTION
1
63
63
Recording Fee
1
13
13
TOTAL PERMIT FEE
DUPLEX (EACH UNIT
HOUSESQUAREFOOTAGE=
UNFINISHED BASEMENT SQ FT. _
k OF GARAGE BAYS =
ZONING PERMIT HOUSE
0
0.45
0
ZONING PERMIT UNFINISHED BASEMENT
0
0.2
0
ZONING PERMIT GARAGE BAYS
0
50
0
SEWER ALLOCATION FEE
210
11.52
2419.2
RECREATION IMPACT FEE
1
1665.08
1665.08
ROAD IMPACT FEE
1
594.79
594.79
POLICE IMPACT FEE
1
461.74
461.74
SEWER CONNECTION INSPECTION
1
63
63
TOTAL PERMIT FEE 1 5203.81
Cost Code
Total for Code
205-12
1370.95
205-07
2798.784
205-04
1665.08
205-03
902.12
205-06
468.89
205-07
63
205-09
13
•� REAL ESTATE DEVELOPMENT AND MANAGEM ENT
VIA HAND -DELIVERY
April 25, 2018
1
Mr. Raymond Belair, Administrative Officer
South Burlington Planning and Zoning
575 Dorset Street
South Burlington, VT 05403
Re: Zoning Permit Application 58 Laurentide Lane, South Burlington, VT 05403
Ray,
Further to Final Plat Permit SD-17-17, enclosed please find a zoning permit application for 58
Laurentide Lane, South Burlington, Vermont 05403, Unit 004 on the Final Plat/Site Plan submitted as part of
SD-17-17.
This zoning permit request is for a unit which X IS inside a phase that has submitted the required
infrastructure letter of credit and three -party agreement If not, the required letter of credit and three -party
agreement are attached to this application.
This zoning permit request is for a unit which X IS inside a phase that has submitted the required
landscaping letter of credit and three -party agreement. If not, the required letter of credit and three -party
a reement are attached to this application in triplicate. Please sign all three copies and return two to our office.
e approved landscape bonding scheme plan, as well as the approved bonding spreadsheet are also attached
for reference.
Attached please find a worksheet which is programmed with figures provided by the City, to determine
the exact fee owed for this zoning permit. Per that spreadsheet, the requisite fee for this application is
$7,281.82. A check for the requisite fee is enclosed.
This application requires a sewer connection and allocation. Attached to this letter please find the sewer
allocation tracking spreadsheet for the Hillside project. This includes information on the current allocation and
connection request as well as information on previous requests. This spreadsheet also has the address of the
unit seeking connection. Historical data and requests are filled in for reference in issuing this new letter.
A Wastewater Connection application is also attached.
Lastly, a copy of Sheet C-2 from the approved project plans is attached. The current plan is to construct
Unit 004. A detail sheet of Unit 004 is provided. As shown, the green box shows the boundaries of the
approved footprint lot.
Please contact us with any questions or concerns.
Sincerely,
Andrew Gill, Director of Development
Enclosures