HomeMy WebLinkAboutZP-18-153 - 0055 Laurentide Lane 5/2/20181
Applicant:
CITY OF SOUTH BURLINGTON
ZONING PERMIT APPLICATION
O'Brien Farm Road, LLC
Applicant Mailing Address: 1855 Williston Road
Applicant Email: Andrew@obrienbrothersagency.com
Property Street Address: 55 Laurentide Lane South Burlington
Property Owner: O'Brien Farm Road, LLC
Property Owner Mailing Address:
Same As Above
Application No: d— $�!/uSL
[office use only]
Daytime phone: 802 658 5000
, VT 05403
Parcel Size: Total 39.16 acres
Tax Parcel ID No.
PROPOSED project including building dimensions (describe): Construction of a 1,898 square foot single
family home on Lot 05-06 of the O'Brien Farm Road subdivision, approved by Final Plat
SD-17-17, including construction of a 6'x20' front porch, as well as a 8'x14' rear deck.
See attached floor plan and elevation.
2. Present USE(S) of the property:
ElSingle family home on its own parcel
❑ Other (please state the USE per Land Development Regulations- retail, general office, multifamily residential, etc.):
3. List all resent structures on property describe including dimensions or square footage of each): None
P 1) p p YI 9 Q 9 1
4. Does the project include a proposed change of USE?
❑No (the property will still be used for the same purpose)
[Z]Yes (please state proposed changed or added USES per Land Development Regulations- retail, general
office, multifamily residential, etc.): Residential Development Per Final Plat Approval SD-17-17
5. ESTIMATED total cost of improvements (materials and labor): $ Approx. $250,000 Direct Cos
6. Building footprint — i.e. size in sq.ft of main floor of house and all attached and detached structures including enclosed
breezeways, garages, and sheds (describe): Existing: Proposed:
7. Total square feet of other impervious surfaces on site (i.e. driveways, patios, decks)
Existing: Proposed:
8. ATTACH SKETCH PLAN OR SITE PLAN (not required if project consists ONLY of interior renovations or replacement of
existing roof, siding, etc. in the exact same size)
9. APPLICANT/OWNER CERTIFICATION
The undersigne&*r6Rerty owner hereby consents to submit this application and understands that if the application is approved, the
1 ZoningOgrm
/ if
Propedty Owner %gnatu
The t}norsigned app
Sig
ditions will be binding on the property.
Evan Langfeldt CEO
PRINT NAME
-V
" / As
Dat
reby affirms that the information presented in this application is true, accurate and complete.
Evan Langfeldt CEO ,S'
PRINT NAME Date
OFFICE US ONLY —ADMINISTRATIVE OFFICER. TION — OFFICE USE ONLY
n/ Y
DATE Received: / FEE Re eived: $ dV Identification of zonin district:
Identification of proposed use:
PROPOSED USE TYPE F Permitted Conditional
Date of SITE PLAN approval/denial
Approval Date Denial Date
Date of SUBDIVISION approval/ denial
Approval Date Denial Date
Date of CONDITIONAL USE approval/ denial
Approval Date Denial Date
( Date of appeal VARIANCE approval/ denial
Approval Date Denial Date
Date PMISCELLANEOUS approval/ denial
Approval Date Denial Date
Provided applicant copy of URBEC or VCBE Standards Handbook orE]Not Applicable
�APPROVED
Permit EFFECTIVE date
DENIED
Denial Date
FINAL ADMINISTRATIVE
Z O N/I r
I T,
inistr tive Officer's Signature
/F
Permit EXPIRATION date U/ /
REASON for DENIAL
Administrative Officer's Signature
Notice of Appeal Rights: Any interested person may appeal this decision by filing a written Notice of Appeal with the clerk of the
Development Review Board within fifteen [151 days of the date of this decision. The notice of appeal must be accompanied by a filing
fee of $223.00.
This permit does NOT authorize commencement of any development activity approved by the permit until the permit takes
effect as set forth above. Site modifications and improvements made prior to this permit becoming effective may be subject to removal
and site restoration if a timely appeal is commenced.
'NOTE: The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state permits for this project. Call (802)
879-5676 to speak with the regional Permit Specialist.
SOUTH BURLINGTON PERMIT FEE SCHEDULE (FILL IN YELLOW BOXES- PERMIT FEE CACULATED BELOW)
SINGLE FAMILY
HOUSE SQUARE FOOTAGEFFA=
UNFINISHED BASEMENT/HOUSE SQ. FT
# OF GARAGE BAYS
ZONING PERMIT HOUSE
ZONING PERMIT UNFINISHED BASEMENT
ZONING PERMIT GARAGE BAYS
SEWER ALLOCATION FEE
RECREATION IMPACT FEE (Waiver by DRB)
ROAD IMPACT FEE
POLICE IMPACT FEE
SEWER CONNECTION INSPECTION
Recording Fee
TOTAL PERMIT FEE
DUPLEX (EACH UNIT)
HOUSE SQUARE FOOTAGE=
UNFINISHED BASEMENT SQ FT. _
# OF GARAGE BAYS =
ZONING PERMIT HOUSE
ZONING PERMIT UNFINISHED BASEMENT
ZONING PERMIT GARAGE BAYS
SEWER ALLOCATION FEE
RECREATION IMPACT FEE
ROAD IMPACT FEE
POLICE IMPACT FEE
SEWER CONNECTION INSPECTION
TOTAL PERMIT FEE
1898
500
2
Units
Unit Price
Extended Price
1898
0.45
854.1
500
0.2
100
2
50
100
242.95
11.52
2798.784
1
1665.08
1665.08
1
902.12
902.12
1
468.89
468.89
1
63
63
1
13
13
0
0
0
210
1
1
1
1
0.45
0
0.2
0
50
0
11.52
2419.2
1665.08
1665.08
S94.79
594.79
461.74
461.74
63
63
S203.81
Cost Code
Total for Code
205-12
1054.1
205-07
2798.784
205-04
1665.08
205-03
902.12
205-06
468.89
205-07
63
205-09
13
Right Elevation
Roof Plan
InE 1EtiF'ATM •1
sw,fT ev nE wrvis•CNR9,s s�•T�•nuu v[trtm rvn RiEEUE•rtR vert w
Rear Elevation
EA �50R� Ix�tOluYry t
--ft-N ,.,
CONSTRUCTION
ASSEMBLIES:
❑* 'R,"eFE
�R
o.G W/INSxATal p1
Left Elevation
xNnRmNc81w',?aw! `n
ILL
_ R Ery J
GENERAL EXTERIOR
ELEVATION NOTES:—Yl
—1—OX SRF EXT. FINISH SCHEDULE FRO.,,R•.
- Q
Sd•MY s
_ T
EXTERIOR ELEVATION R
�m�°°°'.3
a„� KEYNOTES:
ILL.
cn
E
L M
u. &uaEf-fvrary acrisxiex3 aR [ai (Q
Front Elevation
Elevation - A
EI MORELE ATONSB
ROOF—
DAYLILY REV
AMA
INTERIOR FINISH SCHEDULE GENERAL BASEMENT CONSTRUCTION
PLAN NOTES: ASSEMBLIES:
'. e> �.mxee�°°x"vw..,w� anairn O� a�w�o,mnorz.
�«4-s. nxx a,. •o.ru 4r^�-=..s_-� °mesa nrnm
-� �olalew a,a•4sUla�a9®1 �ycv.. Ra!
`"°ns.er"irwF.fraNr'F e.mw-. c,ssa: °e`°"5 a�.�on, �mua„w
a4 'VFaaa� �`ua,wm cacc�EE.16 'a"0a, w,x
mr R�'y ug6TVn�vn�REfMLd
RroRc ,5'a -
,n.n � MIINW,aFmINc9 e,. rvgcK
/-.w � w � Vr61IilllaaffMxi �si1-Rill
d
75
vRxla.nolZ rNaE WnRa;R aFJne•o115NLL r$
NF,aruvusoaaki[area •,a•vana
- �4G WaWI.RTaN
ru�vr bS SIVa N
Hxv Ceex--.SvfRE4
id lfFx1EREC iN,E1Ua t?a,'1TW ap11O �
T8
C•aM.R.a.�a.rr•YI-•Y: I I 1 K. KK+I®PIRmaKE.S �`p� S ........... ..
�9r4��Ma. P'+4Y eox.vp. f
xF4w R.n rrV•W-4.xv4u»n-a.44•Y ; - VKEaaRmE° a14C1)wH1 : �....
I ��£ oxe.aaarne ro �a�A R
art m.ISnP.Rwa'4!" ' f••••••••----_ i I \ WRDax 9MR1ER Rt yERivnr •`7NnKlFn _
Gwgw.n-5•e M.i
9.T 1rtco.stp-vn�n R7/I Ix KL �•
arw-R.n,�al., I a.0 exmc5ncv 9 ' '
F.x4. • ••n FR,x. selxax.x i i I µ� ouxcK
Raw�.uo-rwl auxxa eumsw.a4r4... art F.uw ,
,
,
,
,
:
:
u.wram-uvv�[n r.amx ' ' : [,tn,a'wnae. et.,
nx�vn-en aaw � ' sa sa '
Bnia-u-.[..r ava• � - s'-w a"n�i.ffmugW[o Rr m.wE�amanc an w•F-oan
� , i I 4[cvwurx nuo 6Ec+nrx svew•»r.ew amu rn.,n4cN
'
_ _ canwCraa wxrRM.+aa nma:wsrnuRURK auvmca
3a0Wc _ _ _ •r _ _ _ • - _ - f_ _____ _________ ___________Lrt oER ° ERI/8 x,.asm�c �F
ax,vv i J T_i_T iFl __________________ J
�� . uwW aRrRaM of —
Unfinished La'ner Level e
I F
COMF,RM dl Srtf ' ' 0 enRS ix R�ix4 aH 0lTDlaoRaa
i4
a.
:
,
------------ --� """" FLOOR PLAN
,. ,b..
„_ „4,•,,,_. �„ y KEYNOTES: cC
:
----cn
t � �
1 t1 ower Level Bonua
'�-' n!••uove,IS�FFn �lve L
2 Car Gasw�scR a•IIaK ` L.I.L.p
pe
rF
FOOTING SCHEDULE _ _ _ _ ® E
❑a _ -»s>u: '�"d ,rn o.RKooa-oRe. o
RaRraolN I i' ,x = ar
'a.o•al I y i �-- - __ � -o c'
ao,w°>Re.uq w.w.,aom •«.wmRlu,• I rRR�R RaR d d
a�•,plaPoR
' � n,cwar enaoavanom•na«rnm, m £
.lo,e uurc¢ulxa awu w.F.xa KinR•sal..Rr faouraarrouna®.I � '-- ------------------- - `------- -----
_____________ i i ,v ua=a Rarrnanax - J
nEmae.Kw,Ease[.[aEr6.K xv,Fa Wlaorta MotaapwMiFua4 ' ,am R:ERK£nVMa4AW O , N
,
_ ____
_____________! c_ -------------------
: mm11R1R Wx. �al of n.{f WCCVrI,9t
FOUNDATION WALL - ��49f14M1NM1�R`F
SCHEDULE
Foundation/Lower Level Plan
FOLf"TKYAMBAeft
Elevation - A DAYLILY REV
A0.1A
GENERALFLOOR CONSTRUCTION
PLAN NOTES: ASSEMBLIES
I— —E.
1,5:714; M—M— 1 E.
-ffAM �Aa
ECm.
—
V
==RoL
INTERIOR FINISH SCHEDULE
�Q
0
_j
FLOOR PLAN
KEYNOTES:
LL.
WON Iwo I
U)
I-= ro LL
c)
logo
Mon —D-
E
Ma�er Bedroom' Z 0 C0
—c.
T m
-=AFI
E== —aE
---- --- ----- go `0 .G
0 — =
o
El
Main Floor Plan
Elevation -A DAYLILY REV
AMA
®�_s,
®II
m
ICI
/ cooto tn
goi W
3533 \ X352 \ ♦
paw \ ♦
��0
00
\ \ \0woI ,
\ 101,
3- 00 \ \ \ ♦ ♦
\ \ A\
G �\ ♦ ♦
\ FF 352 o
New Gross Chonnel
— — — — — — _ ; / #3. 6' min. bottom
O / width x 12" deep. \
Avg. slope 1.4% �' \
000
17
to
0000000
New
underdrain '
cleanou�—
358
ro
/
Krebs & Lansing Consulting
Engineers, Inc. HILLSIDE AT
164 Main sire2°' UNIT 6 Plan
L Cd.h" Vr 65U6 O' B R I E N FARM
r: (eoa BT eyeQ37-osrs
F: (602D 878-9618
9_110krebsendlansing.mm SOUTH BURLINGTON, VERMONT
0' to' 20' <oDrawn by: SWH
Date: April 25, 2018
Spa N Project #: 13187
GRAPHIC SCALE 1" = 2o' Scale: 1" = 20'
tilt b m I 1
S) • d � i i 1111111 \ ..-�"f'�; \ K` , C $. � � O
III
II
I1 � a{f'♦■%9 F! ( v1 C � �`
i11
i
�fill Ilfl // 6 / •',� Ill �yY ...lff"` \`\ \\\�` � i 7 �>iil� d� d 6 � o = ��
..a 100 a4r
/ pifl A�'/; � .'//� a •;� ;� -\lli- L. a� V �.•.� 1 1 \\ 1 \ 1 � »�
rAtli
11
YX
/ ,{ / ' �. ,,iiill � i � rYZ �� \ I �•1 ,; � i 11 1111 `I 1 � , ; /-: -" R
■
'/ ,S1. �'• - -\6Q \ � O 1 1\, `,` I � <1.
i .tl
rF if / / � i ` \\ `. `K.�'t\�J �� �\\ -�� • +� }�J'f'Jy :, `\ `\\\ \I\ ,� ® o
.Illlllf \ \ '' 9� � ;t �; • \ \ •may - � Q K_ �` \ \ \
/i iii ^, 1'I AI \\ \ 1 \ \ \ \ \ \\ ,Fi }�f \\\\\\ \:..1'P~\ \ ` \' �f.•--" • \ .-..'� ��,, % \`\ \ \ t
f I f l `\ 1 S \ \ ` t. \I 1\ 1\ '. ! i i ` i ' � -� t- RR.. \ ,1_- � `\\\ • \\ `\ `\
I \VA�� V V`I AA`�\`1 '1 A A A V,�� II -/i ' lid;x �� ♦ I��y I AA � �V ,A
" `"�����\aaaaa 1 1 \ \ \ 1 \ \ \ •\ \ \ _ � \ ��� Zit=? ' 'L; • \ '',' \�/ 9 l,' `) � \\p\\
vvv 11A AAAA V 1 II ,.
plt all 3 \ ` `11 I II I II II 11 ��'- Oii�i -y+ !•\ �,~ I•
rF�l ;� •ice i i i i i i i d � i i r • \\\ \\ �1` \t 'F i'T'` -•" C , \ \ • ,
• •� , REAL ESTATE DEVELOPMENT AND MANAGEMENT
VIA HAND -DELIVERY
May 1, 2018
Mr. Raymond Belair, Administrative Officer
South Burlington Planning and Zoning
575 Dorset Street
South Burlington, VT 05403
Re: Zoning Permit Application 55 Laurentide Lane, South Burlington, VT 05403
Ray,
Further to Final Plat Permit SD-17-17, enclosed please find a zoning permit application for 55
Laurentide Lane, South Burlington, Vermont 05403, Unit 006 on the Final Plat/Site Plan submitted as part of
SD-17-17.
This zoning permit request is for a unit which X IS inside a phase that has submitted the required
infrastructure letter of credit and three -party agreement If not, the required letter of credit and three -party
agreement are attached to this application.
This zoning permit request is for a unit which X IS NOT inside a phase that has submitted the required
landscaping letter of credit and three -party agreement. If not, the required letter of credit and three -party
a reement are attached to this application in triplicate. Please sign all three copies and return two to our office.
approved landscape bonding scheme plan, as well as the approved bonding spreadsheet can be provided if
requested.
Attached please find a worksheet which is programmed with figures provided by the City, to determine
the exact fee owed for this zoning permit. Per that spreadsheet, the requisite fee for this application is $6,964.97.
A check for the requisite fee is enclosed.
This application requires a sewer connection and allocation. Attached to this letter please find the sewer
allocation tracking spreadsheet for the Hillside project. This includes information on the current allocation and
connection request as well as information on previous requests. This spreadsheet also has the address of the unit
seeking connection. Historical data and requests are filled in for reference in issuing this new letter.
A Wastewater Connection application is also attached.
Lastly, a copy of Sheet C-2 from the approved project plans is attached. The current plan is to construct
Unit 006. A detail sheet of Unit 006 is provided. As shown, the green box shows the boundaries of the approved
footprint lot.
Please contact us with any questions or concerns.
Sincerely,
Andrew Gill, Director of Development
Enclosures