Loading...
HomeMy WebLinkAboutSD-08-60 SD-08-61 - Decision - 1840 Spear Street#SD-08-60 #SD-08-61 CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING AND ZONING SOUTH VILLAGE COMMUNITIES, LLC - 1840 SPEAR STREET PRELIMINARY PLAT APPLICATION #SD-08-60 FINAL PLAT APPLICATION #SD-08-61 FINDINGS OF FACT AND DECISION South Village Communities, LLC, hereinafter referred to as the applicant, is seeking preliminary plat and final plat approval to amend a previously approved planned unit development of Phase I consisting of 156 residential units and a 100-student educational facility, of a 334 residential unit project. The amendment consists of: 1) subdividing a 1.05 acre lot (lot 4) into two (2) lots of 0.53 acres (lot 4A) and 0.52 acres (lot 4B), 64& 96 Aiken Street, and 2) increasing lot coverage waiver from 65% to 75%, 1840 Spear Street. The Development Review Board held a public hearing on Tuesday, January 20, 2009. Dave Marshall represented the applicant. Based on testimony provided at the above mentioned public hearing and the plans and supporting materials contained in the document file for this application, the Development Review Board finds, concludes, and decides the following: FINDINGS OF FACT The applicant is seeking preliminary plat and final plat approval to amend a previously approved planned unit development of Phase I consisting of 156 residential units and a 100-student educational facility, of a 334 residential unit project. The amendment consists of: 1) subdividing a 1.05 acre lot (lot 4) into two (2) lots of 0.53 acres (lot 4A) and 0.52 acres (lot 413), 64& 96 Aiken Street, and 2) increasing lot coverage waiver from 65% to 75%, 1840 Spear Street. 2. The same request was made and approved by the board in May 2008; however the applicant did not record the Mylar in time and the approval lapsed. 3. The owner of record of the subject property is South Village Communities, LLC. 4. The subject property is located in the Southeast Quadrant (SEQ) Zoning District. The plan submitted is entitled, "Phase 1 Subdivision Plat", prepared by Civil Engineering Associates, Inc., dated July, 2004, last revised on 3/31/08. F:\USERS\Planning & Zoning\Development Review Board\Findings_Decisions\2009\SouthVillage\SP086061_FFD.doc #SD-08-60 #SD-08-61 Subdivision of Lot 4: The applicant is proposing to subdivide Lot 4 into two parcels of .53 and .52 acres respectively. The minimum lot size in the Southeast Quadrant for multi -family residential is approximately .92 acres. Therefore, the applicant is requesting a waiver of the minimum lot size. The Board has no objections to this request. Had the applicant not drawn a property line around each building, the same buildings would meet the ordinance as it simply refers to minimum lot size for multifamily residential and does not relate to the number of units. Increased Lot Coverage: The applicant is proposing to increase the approved percentage of impervious lot coverages on the multifamily lots in Phase 1 from 65% to 75%. The applicant is not requesting a change to the limitation on lot coverage for the entire project, which remains in the range of 16% at full build -out. The Board should discuss this request. DECISION Motion by seconded by AbIrk 1 fAC to approve Preli inary Plat Apliilication #SD-08-60 & Final Plat Application #SD-08-61 of South Village Communities, subject to the following conditions: 1. All previous approvals and stipulations shall remain in full effect except as amended herein. 2. This project shall be completed as shown on the plat submitted by the applicant and on file in the South Burlington Department of Planning and Zoning. 3. The plat shall be revised to show the changes below and shall require approval of the Administrative Officer. Three (3) copies of the approved revised plat shall be submitted to the Administrative Officer prior to permit issuance. a. The survey plat shall be revised to include the signature and seal of the land surveyor. 4. The Board approves increasing the overall lot coverage from 65% to 75 % for lots 4A & 4B. 5. Any changes to the final plat plan shall require approval of the South Burlington Development Review Board. 6. The final plat plan (survey plat) shall be recorded in the land records within 180 days or this approval is null and void. The plan shall be signed by the Board Chair or Clerk prior to recording. Prior to recording the final plat plan, the applicant shall submit a copy of the survey plat in digital format. The format of the digital information shall require approval of the Director of Planning and Zoning. 2 FAUSERS\Planning & Zoning\Development Review Boa rd\Findings_Decisions\2009\SouthVillage\SP086061_FFD.doc #SD-08-60 #SD-08-61 Mark Behr - ey/nay/abst in/not present Matthew Birmingham - ea ay/abstain/not present John Dinklage -yea/nay/abstain not resen Roger Farley - ea ay/abstain/not present Eric Knudsen - e nay/abstain/not present Peter Plumeau - ea/nay/abstain of present Gayle Quimby ye nay/abstain/not present Motion carried by a vote of C) Signed this ,���day of A V1- ✓ 2009, by rk Behr, Vice Chairman Please note: You have the right to appeal this decision to the Vermont Environmental Court, pursuant to 24 VSA 4471 and VRECP 5 in writing, within 30 days of the date this decision is issued. The fee is $225.00. If you fail to appeal this decision, your right to challenge this decision at some future time may be lost because you waited too long. You will be bound by the decision, pursuant to 24 VSA 4472 (d) (exclusivity of remedy; finality). FAUSERS\Planning & Zoning\Development Review Boa rd\Findings_Decisions\2009\SouthVillage\SP086061_FFD.doc