HomeMy WebLinkAboutSP-13-33 - Decision - 0074 0110 0144 South Jefferson Road#SP-13-33
CITY OF SOUTH BURLINGTON
DEPARTMENT OF PLANNING AND ZONING
SOUTH VILLAGE COMMUNITIES, LLC
74-110-144 SOUTH JEFFERSON AVENUE
SITE PLAN APPLICATION #SP-13-33
FINDINGS OF FACT AND DECISION
South Village Communities, LLC, is seeking site approval to construct two (2) 12 unit multi -family
dwellings and one (1) 10 unit multi -family dwelling, 74, 110 and 144 South Jefferson Avenue.
The Development Review Board held a public hearing on July 16, August 20, and September 3, 2013.
Dave Marshall & Greg Rabideau represented the applicant.
Based on testimony provided at the file for this application, the Development Review Board finds,
concludes, and decides above mentioned public hearing and the plans and supporting materials
contained in the document the following:
FINDINGS OF FACT
1. South Village Communities, LLC, hereinafter referred to as the applicant, is seeking site approval to
construct two (2) 12 unit multi -family dwellings and one (1) 10 unit multi -family dwelling, 74, 110 and
144 South Jefferson Avenue.
2. The owner of record of the subject property is South Village Communities, LLC.
3. The application was received on June 14, 2013.
4. The subject property is located in the Southeast Quadrant Neighborhood Residential Zoning District.
5. The plans submitted consist of a 23 page set of plans, page one (1) entitled "South Village Spear Street
& Allen Road South Burlington, VT Phase 1 Subdivision Plat", prepared by Civil Engineering Associates,
Inc., dated July 2004, and last revised on 8/30/10.
Zoning District & Dimensional Requirements
The subject lot is part of a previously approved master plan for the entire Planned Unit Development
known as South Village. Setback requirements are met. Building coverage is calculated at 34.5%
(maximum approved per Master Plan is 50%) and is also met.
The proposed project meets dimensional requirements and limits for overall coverage which had been
approved as part of the Master Plan approval (#MP-04-01 and the amendment #MP-05-02). The overall
coverage is proposed to be 65.0% (maximum approved per the MP is 65%).
SP_13_33_74-110-1445_lefferson_SouthVi IIage_ffd
#SP-13-33
6. The Board finds that these requirements are being met.
Height
Section 3.07(C)(1) states that "Where a structure has been approved as part of a Master Plan prior to
January 9, 2012 with a height greater than that permitted in these Regulations, such approved maximum
height shall remain in effect."
The maximum height at time of the Master Plan approval was 40 feet for a pitched roof structure. The
heights of the proposed pitched -roof buildings are as follows:
• Building A = 32.7 ft.
• Building B = 29.1 ft.
• Building C = 29.8 ft.
7. The Board finds that all buildings will comply with the height limitation.
SITE PLAN REVIEW STANDARDS
Section 14.06 of the South Burlington Land Development Regulations establishes the following general
review standards for all site plan applications:
(a) The site shall be planned to accomplish a desirable transition from structure to site, from
structure to structure, and to provide for adequate planting, safe pedestrian movement, and
adequate parking areas.
The 34 units of housing will require 68 spaces calculated as 2 spaces per unit as the spaces will not be
reserved. The applicant proposes a total of 68 spaces on the property itself: 44 underground spaces and 24
surface parking spaces. The applicant also notes that eight (8) parallel parking spaces will be constructed
along the south side of South Jefferson Avenue. The applicant notes that the SBLDR and the ADAAG require
that the 68 combined spaces include three (3) handicap spaces. In response to concerns discussed at the
August 20`h meeting these 3 handicap spaces are now proposed to be located in the off-street parking
areas and are noted on the revised plans submitted on August 23rd. Pedestrian movement is adequate
between buildings.
8. The Board finds that this standard is being met.
(b) Parking shall be located to the rear or sides of buildings.
Parking is proposed to be located to the side and underneath of the buildings.
Section 13.01(G) (5) requires that bicycle parking or storage facilities are provided for employees, residents,
and visitors to the site. Bicycle racks are shown on the plans (one (1) for each building).
(c) Without restricting the permissible limits of the applicable zoning district, the height and scale of
each building shall be compatible with its site and existing or adjoining buildings.
SP_13_33_74-110-144S_Jefferson_SouthVillage_ffd 2
#S P-13-33
The proposed buildings are a pitched roof type structure. The maximum allowable height in the district is
currently 28 feet for a pitched roof. The proposed buildings are between 29.1' and 32.7' high at the
midpoint of the sloped roof. Section 3.07 (C) of the LDRs states that "where a structure has been
approved as part of a Master Plan prior to January 9, 2012 with a height greater than that permitted
in these Regulations, such approved maximum height shall remain in effect ". The structures were
approved as part of a Master Plan prior to 1/9/12 so the current height limit does apply.
9. The Board finds that no height waiver is requested or required.
(d) Newly installed utility services and service modifications necessitated by exterior alterations or
building expansions shall, to the extent feasible, be underground.
Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines, services,
and service modifications shall be underground.
The South Burlington Water Department has no comments.
(e) The DRB shall encourage the use of a combination of common materials and architectural
characteristics, landscaping, buffers, screens and visual interruptions to create attractive
transitions between buildings of different architectural styles.
The applicant has submitted elevations of the proposed buildings.
10. The Board finds that the proposed buildings are in compliance with this criterion.
(f) Proposed structures shall be related harmoniously to themselves, the terrain, and to existing
buildings and roads in the vicinity that have a visual relationship to the proposed structures.
The applicant has submitted elevations of the proposed buildings.
11. The Board finds that the proposed buildings are in compliance with this criterion.
Site plan applications shall meet the following specific standards as set forth in Section 14.07 of the South
Burlington Land Development Regulations:
(a) The reservation of land may be required on any lot for provision of access to abutting properties
whenever such access is deemed necessary to reduce curb cuts onto an arterial of collector street,
to provide additional access for emergency or other purposes, or to improve general access and
circulation in the area.
The proposed buildings are accessed via two curb cuts. Furthermore, the overall layout of the subdivision
has been reviewed as part of Master Plan review and as a 3-step PUD.
12. The Board finds that this this criterion has been met.
(b) Electric, telephone and other wire -served utility lines and service connections shall be
underground. Any utility installations remaining above ground shall be located so as to have a
harmonious relation to neighboring properties and to the site.
SP_13_33_74-110-144S_J effe rso n_So ut hV i I lage_ffd
#SP-13-33
Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines, services, and
service modifications shall be underground.
(c) All dumpsters and other facilities to handle solid waste, including compliance with any recycling
or other requirements, shall be accessible, secure and properly screened with opaque fencing to
ensure that trash and debris do not escape the enclosure(s).
The applicants are proposing to locate the trash and recycling facilities in an enclosed area on the south side
of the parcel between Buildings 50B and 50C. No details on the enclosure are provided.
13. The Board finds that these plans should be revised to include the details of the dumpster enclosure.
(d) Landscaping and Screening Requirements
Based on submitted building costs of $3,600,000, the minimum landscaping budget should be $43,500. The
applicant's current on -site landscaping budget for acceptable trees and shrubs is $43,500.
Pursuant to Section 13.06(B) of the Land Development Regulations, the plans shall depict snow storage
areas that will minimize the potential for run-off. Snow storage will be off -site and the plans should be
revised to note this.
The landscaping plan depicts a "Japanese Pagoda Tree" within the street right-of-way at the northeast
corner of the site. This tree should be relocated so that it located on -site.
14. The landscaping plan should be revised to relocate the "Japanese Pagoda Tree" located at the
northeast corner of the site such that it is placed on -site.
Lighting
Pursuant to Section 13.07(A) of the Land Development Regulations, all exterior lighting shall be shielded
and downcasting to prevent light from spilling onto adjacent properties and rights -of -way.
The applicant has submitted revised lighting details on August 23rd in response to concerns identified at
the August 201h meeting. Different luminaires and rear shields are now proposed to reduce the lighting
levels to comply with the 0.3 fc standard.
15. The Board finds that these standards are being met.
Other — Units in a Structure
Section 9.05(B) of the LDRs limits the number of units in a building to four (4), and provides the
following:
"Where a structure has been approved as part of a Master Plan prior to January 9, 2012 with a greater
number of dwelling units than those permitted in these Regulations, such approved number of units in a
structure shall remain in effect".
SP_13_33_74-110-1445_Jefferson_SouthVillage_ffd 4
#SP-13-33
16. The Board finds that the proposed two (2) 12 unit buildings and the 10-unit building were
approved as part of the South Village Master Plan on this lot and are therefore in compliance.
DECISION
Motion by Tim Barritt, seconded by Bill Miller, to approve the site plan application #SP-13-33 of South
Village Communities, LLC, subject to the following conditions:
1. All previous approvals and stipulations shall remain in full effect except as amended herein.
2. This project shall be completed as shown on the plat submitted by the applicant and on file in the
South Burlington Department of Planning and Zoning.
3. Prior to permit issuance, the applicant shall post a $43,500 landscaping bond. This bond shall remain
in full effect for three (3) years to assure that the landscaping has taken root and has a good chance
of survival.
4. Any new exterior lighting shall consist of downcasting fixtures. Any change to approved lights shall
require approval of the Administrative Officer prior to installation.
5. Prior to permit issuance, the applicant shall obtain final wastewater allocation.
6. The applicant shall adhere to the comments of the Fire Chief in his letter dated August 13, 2013.
7. The proposed project shall adhere to standards for erosion control as set forth in Section 16.03 of the
South Burlington Land Development Regulations. In addition, the grading plan shall meet the standards
set forth in Section 16.04 of the South Burlington Land Development Regulations.
8. Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines, services,
and service modifications shall be underground.
9. The site plan shall be revised to show the changes below and shall require approval of the
Administrative Officer. Three (3) copies of the approved revised plan shall be submitted to the
Administrative Officer prior to permit issuance.
a. The landscaping plan shall be revised to show the "Japanese Pagoda Tree", which is located
at the northeast corner of the site, relocated such that it is placed on -site.
b. The site plan shall be revised to indicate that snow storage will be off -site.
c. The site plan shall be revised to include details of the dumpster enclosure.
10. The applicant shall obtain a zoning permit within six (6) months pursuant to Section 17.04 of the
Land Development Regulations or this approval is null and void.
11. The applicant shall obtain a Certificate of Occupancy from the Administrative Officer prior to use or
occupancy of the buildings.
S P_13_33_74-110-144S_J effe rso n_Sout h V i l lage_ffd
I
#S P-13-33
12. Any changes to the site plan shall require approval of the South Burlington Development Review
Board.
Tim Barritt—
yea
nay
abstain
not present
Mark Behr —
yea
nay
abstain
not present
Art Klugo —
yea
nay
abstain
not present
Bill Miller—
yea
nay
abstain
not present
David Parsons
yea
nay
abstain
not present
Michael Sirotkin —
yea
nay
abstain
not present
Jennifer Smith —
yea
nay
abstain
not present
The application was approved by a vote of 5 — 0 — 0
Signed this 201h day of September 2013, by
Digitally signed by Mark C. Behr
Mark C. BQ h r em cn=Mark C. Behr, o, ou,
email=mark@rhbpccom, c=US
Date: 2013.09.20 15:12:32-04'00'
Mark Behr, Chair
Please note: An appeal of this decision may be taken by filing, within 30 days of the date of this
decision, a notice of appeal and the required fee by certified mail to the Superior Court, Environmental
Division. See V.R.E.C.P. 5(b). A copy of the notice of appeal must also be mailed to the City of South
Burlington Planning and Zoning Department at 575 Dorset Street, South Burlington, VT 05403. See
V.R.E.C.P. 5(b)(4)(A). Please contact the Environmental Division at 802-828-1660 or
http://vermontiudiciary.org/GTC/environmental/defauIt.aspx for more information on filing
requirements, deadlines, fees and mailing address.
The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state
permits for this project. Call 802.879.5676 to speak with to speak with the regional Permit Specialist.
SP_13_33_74-110-144S_Jefferson_SouthViIlage_ffd 6