Loading...
HomeMy WebLinkAboutSD-95-0001 - Decision - 1751 Spear StreetFINDINGS OF FACT & DECISION STATE OF VERMONT COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of Ruth Trevithick for subdivision of a 5.2 acre lot into three (3) lots of 2.18 acres, 1.49 acres and 1.53 acres, 1751 Spear Street. On the 4th of April, 1995, the South Burlington Planning Commission approved the request of Ruth Trevithick for preliminary plat approval under Section 203 of the South Burlington Subdivision Regulations based on the following findings: 1. This project consists of the subdivision of a 5.2 acre lot with an existing single family dwelling into three (3) lots of 2.18 acres, 1.53 acres and 1.49 acres. This proposal is to supersede the approval granted on 1/10/95. Under the previous approval lot #3 was to be merged with an adjoining lot. The current proposal calls for lot #3 to be a separate developable lot. Since this lot does not have frontage on a public street, this application is being treated as a major subdivision. The Zoning Board of Adjustment on 10/24/94 granted the applicant a variance from the frontage requirement for lot #2. 2. This property located at 1751 Spear Street lies within the R1 and R2 Districts. It is bounded on the north, south and west by single family dwellings and on the east by Spear Street. 3. Access: Access to lot #1 is from an existing 16 foot wide access drive on Spear Street. Access to lot #2 and 3 will be via a shared driveway which is also a 20 foot r.o.w. across lot #2 to access lot #3 which does not have frontage. 4. Lot size/frontage: The minimum lot size in the R1 District is 1 acre and the two (2) lots in this district will be 1.49 acres and 2.18 acres. The minimum lot size in the R2 District is 19,000 square feet (0.44 acres) and the lot proposed in this district is 1.53 acres. 5. The minimum lot frontage requirement is 170 feet. Lot #1 has 183.7 feet of frontage and meets this requirement. The ZBA on 10/24/94 granted a variance to allow lot #2 to have 150 feet of frontage instead of the required 170 feet. Lot #3 has no frontage. 6. Sewer: The existing home on lot #1 is proposing to connect to the municipal sewer system in addition to the homes on lots #2 and #3. The total allocation needed is 1650 gpd. The per gallon fee for lot #1 should be paid prior to connection and the fee for lots #2 and #3 paid prior to permit issuance. 1 7. Impact Fees: The applicant was made aware that school, road and recreation impact fees will be required for the development of lots #2 and 3 pursuant to the South Burlington Impact Fee Ordinance. 8. Other: --- the subdivision plat should be revised to show the easement for the sewer pump station. --- the applicant should be responsible for repairing any settlement problems caused by the new force main along Spear Street and within driveway crossings for a period of two (2) years after installation of the sewer system. --- the complete sewer system, including the force main, should be a private system maintained jointly by the users. When a municipal collection system is constructed, the private system should be abandoned and the owners should connect to the municipal system at their own expense. DECISION & CONDITIONS Based on the above Findings of Fact, the South Burlington Planning Commission approves the preliminary plat application of Ruth Trevithick for subdivision of a 5.2 acre lot into three (3) lots of 2.18 acres, 1.49 acres and 1.53 acres, 1751 Spear Street, as depicted on a three (3) page set of plans, page one (1) entitled "Ruth W. Trevithick Trust, 1751 Spear Street South Burlington, VT" prepared by Trudell Consulting Engineers, Inc., dated 11/2/94, last revised 2/28/95, subject to the following stipulations: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. A sewer allocation of 1650 gpd is granted. The per gallon fee for lot #1 shall be paid prior to issuance of a sewer connection permit. The per gallon fee for lots #2 and 3 shall be paid prior to issuance of a zoning permit. 3. The plans shall be revised prior to submittal of the final plat application as follows: a) The subdivision plat shall be revised to an easement for the sewer pump station which lies outside of the 20 foot sewer easement. 4. The applicant shall be responsible for repairing any settlement problems caused by the new force main along Spear Street and within driveway crossings for a period of two (2) years after installation of the sewer system. 5. The complete sewer system, including the force main and pump 2 stations, shall be a private system maintained jointly by the users. When a municipal collection system is constructed, the private system must be abandoned and the owners must connect to the municipal system at their own expense. 6. The applicant must submit the final plat application within 12 months or this approval is null and void. Chairman or clerk South Burlington Planning Commission Date 3