Joseph and Susan Mack, hereafter referred to as the applicants, are seeking final plat
approval to amend a previously approved four (4) lot subdivision. The amendment
consists of modifying the location of the driveway, sewer pump station, and the
stormwater detention area on lot #4, Westview Drive. The Development Review Board
held a public hearing on February 6, 2007. Bob Gallo represented the applicant.
Based on testimony provided at the above mentioned public hearing and the plans and
supporting materials contained in the document file for this application, the Development
Review Board finds, concludes, and decides the following:
FINDINGS OF FACT
1. The applicants are seeking final plat approval to amend a previously approved
four (4) lot subdivision. The amendment consists of modifying the location of the
driveway, sewer pump station, and the stormwater detention area on lot #4,
Westview Drive.
2. The owner of record of the subject property is the Ruth Trivithick Trust.
3. The subject property is located in the Residential 1 (R1) Zoning District and the
Bartlett Brook Overlay District.
4. The plans submitted consist of a four (4) page set of plans, page one (1) entitled,
"Ruth Trevithick 1751 Spear St. So. Burlington, VT. Lot 4 Subdivision Plat",
prepared by Trudell Consulting Engineers, Inc., dated 4/25/05, last revised on
7/20/05.
SUBDIVISION CRITERIA
Pursuant to Section 15.18 of the South Burlington Land Development Regulations
subdivisions shall comply with the following standards and conditions:
Sufficient water supply and wastewater disposal capacity is available to meet the
needs of the project.
- 1 -
#SD-06-107
According to Section 15.13 of the South Burlington Land Development Regulations, the
existing public water system shall be extended so as to provide the necessary quantity of
water, at an acceptable pressure.
The South Burlington Water Department has reviewed the proposed water lines and
provided commP_.nts in a IPttP_.r datPd June 24 innF HP hnc czint-o stated that no no
, i wvv r%vic vv
is necessary and that previous comments remain in effect.
According to Section 15.13 of the South Burlington Land Development Regulations, the
subdivider or developer shall connect to the public sewer system or provide a community
wastewater system approved by the City and the State in any subdivision where off -lot
wastewater is proposed.
The City Engineer has reviewed the proposed sewer lines and his comments are in a June
9 memo. He has stated that he has no new comments and that previous comments remain
in effect.
Sufficient grading and erosion controls will be utilized during and after construction
to prevent soil erosion and runoff from creating unhealthy or dangerous conditions
on the subject property and adjacent properties.
The applicant has submitted acceptable plans for erosion control.
The project incorporates access, circulation, and traffic management strategies
sufficient to prevent unreasonable congestion of adjacent roads.
The proposed subdivision and its related private drive are located more than 400 yards
from the next roadway entering or exiting Spear Street. The changes proposed herein will
not cause congestion of any adjacent roads.
The project's design respects and will provide suitable protection to wetlands,
streams, wildlife habitat as identified in the Open Space Strategy, and any unique
natural features on the site.
The City's Official Wetland Map indicates that there are no wetlands on the subject
property. However, the property falls within the Bartlett Brook Overlay District.
Section 12.03 (C) (2) applies:
The Development Review Board shall not approve any land development proposal which
must be reviewed under this section unless it includes appropriate storm management
design to prevent an increase over pre -development conditions of the peak discharge and
velocity of stream flow downstream of the development site.
Section 12.03(D) governs the procedures for evaluation:
In order for the City to determine that the standards in section C above are met the
applicant for a land development project shall submit applicable information regarding the
development and storm management design to the City for inclusion into the City's
stormwater hydrology computer model.
The applicant has contracted Heindel and Noyes Inc. to complete a revised assessment as
outlined in Section 12.03. Heindel and Noyes Inc. reviewed the site plan at the time of the
-2-
#SD-06-107
previous final plat application in September of 2005. However, the changes proposed as
part of this application warrant additional review. The applicant shall adhere to any
recommendations by the consultant and provided in the final report dated February 2,
2007.
The project is designed to be visually compatible with the planned development
patterns in the area, as specified in the Comprehensive Plan and the purpose of the
zoning district(s) in which it is located.
The proposed subdivision is compatible with the planned development patterns of the R1
Zoning District, as outlined in Section 4.01(A) of the Land Development Regulations.
Open space areas on the site have been located in such a way as to maximize
opportunities for creating contiguous open spaces between adjoining parcels and/or
stream buffer areas.
The proposed building envelopes are designed to maximize open space in the front of the
homes. This is sufficient to satisfy this criterion.
The layout of a subdivision or PUD has been reviewed by the Fire Chief or (designee)
to ensure that adequate fire protection can be provided.
Previous subdivision of this property required residential sprinklering of units because the
private road was below city public road standards. The fire chief specified this as a
requirement for those units and for all units accessed by this private drive. In a memo
dated July 1, 2005, the fire chief has stated that this requirement will be continued as a
stipulation to homes built on lot 4. His comments have not changes as a result of the new
application.
This criterion was addressed at the previous approval. All stipulations from that approval
will remain in effect.
Roads, recreation paths, stormwater facilities, sidewalks, landscaping, utility lines
and lighting have been designed in a manner that is compatible with the extension of
such services and infrastructure to adjacent landowners.
This criterion was addressed at the previous approval. All stipulations from that approval
will remain in effect.
Roads, utilities, sidewalks, recreation paths, and lighting are designed in a manner
that is consistent with City utility and roadway plans and maintenance standards.
The applicant is proposing to relocate the driveway for lot 4 more easterly. The Board has
no issues with this proposal.
The project is consistent with the goals and objectives of the Comprehensive Plan
for the affected district(s).
The proposed subdivision is in conformance with the South Burlington Comprehensive
Plan.
-3-
#SD-06-107
Lot Layout
There are no changes to this criterion as a result of this application.
Other
Per Section 3.05(B) of the South Burlington Land Use Regulations, concerning lots with
no public road frontage, this subdivision shall be considered a major subdivision and is
subject to the requirements and major subdivision criteria of Article 15 of the South
Burlington Land Development Regulations.
DECISION
Motion by '� L�� `� `1 ��� , seconded by 1"1/1�6 1 A/1 L� y� to approve
Final Plat Application #SD-06-107 of Joseph & Susan Mack, subject to the following
conditions:
1) All previous approvals and stipulations shall remain in full effect, except as
amended herein.
2) This project shall be completed as shown on the plat submitted by the applicants,
and on file in the South Burlington Department of Planning and Zoning.
3) The applicant shall adhere to the recommendations of the Heindel and Noyes
report dated 2/2/07as follows: The amount of impervious surfaces on lot #4 shall be
limited to 5400 sq. ft. (2700 sq. ft. building footprint/paved, and 2700 sq. ft. gravel
surfaces). Any additional impervious surfaces will require additional review by the
Development Review Board.
4) Any change to the final plat plan shall require approval of the South Burlington
Development Review Board.
5) The mylar shall be recorded prior to permit issuance.
6) The final plat plan (sheet SP1) shall be recorded in the land records within 180
days or this approval is null and void. The plan shall be signed by the Board
Chair or Clerk prior to recording.
IM
t
I
#SD-06-107
Mark Behr —yea/nay/abs in/ of presen
sa Matthew Birmingham — ea ay ain/not present
John Dinklage nay abstain/not present
Roger Farley — e ay/abstain/not present
Eric Knudsen — e ay/abstain/not present
Peter Plumeau — nay/abstain/not present
Gayle Quimby — e nay/abstain/not present
Motion carried by a vote of G - b - b
Signed this � day of4all't2007, by
John Dinklage, Chair
Please note: You have the right to appeal this decision to the Vermont Environmental
Court, pursuant to 24 VSA 4471 and VRCP 76 in writing, within 30 days of the date this
decision is issued. The fee is $225.00. If you fail to appeal this decision, your right to
challenge this decision at some future time may be lost because you waited too long.
You will be bound by the decision, pursuant to 24 VSA 4472 (d) (exclusivity of remedy;
finality).