From: Graham Tidman <gtidman@olearyburke.com>
Sent: Tuesday, September 4, 2018 2:02 PM
To: John Tymecki
Cc: David Burke
Subject: 1725 Spear Street, So. Burlington Allocation Request
Attachments: SH.1 - SKETCH.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
Hi John,
1 am writing on behalf of Tom Hergenrother to request water allocation for a proposed project at 1725 Spear Street in
South Burlington, Vermont. The project consists of a new 3-Bedroom single family home on the existing lot at 1725
Spear Street which is to be served by municipal water. Could you please provide a water allocation approval letter for
the 405 gallons per day required for this project? (150 gpd/bdrm x 3 bdrm x .9(Low-Flow fixture reduction) = 405 gpd)
have attached our most current site plan for your consideration.
Please let me know if you have any questions or comments.
Thank you.
Graham Tidman
O'Leary -Burke Civil Associates, PLC
13 Corporate Drive
Essex Junction, VT 05452
email: gtidmanCa?olearyburke.com
phone: (802) 878-9990 1 fax: (802) 878-9989
Via Email
September 05, 2018
Mr. Graham Tidman, P.E.
O'Leary -Burke Civil Associates, PLC
13 Corporate Drive
Essex Junction, VT 05452
Re: Preliminary Water Allocation, 1725 Spear Street, South Burlington, VT 05403
Dear Mr. Tidman,
In response to your email request of September 04, 2018 for information regarding the
capability of City of South Burlington water distribution system to supply water to the above
referenced project we submit the following Preliminary Allocation Determination.
1. The water supply requirement of 405 gpd for this proposed 3-bedroom residential home
can be furnished by the City of South Burlington without restricting or encumbering its
present users on the South Burlington distribution system.
Water is supplied to the referenced area through a 12" South Burlington water
distribution main.
3. Existing water storage is located at the 2.1 MG South Burlington East Tank off Dorset
Street in the City of South Burlington.
4. Based upon the final allocation request, a water service connection fee shall be applied
to this project according to the City Water Ordinance Rate and Fee Schedule. It must be
recognized by all developers that the Rate and Fee Schedule established by the South
Burlington City Council may be modified at any time by resolution at an open meeting of
the City Council.
5. You are also required to contact Joe Duncan at the Champlain Water District (CWD) in
order that they verify supply, treatment, and transmission capability as the wholesale
water supplier for the City of South Burlington Water Department.
6. Any significant increase in current demand or any change in use will require water
allocation re -approval from the South Burlington Water Department.
7. This Preliminary Allocation Determination shall not constitute a binding commitment of
capacity to the applicant and may be revoked by the Superintendent before a final
allocation of capacity is granted if uncommitted reserve capacity ceases to be available.
A preliminary determination may be used by the applicant that a proposed
development has sufficient water capacity available to proceed through the
development process.
Please don't hesitate to contact me with any questions.
Sincerely,
South Burlington Water Department
John J. Tymecki
CWD Retail Superintendent