Loading...
HomeMy WebLinkAboutZP-18-264 - 0008 Moss Glen Lane 6/29/2018CITY OF SOUTH BURLINGTON ZONING PERMIT APPLICATION Applicant: Tesla Energy Operations Applicant Mailing Address: 66 BOwdoin St., Suite 200, South Burli Applicant Email: danphillips@tesla.com Application No: ton, VT 05403 -9-3 [office use only] Daytime phone: 802-777-4842 Property Street Address: 8 Moss Glen Lane Property Owner: Steven Hollister p Y Parcel Size: Property Owner Mailing Address: 8 Moss Glen Ln South Burlington VT 054( p Y 9 Tax Parcel ID No. 1. PROPOSED project including building dimensions (describe): Remove and replace roofing, shingles and underlayment, 2800 square foot. VT 05403 1195-00CM 2. Present USE(S) of the property: c ❑✓ Single family home on its own parcel ❑ Other (please state the USE per Land Development Regulations- retail, general office, multifamily residential, etc.): 3. List all present structure(s) on property (describe including dimensions or square footage of each): 4. Does the project include a proposed change of USE? ❑✓ No (the property will still be used for the same purpose) ❑Yes (please state proposed changed or added USES per Land Development Regulations- retail, general office, multifamily residential, etc.): 5. ESTIMATED total cost of improvements (materials and labor): $ 9,870 6. Building footprint — i.e. size in sq.ft of main floor of house and all attached and detached structures including enclosed breezeways, garages, and sheds (describe): Existing: Proposed: 7. Total square feet of other impervious surfaces on site (i.e. driveways, patios, decks) Existi Proposed: 8. ATTACH SKETCH PLAN OR SITE PLAN (not required if project consists ONLY of interior renovations or replacement of existing roof, siding, etc. in the exact same size) 9. APPLICANT/OWNER CERTIFICATION The undersigned property owner hereby consents to submit this application and understands that if the application is approved, the Zoning Permit and any attached conditions will be binding on the property. ayw,� S{eve✓] }�1� Property Owner Signature PRINT NAME Date The undersigned applicant hereby affirms that the information presented in this application is true, accurate and complete. Danielle Phillips 6/29/18 Applicant Signature PRINT NAME Date OFFICE USE Q Y — ADMINISTRATIVE OFFICER ON — OFFICE USE ONLY 7 DATE Received: /(/'J( FEE Received: $ (/ I ntification of zoning district: Z Identification of proposed use: PROPOSED USE TYPE: EZ'Permitted Conditional Date of SITE PLAN approval/denial Approval Date Denial Date Date of SUBDIVISION approval/ denial Approval Date Denial Date Date of CONDITIONAL USE approval/ denial Approval Date Denial Date Date of appeal VARIANCE approval/ denial Approval Date Denial Date Date of MISCELLANEOUS approval/ denial Approval Date Denial Date Provided applicant copy of URBEC or VCBE Standards Handbook or Not Applicable FINAL ADMINISTRATIVE OFFICER ACTION APPROVED �N I N G Appro al Date / ` i str ti a Officer's Signature Permit EFFECTIVE date ( Permit EXPIRATION date DENIED REASON for DENIAL Denial Date Administrative Officer's Signature Notice of Appeal Rights: Any interested person may appeal this decision by filing a written Notice of Appeal with the clerk of the Development Review Board within fifteen [15] days of the date of this decision. The notice of appeal must be accompanied by a filing fee of $223.00. This permit does NOT authorize commencement of any development activity approved by the permit until the permit takes effect as set forth above. Site modifications and improvements made prior to this permit becoming effective may be subject to removal )d site restoration if a timely appeal is commenced. NOTE: The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state permits for this project. Call (802) 879-5676 to speak with the regional Permit Specialist. Is DocuSign Envelope ID: 5F977AOD-F583-46AC-AB99-ADA22F750BEB I have read this Amendment in its entirety and I acknowledge that I have received a complete copy of this Amendment. This amendment supersedes any prior amendments that are inconsistent with the subject matter contained herein. The pricing in this PPA Amendment is valid for 30 days after 5/19/2018. If you don't sign this PPA Amendment and return it to us on or prior to 30 days after 5/19/2018, Tesla reserves the right to reject this PPA Amendment unless you agree to our then current pricing. DMUSIfb Customer' e Signature: s �4C77UBE0131407 Date: 5/20/2018 Customer's Name: Signature. - Date: Power Purchase Agreement Amendment, version 2.5.0, April 30, 2018 3281804 Power Purchase Agreement Amendment Tesla Approved Cal Lankton VP, Energy Sales and Operations Date: 5/19/2018