HomeMy WebLinkAboutBATCH 4 - Supplemental - 1600 Spear StreetTRAFFIC IMPACT ANALYSIS
PROPOSED NOWLAND TWO RESIDENTIAL SUBDIVISION
SOUTH BURLINGTON, VERMONT
January 15, 1993
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
One Wentworth Drive • Williston • Vermont • 05495 • (802) 878-3000
January 15, 1993
Mr. Gerald Milot c
Milot Real Estate
P.O. Box 4193
Burlington, Vermont 05406-4193
RE: Traffic Impact Evaluation - Nowland Two
Spear Street, South Burlington
FILE: 92075
Dear Mr. Milot:
As requested, we have analyzed potential traffic impacts of the
above -referenced project, which will be the construction of 73
single-family houses to be located along the easterly side of Spear
Street just south of the Spear Street/Swift Street intersection in
South Burlington.
It is anticipated that this project will be constructed in two
phases. Phase I will commence in 1993 and includes the construction
of 37 single-family houses. Phase II will be the full build -out of
this project, 73 single-family houses, and will commence in 1994.
Two accesses are proposed to connect from this project to Spear
Street; a southerly access is proposed to be located at the existing
Spear Street/Deerfield Drive intersection and a northerly access is
proposed to be located adjacent to the northerly property line,
approximately 1,640 feet north of the above -referenced southerly
access.
The study area of this traffic evaluation includes the two proposed
accesses along Spear Street and the Spear Street/Swift Street
19 intersection. The posted speed limit within the vicinity of this
project equals 35 mph.
Three areas of concern to local and State officials are addressed
herein: Traffic Congestion, Traffic Safety and Geometric
Conditions. The objective of this evaluation is to identify and
assess potential impacts created by this project in each of the above
areas of concern for both existing and future traffic conditions.
Design 9 Inspection • Studies 0 Permitting 0 Surveying
'If
Mr. Gerald Milot
FILE: 92075
January 15, 1992
Page Two
TRAFFIC DATA
Traffic volume information was ascertained from the following data:
1. Route Log and Progress Chart - Spear Street,'Vermont Agency of
Transportation (VAOT).
2. Turning Movement Count, Spear Street/Swift Street, Chittenden
County Regional Planning Commission, June 25, 1992.'
3. Automatic Traffic Recorder Count, Spear Street — Station D85,
VAOT, May 2-9, 1989.
4. Automatic Traffic Recorder Count, Swift Street — Station D227,
VAOT, May 2-9, 1989.
5. Automatic Traffic Recorder Count, Swift Street - Station D337,
VAOT, May 9-16, 1989. - -
6. Turning Movement Count, Spear Street/Deerfield Drive,
FitzPatrick-Llewellyn Inc., January 6, 1993 (A.M.) & January 7,
1993 (P.M.).
7. Automatic Traffic Recorder Count, Spear Street,
FitzPatrick-Llewellyn Inc., January 5-11, 1993.
TRAFFIC CONGESTION
The preceding traffic volume data were used to develop 1993 and 1998
design hourly volumes (DHV) at the Spear Street/Project Access
intersections and the Spear Street/Swift Street intersection. The
DHV is the 30th highest hourly traffic volume of the year, and is
used to design highways and traffic control systems. Future design
hour volumes are calculated by projecting annual average daily
traffic volumes (AADT) at an annual background growth rate. Within
the aforementioned study area, that growth rate is best estimated by
examining recent historical traffic growth at VAOT Automatic Traffic
Recorder Count Station D85, located north of the Spear Street/Swift
Street intersection. Based on data from that count station and
recently observed growth trends, an annual growth rate of 4% was used
to calculate future AADT's. DHV's were then determined for future
AADT's using DHV/AADT ratios recommended by the VAOT. The resulting
DHV's constitute future background traffic volumes.
An estimate of the traffic generation for this project was calculated
by applying vehicular trip generation rates from "Trip Generation,
Institute of Transportation Engineers, 5th Edition, 1991". That
report contains the results of trip generation studies for numerous
land -uses. Table 1 outlines the projected vehicular trip generation
for this project. Detailed calculations are attached as Appendix A.
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
Mr. Gerald Milot
FILE: 92075
January 15, 1992
Page Three
TABLE 1
PROJECTED VEHICULAR TRIP GENERATION
Phase II
Phase I (Full Build -Out)
Average Weekday (vte*/da
Y) 413 772
A.M. Peak Hour (vte/hour)
Enter
Exit
TOTAL
P.M. Peak Hour (vte/hour)
Enter
Exit
TOTAL
9
16
25
45
34
61
28 _ - -
52
16
29
44
81
*A vehicle trip end (vte) is a single vehicle either exiting or
entering the project.
The directional distribution of project -generated traffic was
estimated from the existing directional traffic patterns on Spear
Street. The projected A.M. and P.M. peak -hour distribution of
project -generated traffic is enclosed as Appendix B.
Levels of traffic congestion are defined differently for certain
types of intersections. For example, signalized intersections use
vehicular delay (seconds) and most unsignalized intersections use
reserve capacity (vehicles per hour). In all cases, those parameters
are subdivided into ranges which are referred to as levels -of -service
(L.O.S.). L.O.S. "A" represents very low loading with ample reserve
capacity and no vehicular delays; L.O.S. C represents average
conditions; and the threshold of L.O.S. E/F represents a street or
intersection at or near capacity. L.O.S. F is a condition of "forced
flow" resulting in long queues when traffic volumes exceed the
available capacity of an intersection.
Since traffic flow on a street network is typically limited by the
available capacity at intersections, potential traffic congestion
impacts of this project were determined by performing intersection
capacity analyses at the two proposed Spear Street/Project Access
intersections and at the Spear Street/Swift Street intersection. The
methodology used to determine intersection capacity was obtained from
the "Highway Capacity Manual - Special Report 209, Transportation
Research Board, 1985".
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
Mr. Gerald Milot
FILE: 92075
January 15, 1992
Page Four
Tables 2 through 4 present the results of the capacity analyses at
both of the project access intersections and at the Spear
Street/Swift Street intersection, ,for Phases I and II. Detailed
intersection capacity analyses are enclosed as Appendix C, D, E and
F.
TABLE 2
PHASE I & II - LEVELS OF SERVICE
SPEAR STREET/DEERFIELD
DRIVE/SOUTHERLY PROJECT ACCESS
Phase I
- 1993
Phase II -
1998
Approach-& Turning Movement
A.M.
P.M.
A.M.
P.M.
Deerfield Drive Eastbound
Left -turn
D
D
E
E
Thru
C
D
C
D
Right -turn
A
A
A
A
OVERALL APPROACH
D
D
E
E
Deerfield Drive Westbound
Left -turn
Thru
Right -turn
OVERALL APPROACH
Spear Street Southbound
Left -turn
Spear Street Northbound
Left -turn
i
C D
D D
C D
C D
A A
A A
B B
C C
A A
A A
A A
A A
TABLE 3
PHASE I & II LEVELS OF SERVICE
SPEAR STREET/NORTHERLY PROJECT ACCESS
Phase I - 1993 Phase II - 1998
Approach & Turning Movement A.M. P.M. A.M. P.M.
Project Access Westbound
Left -turn
C
D
D
D
Right -turn
A
A
B
A
OVERALL APPROACH-
B
B
C
C
Spear Street Southbound
Left -turn
A
A
A
A
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
Mr: Gerald Milot
FILE: 92075
January 15, 1992
Page Five
Approach &
Turnina Movement
Swift Street
Eastbound
Westbound
Spear Street
Northbound
Southbound
OVERALL INTERSECTION
TABLE 4
LEVELS OF SERVICE
SPEAR STREET/SWIFT STREET
w/o Project
1993 1998
A.M. P.M. A.M. P.M.
w/ Project
1993 1998
A.M. P.M. A.M. P.M.
B B
B
B
B
B
B
B
B B
B
C
B
B
C
C
B B
B
C
B
B
B
C
A B
A
B
A
B
A
B
B B
B
B
B
B
B
C
Accepted design standards for roadways recommend that a minimum of
L.O.S. C be maintained during DHV conditions on collector highways,
which in this case includes Spear Street. On a case by case basis
in urban areas, that can be lowered to L.O.S. D.
At unsignalized intersections, it is not uncommon for traffic
exiting the minor street to experience long delays. This is caused
by their having to yield right-of-way to all other movements. The
threshold of L.O.S. E/F is therefore used at unsignalized
intersections as being the point at which unacceptable traffic
congestion conditions typically occur on such approaches.
An examination of the levels of service at the Spear Street/Project
Access intersections and the Spear Street/Swift Street intersection
indicate acceptable levels of service, with good levels of service
at the Spear Street/Swift Street intersection.
TRAFFIC SAFETY
The safety of vehicular traffic traveling to and from this project
is largely dependent on the geometric and physical conditions of
the existing roadways and intersections within the study area,
projected traffic volumes, and on the presence of adequate traffic
control devices.
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
Mr, , Gerald Milot
FILE: 92075
January 15, 1992
Page Six
The most recent available 5-year (1987-1991) accident history was
examined for Spear Street from the intersection of Spear
Street/Swift Street to 1,000 feet south of the Deerfield
Drive/Project Access intersection and at the intersection of Spear
Street/Swift Street. (During that period, 14 accidents were
reported along the aforementioned section of Spear Street, and 6
accidents were reported at the Spear Street/Swift Street
intersection. The resultant accident rate along that section of
Spear Street equaled 1.08 accidents/million vehicle -miles
(acc/mvm). The resultant accident rate at the Spear Street/Swift
Street intersection equaled 0.30 accidents/million vehicles
(acc/mv). By comparison, the statewide average accident rate for
that 5-year period on similar highways in Vermont equaled 3.63
acc/mvm, and for similar intersections equaled 0.56 acc/mv. For
both the roadway section and the intersection the actual accident
rates do not exceed the average accident rate, therefore these are
not considered to be high -accident locations.
Sight distances were measured at the locations of the proposed
Project Accesses. Based on an average vehicular running speed of
45 mph and a minimum seven second perception/reaction time, the
minimum recommended sight distance equals 462 feet. For a motorist
entering Spear Street from the proposed southerly Project Access,
sight distance will exceed 700 feet in the southbound direction and
equals 620 feet in the northbound direction. For a motorist
entering Spear Street from the proposed northerly Project Access,
sight distance will exceed 700 feet in both the northbound and
southbound direction.
GEOMETRIC CONDITIONS
Upon the completion of Phase I, several geometric improvements will
be required.
A left -turn lane warrant analysis for southbound left -turning
traffic entering the project indicates that a left -turn lane will
be required at both of the proposed accesses. The recommended
storage length for those lanes equals 125 feet. To accomplish the
roadway widening for the left -turn lane, Spear Street must be
modified to provide a centerline shift and taper. The left -turn
lane warrant analysis and the calculation of the left -turn lane
storage length is included as Appendix G.
A right -turn lane analysis for northbound right -turning traffic
entering the project indicates that a right -turn lane will not be
warranted for 1998 Phase II conditions. Detailed calculations for
the right -turn lane warrant are enclosed as Appendix H.
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
R
Mi.' Gerald Milot
FILE: 92075
January 15, 1992
Page Seven
A traffic signal warrant analysis was performed and it is
anticipated that a traffic signal will not be warranted for 1998
Phase II conditions.
CONCLUSION
This report has evaluated the potential traffic impacts resulting
from the two-phase construction of 73 single-family houses to be.
located on the easterly side of Spear Street south of the Spear
Street/Swift Street intersection in South Burlington.
The study area of this evaluation includes that section of roadway
just south of the Spear Street/Deerfield Drive intersection to the
Spear Street/Swift Street intersection.
As part of the construction of this project, geometric improvements
are recommended in the vicinity of the proposed Project Accesses.
Those improvements include exclusive left -turning lanes for Spear
Street entering traffic. Upon the construction of those
improvements, it is anticipated that this project will not create
any unreasonable or adverse traffic congestion conditions to the
adjacent roadway network.
Traffic safety conditions were analyzed along Spear Street in the
vicinity of the Project Accesses and at the Spear Street/Swift
Street intersection and it has been determined that the
construction of this project will not result in any adverse safety
impacts.
We thank you for this opportunity to be of service. Should you
have any questions, or if we may be of additional assistance,
please contact us.
Sincerely,
FITZPATRICK-LLEWELLYN INCORPORATED
Brendan Kelly, P.E.
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
INDEX OF APPENDICES
APPENDIX A
DETAILED TRIP GENERATION CALCULATIONS
APPENDIX B
PROJECTED A.M. & P.M. PEAK HOUR DIRECTIONAL
DISTRIBUTION OF PROJECT —GENERATED TRAFFIC
a c
APPENDIX C
UNSIGNALIZED INTERSECTION CAPACITY ANALYSES
SPEAR STREET/DEERFIELD DRIVE/SOUTHERLY PROJECT
ACCESS
APPENDIX D
UNSIGNALIZED INTERSECTION CAPACITY ANALYSES
SPEAR STREET/NORTHERLY PROJECT ACCESS
APPENDIX E
EXISTING CONDITIONS — SIGNALIZED INTERSECTION
CAPACITY ANALYSES, SPEAR STREET/SWIFT STREET
APPENDIX F
PHASE I & II — SIGNALIZED INTERSECTION CAPACITY--- -
ANALYSES, SPEAR STREET/SWIFT STREET
APPENDIX G
LEFT —TURN LANE WARRANT ANALYSIS & STORAGE LENGTH
APPENDIX H
RIGHT —TURN LANE WARRANT ANALYSIS
3-1 FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
VEHICULAR TRIP GENERATION
-------------------------
JOB NAME:
NOWLAND II
DATE: DECEMBER 22, 1992
ANALYST: D. CONGER
�
JOB NO.: 92045
r
DATA SOURCE: ITE TRIP
GENERATION
- 5th EDITION
ITE
AVERAGE
-- AM
PEAK HOUR --
-- PM PEAK HOUR --
DESCRIPTION
---------------------------------------------------------------------------------------------------------------------
L.U.C.
SIZE
UNITS
WEEKDAY
ENTER
EXIT TOTAL
ENTER EXIT TOTAL
SINGLE FAMILY DWELLING
---------------------------------------------------------------------------------------------------------------------
210
37
UNITS
413
9
25 34
28 16 44
ITE
AVERAGE
-- AM
PEAK HOUR --
-- PM PEAK HOUR --
DESCRIPTION
---------------------------------------------------------------------------------------------------------------------
L.U.C.
SIZE
UNITS
WEEKDAY
ENTER
EXIT TOTAL
ENTER EXIT TOTAL
SINGLE FAMILY DWELLING
---------------------------------------------------------------------------------------------------------------------
210
73
UNITS
772
16
45 61
52 29 81
APPENDIX B
PROJECTED A.M. & P.M. PEAK HOUR
DIRECTIONAL DISTRIBUTION OF PROJECT -GENERATED TRAFFIC
A-2 FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
FITZPATRICK-LLEWELLYN INCORPORATED
One Wentworth Drive
WILLISTON, VERMONT 05495
(802) 878-3000
xT 204.1 (Single Sheets) M-1(Padded) ®, Mrc., 6rabn, Lou OIOt. To Ordlf NX TOIL FREE t-WZ!5-M
JOB ���✓ / Y!y �GG [ ! c:�. lJ
SHEET NO.
OF
CALCULATED BY DATE / --& 2 i
CHECKED BY
DATE
APPENDIX C
UNSIGNALIZED INTERSECTION CAPACITY ANALYSES
SPEAR STREET/DEERFIELD DRIVE/SOUTHERLY PROJECT ACCESS
A-3 FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
--- '�--�-_� Y$
,
�
>�
1985 HCM: UNSIGNALIZED INTERSECTIONS
***************************************************************Page_1
IDENTIFYING INFORMATION
--------------------------- 0------------------------ _________________
AVERAGE RUNNING SPEED, MAJOR STREET.. 45
PEAK HOUR FACTOR
^~^^^^^^^^^^^~^^^^^^^ .95
�
AREA POPULATION .........''''.',.'.... 40000
~
NAME OF THE EAST/WEST STREET.''.-','. DEERFIELD DRIVE
NAME OF THE NORTH/SOUTH STREET....... SPEAR STREET
NAME OF THE ANALYST ^.^..^^^.......... D. CONGER
DATE OF THE ANALYSIS (mm/dd/yy)...... 01-13-1993
TIME PERIOD ANALYZED ................. 1993 AM OHV
OTHER INFORMATION.... PHASE I PROJECT TRAFFIC
INTERSECTION TYPE AND CONTROL
_... ..... ... ... ... .... ..... ..... .... .... ______________-_______-_-___________ -' -__--
INTERSECTION TYPE: 4-LEG
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
_______________________________-_____- � �
EB WB NB SB
..... .... ..... .... _..... ..... .... ..... __.....
LEFT 67 4 3 3
THRU 0 0 544 179
RIGHT 3 9 2 6
`
NUMBER OF LANES AND LANE USAGE
___________________________ ----- ------------------------------------ �
EB WB NB SB r
....__ ---
'---- ------- -------
LANES
/ �^~
LANE USAGE LTR LTR �~� �
^ '+
ADJUSTMENT
FACTORS
.
�
`
Page-2
PERCENT RIGHT TURN
CURB
RADIUS (ft) ACCELERATION LANE
_GRADE_ __ANGLE___
FOR RIGHT
TURNS FOR
RIGHT TURNS
EASTBOUND
0.00 90
----------------
--------
20
«
N---------
WESTBOUND
0.00 90
20
N
NORTHBOUND
1.00 90
20
N
. SOUTHBOU�D
-2.00 90
20
N
�VEHICLE COMPOSITION
_____________________________________________________________________
_ -' ----'-%
Sl�TRUCKS %
COMBINATION
AND RV'S
-----------
VEHICLES
% MOTORCYCLES
EASTBOUND
-------------
0
-----------------
0
0 '
WESTBOUND
0
0
0
NORTHBOUND
2
0
0
SOUTHBOUND
2
0
0
CRITICAL GAPS
------- ---- ------------ __---------
-
-------
---- -------------
TABULAR VALUES
ADJUSTED
SIGHT DIST.
__________
FIHAL
_(Table 10-2)
VALU[
ADJUSTMENT
CRITICAL GAP
MINOR RIGHTS
------------
EB 6.10
6.10
0.00
6 10
WB 6,10
6.10
0.00
6'10
MAJOR LEFTS
SB
5.80
5.60
0.00
NB
5.80
5.80
0.00
5 80
5^80
MINOR THROUGHS
EB
7.40
7.40
0.00
7 40
WB
6.90
6.90
0'00
6^90
MINOR LEFTS
EB
7.90
7.90
0.00
7.90
WB
7'40
7.40
0.00
7^40
IDENTIFYING
______________________________________________________
INFORMATION
NAME OF THE
EAST/WEST
STREET......
DEERFIELD
DRIVE ---------------
NAME OF THE
NORTH/SOUTH
STREET...'
SPEAR STREET
DATE AND TIME
OTHER
OF THE
ANALYSIS....,
01-13-1993
; 1993 AM DHV
INFORMATION....
PHASE 1
PROJECT TRAFFIC
^
T ,
CAPACITY AND
_____________________________________________________________________
LEVEL -OF
-SERVICE
Page-3
POTEN-
ACTUAL
FLOW-
TIAL
MOVEMENT
SHARED
RESERV-
�
v
RATE
CAPACITY
CAPACITY
CAPACITY
CAPACITY
MOVEMENT
v(pcph)
c (pcph)
c (pcph)
c (pcph)
c = c
- v
LOS
..... .... ..... .... .... �.....
p
.... .... ..... -----
M
--------- ---------
SH
m --
R SH
------------
MINOR STREET
EB LEFT
71
219
215 >
215
>
145
> D
THRH
0
254
253 >
223 253
> 149
253
>D C
RIGHT
3
883
883 >
883
>
880
> A
--
MINOR STREET
WB LEFT
4
252
250 >
250
>
246
> C
THROUGH
0
288
286 >
377 286
> 363
286
>B C
RIGHT
9
487
487 >
487
>
478
> A
MAJOR STREET
SB LEFT
3
528
528
528
525
A
NB LEFT
-
4
838
838
838
835
A
/ING INFORM('--,,
NA�E OF THE EAST/WEST STREET...... DEERFIELD DRIyE
NAME OF THE NORTH/SOUTH STREET.... SPEAR STREET
DATE AND TIME OF THE ANALYSIS..... 01-13-1993 ; 1993 AM DHV
OTHER INFORMATION.... PHASE I PROJECT TRAFFIC
1985 HCM: UNSIGNALIZED INTERSECTIONS
Page-1
*********************************************************************
IDENTIFYING INFORMATION
________________________________________
« ----------r------------------
AVERAGE RUNNING SPEED, MAJOR STREET..
45
PEAK HOUR FACTOR.....................
.95
AREA POPULATICN......................
40000
NAME OF THE EAST/WEST STREET.........
DEERFIELD DRIVE
NAME OF THE NORTH/SOUTH STREET''''...
SPEAR STREET
NAME OF THE ANALYST...........''''''.
D. CONGER
DATE OF THE ANALYSIS (mm/dd/yy)......
01-13-1993
TIME PERIOD ANALYZED...''...`........
1993 PM DHV
OTHER INFORMATION.... PHASE I PROJECT
TRAFFIC
INTERSECTION TYPE AND CONTROL
---------- __----------- ------ -------------
------- --------------- ----- ___
-
IUTERSECTION TYPE: 4-LEG
'
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
EB WB NB SE,
LEwT 28 2 3 10
THRU 0 0 321 579
RI[HT 3 6 4 54
NUMBER OF LANES AND LANE USAGE
------ -... ..... ... ---------... .... —'---------..... ..... ..... ..... .... .... .... ..... ..... ... .... ... .... ..... ..... -.... ..... -.... --..... .... -..... .....
------
EB
WB
N,B
C8
_..... ..... ..... ..... ..... ...
.... ..... ..... ..... ..... ....
LANES
1
1
....
1
-..... .....
2
LANE
USAGE
1TR
LTR
`
.`
ADJUSTMENT FACTORS
______________________________________________________________
Page-2
_
PERCENT RIGHT TURN
CURB RADIUS (ft) ACCELERATION
LANE
GRADE ANGLE
FOR RIGHT TURNS FOR
RIGHT TURNS
o..... .... ........ ___ _________
EASTBOUND 1.00 90
_______
20
----------
N
WESTBOUND 0.00 90
20
N
NORTHBOUND 1.00 90
20
N
SOUTHBOUND -2.00 90
20
N
VEHICLE COMPOSITION
% SU TRUCKS %
COMBINATION
_______
� ��
AND RV'S
VEHICLES % MOTORCYCLES
___________
_____________
EASTBOUND 0
_____________
0
0
WESTBOUND 0
0
0
NORTHBOUND 2
0
0
SOUTHBOUND 2
0 .
0
CRITICAL GAPS
... ..... .... ..... .... ___.... ..... ... ..... ... ..... ... ..... ________________________________________________
'
TABULAR VALUES ADJUSTED SIGHT DIST .
/
FINAL
_(Table _10-2)_
_VALUE__ ADJUST'1EN-
CRITICAL GA� ,
MINOR RICHTS
�--------
----------
EB 6.10
6.10 0 ^00
6 10 `
WB 6.10
6.10 000
6^10 \
MAJOR LEFTS
SB 5.80
5.80 0.00
5 80
NB 5.80
5.80
5^80
MINOR THROUGHS
EB 7.40
WB
7.40 0.00
7 40
6.90
6.90 0.00
6^90
MINOR LEFTS
'
EB 7.90
7.90 0.00
7 90
WB 7.40
7.40 0.00
7^40
IDENTIFYING INFORMATION
_____________________________________________________
NAME OF THE EAST/WEST STREET......
NAME
DEERFIELD DRIVE ----------------
OF THE NORTH/SOUTH STREET....
SPEAR STREET
DATE AND TIME OF THE ANALYSIS.....
01-13-1993 ; 1993 PM
DHV
OTHER INFORMATION.... PHASE I
PROJECT TRAFFIC
^
. .
CAPACITY AND
LEVEL -OF
-SERVICE
|.
'
------------------------________--------------------___________'ay]e-3
i
POTEN-
ACTUAL
FLOW-
TIAL
MOVEMENT
SHARED
RESERVE
MOVEMENT
RATE
v(pcph)
CAPACITY
(pcph)
CAPACITY
CAPACITY
CAPACITY
c
c (pcph)
c (pcph)
c = c - v
LOS
_______
_p______
__M__---- ___5H_______
__R___SH
MINOR STREET
___
�
-------
EB LEFT
32
140
137 >
137
>
..OUGH
RIGHT
o
168
166 >
149 166
1 /5
> 113 1`o6
> D
>D D
3
666
666 >
666'
> ��--- —
663
----'
> A
MINOR STREET
WB LEFT
2
161
158 >
158
>
/mRu
.`^""T UGH
0
6
193
190 >
368 190
156
> 360 190
> D
>B D
660
660 >
660
> 654
> A
MAJOR STREET
SB LEFT
np Lcr/
. 10
704
704
704
695
A
4
470
47)
470
466
A
[DENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET DEERFIELC�------------------------
NAME OF THE NORTH/SOUTH STRE^`^^^^ u DRIVE----
�1YE ^
E|.... SPEAR STREET '
DATE AND TIME OF THE ANALYSIS ..... 01-13-1993 ; 1993`PM DHV
OTHER INFORMATION.... PHASE I PROJECT TRAFFIC
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
*********************************************************************
IDENTIFYING INFORMATION
------------------------------------------------------ T--------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 45
PEAK HOUR FACTOR......'..'''......... .95
AREA POPULATION.......'..'........... 40000
'
NAME OF THE EAST/WEST STREET......... DEERFIELD DRIVE
NAME OF THE NORTH/SOUTH STREET....... SPEAR STREET
NAME OF THE ANALYST.................. D. CONGER
DATE OF THE ANALYSIS (mm/dd/yy)...... 01-13-1993
TIME PERIOD ANALYZED................. 1998 AM DHV
OTHER INFORMATION.... PHASE II PROJECT TRAFFIC
INTERSECTION TYPE AND CONTROL
..... ..... _..... __.... ..... ... .... __.... _..... ..... .... ..... ..... ... _..... ... ..... ..... ..... ..... ..... ..... .... ..... .... _____________________________________
INTERSECTION TYPE: 4-LEG
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
`
CONTROL TYPE WESTBOUND: STOP SIGN
,
`
TRAFFIC VOLUMES
------------- _____________-__________________________________________
EB WB NB SB
LEFT 76 7 4 6
THRU 0 0 616 206
RIGHT 4 15 ' 2 7
NUMBER OF LANES AND LANE USAGE
---------------------------- _________________________________________
EB WB NB SB
_______ _______
LANES 1 1 1 2
LAME USAGE LTR LTR
3IAM8l 1332OU6 II 3SVH6 ^^^^NOIlVW8OjNI 83HlO
AHO W� 866T 1 S66T-CT-TO ^^'^^SISAIUNU 3Hl AO AWIl GNU 31VO
133UlS 8V36S ^^^^l338lS HlOOS/Hl8ON 3Hl 30 EWVN
3AI8O O13IJU33O ^^^^^^l33U1S lS3M/lSV3 3H1 AO 3i1V;,,l
.... .... ..... ���.... �..... ..... .... .... �..... ..... .... .... ..... ..... �----------------------------------`-----------------
NOIlVW8OJNI 8NI/.MlNMI
OWL 00^0 OWL 8M
06~� 00^0 06^Z� 06^L 83 '
SlMI 8ONIW
06^9
00^0
06^9
06^9
or.,
0t^L
00^0
0t^�
OWL
8�
SHSOO8Hl 8ONIW
08^S
00^0
08^S
08^9
81\1
08,9
00^0
08^s
08^2
8S
SlAM 8O2M
�
01^9
00^0
0T^9
0T^9
8M
0T^9
00^0
01^9
0T^9
M-1
------------
___________
________
Sl` I8 8ONIW
duo IV3I1I83
lNwlSOvOv
mim
------------------
(B-0T eIqel)
-TJNI�
^lSIO lHBIS
O3lSO2Ov
Mmm 8umml
'
_.... ..... ..... ..... ..... ..... _..... ..... ..... ---------------------------------------------------------
_
... ..... ... ..... .....
S6uS 1v3IlI83
0
0
ONOO8HlOOS
0
ONOO8Hl8ON
0
0
0
ONDO8lSM
0
0
0
ONOO8lSw
_____________ _____________ ___________
S313A38OlOW % S313IH3A S'A8 OM)
-'-NUTTtHI8WO3 % m3O8l OS% —
___________________
NOIlISO6WO3 313IMA
N
02,
06
00^2-
ONOO8HlOOS
N
0a
06
ONOO8Hl8ON
N
02
06
00^0
ONOO8lSm
N
_________________
02
06
00^0
ONOO81Sw
SN8Ol lHSI8 8OJ
________________
SN8Ol lHSI8 8OJ
__________
318NV
Mu8S
3NVI NOIlV831333W
(m SDIOm 88D3
N8Dl lHSI8
lN33836
_____________________________________________________________________
S8Ol3VA lN3WlSOfOv
`
^
CAPACITY AND
LEVEL -OF -SERVICE
i
----------------------------------______
Page-3 /
|
POTEN-
ACTUAL
|
FLOW- /
TIAL
MOVEMENT
o
SHARED
RESERVE
RATE
CAPACITY
CAPACITY
CAPACITY
CAPACITY
MOVEMENT
v(pcph)
c (pcph)
c (pcph)
c (pcph)
c = c - v
LOS
_______
p
________
M
_________ ____________
SH
R SH
____________
------
MINOR STREET
EB LEFT
80
176
171 >
171
> 91
> E '
THROUGH
0
210
208 >
178 208
> 94 208
>E C
RIGHT
4
868
868 >
868
> 86+
> A
MINOR STREET
WB LEFT
7
208
205 >
205
> 198
> D
THROUGH
0
242
239 >
323 239
> 299 239
>C C
RIGHT
16
441
441 >
441
> 425
> A
MAJOR STREET
SB LEFT
6
479
479
479
474
A
NB LEFT
5
811
811 -
811
806
A
IDENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET...... DEERFIELD DRIVE
NAME OF OF THE NORTH/SOUTH STREET.... SPEAR STREET
DATE AND TIME OF THE ANALYSIS..... 01-13-1993 ; 1998 AM DHV
OTHER INFORMATION.... PHASE II PROJECT TRAFFIC
r.=
m
1985 HCM: UNSIGNALIZED INTERSECTIONS
***************************************************************Page-1
IDENTIFYING INFORMATION
------------------ T_________________________________________��_______
AVERAGE RUNNING SPEED, MAJOR STREET..
45
PEAK HOUR FACTOR................~....
.95
AREA POPULATION ............''..,.'.,.
40000
NAME OF THE EAST/WEST STREET,.'......
DEERFIELD DRIVE
NAME OF THE NORTH/SOUTH STREET.......
SPEAR STREET
NAME OF THE ANALYST..................
D. CONGER
DATE OF THE ANALYSIS (mm/dd/yy)......
01-13-1993
TIME PERIOD ANALYZED.................
1998 PM DHV
OTHER INFORMATION,.., PHASE II PROJECT
TRAFFIC
INTERSECTION TYPE AND CONTROL
---------------- ----------- __----------------
-------------------------
-
INTER3ECTION TYPE: 4-LEG
-
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
EB WB NB SB
LEFT 31 5 4 18
THRU 0 0 367 657
RIGHT 4 10 8 61
NUMBER OF LANES AND LANE USAGE
__--- ________________________________________________________________
EB WB NB SB
..... ..... __..... .......... .... ..... .... .... _
LANES 1 1 1 2
LANE USAGE LTR LTR
ADJUSTMENT
____________________________________________________________-________
FACTORS
Page-2
PERCENT RIGHT TURN CURB RADIUS (ft) ACCELERATION LANE
GRADE ANGLE
__________
FOR RIGHT TURNS FOR
RIGHT TURNS
EASTBOUND
0.00 90
________________ _________________
20
N
^
WESTBOUND
0.00 90
20
N
NORTHBOUND
1.00 90
20
N
SOUTHBOUND
-2.00 90
20
N
VEHICLE COMPOSITION
_____________________________________________________________________
�
% SU TRUCKS %
CoMBINATION
AND RV'S
___________
VEHICLES % MOTORCYCLES
EASTBOUND
_____________
0
0 0
WESTBOUND
0
0 0
NORTHBOUND
2
0 0
SOUTHBOUND
2
0 0
CRITICAL GAPS
'
..... ..... ....
TABULAR VALUES
ADJUSTED SIGHT DIST.
/FINAL
(Table 10-2)
______________
VALUE ADJUSTMENT
________
CRITICAL GAP
MINOR RIGHTS
___________
`
EB 6.10
6.10 0.00
6'10
WB 6.10
6.10 0.00
6.10 `
MAJOR LEFTS
SB 5.80
5.80 0.00
5.80
ND 5.00
5.80 0.00
5.80
MINOR THROUGHS
'
EB 7.40
7.40 0.00
7.40
WB 6.90
6.90 0.00
6.90
MINOR LEFTS
EB 7.90
7.90 0.00
7.90 '
WB 7.40
7.40 0.00
7.40
IDENTIFYING
_____________________________________________________________________
INFORMATION
NAME OF THE
EAST/WEST STREET...... DEERFIELD DRIVE
NAME OF THE
NORTH/SOUTH STREET....
SPEAR STREET
DATE AND TIME
OF THE ANALYSIS.....
01-13-1993 ; 1998 PM
DHV
OTHER INFORMATION....
PHASE 11
PROJECT TRAFFIC
-�
CAPACITY AND LEVEL -OF -SERVICE Page-3
_____________________________________________________________________
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
_______ ________ _________ ____________ ____________ -----
MINOR STREET
EB LEFT
33
106
102
> 102 >
70
> I
T1--!ROUGH
0
133
130
> 113 130
> 76 130
>E D
RIGHT
4
627
627
> 627 >
-
623
-'-
> A
—
MINOR STREET
WB LEFT
5
126
123
> 123 >
117
> D
THROUGH
0
154
150
> 263 150
> 248 150
>C D
RIGHT
11
616
616
> 616 >
606
> A
MAJOR STREET
SB LEFT
17
657
657
657
640
A
NB LEFT
5 '
416
416
416
411
A
IDENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET....,. DEERFIELD DRIVE
NAME OF THE NORTH/SOUTH STREET'.'. SPEAR STREET
DATE AND TIME OF THE ANALYSIS...,. 01-13-1993 ; 1998 PM DHV '
OTHER INFORMATION.... PHASE II PROJECT TRAFFIC `
APPENDIX D
UNSIGNALIZED INTERSECTION CAPACITY ANALYSES
SPEAR STREET/NORTHERLY PROJECT ACCESS
A-4 FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
1985 HCM: UNSIGNALIZED INTERSECTIONS
Page-1
*********************************************************************
IDENTIFYING INFORMATION
----------------------------- r-----------------------
-----------------
AVERAGE RUNNING SPEED, MAJOR STREET..
45
PEAK HOUR FACTOR.....................
.95
AREA POPULATION....'.................
~
40000
NAME OF THE EAST/WEST STREET.........
NORTH PROJECT ACCESS
NAME OF THE NORTH/SOUTH STREET.......
SPEAR STREET
NAME OF THE ANALYST..................
D. CONGER
DATE OF THE ANALYSIS (mm/dd/yy)......
01-13-1993
TIME PERIOD ANALYZED.................
1993 AM DHV
OTHER INFORMATION.... PHASE I PROJECT
TRAFFIC
INTERSECTION TYPE AND CONTROL
_____________________________________________________________________
INTERSECTION TYPE: T-INTERSECTION
-
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
_____________________________________________________________________
EB WB NB SB
____ ____ ____
LEFT -- 3 0 3
THRU -- 0 619 185
RIGHT -- 9 1 0
NUMBER OF LANES
----------- ------------------------------- ------ --- --- _______________
EB WB NB SB
_______ _..... ..... ..... ..... ..... ..... ..... _..... .... ..... ..... .... .... ______
LANES -- 1 1 2
^ .
'
^
ADJUSTMENT
-----------
FACTORS`
__________________________________________________________
Page-2
PERCENT RIGHT TURN CURB RADIUS (ft) ACCELERATION LANE
GRADE ANGLE
FOR RIGHT TURNS FOR
RIGHT TURNS
EASTBOUND
----- ---
___
/
^
- �
WESTBOUND
0.00 90
20
N
NORTHBOUND
0.00 90
20
N
SOUTHBOUND
0.00 90
20
N
VEHICLE COMPOSITION
_____________________________________________________________________
% SU TRUCKS %
COMBINATION
AND RV'S
VEHICLES % MOTORCYCLES
EASTBOUND
---
_____ _____________
___ ---
WESTBOUND
0
0 0
NORTHBOUND
2
0 0
SOUTHBOUND
2
0 0
CRITICAL GAPS
--------------------------------------------------------------
--- ____
TABULAR VALUES
ADJUSTED SIGHT DIST.
FINAL
(Table 10-2)
--------------
VALUE ADJUSTMENT
CRITICAL GAP
MINOR RIGHTS
-------- -----------
------------
WE 6.10
6.10 0.00
6.10
MAJOR LEFTS
SB 5.30
5-30 0.00
5.30
MINOR LEFTS
WB 7.40
7.40 0.00
7.40
IDENTIFYING
_____________________________________________________________________
INFORMATION
NAME OF THE
EAST/WEST STREET...... NORTH PROJECT ACCESS
NAME OF THE
NORTH/SOUTH STREET....
SPEAR STREET
DATE AND TIME OF THE ANALYSIS.....
01-13-1993 ; 1993 AM
DHV
OTHER INFORMATION.... PHASE 1
PROJECT TRAFFIC
CAPACITY AND
_____________________________________________________________________
LEVEL -OF -SERVICE
Page-3
POTEN-
ACTUAL
o
FLOW- TIAL
MOVEMENT t
SHARED
RESERVE
RATE CAPACITY
CAPACITY
CAPACITY
CAPACITY
MOVEMENT
v(pcph) c (pcph)
c (pcph)
c (pcph)
c = c - v LOS
p
_______ ________
M
_________ ____________
SH
R SH
____________ -------
MINOR STREET
WB LEFT
3 222
221 >
221
> 218 > C
>
352
> 340 >B
RIGHT
9 439
439 >
439
> 430 > A
MAJOR STREET
-
SB LEFT
3 551
551
551
548 A
IDENTIFYING INFORMATION
_____________________________________________________________________
NAME OF THE EAST/WEST STREET...... NORTH PROJECT ACCESS
NAME OF THE NORTH/SOUTH STREET.... SPEAR 'STREET
DATE AND TIME OF THE ANALYSIS..... 01-13-1993 ; 1993 AM DHV
OTHER INFORMATION.... PHASE I PROJECT TRAFFIC
r' ~
`. .
1985 HCM: UNSIGNALIZED INTERSECTIONS
Page-1
*********************************************************************
�
� IDENTIFYING INFORMATION
; _________________ T___________________________________________________
AVERAGE RUNNING SPEED, MAJOR STREET..
45
PEAK HOUR FACTOR.....................
.95
AREA POPULATION......................
40000
NAME OF THE EAST/WEST STREET.........
~
NORTH PROJECT ACCESS
NAME OF THE NORTH/SOUTH STREET.......
SPEAR STREET
NAME OF THE ANALYST..................
- --
D. CONGER
DATE OF THE ANALYSIS (mm/dd/yy)......
01-13-1993
TIME PERIOD ANALYZED.................
1993 PM DHV
OTHER INFORMATION.... PHASE I PROJECT
TRAFFIC
INTERSECTION TYPE AND CONTROL
_____________________________________________________________________
^
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
,
CONTROL TYPE WESTBOUND: STOP SIGN
`
TRAFFIC VOLUMES `
------------------------------------------------------ _______________
EB WB NB SB
____ ____ ____
LEFT
THRU -- 0 350 641
RIGHT -- 6 4 0
NUMBER OF LANES
_____________________________________________________________________
EB WB NB SB
LANES
. ^
p' ^
'
� ADJUSTMENT FACTORS
_____________________________________________________________________
Page-2
0 PERCENT RIGHT TURN CURB RADIUS (ft) ACCELERATION
LANE
GRADE ANGLE
_______ ___
FOR RIGHT TURNS FOR
RIGHT TURNS
� EASTBOUND ----- ---
________________ _________________
---
WESTBOUND 0.00 90
20
N
|
| NORTHBOUND 0.00 90
20
N
SOUTHBOUND 0.00 90
20 .
N
VEHICLE COMPOSITION
| ..... ... ..... ... ..... ..... ..... ..... ..... ... .... ..... ..... ..... .... ..... ..... ..... -..... ... ---..... ..... .... ..... .....
�
'
... ..... ..... --------------------- -..................
% SU TRUCKS %
COMBINATION -- -
- ----'--
AND RV'S
VEHICLES % MOTORCYCLES
EASTBOUND ---
--- -__
WESTBOUND 0
0 0
NORTHBOUND 2
0 0
SOUTHBOUND 2
0 0
CRITICK GAPS
... ..... ... _______..... ... ..... _..... ..... .... _... ..... .... ... ......... .... ____________________________________________
TABULAR VALUES
ADJUSTED SIGHT DIST.
FINAL
(Table 10-2 )
______________
VALUE ADJUSTMENT
CRITICAL
SAP
MINOR RIGHTS
________ ___________
WB 6.10
6.10 0.00
,
6.10
MAJOR LEFTS
�
SB 5.30
5.30 0.00
5.30
MINOR LEFTS
WB 7.40
7.40 0.00
7.40
IDENTIFYING INFORMATION
_____________________________________________________________________
NAME OF THE EAST/WEST STREET...'.. NORTH PROJECT ACCESS
NAME OF THE NORTH/SOUTH STREET....
SPEAR STREET
DATE AND TIME OF THE ANALYSIS..... 01-13-`1993 ; 1993 PM
DHV
OTHER INFORMATION.... PHASE I
PROJECT TRAFFIC
_
^
'
.
` ^
^
CAPACITY AND LEVEL -OF -SERVICE Page-3
_____________________________________________________________________
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY ^ CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
_______ ________ _________ ____________ ____________ ------
MINOR STREET
WB LEFT
RIGHT
-
MAJOR STREET
SB LEFT
~
2 153
152
> 152 >
150 > D
> 353 >
345 >B
6 634
---
634
—
> 634 >
` ----'--` `--
627 > A
11 763 763
[DENTIFYING INFORMATION
763
NAME OF THE EAST/WEST STREET...... NORTH PROJECT ACCESS
NAME OF THE NORTH/SOUTH STREET''.. SPEAR STREET
DATE AND TIME OF THE ANALYSIS..... 01-13-1993 ; 1993 PM DHV
OTHER INFORMATION.... PHASE I PROJECT TRAFFIC
'
753 A
1985 HCM: UNSIGNALIZED INTERSECTIONS
Page-1
*********************************************************************
IDENTIFYING INFORMATION
_____________________________________________________________________
/
u
AVERAGE RUNNING SPEED, MAJOR STREET..
45
PEAK HOUR FACTOR...'''.'''.'''''''.'.
.95
AREA POPULATION.,...''..'..''''''....
40000
~
NAME OF THE EAST/WEST STREET.........
NORTH PROJECT ACCESS
NAME OF THE NORTH/SOUTH STREET.......
SPEAR STREET
NAME OF THE ANALYST..................
D. CONGER
DATE OF THE ANALYSIS (mm/dd/yy)......
01-13-1993
TIME PERIOD ANALYZED.................
1998 AM DHV
OTHER INFORMATION. . . . PHASE 11 PROJECT
TRAFFIC
INTERSECTION TYPE AND CONTROL
_____________________________________________________________________
INTERSECTION TYPE: T-INTERSECTION
-
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
_____________________________________________________________________
EB WB NB SB
____
LEFT -- 7 0 6
THRU -- 0 705 212
RI2HT -- 16 2 0
NUMBER OF LANES
_____________________________________________________________________
EB WB NB SB
LANES -- 1 1 2
ADJUSTMENT FACTORS` Pdge-2
_____________________________________________________________________
PERCENT RIGHT TURN CURB RADIUS (ft) ACCELERATION LANE
GRADE
_______
ANGLE
___
FOR RIGHT
TURNS FOR RIGHT TURNS
EASTBOUND
-----
---
________________
---
_________________
-
/
u
WESTBOUND
0.00
90
20
N
.NORTHBOUND
0.00
90
20
N
SOUTHBOUND
0.00
90
20
N
VEHICLE COMPOSITION
_____________________________________________________________________
— -' -----'
'%-SU TRUCKS
%
COMBINATION
AND RV`S
VEHICLES
% MOTORCYCLES
EASTBOUND
---
---
---
WESTBOUND
0
0
0
NORTHBOUND
2
0
0
SOUTHBOUND
2
0
0
CRITICAL GAPS
_____________________________________________________________________
-
TABULAR
VALUES
ADJUSTED
SIGHT DIST. FINAL
(Table
______________
10-2)
VALUE
ADJUSTMENT CRITICAL GAP
MINOR RIGHTS
________
___________
WB 6.10
6.10
0.00 6.10
MAJOR LEFTS
SB 5.30
5.30
0.00 5.30
MINOR LEFTS
WB 7.40 7.40 0.00 7.40
IDENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET.'.... NORTH PROJECT ACCESS
NAME OF THE NORTH/SOUTH STREET.... SPEAR STREET
DATE AND TIME OF THE ANALYSIS'.... 01-13-1993 ; 1998 AM DHV
OTHER INFORMATIOH.... PHASE 11 PROJECT TRAFFIC
`
CAPACITY AND LEVEL -OF -SERVICE Page-3
_____________________________________________________________________
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
^ RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M Sol R SH
_______ ________ _________ ____________ ___________ -------
MINOR STREET
WB LEFT 7 176 175
RIGHT 17 387 387
MAJOR STREET
SB LEFT 6 491 491
> 175 > 168 > D
> 283 > 258 >C
> 387 > 370 > B
491
485 A
IDENTIFYING INFORMATION
------------------------------------------------------------------------
NAME OF THE EAST/WEST STREET...... NORTH PROJECT ACCESS
_ NAME OF THE NORTH/SOUTH STREET.... SPEAR STREET
DATE AND TIME OF THE ANALYSIS..... 01-13-1993 ; 1998 AM DHV
OTHER INFORMATION.... PHASE II PROJECT TRAFFIC
^
'.
�
1985 HCM: UNSIGNALIZED
INTERSECTIONS
Page-1
*********************************************************************
IDENTIFYING
INFORMATION
---- T----------------------------------------------------------------
v
AVERAGE RUNNING SPEED, MAJOR STREET..
45
PEAK HOUR FACTOR..........''...''....
.95
AREA POPULATION....,......'''','''.'.
40000
NAME OF THE
EAST/WEST STREET.........
'
NORTH PROJECT ACCESS
NAME OF THE
NORTH/SOUTH STREET.......
SPEAR STREET
NAME OF THE
'
ANALYST..................
-- — ' ------ -
D. CONGER
DATE OF THE
ANALYSIS (mm/dd/yy)......
01-13-1993
TIME PERIOD
ANALYZED.................
1998 PM DHV
OTHER INFORMATION.... PHASE II PROJECT TRAFFIC
INTERSECTION
_..... .... .... _.... .... ..... .... ______
TYPE AND CONTROL
..... .... .... .... ..... _........ .... ..... .... _.... _..... ..... .... ..... ____________________________________
,
INTERSECTION
TYPE: T-INTERSECTION
MAJOR STREET
DIRECTIONs NORTH/SOUTH
CONTROL TYPE
WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
__________________________________-__________________________________
EB WB NB SB
LEFT
THRU -- 0 400 732
RIGHT -- 10 8 0
NUMBER OF LANES
_______-________-__-_________________________________________________
EB WB NB SB
_ ... .... .... ..... ..... ..... _ ..... _.... ..... __ _.... .... _..... ...
_
LANES -- 1 1 2
�
�
ADJUSTMENT FACTORS
_____________________________________________________________________
Page-2
PERCENT RIGHT TURN CURB RADIUS (ft) ACCELERATION
LANE
GRADE ANGLE
FOR RIGHT TURNS FOR
RIGHT TURNS
EASTBOUND ----- ---
_________
___
WESTBOUND 0.00 90
20
N
NORTHBOUND 0.00 90
20
N
SOUTHBOUND 0.00 90
. 20
N
~
VEHICLE COMPOSITION
..... ..... .... ___.... ..... _... .... ____..... .... ..... ..... ..... .... ..... ..... ..... ..... ..... ..... ..... .....
'
.... ..... _..... ____________________________________
%-SU-TRUCKS '%-G{M8INff'rTION
-' ----'--
-'-
AND RV`S
VEHICLES % MOTORCYCLES
EASTBOUND ---
______ _____________
---
WESTBOUND 0
0 0
NORTHBOUND 2
0 0
SOUTHBOUND 2
0 0
CRITICAL GAPS
_______________________________________________-_____________________
-
TABULAR VALUES
ADJUSTED SIGHT DIST.
FINAL
(Table 10-2)
______________
VALUE ADJUSTMENT
CRITICAL GAP
MINOR RIGHTS `
________ ___________
WB 6.10
^
6.10 0.00
6.10
`
MAJOR LEFTS
SB 5.30
5.30 0.00
5.30
MINOR LEFTS
WB 7.40
7.40 0.00
7.40
IDENTIFYING INFORMATION
_____________________________________________________________________
NAME OF THE EAST/WEST STREET..,... NORTH PROJECT ACCESS
NAME OF THE NORTH/SOUTH STREET,...
SPEAR STREET
DATE AND TIME OF THE ANALYSIS.....
01-13-1993 ; 1998 PM
DHV
OTHER INFORMATION.... PHASE 11
PROJECT TRAFFIC
. '
'
. �
�
CAPACITY AND
_____________________________________________________________________
LEVEL -OF
-SERVICE
`
Page-3
�
POTEN-
ACTUAL
°
FLOW7
TIAL
MOVEMENT
oSHARED
RESERVE
RATE
CAPACITY
CAPACITY
CAPACITY
CAPACITY
�- MOVEMENT
v(pcph)
c (pcph)
c (pcph)
c (pcph)
c = c - v
LOS
`
_____
p
________
M
_________ ____________
SH
R SH
____________
-------
MINOR STREET
� ' WB LEFT
4
117
116 >
116
> 111
> D
> 272
> 257
>C
RIGHT
11
590
590 >
590
> 580
> A
MAJOR STREET
SB LEFT
19
715
715
715
696
A
IDENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET,..... NORTH PROJECT ACCESS
NAME OF THE NORTH/SOUTH STREET.... S9EAR STREET
DATE AND TIME OF THE ANALYSIS...,. 01-13 1773 ; 1999 PM DHV
OTHER INFORMATION.... PHASE II PROJECT TRAFFIC
APPENDIX E
EXISTING CONDITIONS - SIGNALIZED INTERSECTION CAPACITY ANALYSES
SPEAR STREET/SWIFT STREET
A-5 FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
HCS:==8ignalized Intersection
Version 2.1
FitzPatrick-Llewellyn Incorporated
1 Wentworth Drive
Williston, VT 05495
============================ (802) 878-3000
Streets: (E-W) SWIFT STREET ==================================
=========
Analyst: D. CONGER (N-S) SPEAR
STREET
Area Typ6: Other File Name: 92075AO1 HCq
~
'
Comment: 1993 W/0 PROJECT TRAFFIC 1-12-93 AMDHV
____________________
Traffic and Roadway Conditions
----------------------------
----------
| Eastbound / Westbound 7------------------
| n | Northbound
----
L T R / L T R �
i Southbo
u nu
NoL /---- ---- -- �____ __ L T
an / - |
R / L
T R
PH
-------------------------
______________ Signal Operations
Phase combination
1
--------------- L---------
2
------------------
E� Left
*
3 4 /
---�
5 6 7
Thru
*
1 N� Left
�
*
Right
*
`
� Thru
*
Peds
/ Right
` *
| Peds
WB Left
*
Thru
*
|SB Left
*
Right
*
� Thru
*
Ped
Right
*
.
� Peds
NB Right
/
SB Right
!EB Right
/WB Right
Green
17 A
�
Yellow/A-R
6
!Green
41A
Lost Time
3,0
!Yellow/A-R
6
!Lost Time
3.0
Cycle Length: 70
secs
Phase combination
order:
#1 #5
�
HCS:
==========================================,=======================
Signalized
Intersection Version 2.1
2
Streets: (E-W) SWIFT STREET
(N-S)
SPEAR STREET
=====
Analyst: D.
CONGER
File Name:
92075AO1
^ HC9
Area
Type:
Other
1-12-93
AM DHV
Comment: 1993 W/0
=======================================================================
PROJECT TRAFFIC
---------------------------
Volume
Adjustment
+
Worksheet
Direc-
_________________________________
Lane
Lane
Adj
-----------
tion/
M«t
Mvt
Vol
Adj
Lane
Grp
N Util
Growth
Grp
prop
prop
_____
____
PHF
____
yol
____
Grp
____
Vol
... ..... ....
io^
n Fact
Fact
Vol
LT
RT
EB
.....
__ _____
..... .... __..... _
____
----
----
Left
32
0.95
34
^
Thru
Right
37
0.95
39
LTR
122
1 1.000
^
1.000
122
0 28
^
0 40
47
0.95
49
^
Left
54
0.95
57
Thru
Right
87
39
0.95
0.95
92
LTR
190
1 1'000
1.000
`
190
^
0 30
^
0 22
41
NB
'
Left
216
0.95
227
Thru
293
0.95
308
LTR
666
1 1.000
^
1.000
666
^
0.34
0 20
Right
124
0.95
131
'
,
^
SB
Left
10
0A5
11
Thru
57
0.95
60
LTR
83
1 1.000
1.000
'
83
0 13
0 14
Right
11
0,95
12
^
^ -
_______`_______
'
Saturation
_
Flow
Adjustment
Worksheet
Direc-
Ideal
----------------------------------------
`
------------
tion/
Sat
N o.
f
f
f
f
Adj
LnGrp
Flow
L
W
` HV_
G__
f
p__ BB_
f
A__
f
f
S t
a
___
____
_ns
LT
F1'w
EB---
__RT
..... ..... ... --
----
LTR
WB
1800
1 1.00
0.99
1.00
1.00 1.00
1^ 00 0^
85
0^ 96
1443
LTR
1800
1 0.97
0.99
1.00
1.00 1.00
1.00 0.87
0.99
1495
NB
LTR
1800
1 0.97
0.99
1.00
1.00 1.00
1^ 00 0
87
0 95
1430
SB
^
^
LTR
1800
1 0.99
0.99
1.00
1.00 1.00
1.00 0.88
0.90
1388
HCS: Signalized Intersection Version 2.1 3
Streets: (E-W) SWIFT STREET (N-S) SPEAR STREET
Analyst: D. CONGER File Name: 92075AO1'HC9
Area Type: Other 1-12-93 AM DHV
Comment: 1993 W/0 PROJECT TRAFFIC
=======================================================================
/ «
Supplemental Worksheet For Left -Turn Adjustment Factor
Input Variables
____________________________________________________________________________
EB
WB
NB
SD
Cycle Length, C (sec)
70
70
70
70
Effective Green, G (sec)
20.0
20.0
44.0
44.6
Number of Lanes, N
1
1
1
1
Total Approach Flow Rate, Va (vph)
122
190
666
83
Mainline Flow Rate, Vm (vph)
88
133
439
72
Left -Turn Flow Rate, Vlt (vph)
34
57
227
11
Proportion. -of LT' Plt -' ----'-- -
0.279
0.300
0.341
0.133
Opposing Lanes, No
1
1
1
1
Opposing Flow Rate, Vo (vph)
133
88
72
439
Proportion of LT in Opp. Vol., Plto
____________________________________________________________________________
0.300
0.279
0.133
0.341
Computations
____________________________________________________________________________
EB
WB
NB
SB
Sop=(1800No)/(1+Plto((400+Vm)/(1400-Vm))>
1619
1611
1613
1606
Yo=Vo/SoP
0.082
0.055
0.045
0.273
Gu=(G-C*Y0)/(1-Y0)
15.526
17.111
42.785
34.215
Fs=(875-0.625Vo)/1000
0.792
0.820
0.830
0.601
Pl=Plt(1+((N-1)G)/(Fs*Gu+4.5)>)
0.279
-0.300
0.341
0.133
Gq=G-Gu
4.474
2.889
1.215
9.785
Pt=1-Pl
0.721
0.700
0.659
0.867
Gf=2Pt(1-(Pt**0.5Gq))/Pl
2.684
1.879
0.865
6.561
El=1800/(1400-Vu)
1.42
1.37
1.36
1.87
Fm=Gf/G+(Gu/6)(1/(1+Pl(El-1)))+(2/G)(1iPl)
0.957
0.994
0.948
0.898
Flt=(Fm+N-1)/N
--------------------------------------------------------------
`
0.957
0.994
0.948
0.898
-----------------------
HCS: Signalized Intersection Version 2.1 4
Streets: (E-W) SWIFT STREET (N-S) SPEAR STREET
Analyst: D. CONGER File Name: 92075AO1.HC9
Area Type: Other 1-12-93 AM DHV
Comment: 1993 W/0 PROJECT TRAFFIC
=======================================================================
Cap&city Analysis Worksheet
_______________________________________________________________________
Direc- Adj Adj Sat Flow Lane Group
tion/ Flow Rate Flow Rate Ratio Green Ratio Capacity v/c
LnGrp (v) (s> (v/s) (g/C) (c) Ratio
_________ _________ _____ ___________ __________ _____
EB
LTR 122 1443 0.085 0.286 412 0.21j",
WB
LTR 190 1495 0.127 0.286 427 0.445 *
�E}--
LTR 666 1430 0.466 0.629 899 0.741 *
SD
LTR 83 1388 0.060 0.629 872 0.095
Cycle Length, C = 70.0 sec. Sum (v/s) critical = 0.593
Lost Time Per Cycle, L = 6.0 sec. X critical = 0.648
_______________________________________________________________________
Level of Service Worksheet
-----------------------------------------------------------------------
Direc- Delay Lane Delay Lane Lane Delay LOS
tion/ v/c g/C Cycle d Group d Prog Grp Grp By By ,
LnGrp Ratio Ratio Len 1 Cap 2 Fact Delay LOS App Apr.)
-...... ......... ..... -... -..... .... .... ..... ... .... ... ..... ..... ..... ..... -.... ..... ..... ..... .... .... .... -..... .... ..... ..... .... ..... .... .... ..... -.... ----- ---- ----- ----
EB
LTR 0.30 0.286 70.0 14.8 412 0.1 0.85 12.7 B 12.7 B
WB
LTR 0.44 0.286 70.0 15.5 427 0.5 0.85 13.6 B 13.6 B
NB
LTR 0.74 0.629 70.0 6.9 899 2.3 0.85 7.8 B 7.8 B
SB
LTR 0.10 0.629 70.0 3.9 872 0.0 0.85 3.3 A 3.3 A
Intersection Delay = 9.1 (sec/veh) Intersection LOS = B
_______________________________________________________________________
\
HCS: Signalized Intersection Version 2.1 1
FitzPatrick-Llewellyn Incorporated
1 Wentworth Drive
Williston, VT 05495 (802) 878-3000
Streets: (E-W) SWIFT STREET (N-S) SPEAR STREET
Anal D. CONGER File NameR 92075PO1.HC9
Area Type: Other 1-12-93 PM DHV
Comment: 1993 W/O PROJECT TRAFFIC
=======================================================================
Traffic and Roadway Conditions
| Eastbound |
Westbound
| Northbound |
Southbound
|L T
R |L
T R
|L
T
R |L
T R
|---- ----
|
|----
----
----|----
No , Lanes
| >
1
Volumes
PHF
| 134
166
103|
-- ^~~ �'
or PK15|0.93
O.95
0.90|0.9�
|0'95
V�
-�
Lane Width
1 12.0
^
�
11 0
^
|
11 ^»
'
11.3
Grade
1 0
|
0
|
0
|
^0
X Heavy Veh|
2 2
21
2 2
21 2
2
21
2 2 2
Parking
| (Y/N) N
|
(Y/N) N
| (Y/N)
N
|
(Y/N) N
Bus Stops
|
0|
0|
0|
0
Con. Peds
|
0|
0|
0|
0
Ped Button
|(Y/N) N
|(Y/N)
N
|(Y/N)
N
|(Y/N)
N
Arr Type
| 3 3
31
3 3
31 3
3
31
3 3 3
RTOR Vols
|
0|
0|
0|
7------------------------------------------------
1-------------------
0
"_
Signal
--------------------------------
Phase combination 1 2 3
EB Left *
Thru *
Right *
Peds
WB Left *
Thru *
Right *
Peds
NG Right
SB Right
Green 24A
Yellow/A-R 6
Lost Time 3.0
Operations
______________________________________
4|
5 6 7 8
|NB Left
*
| Thru
*
| Right
*
| Peds
|
|SB Left
*
| Thru
*
| Right
*
| Peds
|
.
{EB Right
|WB Right
|
!Green
24A
!Yellow/A-R
6
Most Time
3.O
Cycle Length: 60 secs Phase combination order: #1 #5
HCS: Signalized Intersection Version 2.1 2
Streets: (E-W) SWIFT STREET (N-S) SPEAR STREET
Analyst: D. CONGER File Name: 92075PO1.HC9
Area Type: Other 1-12-93 PM DHV
Comment: 1993 W/O PROJECT TRAFFIC
�
Volume Adjustment Worksheet
_______________________________________________________________________
Direc- Lane Lane Adj
tion/ Mvt Adj Lane Grp No. Util Growth Grp Prop Prop
Mvt Vol PHF Vol Grp Vol Ln Fact Fact Vol LT RT
_____ ____ ____ ____ ____ ____ __ _____ ______ ____ ____ ____
EB
Left 31 0.95 33 ^
Thru 135 0.95 142 LTR 413 1 1'000 1.000 413 0.08 0.58
Right 226 0.95 238
WB
Left 161 0.95 169
Thru 79 0.95 83 LTR 278 1 1.000 1.000 278 0.61 0.09
Right 25 0.95 26
NB
Left 134 0.95 141
Thru 166 0.95 175 LTR 424 1 1.000 1.000 424 0.33 0.25
Right 103 0.95 108
SB
Left 32 0.95 34
Thru 185 0.95 195 LTR 260 1 1.000 1.000 260 0.13 0.12
Right 29 0 .9a 31
----------------------------------- -------------------------------------
Saturation Flow Adjustment Worksheet
Direc-
Ideal
Adj
tion/
Sat
No. f
f
f
f
f
f `
f
f
Sat
LnGrp
Flow
Lns W
HV
G
p
_____
BB
_____
A
_____
RT
_____
LT
_____
Flow
____
______
EB
____
___ _____
_____
_____
�
LTR
1800
1 1.00
0.99
1.00
1.00
1.00
1.00
0.82
1.00
1464
WB
LTR
1800
1 0.97
0.99
1.00
1.00
1.00
1.00
0.89
0.62
946
NB
'
LTR
1800
1 0.97
0.99
1.00
1.00
1.00
1.00
0.87
0.88
1320
Si..-.'(
LTR
1800
1 0.99
0.99
1.00
1.00
1.00
1.00
0.88
0.95
1480
HCS: Signalized Intersection Version 2.1 3
Streets: (E-W) SWIFT STREET (N-S) SPEAR STREET
Analyst: D. CONGER File Name: 92075PO1.HC9
Area Type: Other 1-12-93 PM DHV
Comment: 1993 W/O PROJECT TRAFFIC
=======================================================================
Supplemental Worksheet For Left -Turn Adjustment F
/actor
Input Variables
-------------------------------------------------
EB
WB
NB
SD
Cycle Length, C (sec)
___________________________
60
60
60
60
Effective Green, G (sec)
27.0
27.0
27.0
27.0
Number of Lanes, N ~
1
1
1
1
Total Approach Flow Rate, Va (vph)
413
278
424
260
Mainline Flow Rate, Vm (vph)
380
109
283
226
Left -Turn Flow Rate, Vlt (vph)
33
169
141
34
Proportion of LT, Plt -- ---_
_0.080
-0.6(H�-'-0���]S
0.131
Opposing Lanes, No
1
1
1
1
Opposing Flow Rate Vo (vph)
, vp
109
380
226
283
Proportion of LT in Opp. Vol., Plto
_____---- ____________--- ___--- ---
0.608
0.080
0.131
0.333
----- __---
Computations
------ ___
EB
--- _____________________
WB
NB
SB
Sop=(1800No)/(1+Plto((400+Vm)/(1400-Vm))>
1229
1745
1667
1529
Yo=Vo/Sop
0.089
0.218
0.136
0.185
Gu=(8-C*Yo)/(1-Yo)
23.788
17.813
21.823
19.504
Fs=(875-0.625Vo)/1000
0.807
0.637
0.734
0.698
Pl=Plt(1+((N-1)G)/(Fs*Gu+4.5)))
0.080
0.608
0.333
0.131 -
Gq=G-8u
3.212
9.187
5.177
7.496
Pt=1-Pl
0.920
0.392
0.667
0.869
Gf=2Pt(1-(Pt**0.5Gq))/Pl,
2.883
1.272
2.604
5.432
El=1800/(1400-Vo)
1.39
1.76
1.53
1.61
Fm=Gf/G+(Gu/G)(1/(1+Pl(El-1)))+(2/G)(1+Pl)
1.041
0.617
0.882
0.954
Flt=(Fm+N-1)/N `
..... ..... ..... ..... _..... ..... ... .....
`
1.000
.... ... ... _______________________-______
0.617
0.882
0.954
HCS: Signalised
Intersection
Version 2.1.
4
Streets:
(E_ W) SWIFT
STREET
(N--S) SPEAR
STREET
Analyst:
D . CCJi• GEri
File Name:
9 c? (:;7 5 i=' C)1 . L-I G 9
Area Type:
Other
1.--1.2--9 3 PM
I HV
Comment:
1993 W/O PROJECT TRAFFIC:
Capacity
Analysis
Worksheet
e
Dir'ec--•
Hd j
........_..........-
Ad j Scat
-----....._......_.........._
Flow ='w
....................._..._....._..._._.......
_... _... - _._..._...............- _._ ......._....----._..... _._
Lane Group
tionr
Flow Rate
Flow Rate
Ratio
Green Ratio
Capacity v/c
i_r'tGr"p
(v)
(S)
__ __
(v% s)
(g C)
(c) Ra.t1(:�
ED
-----
1464
0.282
0.450
659
L...TR
278
946
( ) . ca94
0.450
r.::• 1a
iV I3
L. l" F:
t�
ti• 2 Ci
.a 0
1 sic- -
1 7
(-... �i_ 1.
0.450
594 0.714 -x
L_.l R
260
1480
0.176
0.450
666 0.39f.)
Cycle Length, C = 60.0
sec.
Sum (v/s) c_r'i.t:ir..:.:a1
= 0.61.5
Lost Time m(
Per Cyc l e•:� q L
.: -• 6.0 sec,
x critical =_:
i) ., %a 8i
L...evel of Service Wor'ksheat;
i rec--
Delay
Lane
Delay
Lane
Lane
Delay
L 0 S)
ti.oni
v/c:_
gfC
Cycle
d
Group
d
Pr-og
Grp
i:,r-p
By
By
L-nur_p
Ratio
Ratio
Len
I
Cap
2
Fact
Delay
L_.11S
jpp
Apl::)
E I
L... �T R
0.63
0.450
60.0
9.6
�!" a
C.: 3 ��i
1.4
0,85
t�i .:3
t-
.l_�
9.3
I-(
11
L...TR
0.65
0.450
60.0
9
L,2w.
2.5
8f.:
raI_i
L_. T R
0.71
0.450
t: 0.0
10.2
`.:19 4
2.8
0,85
11,0
B
11.0
..a l:i
S
L...TR
0.39
0.450
60.0
8.4
,:ar' 6
0.2
0.85 85
33
I
Intersection
Delay
=-: 9.7
(Seclveh)
10he,r-cy(:?ct:ion
L._ClS :::=
B
HCS: Signalized Intersection Version 2.1
======================================================= 1
FitzPatrick-Llewellyn Incorporated ================
1 Wentworth Drive
Williston, VT 05495 (802) 878-3000
=======================================================
Streets: (E-W) SWIFT STREET (N-S) SPEAR STREET'
=================
� Analyst: D. CONGER , File Name: 92075Au2 HC9 �
Area Type: Other ^
1-12-93 AM DHV
Comment: 1998 W/O PROJECT TRAFFIC
=======================================================================
____________________
Traffic
------------------------------------------
and
Roadway Conditions
| Eastbound
|
Westbound
| Northbound 1
Sout--------
| L T
R 1
L
T R
| L T
R 1
L //u»�^nq
|____ ____
____|____
____
|
R
No. Lanes
| > 1
< |
>
----
|---- __
|
----
_-' Uolumes
| 36 42
531
62
1 <
99
| > 1--<----|---->----
441 244 332
1401
11 1�5<
�
12
r'�ForpK15|0.95/0.94
Lane Width
0.9S10.95
0.95 0.95|0.95
0'95
0.95|0
^ 95 0
0 95
Grade
� 12.0
|
|
11.0
� 11 0
`
|
1^'�
z^�
^
% Heavy Veh|
0
2 2
�
21
2
0
2
|
21 2 0
(
0
Parking
| (Y/N) N
1
(Y/N)
N
| (Y/N) N�
2|
2 2
2
Bus Stops
|
0|
(Y/N> N
Con. Peds
|
0�
0|
0/
/
0
Ped Button
|(Y/N) N
|(Y/N)
N
0�
|(Y/N) N
0|
0
Arr/ype
| 3 3
31
3
3
|(Y/N)
N
n/uR
31 3 3
31
3 3
3
__vols__|_____________0�_____________0�_____________0|________'___0_
Signal Operations
Phase combination 1 2
3 4 | �------------------------
EB Left *
5 6 7 8
Thru
1NB Left
*
*
Right *
| Thru
*
Peds
| Right
*
| Peds
WB Left *
|
|SB Left
*
Thru *
Right X.
| Thru
*
Peds
| Right
*
| Peds
.
NB Right
|
SB Right
|EB Right
|WB Right
Green 17A
Yellow/A-R 6
|
!Green
41A
Lost Time 3,0
!Yellow/A-R
6
!Lost Time
3.0
Cycle Length: 70 secs Phase combination order: #1 #5
HCS:
=======================================================================
Signalized
Intersection Version
2.1
2
Streets: (E-W) SWIFT
STREET
(N-S)
SPEAR STREET
Analyst: D.
CONGER
File Name:
92075AO2.HC9
Area
Type:
Other
1-12-93
AM DHV
Comment: 1998 W/O PROJECT TRAFFIC
=======================================================================
�
_______________________________________________________________________
Volume
Adjustment Worksheet
Direc
-
Lane
Lane
Adj
tion/
Mvt
Adj
Lane
Grp
No. Util
Growth
Grp
Prop
Prop
Mvt
Vol
PHF
Vol
Grp
Vol
Ln Fact
Fact
Vol
LT
RT
EB
_
__ .... .... ..... ..... .....
..... ..... ..... ..... ..... .....
__
____
'
Left
36
0.95
38
Thru
42
0.95
44
LTR
138
1 1.000
1.000
138
0.28
0.41.
Right
53
0.95
56
^
WB
Left
62
0.95
65
Thru
99
0.95
104
LTR
215
1 1.000
1.000
215
0.30
0 21
Right
44
0.95
46.)
^
NB
Left
244
0.95
257
Thru
332
0.95
349
LTR
753
1 1.000
1.000
753
0.34
0.20
Right
140
0.95
147
~
SB
Left
11
0.95
12
'
Thru
65
0.95
68
LTR
193
1 1.000
1.000
93
0.13
0.14
Right
_______________________________________________________________________
12
0.95
13
^
_______________________________________________________________________
Saturation Flow
Adjustment
Worksheet
'
Direc-
Ideal
tion/
Sat
No.
f
f
f
f f
f
f
f
Adj
LnGrp
______
Flow
____
Lns
___
W
_____
HV
_____
G
_____
p BB
A
RT
LT
~~
Flow '
EB
_____ _____
_____
_____
_____
____
LTR
1800
1
1.00
0.99
1.00
1.00 1.00
1.00
0.84
0.94
1413
WB
LTR
1800
1
0.97
0.99
1.00
1.00 1.00
1.00
0.87
0.98
1478
NB
LTR
1800
1
0.97
0.99
1.00
1.00 1.00
1-00
0.87
0.94
1425
SB
^
LTR
1800
1
0.99
0.99
1.00
1.00 1.00
1.00
0.88
0.87
1349
HCS: Signalized Intersection Version 2.1
==========================================~==================== 3
Streets: (E-W) SWIFT STREET (N-S) SPEAR STREET ========
Analyst: D. CONGER
File Name: 92075AO2 HC9
Area Type: Other ^
1-12-93 AM DHV
Comment: 1998 W/O PROJECT TRAFFIC
=======================================================================
o
Supplemental Worksheet For Left -Turn Adjustment Factor
Input Variables
_______________________________________________EB______WB
NB
SB
Cycle Length, C (sec)
------------7--------
Effective Green, G (sec)
70
70
70
70
Number of Lanes, N
20^0
20~0
44.0
44,0
Total Approach Flow Rate, Va (vph)
131
V
215
1
18
Mainline Flow Rate, ym (vph)
100
753
93
-eft-Turn Flow Rate, ylt (vph)
150
496
81
Proportion of LT, pit
3 u
65
257
12
]pposing Lanes, No
0v275
0.302
0�341
—0,12q
]pposing Flow Rate, Vo (vph)
1
150
1
1
1
'roportion_of_LT_inOpp, Vol.,_ Plto0.302
^|00
0.75
81
496
__
0.129
0.341.
__________
>mputations
-----------------------------
_ ______________________________________
EB
NB
SB
______
!op=(1800No)/(1+Plto((400+Vm)/(1400-Vm)))
______WB
1613
1�--------------------
'o=Vo/Sop
�»5
1596
1601
m=(G-C*Yo)/(1-yo)
0`093
0^062
0.051
0,310
s=(875-0.625Vo)/1000
14^872
16^679
42.610
32,327
l=Plt(1+((N-1)G)/(Fs*Gu+ 4 5>))
0^781
0^813
0.824
0,565
�q=G_Gu ^
0^275
0.302
0.341
0,129
t=1_pl
5.128
3.321
1.390
11.673
f=2Pt(1-(Pt**0 5Gq))/pl
0^725
0^698
0.659
0,871
l=1800/(1400-y-^)
2^S59
2^077
0.972
7,472
m=Cf/G+(8u/G)(-r/(1+Pl(El-1)))+(2/G)(1+�l)
01^44
1^38
0^981
1^36
1.99
lt=(Fm+N_1)/N
^939
0.944
0,873
_ __---- --- __------------- --------- ________0.939
-------------r-----------------
0.981
0.944
0.873
HCS: Signalized Intersection Version 2.1 4
=======================================================================
Streets: (E-W) SWIFT STREET (N-S) SPEAR STREET
Analyst: D. CONGER File Name: 92075AO2.HC9
Area Type: Other 1-12-93 AM DHV
Comment: 1998 W/O PROJECT TRAFFIC
=======================================================================
/ o
Capacity Analysis Worksheet
_______________________________________________________________________
Direc- Adj Adj Sat Flow Lane Group
tion/ Flow Rate Flow Rate Ratio Green Ratio Capacity v/c
LnGrp (v) (s) (v/s) (g/C) (c) Ratio
_________ _________ _____ ___________ __________ _____
EB ~
LTR 138 1413 0.098 0.286 404 0.342
WB
LTR 215 1478 0.145 0.286 422 0.509 *
NB ---- ----'--' '--
LTR 753 1425 0.528 0.629 896 0.841 *
SB
LTR 93 1349 0.069 0.629 848 0.110
Cycle Length, C = 70.0 sec. Sum (v/s) critical = 0.674
Lost Time Per Cycle, L = 6.0 sec. X critical = 0.737
_______________________________________________________________________
Level of Service Worksheet
Direc-
Delay
Lane
Delay
Lane
Lane
Delay
LOS
tion/
v/c
g/C
Cycle
d
Group
d
Prog
Grp
Grp
By
By
LnGrp
Ratio
Ratio
Len
1
Cap
2
_____
Fact
Delay
_____
LOS
____
App
_____
App
____
_____
, EB
_____
_____
_____
_____
_____
_____
LTR
0.34
0.286
70.0
15.0
404
0.2
0.85
13.0
B
13.0
B
WB
LTR
0.51
0.286
70.0
15.9
422
0.9
0.85
14.2
B
14.2
B
NB
LTR
0.84
0.629
70.0
7.8
896
5.1
0.85
10.9
B
10.9
B
BB
�
LTR
0.11
0.629
70.0
3.9
848
0.0
0.85
3.4
A
3.4
A
Intersection
_______________________________________________________________________
Delay
= 11.2 (sec/veh)
Intersection
LOS
= B
-
HCS: Signalized Intersection Version 2.1 1
FitzPatrick-Llewellyn Incorporated
1 Wentworth Drive
Williston, VT 05495 (802) 878-3000
=======================================================================
Streets: (E-W) SWIFT STREET (N-S) SPEAR STREET
Analyst: D. YONGER o File Name: 92075PO2.HC9
Area Type: Other 1-12-93 PM DHV
Comment: 1998 W/O PROJECT TRAFFIC
=======================================================================
Traffic and Roadway Conditions
|
Eastbound |
Westbound |
Northbound 1 Southbound
|L
T
R |L
T
R |L
T
R |L
T
R
|----
----
----|----
----
----|----
----
----|----
----
No. Lanes |
>
1
< |
>
1
< |
>
1
< | >
1
<
153
2561
182
90
28|
152
188
1171 36
209
33
PHF or PK1510.95
0.95
0.9510.95
0.95
0.9510.95
0.95
0.9510.95
0.95
0.95
Lane Width |
12.0
|
11.0
|
11.0
|
11.5
Grade |
0
|
0
|
0
|
0
% Heavy Veh|
2
2
21
2
2
21
2
2
21 2
2
2
Parking /
(Y/N)
N
|
(Y/N)
N
|
(Y/N)
N
| (Y/N)
N
Bus Stops |
0{
0:
0|
0
Con. Peds |
0|
0|
0|
0
Ped Button |(Y/N)
N
|(Y/N)
N
|(Y/N)
N
|(Y/N)
N
Arr Type }
3
3
31
3
3
31
3
3
31 3
3
3
RTOR Vols (
-------------------------------
0|
=---------------------------------------
0|
0|
0
Signal Operations
Phase combination
1 2 3
4 |
5 6 7 8
EB Left
*
:NB Left
M.
Thru
*
| Thru
*
Right
*
| Right
*
Peds
| Peds
WB Left
*
|
|SB Left
*
Thru
*
| Thru
*
Right
*
| Right
*
Peds
| Peds
NB Right
|
|EG Right
SB Right
|WB Right
Green 24A
|
!Green
24A
Yellow/A-R
6
!Yellow/A-R
6
Lost Time 3.0
Most Time
3.0
Cycle Length: 60 secs Phase combination order: #1 #5
. HCS:==Signalized
Intersection
Version 2.1
2
Streets: (E-W)
SWIFT
STREET
=============================
Analyst: D.
CONGER
(N-S>
SPEAR
STREET
Area
Type:
Other
File Name: 92075PO2,HC9
Comment:
=================================================================
1998 W/O
PROJECT TRAFFIC
1-12-93
PM DHV
________________����������������Volume
Adjustment Worksheet
Direc-
-------------------------______
--
tion/
Mvt
Adj
Lane Lane
Lan e Grp No. Util
Adj
Mvt
Vol
pHF
Vol
G Vol_
Ln Fact
Growth
Grp
prop
prop
_rp_
Fact
Vol
LT
RT
EB--
-----
------
----
--__
__--
Left
35
0.95
37
Thrut
153
0.95
161
LTR 467
1 1.000
1.000
467
0.08
0.58
WB
Left
182
0.95
192
Thrut
90
0.95
95
LTR 316
1 1.000
1.000
316
0.61
0.09
NB
Left
152
0.95
160
Thrut
188
0.95
198
LTR 481
1 1.000
1.000
481
0.33
0.26
SB
Left
36
0.95
38
Thrut
209
0.95
220
LTR 293
1 1.000
1.000
293
0.13
0.12
_______________________________________________________________________
________
_____
____8aturation
��-----------------
Flow Adjustment
Worksheet
'
Direc-
Ideal
----------------------------------
tion/
Sat
No.
f
f f
Adj
LnGrP
Flow
Lns
W
HV G
f f
f
f
f
Sat
______
____
___ _____
p BB
A
RT
LT
Flow
EB-----
_____ _____
-----
-----
-----
WB LTR
1800
1 1.00
0.99 1.00
1.00 1.00
1.00
.
0.82 1.00
----
146`
NB LTR
1800
1 0.97
0.99 1.00
1.00 1.00
1.00
0.89
0.56
861
LTR
SB
1800
1 0.97
0.99 1,00
^^
1,00 1 00
1^00
^
0.86 0.86
1280
LTR
1800
1 0.99
0.99 1.00
1.00 1.00
1.00
0.88
0.93
1443
/`
�
HCS: Signalized Intersection Version 2.1 3
Streets: (E-W) SWIFT STREET (N-S) SPEAR STREET
Analyst: D. CONGER File Name: 92075PO2.HC9
Area Type: Other 1-12-93 PM DHV
Comment: 1998 W/O PROJECT TRAFFIC
=======================================================================
` Supplemental Worksheet For Left -Turn
Adjustment Factor
'
Input Variables
____________________________________________________________________________
EB
WB
NB
SB
Cycle Length, C (sec)
60
60
60
60
Effective Green, G (sec)
27.0
27.0
27.0
27.0
Number of Lanes, N
1
1
1
1
Total Approach Flow Rate, Va (vph)
/
^+67
316
481
293
Mainline Flow Rate, Vm (vph)
430
i24
321
255
Left -Turn Flow Rate, Vlt (vph)
37
192
160
38
Proportion of LT, Plt
0.079
0.608
0.333
{}.130'
_
Opposing Lanes, No
1
1
1
1
Opposing Flow Rate, Vo (vph)
124
430
255
321
Proportion of LT in Opp. Vol., Plto
____________________________________________________________________________
0.608
0.079
0.130
0.333
Computations
EB
WB
NB
SB
Sop=(1800No)/(1+Plto((400+Vm)/(1400-Vm)))
1184
1743
1656
1512
Yo=Vo/Sop
0.105
0.247
0.154
0.212
23.141
16.195
20.995
18.108
Fs=(875-0.625Vo)/1000
0.798
0.606
0.716
0.674
Pl=Plt(1+((N-1)G)/(Fs*Gu+4.5)))
0'079
0.608
0.333
0.130
Gq=G-Gu
3.859
10.805
6.005
8.892
Pt=1-Pl
0.921
0.392
0.667
0.870
Gf=2Pt(1-(Pt**0.5Gq))/P1.
3.422
1.283
2.821
6.184
E1=1800/(1400-Vo) /
1.41
1.86
1.57
1.67
Fn=Gf/8+(Gu/0)(1/(1+Pl(El-1)))+(2/0)(1+Pl)
1.037
0.561
0.856
0.930
Flt=(Fm+N-1)/N
... ... ..... ______.... ..... ---------------------- _________________________________________
1.000
0.561
0.856
0.930
,
HCS: Siqnalized Intersection Version 2.1 4
Streets: (E-W) SWIFT STREET (N-S) SPEAR STREET
Analyst: D. CONGER File Name: 92075PO2.HC9
Area Type: Other 1-12-93 PM DHV
Comment: 1998 W/O PROJECT TRAFFIC
=======================================================================
Capacity/
Analysis Worksheet
o
____________________________________________________________________
Direc-
Adj
Adj Sat
Flow
Lane Group
tion/ Flow
Rate
Flow Rate
Ratio
Green Ratio
Capacity
v/c
LnGrp
v)
(s)
(v/s)
(g/C)
(c)
Ratio
_.... ..... .... .... ..... ..... .....
EB '
..... ..... .... _
..... ..... ..... ..... ..... ..... .... ..... ..... ..... ....
..... ..... .... _....
..... .... .... ..... ..... .... .... ..... ..... .... .....
_..... .... ... _..... ..... ..... ..... .....
..... _..... ..... ...
~TR
467
1464
0.319
0.450
659
0.709
WB
LTR
316
861
0.367
0.450
387
0.816 *
NB
LTR
481
1280
0.376
0.450
576
0.835 *
SB
LTR
293
1443
0.203
0.450
649
0.451
Cycle Length,
C =
60.0 sec.
Sum (v/s) critical = 0.743
Lost Time Per
_______________________________________________________________________
Cycle,
L = 6.0 sec.
X critical =
0.825
Level of Service Worksheet
Direc-
Delay
Lane
Delay
Lane
Lane
Delay
LOS
tion/
v/c
g/C
Cycle
d
Group
d
Prog
Grp
Grp
By
By
LnGrp
.... _... .... .....
Ratio
..... ..... ..... .....
Ratio
Len
1
Cap
2
Fact
Delay
LOS
App
App
EB
...
_..... .... .... .....
..... _..... ..... .....
LTR
WB
0.71
0.450
60.0
10.1
659
2.5
0.85
10.7
B
10.7
B
LTR
0.82
0.450
60.0
10.9
387
8.7
0.85
16.7
C
16.7
C
LTR
0.84
0.450
60.0
11.0
576
7.2
0.85
15.5
C
15.5
C
qB
LTR
0,45
0.450
60.0
8.7
649
0.4
0.85
7.7
B
7.7
B
Intersection
_______________________________________________________________________
Delay
= 12.8
(sec/veh)
Intersection
LOS
= B
APPENDIX F
PHASE I & II —.SIGNALIZED INTERSECTION CAPACITY ANALYSES
SPEAR STREET/SWIFT STREET
A-6 FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
. . -
'
�
HCS: Signalized Intersection Version 2.1 1
=======================================================================
� FitzPatrick--- Llewellyn Incorporated
1 Wentworth Drive
Williston, VT 05495 (802> 878-3000
=======================================================================
Streets: (E-W) SWIFT STREET (N-S> SPEAR STREET
9 An�lyst: D. CONGER File Name: 92075AW1.HC9
Area Type: Other 1-12--- 93 AM DHV
� Comment: 1993 W/ PHASE I TRAFFIC
[raffic and Roadway Conditions
|
Eastbound |
Westbound
|
Nort
hbound |
Snuthbound
|L
T
R |L
T
R |L
T
R |L
T R
..... ..... .... _|....
......... .... ____
...
..... ..... ..... |..... .....
.... .... .... ..... ..... ....
Volumes
1
32 37
49|
57
87
391
222
301
1281
10 59 11
PHF or PK1510.95
0.95
0.95|0.95
0.95
0.95|O.95
0.95 0.95|0.93
0.95 O.cs5
Lane Width
(
12.0
|
11.0
|
11.0
|
11.5
Grade
|
0
|
0
�
0
�
0
% Heavy Veh|
2 2
2|
2
2
2|
2
2
2|
2 2 2
r Paking
|
(Y/N) N
|
(Y/N)
N
|
(Y/N)
N
' 1 (Y/N)
N
Bus Stops
|
0|
Con. Peds
|
0
0|
0|
0
Ped Button
|(Y/N)
N
�(Y/N)
N
|(Y/N)
N
|(Y/N>
N
Arr Type
|
3 3
3|
3
3
3|
3
3
3|
3 3 3
RTOR Vols
- _____-___________________________
|
0|
0�
..... ..... .....
'
..... ..... ....
..... ..... ..... ..... ..... .....
0�
..... ..... ..... ..... ..... ....
0
..... ..... .... .... ..... ..... ..... ..... ... ..... ..... .....
Signal Operations
'
Phase combination
1
2 3 4 |
5 6 7 8
EB Left
*
|NB Left
*
Thru
*
| Thru
*
Right
*
| Right
*
Peds
| Peds
WB Left
*
|
|SB Left
*
Thru
*
| Thru
*
Right
*
| Right
*
Peds
| Peds
.
NB Right
|
|EB Right
SB Right
|WB Right
Green 17A
|
|Green
41A
YelIow/A-R
6
|Yellow/A-R
6
Lost Time 3.0
|Lost Time
3.0
Cycle Length: 70
secs
Phase combination order:
#1 #5
S8ST
68^0
88^0
00^T 00^T 00^T
00^T
66^0
66^0
T
008T
81-1
8S
629T
26^0
L8^0
00^T 00^T 00^T
00^T
66^0
L6^0
T
008T
81-1
8N
88NT
66^0
L8^0
00^T 00^T 00'T
00^T
66^0
L6^0
T
008T
81 1
8M
2551
96^0
Q8^0
00^T 00^T 00^T
00^1
66^0
00^1
T
0081
8l-1
____
_____
_____
_____ _____ _____
83
Mold
11
18
v 88 .d
_____
S
_____
AI-4
_____
M
___
sul
____
moId
---------
diSul
WS
1
j
j j
�
�
�
^oN
4eS
/uoT4
�p�
`
leepI
-zeilO
..... ..... _..... .... ....
..... ..... ..... .... _____________________________________________________________
4eeqslioM Juem1snopu
molJ
'
uolleinjeS
_______________________________________________________________________
2T
96^0
TT
Wwj
KT^0
ST^0
08
000^T 000^T T
s8
oil
29
G6^0
6G
nj4l
TT
S6^0
01
UK]
8S
SST
S6^0
82T
4 4 B V8
02^0
KC^0
989
000^T 000^T T
989
811
ME
26^0
TOE
nj4l
fC2
26^0
222
41e*1
8N
is
S6^0
6E
Wu8
TWO
TWO
S6T
000^T 000^T A
E6T
oil
26
S6^0
L8
njq1
09
S6^0
L9
- '-----
— -----
8M
2G
96^0
69
4B 18
25^0
LW0
G21
000^T 000^T T
G2T
811
6E
96^0
LE
nAql
KS
96^0
2E
4jel
'
83
____
l8
____
l-I
____
loA
______ _____ __
4zeJ Izej ul
____
loA
____
dig
____
loA
____
AM
____
IoA
_____
4»W
doi6
doi6
dib
wmojS mD -ON
dig
euel
fptj
4xW
/uojj.
_______________________________________________________________________
CPU
euel
eueI
_zenyj
4eeqsjjoM ;uem4sn?pv
emnloA
/
»
=======================================================================
3IJJt/8l I
3SVH6
/M S661 :Iuemmo3
AHO WV 66-2T-T
jeq, :edAl eeAV
63H^TMUM026 :emeN eITJ
838NO3
^O WsAleuV
=======================================================================
1338lS 8hB6S (S-N)
1338lS lJIMS (M-3) :sleeJ4S
�
1^2 uolsneA uoTIzesieluI
pezTIeubTS
:S3H
,
'
. ..
.~
'
HCS: Signalized Intersection Version 2.1 3
� Streets: (E-W) SWIFT STREET (N-S) SPEAR STREET
� Analyst: D. CONGER File Name: 92075AW1.HC9
� Area Type: Other 1-12-93 AM DHV
Comment: 1993 W/ PHASE I TRAFFIC
/
Supplemental Worksheet For Left -Turn
Adjustment Factor
o
Input Variables
_..... _..... ________________________________________________________________________
EB
WB
NB
SB
Cycle Length, C (sec)
70
70
70
70
Effective Green, G (sec)
20.0
44.0
44.0
Number of Lanes, N ^
1
1
1
1
Total Approach Flow Rate, Va.(vph)
125
193
686
85
Mainline Flow Rate, Val (vph)
91
133
452
74
Left -Turn Flow Rate, Vlt (vph)
34
60
234
11
Propprtiorlof LT, plt
Opposing Lanes, No
1
1
1
1
Opposing Flow Rate, Vo (vph)
133
91
74
452
Proportion of LT in Opp. Vol., Plto
_..... .... .... .... _..... ... ..... .... _______
0.311
0.272
0.129
0.341
Computations
... ..... .... ..... ..... .... ..... ..... .... ..... ..... ..... .... .... .... ..... ..... ..... ..... ..... ....
EB
... ..... ..... _____________________
WB
NB
SB
..... ..... ..... ..... ..... .....
Sop=(1800No)/(1+Plto((400+Vm>/(1400-Vm)>>
..... .... .... ..... ... ... ..... .....
1612
_..... ..... ______
1615
..... ..... ..... _..... ..... ..... .....
1612
..... ..... .... ..... ... ..... .... _
1604
Yo=Vo/Sop
0.083
0.056
0.046
0.282
Gu=(G-C*Yc;)/(1-yo)
15.504
17.015
42.749
33.802
Fs=(875-0.625Vo)/10O0
0.792
0.818
0.829
0.592
Pl=Plt(1+((N-1>G)/(Fs*Gu+4.5>))
0.272
0.311
0.341-
0,129
Gq=8-Gu
4.496
2,985
1.251
10.198
Pt=1-Pl
0.728
0.689
0.659
0.871
Gf=2Pt(1..... (Pt** ....
.5Gq))/Pl
2.731
1.890
0.887
6.) 818
/..
El=1800/(1400-Vo>
1.42
1.38
1.36
1.90
Fm=Gf/G+(Gu/G)(1/(1+Pl(El-1G)(1+Pl>
0.959
0.987
0.947
0.894
Flt=(Fm+N-1>/N `
-_____..... .... _.... ..... ..... ... .... ... ..... .... .... ..... ___..... ..... ..... ..... ..... ..... ..... _..... _..... ..... _..... .... .... .... .... .... ..... ....
0.959
..... ..... .... ..... .... .... ..... ....
0.987
.... ____.... .... ..... ...
0.947
.... ..... ..... ... ___.....
0.894
.... _..... ..... ____
HCS: Signalized Intersection Version 2.1 4
Streets: (E-W) SWIFT STREET (N-S) SPEAR STREET
Analyst: D. CONGER File Name: 92075AW1.HC9
Area Type: Other 1-12-93 AM DHV
Comment: 1993 W/ PHASE I TRAFFIC
=======================================================================
_______________________________________________________________________
�
Capaczty
Analysis Worksheet
o
Direc- Adj
Adj Sat
Flow
Lane Group
tion/
Flow Rate
Flow Rate
Ratio
Green Ratio
Capacity
v/c
LnGrp
(v>
_________
(s)
_________
(v/s)
_____
(g/C)
___________
(c)
__________
Ratio
EB
'
_____
LTR
` 125
1442
0.087
0.286
412
0.303
WB
LTR
193
1488
0.130
0.286
425
0.454 *
LTR
686
1429
0.480
0.629
898
0.764 *
SB
LTR
85
1383
0.061
0.629
869
0.098
Cycle
Length, C = 70.0
sec.
Sum (v/s) critical = 0.610
Lost Time
_______________________________________________________________________
Per Cycle,
L = 6.0 sec.
X critical =
0.667
Level of Service Worksheet
Direc-
Delay
Lane
Delay
Lane
Lane
Delay
LOS
tion/
v/c
g/C
Cycle
d
Group
d
Prog_
Grp
Grp
By
By
LnGrp
_____
Ratio
_____
Ratio
_____
Len
_____
1
Cap
2
Fact
Delay
LOS
App
App
EB
_____
_____
_____
_____
_____
____
_____
____
LTR
0.30
0.286
70^0
14.9
412
0.1
0.85
12.7
B
12.7
B
WB
LTR
0.45
0.286
70.0
15.6
425
0.5
0.85
13.7
B
13.7
B
NB
` LTR
0.76
0.629
70.0
7.1
898
2.7
0.85
8.3
B
8.3
B
SE'
LTR
0.10
0.629
70.0
3.9
869
0.0
0.85
3.3
A
3.3
A
Intersection
_______________________________________________________________________
Delay
= 9.4
(sec/veh)
Intersection
LOS
= B
HCS: Signalized Intersection Version 2.1 1
FitzPatrick-Llewellyn Incorporated
1 Wentworth Drive
Williston, VT 05495 (802) 878-3000
=======================================================================
Streets: (E-W) SWIFT STREET (N-S) SPEAR STREET
Analyst: D. CONGER File Name: 92075PW1.HC9
Area Type: Other 1-12-93 PM DHV
Comment: 1993 W/ PHASE I TRAFFIC
�
g =======================================================================
Traffic and Roadway Conditions
1 Eastbound |
Westbound | Northbound 1
Southbound
|L T
R |L
T
R |L
T
R |L
T
R
|___' ____
____|____
____
____|____ ____
____|____
____
No. Lanes
| > 1
< |
>
1 <
| >
1 <
|
>
1 <
Volumes
1 31 135
2341
167
79
251 138
171
1061
32
191
2�
PHF or PK1510.95
0.95
0.900.95
0.95
0.9110.9S 0.15
0.9510.95
0.95
0.0:
Lane Width
1 12.0
|
11.0
| 11.0
|
11.5
Grade
| ` 0
0
|
0
|
0
% Heavy Veh|
2 2
21
2
2
21 2
2
21
2
2
2
Parking
| (Y/N) N
|
(Y/N)
N
| (Y/N)
N
|
(Y/N)
N
Bus Stops
(
0|
0|
0|
0
Con. Peds
|
0|
0|
0(
0
Ped Button
|(Y/N) N
|(Y/N)
N
{(Y/N)
N
|(Y/N)
N
Arr Type
| 3 3
31
3
3
31 3
3
31
3
3
3
RTOR Vols
---------- -�____________________________________________________________
|
0:
0|
_______________________________________________________________________
Signal
Operations
Phase combination
1
2
3
4
|
5
6
7
8
EB Left
*
|NB Left
*
Thru
*
) Thru
*
Right
*
| Right
*
Peds
{ Peds
WB Left
*
|
|SB Left
*
Thru
*
| Thru
*
Right
*
| Right
*
Peds
| Peds
NB Right
|
|EB Right
SB Right
|WB Right
Green
24A
|
!Green
24A
Yellow/A-R
6
!Yellow/A-R 6
Lost Time
3.0
Most Time
3.0
Cycle Length: 60 secs Phase combination order: #1 #5
HCS: Signalized Intersection Version 2.1 2
Streets: (E-W) SWIFT STREET (N-S) SPEAR STREET
Analyst: D. CONGER File Name: 92075PW1.HC9
Area Type: Other 1-12-93 PM DHV
Comment: 1993 W/ PHASE I TRAFFIC
o Volume Adjustment �Worksheet
_______________________________________________________________________
Direc- Lane Lane Adj
tion/ Hvt Adj Lane Grp No. Util Growth Grp Prop Prop
Mvt Vol PHF Vol Grp Vol Ln Fact Fact Vol LT RT
_____ ____ ____ ____ ____ ____ __ _____ ______ ____ ____ ____
EB
Left 31 0.95 33
Thru 135 0.95 142 LTR 421 1 1.000 1.000 421 0.08 0.58
Right 234 0.95 246
WB
Left 167 0.95 176
Thru 79 0.95 83 LTR 285 1 1.000 1.000 285 0.62 0'09
Right 25 0.95 26
NB
Left 138 0.95 145
Thru 171 0.95 180 LTR 437 1 1.000 1.000 437 0.33 0.26
Right 106 0.95 112
SB
Left 32 0.95 34 '
Thru 191 0.95 201 LTR 266 1 1.000 1.000 266 0.13 0.12
Right 29 0.95 31 '
-----------------------------------------------------------������������
Saturation Flow Adjustment Worksheet
Direc-
Ideal
Adj
tion/
Sat
No. f
f
f
f
f
f
f
f
Sat
LnGrp
______
Flow
Lns W
HV
G
p
BB
A
RT
LT
Flow
EB
____
___ _____
_____
_____
_____
_____
_____
_____
_____
____
LTR
1800
1 1.00
0.99
1.00
1.00
1.00
1.00
0.82
1.00
1464
WB
LTR
1800
1 0.97
0.99
1.00
1.00
1.00
1.00
0.89
0.60
928
NB
.
LTR
1800
1 0.97
0.99
1.00
1.00
1.00
1.00
0.86
0.88
1311
SB
LTR
1800
1 0.99
0.99
1.00
1.00
1.00
1.00
0.88
0.95
1475
`
' ^
HCS: Signalized Intersection Version 2.1 3
Streets: (E-W) SWIFT STREET (N-S) SPEAR STREET
Analyst: D. CONGER File Name: 92075PW1.HC9
Area Type: Other 1-12-93 PM DHV
Comment: 1993 W/ PHASE I TRAFFIC
�
Supplemental Worksheet For Left -Turn Adjustment Factor
Input Variables
EB
WB
NB
SB
___ ___
_______________________________________________
Cycle Length, C (sec)
60
60
60
60
Effective Green, G (sec)
27.0
27.0
27.0
27.0
Number of Lanes, N
1
1
1
1
Total Approach Flow Rate, Va (vph)
421
285
437
266
Mainline Flow Rate, Vm (vph)
388
109
292
232
Left -Turn Flow Rate, Vlt (vph)
33
176
145
34
Proportion of LT, Plt
0.078
0.618
0.3320.128
Opposing Lanes, No
1
109
1
388
1
232
I
292
Opposing Flow Rate, Vo (vph)
Proportion ofLTinOpp. Vol.,_Plto__________0.618___0.078___0.128___0.332__
---------- _____
Computations
EB
WB
NB
SB
Sop=(1800No)/(1+Plto((400+Vm)/(1400-Vm)>)
1216
1746
1667
1526
Yo=Vo/Sop
0.090
.
0 222
.
0 139
.
0.191
Gu=(G-C*Yo)/(1-Yo)
23.749
17.572
21.665
19.191
Fs=(875-0.625Vo)/1000
0.807
0.632
0.730
0.692
Pl=Plt(1+((N-1)G)/(Fs*Gu14.5)))
0.078
0.618
0,332
0.128
Gq=G-Gu
.
3 251
9 428
.
5 . 335
7.809
Pt=1-Pl
.
0 922
.
0 382
0 . 668
0.872
Gf=2Pt(1-(Pt**0.5Gq))/Pl
2.922
1.225
2.654
5.646
E1=1800/(1400-Vo)
1.39
' 1.78
1.54
1.62
Fm=Gf/G+(Gu/6)(1/(1+Pl(El-1)))+(2/G)(1+Pl)
1.041
0.605
0.877
0.951
Flt=(Fm+N-1)/N
____________________________________________________________________________
1.000
0.605
0.877
`
0.951
m
HCS: Signalized Intersection Version 2.1 4
Streets: (E-W) SWIFT STREET (N-S) SPEAR STREET
Analyst: D. CONGER File Name: 92075PW1.HC9
Area Type: Other 1-12-93 PM DHV
Comment: 1993 W/ PHASE I TRAFFIC
=======================================================================
k
_______________________________________________________________________
Capacity
Analysis Worksheet
/
[>irec-
Adj
Adj Sat
Flow
Lane Group
tion/ Flow
Rate
Flow Rate
Ratio
Green Ratio
Capacity
v/c
LnGrp
(v)
(s)
_________
(v/s)
(g/C)
(a)
Ratio
EB
_____
___________
__________
'
_____
LTR
421
1464
0.288
0.45~
659
0.639
WB
LTR
285
928
0.307
0.450
418
0.682 *
NB
LTR
437
1311
0.333
0.450
590
0.741 *
SB
LTR
266
1475
0.180
0.450
664
0.401
Cycle Length,
C = 60.0 sec.
Sum (v/s) critical
= 0.640
Lost Time Per
-----------------------------------------------------------------------
Cycle,
L = 6.0 sec.
X critical =
0.712
Level of Service Worksheet
Direc-
Delay
Lane Delay
Lane
Lane
Delay
LOS
tion/
V/c
g/C
Cycle
d
Group d
Prog
Grp
Grp
By
By
LnGrp
Ratio
_..... ..... ... _
Ratio
_____
Len
..... ..... ..... ..... .....
1
_____
Cap 2
..... ..... ..... ..... ..... _..... ... ... ...
Fact
... ..... ...
Delay
LOS
App
Apr.)
EB
..... ...
.... ..... ..... .... ....
..... ..... ..... ...
.... ..... ..... ..... .....
... ..... ... .....
LTR
0.64
0.450
60.0
9'7
659/ 1.5
0.85
9.5
B
9.5
B-
WB
LTR
0.68
0.450
60.0
10.0
418 3,1
0.85
11.1
B
11.1
B
NB
LTR
0.74
0.450
60.0
10.3
590 3.4
0.83
11.7
B
11.7
B
SB
LTR
0.40
0.450
60.0
8.4
664 0.2
0`.85
7.3
B
7.3
B
Intersection
_______________________________________________________________________
Delay
= 10.1 (sec/veh)
Intersection
LOS =
B
HCS: Signalized Intersection Version 2.1
========================================================== 1
FitzPatrick-Llewellyn Incorporated =============
1 Wentworth Drive
Williston, VT 05495 (802) 878-3000
=========================================================
Streets: (E-W) SWIFT STREET (N-S) SPEAR STREET======�=======
Analyst: D. CONGER
File Name: 92075AW2 HC9
r
Area Type: Othe^
1-12-93 AM DHV
Comment: 1998 W/ PHASE II TRAFFIC
=======================================================================
Traffic and Roadway Cbnditions
1 Eastbound | Westbound | Northbound 1��
n
5-----------
| L T
|----
R | L
T
R i L
T
R |
Louthbound
/ R
____
No. Lanes | > 1
____| ____
<
____
____�____
___ -<----|---->----<----
|
| >
1
< | >
1
volumes 1 36 42
rn+orPK1510.95 0.95
57166
99-
444-255
346
�69 12
LaneWidth
0.9510.95
0.95
0.9510.95 0.95
^
0.9510 95 0.95 0,95
1 12.0
|
11.0
1 11.0
^
|
1`�^ 5 ^
Grade | 0
|
0
|
% Heavy Vehl 2 2
21 2
2
21 2
0
|
0
Parking 1 (Y/N) N
| (Y/N)
N
| (Y/N)
N�
2|
2
2 2
Bus Stops �
0|
�
(Y/N)
N
Con. Peds �
0|
0/
Ped Button ((Y/N) N
0|
1(Y/N)
N
!(Y/N)
N
0
HrrType | 3
31 3
3
31 3
!(Y/N)
N
:TORvols|_____________0i_____________0|
3
31
3
3 3
____
_____________0|____________0_
_____________________
Signal
Operations
---
Phase combination 1 '
_________
2 3
--- ----
4
_________
|
----�-----------------
5
EB Left *
6
7 8
Thru *
|NB Left
*
Right *
.
� Thru
*
Peds
1 Right
*
| Peds
WB Left *
�
|
Thru
|SB Left
*
*
Right *
| Thru
*
Peds
1 Right
*
| Peds
NO Right
|
SB Right
|EB Right
|WB Right
Green 17A
Yellow/A-R
|
!Green
45A
6
Lost Time 3 0
!Yellow/A-R
6
.
|Lost Time
3.0
Cycle Length: 74 secs Phase combination order: #1 #5
~
' .
,
..
'
� .
HCS: Signalized Intersection Version 2.1 2
`
Streets: (E-W) SWIFT STREET (N-S) SPEAR STREET
Analyst: D. CONGER File Name: 92075AW2.HC9
. Area Type: Other 1-12-93 AM DHV
Comment: 1998 W/ PHASE II TRAFFIC
Volume Adjustment Worksheet
-----------------------------------------------------------------------
Direc- Lane Lane Adj
tion/ Mvt Adj Lane Grp No. Util Growth Grp Prop Prop
� Mvt Vol PHF Vol Grp 'Vol Ln Fact Fact Vol LT RT
..... ..... ..... ..... ..... ..... .... ..... ..... ..... .... ..... - ---- ... ..... ..... r ---- -- ----- .... -..... -..... - ..... ..... ..... ... ---- ..... .... .... ....
EB ~
. Left 36 0.95 38
Thru 42 0.95 44 LTR 142 1 1.000 1.000 142 0.27 0.42
Right 57 0.95 60
WB
Left 66 0.95 69
Thru 99 0.95 104 LTR 219 1 1.000 1.000 219 0.32 0.21
Right 44 0.95 46
NB
Left 255 0.95 268
Thru 346 0.95 364 LTR 786 1 1.000 1.000 786 0.34 0.20
Right 146 0.95 154
SB
Left i1 0.95 12
Thru 69 0.95 73 LTR 98 1 1.000 1'000 98 0.12 0.13
Right 12 0.95 13 -
_________________________________________________________________ ----------------
Saturation Flow Adjustmdnt Worksheet
Direc-
Ideal
Adj
tion/
Sat
No.
f
f
f
f
f
f
f
f
Sat
LnGrp
______
Flow
____
Lns
________
W
HV
_____
G
_____
p
BB
A
RT
LT
Flow
EB
_____
_____
_____
_____
_____
____
LTR
1800
1
1.00
0.99
1'00
1'00
1.00
1.00
0.84
0.93
1399
WB
LTR
1800
1
0.97
0.99
1.00
1.00
1.00
1.00
0.87
0.97
1456
NB
LTR
1800
1
0.97
0.99
1.00
1.00
1.00
1.00
0.87
0.94
1415
SB
LTR
1800
1
0.99
0.99
1.00
1.00
1.00
1.00
0.88
0.87
1347
0
HCS: Siqnalized Intersection Version 2.1
Streets: (E-W) SWIFT STREET
(N-S) SPEAR STREET
Analyst: D. CONGER
File Name: 92075AW2.HC9
Area Type: Other
1-12-93
AM DHV
Comment: 1998 W/ PHASE II TRAFFIC
Supplemental Worksheet For Left -turn Adjustment
Factor
«
Input Variables
EB
WB
NB
SB
____________________________________________________________________________
Cycle Length, C (sec)
74
74
74
74
Effective Green, G (sec)
20.0
20.0
48.0
48.0
Number of Lanes, N.
1
1
1
1
Total Approach Flow Rate, Va (vph)
142
219
786
98
Mainline Flow Rate, Vm (vph)
104
150
518
86
Left -Turn Flow Rate, Vlt (vph)
38
69
268
12
Proportion of LT, Plt__
��`268
0.315
0.341
0.122
Opposing Lanes, No
1
1
1
1
Opposing Flow Rate, Vo (vph)
150
104
86
518
Proportion of LT in Opp. Vol., Plto
____________________________________________________________________________
0.315
0.268
0.122
0.341
Computations
EB
WB
NB
SB
____________________________________________________________________________
Sop=(1800No)/(1+Plto((400+Vm)/(1400_Vm))>
1604
1610
1597
1598
Yo=Vo/Sop
0.094
0.065
0.054
0.324
Gu=(G-C*Yo)/(1-Yo)
14.427
16.272 46.520
35.534
Fs=(875-0.625Vo)/1000
0.781
0.810
0.821
0.551
Pl=Plt(1+((N-1)0)/(Fs*Gu+4.5))>
0.268
0.315
0.341
0.122
Gq=G-Gu
5.573
3.728
1.480
12.466
Pt=1-Pl
0.732
0.685
0.659
0.878
Gf=2Pt(1-(Pt**0.50q)>/Pl
3.175
2.200
1.027
7.983
E1=1800./(1400-Vo)
1.44
1.39
1.37
2.04
Fm=Gf/G+(Gu/G)(1/(1+Pl(El-1)))+(2/G)(1+Pl)
0.931
0.966
0.938
0,870
Flt=(Fm+N-1)/N `
-------------------------------------------------------------------------
`
0.931
0.966
0.938
0.870
`
-
^
� .
HCS: Signalized Intersection Version 2.1 4
=======================================================================
Streets: (E-W) SWIFT STREET (N-S) SPEAR STREET r
�
Analyst: D. CONGER File Name: 92075AW2.HC9
Area Type: Other 1-12-93 AM DHV
Comment: 1998 W/ PHASE II TRAFFIC
=======================================================================
' o
Capacity Analysis Worksheet
_______________________________________________________________________
Direc- Adj Adj Sat Flow Lane Group
tion/ Flow Rate Flow Rate Ratio Green Ratio Capacity v/c
LnGrp (v) (s) (v/s) (g/C) (c) Ratio
_____ _________ _________ _____ ___________ __________ _____
EB
LTR 142 1399 0.102 0.270 378 0.376
WB
LTR 219 1456 0.150 0.270 394 0.557 *
_ NB
LTR 786 1415 0.555 0.649 918 0.856 *
SB
LTR 98 1347 0.073 0.649 874 0.112
Cycle Length, C = 74.0 sec. Sum (v/s) critical = 0.706
Lost Time Per Cycle, L = 6.0 sec. X critical = 0.768 NN
______________________________________________________________________ NN
Level of Service Worksheet
D i r e c ----
Delay
Lane
Delay
Lane
Lane
Delay
LOS
tion/
v/c
g/C
Cycle
d
Group
d
Prog
Grp
Grp
By
By
LnGrp
-----
Ratio
-----
Ratio
-----
Len
-----
1
-----
Cap
-----
2
-----
Fact
-----
Delay
-----
LOS
----
App
-----
App
��
EB
LTR
0.38
0.270
74.0
16.7
378
0.3
0.85
14.4
B
14.4
B
WB
LTR
0.56
0.270
74.0
17.6
394
1.3
0.85
16.1
C
16.1
C
NB
LTR
0.86
0.649
74.0
7.8
918
5.7
0.85
11.5
B
11.5
B
SD
LTR
0.11
0.649
74.0
3.7
874
0.0
0.85
3.2
A
3.2
A
Intersection
--------------------------------------------------------------------
Delay
= 12.0 (sec/veh)
Intersection
LOS
= B
�
HCS: Signalized Intersection Version 2.1 1
FitzPatrick-Llewellyn Incorporated
1 Wentworth Drive
Williston, VT 05495 (802) 878-3000
=======================================================================
Streets: (E-W) SWIFT STREET (N-S) SPEAR STREET
Analyst: D. CONGER File Name: 92075RW2.HC9
Area Type: Other 1-12-93 PM DHV
Comment: 1998 W/ PHASE II TRAFFIC
=======================================================================
_______________________________________________________________________
Traffic
and
Roadway
Conditions
1 Eastbound
1
Westbound
1
Northbound
|
Southbound
|L
T
R |L
T R
|L
T R
(L
T
R
|____ ____
---- |----
____ ____1____
____ ____|____
____
-----
No.
Lanes
| >
1 <
1
>
1 <
|
> 1 <
|
> 1
<
Volumes
1 35
153
2701
192
90
281
159 196 1221
36 221
33
PHF
or PK1510.95
0.95
0.9510.95
0.95 0.9510.95
0.95 0.9510.95
0.95
0.95
Lane
Width
( 12.0
(
11.0
|
11.0
|
11.5
Grade
|
0
i
0
0
% Heavy
Veh|
2
2
21
2
2
21
2 2
21
2 2
E.
Parking
1 (Y/N)
N
|
(Y/N)
N
|
(Y/N) N
|
(Y/N) N
Bus
Stops
0|
0|
0i
0
Con.
Peds
|
0|
0i
0|
0
Ped
Button
|(Y/N)
N
|(Y/N)
N
|(Y/N)
N
|(Y/N) N
Arr
Type
| 3
3
31
3
3
31
3 3
31
3 3
3
RTOR
--------------------------------------------------------
Vols
|
0|
0|
0|
!______-_______
0
Signal Operations
Phase combination
1 2 3
4 |
5 6 7 8
EB Left
*
|NB Left
*
Thru
*
| Thru
*
Right
*
| Right
*
Peds
} Peds
WB Left
*
WO Left
*
Thru
*
| Thru
*
Right
*
| Right
*
Peds
1 Peds
NB Right
|
|EB Right
SO Right
MB Right
Green 25A
|
!Green
24A
Yellow/A-R
6
!Yellow/A-R
6
Lost Time 3.0
Most Time
3.0
Cycle Length: 61 secs Phase combination order: #1 #5
11
HCS: Siqnalized Intersection Version 2.1 2
Streets: (E-W) SWIFT STREET (N-S) SPEAR STREET
Analyst: D. CONGER File Name: 92075PW2.HC9
Area Type: Other 1-12-93 PM DHV
Comment: 1998 W/ PHASE II TRAFFIC
=======================================================================
Volume AdjulLstment Worksheet
Direc-
Lane
Lane
Adj
tion/
Mvt
Adj
Lane
Grp
No.
Util
Growth
Grp
Prop
Prop
Mvt
Vol
PHF
Vol
Grp
Vol
Ln
Fact
Fact
Vol
LT
RT
..... ..... ..... _.....
EB
____
____
____
____
.... ..... ..... .....
__
..... .... .... ..... .....
... ... ..... ... ..... ...
.... ..... ..... ....
____
Left
35
0.95
37
~
Thru
153
0.95
161
LTR
482
1
1.000
1.000
482
0.08
0.59
Right
270
0.95
284
WB
Left
192
0.95
202
-
Thru
90
0.95
95
LTR
326
1
1.000
1.000
326
0.62
0.09
Right
28
0.95
29
NB
Left
159
0.95
167
Thru
196
0.95
206
LTR
501
1
1.000
1.000
501
0.33
0.26
Right
122
0.95
128
SB
Left
36
0.95
38
Thru
221
0.95
233
LTR
306
1
1.000
1.000
306
0.12
0.11
Right
------------------------------------------------------------
33
0-95
35
'
___________
Saturation
Flow
Adjustment
Worksheet
/
_______________________________________________________________________
Direc-
Ideal
Adj
tion/
Sat
No.
f
f
f
f f
f
f
f
Sat
LnGrp
Flow
Lns
___
W
_..... .... .... .....
HV
_____
G
.... .... ..... ..... .....
.....
p BB
..... ..... .... .... ..... ..... .... .... .....
A
..... .... .... .... .....
RT
.... .... ..... ..... ....
LT
_____
Flow ,
..... _.... _
EB
LTR
1800
1
1.00
0.99
1.00
1.00
1.00
1.00
0.82
1.00
�
1462
WB
LTR
1800
1
0.97
0.99
1.00
1.00
1.00
1.00
0.89
0.54
836
NB
LTR
1800
1
0.97
0.99
1.0
1.00
1.00
1.00
0.86
0.84
1257
SB
LTR
1800
1
0.99
0.99
1.00
1.00
1.00
1.00
0.89
0.92
1431
' . ~
HCS: Signalized Intersection Version 2.1 3
� Streets: (E-W) SWIFT STREET (N-S) SPEAR STREET
' Analyst: D. CONGER File Name: 92075PW2.HC9
� Area Type: Other 1-12-93 PM DHV
� Comment: 1998 W/ PHASE II TRAFFIC
G=======================================================================
SuppDemental Worksheet For Left -Turn Adjustment Factor -
Input Variables
EB
WB
NB
SD
____________________________________________________________________________
Cycle Length, C (sec)
61
61
61
61
Effective Green, G (sec)
28.0
28.0
2710
27.0
Number of Lanes, N
1
1
1
1
Total Approach Flow Rate, Va (vph)
482
326
501
306
Mainline Flow Rate, Vm (vph)
445
124
334
268
Left -Turn Flow Rate, Vlt (vph)
37
202
167
38
Proportion of LT, Plt
0.077
0.620
0.333
0.124
Opposing Lanes, No
'-� 1
1
'-- 1-
1
Opposing Flow Rate, Vo (vph)
124
445
268
334
Proportion of LT in Opp. Vol., Plto
0.620
0.077
0.124
0.333
----------------------------------------------------------------------------
Computations
____________________________________________________________________________
EB
WB
NB
SB
Sop=(1800No)/(1+Plto((400+Vm)/(1400-Vm)))
1163
1745
1658
1504
Yo=Vo/Sop
0.107
0.255
0.162
0.222
Gu=(G-C*Yo)/(1-Yo)
24.060
16.704
20.446
17.295
Fs=(875-0.625Vo)/1000
0.798
0.597
0.707
0.666
Pl=Plt(1+((N-1)G)/4Fs*Gu+4.5)))
0.077
0.620
0.333
0.124
Gq=G-3u
3.940
11.296
6.554
9.705
Pt=1-Pl
0.923
0.380
0.667
0.876
Gf=2Pt(1-(Pt**0.5Gq))/Pl
3.502
1.222
2.941
6.693
El=1800/(1400-Vo)
1.41
1.88
1.59
1.69
Fm=Gf/G+(Gu/0)(1/(1+Pl(El-1)))+(2/G)(1+Pl)
1.035
0.545
0.840
0.921
Flt=(Fm+N-1)/N
____________________________________________________________________________
1.000
0.545
0.840
0.921
'
'
/
' HCS: Signalized Intersection Version 2.1 4
=======================================================================
�h Streets: (E-W) SWIFT STREET (N-S> SPEAR STREET
, File Name: 92075PW2 HC9
Analyst: D. CONGER e .
Area Type: Other 1-12-93 PM DHV
Comment: 1998 W/ PHASE II TRAFFIC
Capacity Analysis Worksheet
Direc-
Adj Adj
Sat
Flow
Lane Group
tion/
Flow Rate Flow
Rate
Ratio
Green Ratio
Capacity
v/c
LnGrp
(v)
..... ..... .... _.... .... ..... _..... _
(s)
.... ..... ..... ..... _...
(v/s)
.... .... .... .... .....
(g/C)
.... .... ... ..... ..... ------
(c)
__________
Ratio
_____
_.... ..... .... _
EB
..... ....
LTR
482
1462
~
0.330
0.459
671
0.718
WB
LTR
326
836
0.390
0.459
384
0.850 *
LTR
501
1257
0.399
0.443
-��� '-
0.900 *
SB
LTR
306
1431
0.214
0.443
633
0.483
Cycle
Length, C = 61.0
sec.
Sum (v/s)
critical = 0.789
Lost Time
-----------------------------------------------------------------------
Per Cycle, L =
6.0
sec.
X critical
= 0.875
evel of Service Worksheet
Direc-
Delay
Lane
Delay
Lane
Lane
Delay
LOS
tion/
v/c
g/C
Cycle
d
Group
d
Prog
Grp
Grp
By
By
LnGrp Ratio
Ratio
_____
Len
_____
1
_____
Cap
_____
2
_____
Fact
_____
Delay
_____
LOS
____
App
_____
App
____
_____
EB
_____
LTR
0.72
0.459
/
61.0
10.1
671
2.6
0.85
10.8
B
10.8
B
WB
LTR
O.85
0.459
61.0
11.1
384
11.3
0.85
19.1
C
19.1
C
NB
LTR
0.90
0.443
61.0
12.0
556
12.6
0.85
20.9
C
20.9
C
SB
LTR
0.48
0'443
61.0
.
9.2
633
0.5
0.85
8.2
B
8.2
B
Intersection Delay
_______________________________________________________________________
= 15.1 (sec/veh)
Intersection LOS
= C
APPENDIX G
LEFT —TURN WARRANT ANALYSIS & STORAGE LENGTH
A-7 FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
FITZPATRICK-LLEWELLYN INCORPORATED
One Wentworth Drive
WILLISTON, VERMONT 05495
(802) 878-3000
JOB 97
,,e-,
SHEET NO.
OF
CALCULATED BY //� l �/� ��
// Z
DATE Z 7
CHECKED BY
erel F
DATE
_.... _.............:......__.:.............. [............. ............. .. ...... ....._ ..... ... ... ..... ..._. ._.....
..
M1MW 204 1(SL* SAeeb) 205'I ICI ®w W , f+aloe. E m 01471. To aeee PNW TOLL FREE I-0W225�M
No Text
JOB / ZO7 —/ f C,-✓ /0 1 !401 ;7 c 0
SHEET NO.
OF
CALCULATED BY
DATE
CHECKED BY
DATE
SCALE
I ITZPATRICK-LLEWELLYN INCORPORATED
One Wentworth Drive
WILLISTON, VERMONT 05495
(802) 878-3000
.. i�............. ..............................
...........
,..................... ............. ............. .............
-.1- ......... ... ; ..........
Td..af =Tara ,P_. = LZ5 �;Sd��___Q'S R.aQc•P�
M0011CT 204 1 (SiMk Shms) M I (Padded) ®. tm.. GrOW, MM, 011)1 %Older MX iaL FREE I-8%2M 6W
APPENDIX H
RIGHT —TURN LANE WARRANT ANALYSIS
A—g FITZ PATRIC K- LLEWELLYN INCORPORATED
Engineering and Planning Services
JOB 9Z
MTZPATRICK-LLEWELLYN INCORPORATED
One Wentworth Drive
WILLISTON, VERMONT 05495
(802) 878-3000
SHEET NO.
OF
//��
CALCULATED BY11ad
/
P/ DATE /! 1//e13
CHECKED BY
DATE
SCALE
h_
................ :.............l............:................
rho'
JP r.Q4PdP.__.
ftUT204-t (S*r &mW) M I (NM) Im, Grolon. Mass, 01471. To Order MW TOLL FREE t-B00-225-M
r
� Zo
t YERMONT AGENCY OF TRANSPORTATION 111 //9 3
TRAFFIC VOLUME WARRANTS FOR RIGHT TURN AUXILLARX LANES
At Unsignalized Intersections
Problem Statement:
The Agency's current method of determining the need for right
turn lanes is based strictly on the number of right turning vehicles,
which calls for a right turn lane where the number of right turning
vehicles exceeds 50 for design conditions at commercial drives. There
is concern that this criteria may not be adequately responsive to specific
traffic characteristics.
Policy:
Upon review of current literature, with improved traffic operation
and reduced accident experience the principal concerns, the following
policy is adopted based on traffic volume and speed warrants. Where
the approach highway speed limit is 25 MPH, or the difference between
the speed limit and the intersection design speed for right turning
vehicles (reference 1984 AASHTO Publication A Policy on Geometric Design
of Highways and Streets, Table III.16, etc.) does not exceed 15 MPH,
these criteria are generally exempt.
o The need for a right turn lane shall be met for two-lane highways
where the advancing (total approach volume excluding lefts utilizing
a Se arate left turn lane) traffic volume exceeds the relationship
33 80-S /(R(1-R ; where S is the highway speed (speed limit
assumed), in MPH, and R is the ratio of right turns to the advancing
traffic volume for design conditions, expressed as a decimal.
0 The need for a right -turn lane shall be met for four -Lane highways
where the above two-lane warrant is met and a minimum of 50 right
turning vehicles is exceeded. Two-lane versus four -Lane highway
determination is based on the number of advancing volume lanes
used to carry through traffic, e.g. Where one approach lane carries
through traffic it is considered a two-lane highway..
Specific nmfety concerns may also be cause for inclusion, on a
case by case basis, such as restricted sight distance or other severe
geometric conditions. In any event it shall be the Agency's prerogative
,to determine the implementation of any improvements in considering
any impacts or hardships that might result from such improvements.
APPROVED:
irector Planning
D to
PLANNING COMMISSION 26 May 1992
The South Burlington Planning Commission held a meeting on
Tuesday, 26 May 1992 at 7:00 pm, in the Conference Room, City
Hall, 575 Dorset St.
Members Present:
William Burgess, Chairman; Mary -Barbara Maher, David Austin,
William Craig, Terry Sheahan, Catherine Peacock, Ann Pugh
Also Present: P�
Joe Weith, City Planner; Sid Poger, The Other Paper; Charles
Scott, Lisa Scagliotti, Greg Premo, Andrew Lee, John Larkin,
Dave Andrus, Dave DuBrul, Gerry Milot, Lance Llewellyn, Rene
Bourne, G. Bourne, Vince Bolduc, Holly Campbell, Edwin Faber III,
Andy O'Brien, Jason George, St-ven Jaffe, Greg Barth, Alan
Bartlett, B. Mark, John Steel Chuck Hafter, Albert Audette,
Dick Underwood, Roger Dickinson, L. Hillman
1. Executive Session:
Mrs. Maher moved the Commission meet in Executive Session to
discuss advisement from the C=.:y Attorney. Mr. Craig seconded.
Motion passed unanimously.
Regular Session: (7:45 pm):
1. Other Business:
Mrs. Maher directed the Commission's attention to a letter from
Ann Byrnes regarding problems with Pillsbury Manor construction.
She noted that John Larkin had called Ms. Byrnes today to try to
solve the problems.
Mr. Bur.zess noted that items 3 & 4 on the agenda are sketch plans
for PRD's in the Southeast Quadrant Zone. The question is
whether they would be heard under the old or- proposed zoning.
Mr. Burgess noted the City Council has warned a public hearing
on proposed zoning in a few days. Rather than hear the two items
tonight, Mr. Burgess said he would like to delay them until after
the City Council has met and decided what to do with the proposed
zoning ordinance. He asked for a 2-week delay in hearing the
two sketch plans.
Ms. Pugh moved to delay review of items 3 & 4 on theagenda enda until
16 June 1992. Mr.Crai seconded. Motion passed unanimously.
Mr. Milot said he has designed plans to fit both possibilities.
He noted it has been expensive to cooperate with the city on
this. He asked what would happen if the Council amends the
Ordinance and decreases the densities. Mr. Craig said they
PLANNING COMMISSION
26 May 1992
page 2
should wait and see what happens. Mr. Burgess said he didn't
know how to answer the question. The Council can either reject
or adopt the proposed zoning as a temporary referendum and get a
new density number and try again. He stressed it was not the
Commission's intention to put these items off forever and ever.
Mrs. Maher suggested the applicant look closely at wet areas as
there are more severe standards now. Mr. Milot said they have
done this. He asked if preliminary approval can be phased.
Mr. Burgess said that would be no problem but noted the clock
starts when the applicant begins. If the Commission got edgy
that it wouldn't be completed in time, theycould turn it down.
Mr. Milot asked if a sketch plan could be warned and have
neighbors notified. Mr. Burgess said a sketch plan would still
not have force of law.
2. Site Plan application of the City of South Burlington for con-
struction of Phase I of Dorset Street Park:
Mr. O'Neill said the park concept was thought of by a committee
of city, school and community members. He noted there had been
concerns by residents of Village of Dorset Park which have -now
been addressed.
Bob White presented the plan. The first phase of the plan will
be mainly for site work. The city is planning to do the fol-
lowing: two soccer fields, 2 Little League fields, a Babe Ruth
baseball field, a softball field, a multi -purpose field, tennis
and basketball courts, parking, roadway, site utilities, entrance
sign, lighting for parking areas. There will be no buildings or
stadiums at this time, and tennis court lighting will be done at
a later time.
Mr. Burgess asked about the length of the approval. Mr. Weith
said the regulations allow the approval to be open-ended, or
the Commission could choose an approval time period. Mr. Austin
noted that "by default" the Commission would be approving the
location of buildings. Mr. Burgess said the Commission would
still consider traffic, access, circulation, etc. for the build-
ing locations.
Mr. Sheahan asked about the building time frame. Mr. White said
that optimistically the Little League, baseball and soccer fields
would be seeded by the end of fall. The rest of the site work
would be done by early in the next construction season. He an-
ticipated that active use of the park could begin at the end of
this summer.
Regarding access, the city would re -align Swift Street and create
an access drive. From the parking area there is a connection to
PLANNING COMMISSION
16 June 1992
page 4
that is actually wetland. Mr. Steele said they swapped this for
a piece that is dry and doesn't seem to have any reason not to be
developed. Mr. Weith noted the Regional Planning Commission did
a study last year which identified that piece as wetland. He
said if Mr. Milot can show it isn't, the Commission will look at
the swap.
Regarding the additional density, Mr. Burgess noted it is not the
applicant's by right but has to meet certain criteria. Mr. Craig
felt there had to be something exceptional in the plan to get the
bonus. Mr. Milot noted he is leaving 45 acres open across the
road. He said they will go through the exercise of trying to
convince the Commission that they are a PRD and will also try to
cut back to the allowable amount. Mr. Weith said it would help
if the applicant shows how all the criteria are met. Mr. Milot
asked if it would help if all units were affordable. Members
liked that idea.
Mr. Steele said they have indicated the pedestrian trail accord-
ing to the map they received. He traced the route on the plan.
Mr. Milot said he would grant the easements with the option to
relocate as long as the path isn't put in a buildable area. Mr.
Milot asked if this would cover the recreation fee.
Mrs. Maher asked why the barn is being kept. Mr. Milot said he
hoped it could be used. They are talking to three sources. He
noted it is a state-of-the-art barn, the finest in the north-
east. The University wants it but they are "cash poor." Mr.
Milot said it would be a shame to tear it down as it could be an
asset. He said they are proposing to gift it to the University
for research facilities. This would involve a total of 90 acres,
and Mr. Milot felt this would also benefit the neighborhood. A
house might be built next to it for a tenant farmer.
Mr. Steele said they would provide municipal water and sewer.
The sewer would connect with Village at Dorset Park. Mr. Weith
said they should put in appropriately sized facilities. Mr.
Sheahan asked what burden this puts on current residents. Mr.
Milot said the sewer would be impractical for anyone to tie into.
He noted that the residents he had talked to do want municipal
water.
Mr. Milot said he is proposing a 3-5 year buildout.
5. Continue sketch plan application of G. Milot and John Larkin
for a 93-lot planned residential development on 67 acres of land,
east side of Spear Street opposite Deerfield Drive:
Mr. Steele said they would extend Deerfield Drive to the east
PLANNING COMMISSION
16 June 1992
page 5
property line of the project. It would have an 80 ft. right of
way with 32 ft. paved. They would prefer to go with two access
points on Deerfield Drive but could also access Spear St. or
connect with the Farrell parcel. Mr. Craig noted they still have
a second access problem. Mr. Milot said they talked about a
Spear St. access but staff felt they didn't want another curb cut
on Spear St. It would also infringe on a neighbor's home as
lights from cars would shine directly into the windows. Mr.
Milot said they wanted to put an access as far from single family
homes as possible. He said there is also a wetland
consideration. Mr. Weith said there is a situation here where
there could be roads where the city doesn't want them. Mr.
Craig said the Commission is being asked to evaluate an applica-
tion based on existing law and you can't do "regulations on the
fly." Mr. Milot said they can do the road, dedicate it to the
city and the city can take it up whenever they feel they no
longer need it.
Mr. Steele said they are proposing 97 units (without three lots
that may not be allowable it would be 94). This relies heavily
on the 25% bonus. Mr. Weith noted this may involve the
transferring of units from other properties. Mr. Milot said he
is not interested in transferring any density onto this lot. Mr.
Weith said he has a concern with open space along Spear Street
and said they were trying to discourage forming lots on these
streets. There is also an attempt to maintain an open feeling in
the Quadrant. He said the city is trying to encourage develop-
ments like Village at Dorset Park and trying to discourage such
developments as Butler Farms and Oak Creek Village which have 300
ft. setbacks. Mr. Craig asked if the 3 units were allowed, would
the applicant be willing to designate building envelopes. Mr.
Milot said he would. Mr Steele noted some of the houses would be
restricted in height because of the view protection requirements
of the new ordinance.
Mr. Burgess said the city has just passed a Zoning Ordinance.
Now the Commission is talking about changing what was done. He
said the Ordinance was constructed deliberately to create the
impression of openness. Mr. Burgess said he can't find any
reason to say those units can be built there. Ms. Peacock
agreed. Mrs. Maher said she had no objection if they were as far
back as possible. Mr. Sheahan said he was not thrilled about
waiving anything. Mr. Austin said he wasn't sure this is the
right place to waive anything. He said there don't have to be
buildings everywhere. Mr. Milot said he would stake out the lots
for the Commission to see. He felt they would be impressed at
how far back they are.
PLANNING COMMISSION
16 June 1992
page 6
Mr. Steele then showed the Recreation Path route. Mr. Milot said
they would build the path instead of a sidewalk in some places.
Commission members liked that idea.
The question was raised as to whether the Commission wants a
traffic impact analysis. Mr Austin noted the traffic situation
is already a problem. Mr. Weith said a study could show what
could be done to help the situation. Mr. Sheahan said he would
like some level of service information. Mr. Burgess said he
would like to know what improvements could be done. Mr. Milot
said they would do an intersection analysis.
Mrs. Maher asked the applicant to describe the wetland. Mr.
Milot said it is partially treed and doesn't dry up. They would
leave it in its natural state. It is not deep enough to be a
hazard.
A resident asked about timing. Mr. Milot said it would take them
quite a long time to do preliminary plat drawings, then final
plat, then Act 250.
At this point, members agreed to postpone item #8 -on the Agenda
as the hour was getting late.
6. Discussion of proposed amendments to the South Burlington
Zoning Regulations - Industrial -Agricultural District:
Mr. Weith said he did an industrial lot survey as recommended by
the City Council. He showed slides of industrial sites in
Milton, Williston and Colchester. Mr. Sheahan observed that none
of the projects just seen came close to maxing out on a site.
Mr. Weith warned that this was just a handful of samples, but he
did feel they were typical. Mr. Sheahan said he felt there
should be a standard coverage regardless of lot size. Mr. Weith
noted there seems to be a lot of demand for 3-10 acre parcels.
Members then reviewed Draft #4 of the proposed Regulations.
Permitted and conditional uses would include agriculture,
recreation, municipal facilities, single family homes on pre-
existing lots of three acres or less. Industrial and office
uses would be allowed in PUD's only. The lot size for newly
created lots would require a 3-acre minimum with a 12-acre
average. Maximum building coverage would be 300. There would be
no changes for pre-existing lots of 3 acres or less except that
single family homes would be allowed.
After a discussion, members agreed to a 3 acre minimum with a
10-acre average. Mr. Sheahan felt that land use planning should
leave some larger lots. After further disucssion, members agreed
on a 3 acre minimum, 8 acre average with 30 percent building
PLANNING COMMISSION
9 February 1993
page 5
2. Theslan shall be revised to showthelocation of the access
between this,212perty and 348 Dorset St. The access shall be
located so as not to conflict with the a roved arkin s aces
on the 348 Dorset St. property_. The revised plan shall be sub-
mitted to the City -Planner for approval within 90 days.
3. The applicant shall return to the Planninq Commission in two
years- fo_r_Wa review ofhowthe access _connection between the two
properties has functioned over the two yearPeriod. +WWAt that
time,_ the Planning Commission shall decid_e_whe_ther_ or not the
access shall remain open and whether or not.a-portion of the
paved area shall be removed and replaced with lawn landsca in
to improve the appearance_of the north side of the property.
4. Any chan_gesWto thesitewhich differ_ from this_ approved site
plan shall not be made without first�obtaining_approval from the_
Plannin Commission .
Ms. Peacock seconded the motion which then -passed unanimously.
6. Preliminary application of Larkin-Milot Partnership for a
planned residential development consisting of 73 single family
lots on 66.7 acres of land located on the east side of Spear
Street opposite Deerfield Drive:
Mr. Austin raised the question of whether he should sit on the
Commission for this hearing as he is with a legal firm that has
done work for Fred Hackett who opposes the project. Mr. Milot
stated he had no objection to Mr. Austin sitting on the
Commission for this hearing as he did not feel it represented
a conflict.
Mr. Steele noted that two entrances have been provided. There
will be 27 acres of open space. All lots will be single family.
There is a Class 2 wetlands which dictates the layout of the pro-
ject. This wetlands requires a 50 foot buffer around it. Mr.
Steele then addressed staff comments. Mr. Weith had questioned
the impact of the northerly access on house cross the road as
there would be headlights shining in their windows. mr. Milot
agreed to move the road over one lot.
The question of homes indicated in non -buildable areas was then
addressed. Mr. Steele -paid all or a portion of 45 lots are in
restricted areas. They feel part of the unbuildable area was
thought to be a wetland and it is now known that it isn't. Mr.
Weith noted there is also a restricted area on Spear St. This
can be met by setting the building envelopes back. Mr Milot said
this will be done on final plat. None of the lots will access
Spear St. He said he was willing to give an 80 ft. r.o.w. for a
road along the full boundary with the Economou property.
PLANNING COMMISSION
9 February 1993
page 6
View Protection: Mr. Steele showed the heights of various pro-
posed homes as they would be allowed with view protection re-
strictions.
The proposed landscaping plan was also presented as was the
location of the proposed pedestrian trail. Mr. Milot said they
are willing to build that path and asked for a credit toward the
recreation fee for the part of the path that is not a replace-
ment of sidewalk. Mr. Bresee of the Rec Path Committee said they
have reviewed the plans. Gravel needs to be 10 feet wide with 8
feet paved.
Traffic: Mr. Llewellyn noted a letter on traffic given to Com-
mission members tonight. He felt it explained what the
Commission wanted to know. Mr. Weith said he hadn't yet gotten
comments from Regional Planning. Mr. Llewellyn said they would
change the timing for the light at Swift/Spear Sts. Mr. Weith
said he has asked that the current timing be checked.
Mr. Llewellyn said the overall level of service is not provided
for unsignalized intersections. They will present turning
movement analysis, if required. They will design turning lanes
if the report is accepted. Mr. Austin asked if these would be
the only road improvements. Mr. Llewellyn said they would.
Sewer: Mr. Milot said he tried to come up with a plan to give the
City a time window. Their concern is that to do that infra-
structure, they would have to finance it. Without the sewer cap-
acity so lots can be built, they can't get financing. He sug-
gested a plan that would allow four years holding of the sewer
capacity until roads are built. Once the road is built, they
would be subject to losing the sewer capacity if the homes
weren't built. Mr. Weith said he was comfortable with the con-
cept.
The entire development would require 45,800 gpd. This would be
at the Bartlett Bay facility. According to present calcula-
tions, there is now an available capacity of 63,000 gpd. The
State says this figure should be only 54,000 gpd. There is
another development being reviewed which would use it all up and
leave no capacity for smaller developments or even some additons
to homes already existing. Mr. Weith suggested Mr. Milot
consider some 3 bedroom units to get the required capacity down.
Mr. Milot felt thAt was restrictive. He felt there could be some
3 bedroom homes and, if there were, he would return some capacity
to the city.
Mr. Weith noted another issue. He received a letter from the
City Manager today. The City Council is concerned about force
main sewer systems in the Southeast Quadrant. The City En-
PLANNING COMMISSION
9 February 1993
page 7
gineer will make a presentation on this to the Council on 1
March. Mr. Weith felt the Commission should wait till the
outcome of that study before making a final decision on sewer.
Mr. Milot said he did not want to have to wait 2 years.
Regarding phasing, Mr. Milot felt they would built 36 units in
year one and 37 in year two.
Re: School impact fee, Mr. Steele said the School Board has
suggested $750 per unit but is still discussing it. Mr. Milot
said he wouldn't oppose it. He hoped the schools would put the
money to good use.
Housing types: Mr. Milot said the houses would range in cost from
$175,000 to $400,000. This is not "affordable" by state defin-
ition. He said affordable housing is hard to do with such a low
density.
Mr. Weith said he felt lot 35 was a better place for the access
to the Farrell property. Mr. Milot felt that didn't do them any
good and would encourage development of the Farrell property
which would make their streets collector streets. Mr. Weith felt
both options should be left open. Mr. Milot said they would then
lose another lot and add traffic to the neighborhood. He felt
developments need to access collector roads instead of neighbor-
hood streets. Members of the Commission preferred the easterly
access as shown.
Mrs. Maher noted receipt of information tonight from residents
opposing the project. She noted the Commission has not had time
to review this information.
Mr. Gilbert said his position is that this hearing is a sketch
plan and not a preliminary plat. He felt it was a new plan,
totally different from what was presented at previous sketch
plans. He said the Commission is being asked to assume that the
applicant is entitled to maximum density. He then showed the
developable area and noted the Commission MAP allow development
in other areas. He felt that the base density should be 1.1
times the developable area. The Commission could then grant a
25% bonus, if it chose to. He said if undevelopable area is
allowed to be used to compute base density, all someone would
have to do is buy an adjacent wetland and come up with quarter
acre zoning on a 5-alcre piece they happen to own. He also
questioned whether a wetlands study was ever done or was
put together by someone at a desk.
Regarding traffic, Mr. Gilbert
when schools and the University
may be a philosophical question
said he felt the study was done
were not in session. He said it
as to where cars come from and
1
PLANNING COMMISSION
9 February 1993
page 8
why, but the cars are not philosophical.
Mr. Milot replied that the intent of the "unbuildable" area
concept was to protect the wetland. That wetland has been
flagged by an expert. The State willwill at aquifer recharge.
The density used to be 2/acre. Recalculation was to take the
total area and multiply it by 1.1. The added stipulation was
that at no place on the property could you exceed 4 units per
acre. In p.r.d. requirements, the Planning Commission gave it-
self the right to review buildable/unbuildable areas and to make
changes. Mr. Milot added they are not requesting the 25% bonus.
Arthur Boyd said his concern is that residents have an
established neighborhood of 2 acre lots and now right behind them
would be these 1/2 acre lots. He felt those lots should be the
same as the currently existing lots and then getting progress-
ively smaller. He felt their property values would be adversely
affected by this plan. He asked that the plan be denied and that
residents be given several months to study it and evaluate it. He
also noted it would block their easterly view of mountains.
Mr. Hackett, also a neighbor, felt the Commission should take
into account the impact on the neighborhood and town. He was
also concerned about the transition from 2 per acre to 1/2 acre
zoning and with traffic impacts. He felt the 1.1 per acre zoning
was being manipulated.
Mr. Milot replied they are entitled to reasonable expectation for
the use of their land. He stressed that the zoning changes made
were not intending to take land away from owners.
Members agreed to continue the hearing and to request traffic
information from Regional Planning.
Mr. Austin moved to continue the application until 9 March 1993.
M=Sheahan seconded. Motion passed unanimously.
As there was no further business to come before the Commission,
the meeting was adjourned at 11:00 pm.
Clerk
PLANNING COMMISSION
10 AUGUST 1993.
PAGE 5
Three sets of the approved revised plans shall be submitted to the
City Planner.
a) the engineering plan shall show the existing decks on the rear
of the building.
b) the plan shall show a five foot green strip between the main
access drive and proposed sidewalk.
c) the existing light pole in the green area shall be moved to the
edge of the access drive.
4. All exterior lighting shall be downcasting and shielded and
shall not cast light beyond the property line Any change in
existing lighting or new lighting shall be approved by the Citv
Planner prior to installation.
5. The revised final plat plans shall be recorded in the South
Burlington Land Records within 90 days or this approval is null and
void. The plans shall be signed by the Planning commission Chair
or Clerk prior to recording.
6. The applicant shall obtain a Certificate of Occupancy from the
Administrative Officer prior to occupancy of the new addition
7. Any changes to the plan shall require approval by the South
Burlington Planning Commission
8. The grass paver block area of the emergency access shall be
given one year to get established The Planning Commission shall
review the health and status of this green area in July, 1994 If
the Commission determines that the grass/paver block design is not
working as expected, the applicant shall submit an alternate plan
for the access to the Planning Commission for approval
Mr. Sheahan seconded the motion which then passed 5-1 with Mrs
Maher opposing.
5. Public Hearing: Final Plat application of Larkin-Milot
Partnership for a planned residential development consisting of 73
single family lots on 66.7 acres of land located on the east side
of Spear Street opposite Deerfield Drive:
Mr. Steele said that since last time they have reduced the number
of lots in the sensitive area from 6 to 4 and have extended the
length of the cul de sac to add those 2 lots. The total is still
73 lots.
Mr. Austin said he will vote against the plan as he felt certain
features have to be met and aren't. He felt it doesn't match the
l
PLANNING COMMISSION
10 AUGUST 1993
page 6
features of the area and that 73 lots are too many.
Mrs. Ratkus was concerned with moving the detention system. Mr.
Milot said there can be a stipulation for an easement so the city
can maintain it if the homeowners association doesn't. The
Commission would have the right to enforce it at any time.
Mr. Scollins felt there was too much density. He also questioned
the rec path which is to be between two housing clusters and noted
that people who use the path use the east portion of that area.
Mr. Milot said he worked with the Rec Path Committee and they want
as open an area as possible. Mr. Milot said they have agreed to do
the Rec Path along with the completion of Pinnacle Drive.
Ms. Peacock moved the Planning Commission approve the final plat
application of Larkin-Milot Partnership for a planned residential
development consisting of 73 single family lots on 66.7 acres of
land located on the east side of Spear Street opposite Deerfield
Drive as depicted on a plat entitled, "Nowland Two, Subdivision
Plat," dated 7/92 and last revised 7/28/93, and a 28 page set of
plans, page one entitled "Nowland Two, South Burlington, Vermont,"
dated October, 1992 (stamped "received" 7/30/93) prepared by Fitz-
patrick Llewellyn, Inc, with the following stipulations:
1. Any previous approvals and stipulations affecting the subiect
property which are not superseded by this approval shall remain in
effect.
2. In accordance with section 26.602 of the South Burlinaton Zonin
Regulations, the Planning Commission approves the creation of lots
for development upon land designated as "restricted area" on the
Southeast Quadrant Official Zoning Map. It is the Commission's
opinion that based on the information submitted by the applicant
the proposed development will not adversely affect wetlands on the
property. Also, it is the Commission's opinion that the goals for
maintaining an open space corridor along the north -south arterial
roadways in the Southeast Quadrant will be promoted through the
establishment of building envelopes on lots 5 through 8. The al-
lowance of buildings in this manner is compatible with adjacent
development along Spear Street. Finally, the Planning Commission
supports moving the r.o.w. for a future north -south collector road
to the east as proposed so as not to impact the wetland area.
3. The Commission approves the 1100 foot long cul-de-sac street
serving lots 52-73. It is the Commission's opinion that the 1100
foot length will not result in unsafe or inefficient traffic con-
ditions particularly since r.o.w's are being reserved for roadway
connections to future developments on adjoining parcels.
4. In order for the Commission to find that the proposed develop-
PLANNING COMMISSION
10 AUGUST 1993
page 7
ment will not cause unreasonable highway congestion or unsafe con-
ditions with respect to use of the highways the applicant shall be
responsible for the following:
a) the applicant shall construct the southbound left turn lanes at
each proiect access on Spear Street (sheets 5 and 7) pri_or__to
issuance of a zoning/buiiding permit for the 38th lot
b) The applicant shall construct the improvements to the Spear
Street/Swift Street intersection as shown on the plan entitled
"Spear Street/Swift Street Intersection Improvements" dated 5/93
prior to the issuance of a zoning/building permit for the
construction of any residential structures
c) Prior to issuance of any zoning/building permits for this devel-
opment the applicant shall post a bond to cover the costs of con-
structing the improvements referenced in a) and b) above This
bond or bonds shall remain in effect until such time as the
improvements are constructed.
d) Prior to issuance of any zoning/building permits for this de-
velopment, the applicant shall be responsible for retiming the
signal phasing at the Spear Street/Swift Street intersection as
recommended in the traffic analysis submitted by the applicant
5. The Planning Commission grants a credit of $300 per lot for
construction of the portion of the proposed recreation path located
outside of the public street right-of-way. This credit may be
applied toward required recreation fees At time of application
for a zoning/building permit the applicant shall pay the differ-
ence between the recreation impact fee and the $300 per lot credit
6. The developer shall be required to install two trees on each lot
as required in Section 19.104(a) of the South Burlington Zoninq
Regulations. A "Notice of Condition" addressing this requirement
shall be recorded in the South Burlington land records prior to
recording the final plat plans.
7. Prior to issuance of any zoning/building permits the applicant
shall post a $103 366 landscape bond for proposed street and common
area trees, and a $65 335 bond for proposed lot trees The bonds
shall remain in effect for three years to assure that the planted
landscaping has taken root and has a good chance of surviving.
8. Legal documents for all public streets (i.e, irrevocable offer
of dedication) and easements (e.g., utility easements and
recreation path easements) shall be submitted to the City Attorney
for approval and shall be recorded in the South Burlington Land
Records prior to issuance of any zoning/building permits
PLANNING COMMISSION
10 AUGUST 1993
page 8
9. A "Notice of Condition" addressing the height limitations for
structures and landscaping on each lot shall be submitted to the
City Attorney for approval and shall be recorded in the South
Burlington land records prior to recording the final Plat plans.
10. In accordance with section 301.5 of the subdivision regula-
streets, water mains, sanitary sewers, storm drains, etc.), the
developer shall submit to the City Engineer "as -built" construction
drawings certified by a registered engineer.
11. A "Notice of Condition" addressing the building envelopes on
lots #5-8 and purpose and restrictions thereof shall be submitted
to the City Attorney for approval and shall be recorded in the
South Burlington land records prior to recording the final plat
plans.
12. Prior to recording the final plat plans, the plans shall be
revised to show the following:
a) the survey plat shall show survey data for the recreation path
easement and the utility easement between lots 41-42 and 57-58.
b) lot numbers shall be correctly shown on sheet 2.
c) the plans shall show a 20 foot drainage easement for the pro-
posed drainage pipe on the Ratkus property west of Spear Street.
This easement shall be included in the required legal documents.
13. A bond for streets, sidewalks, recreation paths, sewer and
water shall be posted prior to issuance of a zoning/building
permit. The amount of the bond shall be approved by the City
Engineer.
14. No zoning/building permit will be issued for a lot until the
street serving that lot has a gravel sub -base installed in
conformance with City specifications.
15. The Commission approves a total sewer allocation of 46,957 gpd
for this development. The length of time that this sewer alloca-
tion approval shall remain in effect shall be tied to roadway con-
struction. The roadways serving this development shall be
completed within four years of final plat approval. The sewer
allocation for any lots served by roadways which are not completed
within this four year time limit shall be lost unless reapproved by
the Planning Commission. In addition, if at the end of three years
no more than 50% of the roads have been completed, 25% of the total
sewer allocation shall be lost unless reapproved by the Planning
Commission.
PLANNING COMMISSION
25 OCTOBER 1994
Page 7
Subdivision Approval" which describes the management of the private
roads in the development. The specifics of the agreement shall be
finalized prior to final plat approval. This document shall be
approved by the City Attorney and the Planning Commission and
recorded in the South Burlington Land Records prior to the
recording of the final plat plans.
Mrs. Maher seconded the motion which passed 4-1 with Mr. Teeson
opposing.
Mr. Sheahan rejoined the Commission.
9. Public Hearing: Revised final plat application of Larkin-Milot
Partnership to amend an approved planned residential development
consisting of 73 single family lots on 66.7 acres of land located
on the east side of Spear Street opposite Deerfield Drive. The
amendment consists of revising the landscape plan to include cedar
trees and a four foot high wooden rail fence along the 50 foot
wetland buffer line behind lots #33-45.
Mr. Weith said they need to be sure the landscaping doesn't exceed
height limits because of the view protection zone. These changes
have been mandated by the District Environmental Commission.
Mr. Larkin assured that the fence and landscaping would meet all
requirements.
Mr. Weith was comfortable with the species of trees.
Mr. Austin moved the Planning Commission approve the revised final
plat application of Larkin-Milot Partnership to amend an approved
planned residential development consisting of 73 single family lots
on 66.7 acres of land located on the east side of Spear Street
opposite Deerfield Drive. The amendment consists of revising the
landscape plan to include cedar trees and a four foot high wooden
rail fence along the 50 foot wetland buffer line behind lots #33-
45, as depicted on a plan entitled "Nowland Two, South Burlington,
Vermont, Landscape & Lighting Plan" prepared by FitzPatrick-
Llewellyn, Inc., dated November, 1992, with a last revision date of
3/22/94, subject to the following stipulations:
1. All previous approvals and stipulations which are not
superseded by this approval shall remain in effect.
2. The final plat plan shall be recorded in the land records
within 90 days or this approval is null and void. The plan shall
be signed by the Planning Commission Chair or Clerk prior to
recording.
PLANNING COMMISSION
25 OCTOBER 1994
Page 8
Mr. Sheahan seconded the motion which was then passed unanimously.
As there was no further business to come before the Commission, the
meeting was adjourned at 9:50 P.M.
Clerk
PLANNING COMMISSION
10 AUGUST 1993
page 9
16. No zoning/building permit will be issued for construction of
any dwelling unit within this development until after the City
adopts an education impact fee ordinance or September 1 1993
whichever first occurs. This condition is being imposed to provide
the school district a reasonable period of time to complete devel-
opment of an impact fee ordinance and present the Ordinance to the
South Burlington City Council for adoption No zoning/building
permits shall be issued after the adoption of such an impact fee_
until that impact fee has been paid.
17. A "Notice of Condition" shall be recorded in the land records
prior to recording the final plat plans which addresses the re-
quirement of the homeowner's association to maintain the community
mailbox area and all drainage ditches.
18. The final plat plans, including survey plat shall be recorded
in the South Burlington land records within 90 days or this ap-
proval is null and void The plans shall be signed by the Planninq
Commission Chair or Clerk prior to recording.
19. As provided in Section 605 of the South Burlington Subdivision
Regulations, if no action is taken to construct substantially the
proposed subdivision within three years said approval shall become
null and void.
20. The retention ponds shall be maintained by the homeowners'
association. The legal documents for the Association shall state
this responsibility. The legal documents shall be approved by the
City Attorney prior to permit issuance.
21. The recreation path shall be constructed by the cornlpletion of
Pinnacle Drive or during the construction of the cul-de-sac,
whichever first occurs.
Mrs. Maher seconded. Motion passed 5-1 with Mr. Austin opposing
Mrs. Maher left the meeting at this time.
6. Site plan application of Leland & Patricia Calkins for parking
and coverage changes on a lot currently used for wholesale
distribution, 3 Calkins Court:
Ms. Calkins said they will upgrade, paint, move the doorway and
landscape. There will be new overhead doors.
No issues were raised by the Commission.
Mr. Austin moved the Planning Commission approve the site plan ap-
plication of Leland and Patricia Calkins for parking and coverage
changes on a lot currently used for wholesale distribution as de-
PLANNING COMMISSION
8 AUGUST 1995
PAGE 6
of plans, page two entitled "Southeast Summit South Burlington. -
Vermont, Landscape Plan," prepared by Michael Lawrence &
Associates dated November, 1994 last revised 7/27/95 with the
following stipulations:
1 All previous approvals and stipulations which are not super-
seded by this approval shall remain in effect
2. Prior to issuance of any zoning_permits the applicant shall
post the following landscape bonds to cover the installation cost
and value of all proposed landscaping: (a) a $52 500 bond for
multi -family site landscaping (b) a bond in an amount to be
determined by the City Planner for the proposed street trees and
site landscaping and (c) a $96 600 bond for the proposed two
trees per single-family lot. The bond(s) shall remain in effect
for three years from the date of planting to assure that the
Planted landscaping has taken root and has a good chance of
surviving_
3. The final plat plan shall be recorded in the land records
within 90 days or this approval is null and void The plan shall
be signed by the Planning Commission or Clerk prior to recording
Mr. Crow seconded. The motion then passed unanimously.
8. Public Hearing: Revised Final Plat Application of Larkin-Milot
Partnership to amend a previously approved planned residential
development consisting of 73 single family lots, Spear Street.
The amendment consists of 1) modifying the front yard setback
requirement along a collector street from 50 ft. to 20 ft. and 2)
reducing size of drainage easement on Ratkus property:
Mr. Milot explained that the easement for the sewer right-of-way
is on the Ratkus property. Mr. Ratkus is concerned with trees he
planted being disturbed during maintenance. Since the
disturbance would only be 8 ft., the question is why there has -to
be a 20 ft. easement for maintenance. Mr. Szymanski agrees that
10 ft. would be OK. Mr. Audette is on vacation and can't be con-
sulted.
Commission members felt 10 ft. was OK if agreed to by the City
Engineer.
Mr. Milot then explained that 4 lots are impacted by the 50 ft.
setback. All of these are view protected lots which will have
one-story homes. They are requesting a larger building envelope
in which to build a house. All access to these lots will be off
the interior street so these are side yard setbacks. Lots 1 and
51 are the only ones for which a waiver is now being asked.
PLANNING COMMISSION
8 AUGUST 1995
PAGE 7
Mr. Burgess said he understood the problem but didn't know what
reason he had for approving what is asked for. Mr. Milot said
the impact would be minor and no impact on the community.
A poll of members showed the following opinions: Messrs Beaudin,
Sheahan, and Teeson felt it was OK. Mr. Austin said it would be
OK as long as there were no driveways and there was more land-
scaping provided. Messrs Crow and Burgess were opposed.
Mr. Austin moved the Planning Commission approve the revised
final plat application of Larkin Milot Partnership to amend a
previously approved planned residential development consisting of
73 single family lots, Spear Street. The amendment consists of:
1) modifying the front yard setback requirement for lots 1 and 51
along a collector street from 50 feet to 20 feet and 2) reducing
size of drainage easement on Ratkus property, as depicted on a
plan entitled "Nowland Two, South Burlington, Vermont, Site and
Utilities Plan," sheet 5 of 27, prepared by Fitzpatrick-
Llewellyn. Inc., dated July, 1992, last revised 7 28195, with the
followings stipulations:
1. All previous approvals and stipulations which are not super-
seded by this approval shall remain in effect.
2. The Planning Commission, pursuant to Section 6.607 of the
zoning regulations, modifies the front yard setback requirement
along Nowland Farm Drive from 50 feet to 20 feet for lots 1 and
51 only.
3. The final plat plans shall be revised as follows prior to re-
cording and shall require approval by the City Planner:
a. The landscape plan shall be revised to add a low berm
with dense landscaping along Nowland Farm Drive to buffer
the homes on lots 1 and 51 from the street. Proposed
landscaping shall consist of species which at maturity will
comply with View Protection Zone height limitations.
b. The site and utilities plan (sheet 5 of 27) shall be
revised to show the easement dimensions.
4 The legal documents for the drainage easement shall be ap-
proved by the City Attorney and recorded in the land records
5. Based on the expressed representation of the applicant, there
shall be no driveway access provided from Nowland Farm Drive.
All lots shall be accessed from the local roads only.
PLANNING COMMISSION
8 AUGUST 1995
PAGE 8
6. The final plat plans shall be recorded in the land records
within 90 days or this approval is null and void The plans
shall be signed by the Planning Commission Chair or Clerk prior
to recording.
Mr. Sheahan seconded Motion passed 4-2 with Messrs Crow and
Burgess opposing.
9. Site plan application of William and Lee Bissonette to
construct an 826 sq. ft. addition and add 38 indoor seats to an
existing 3174 sq. ft. standard restaurant with 94 seats and 28
outdoor seats, 1251 Williston Road:
Mr. Bissonette said they are trying to add seating for customers.
He noted the main concern was traffic and they are trying to make
improvements. They will redesign the entrance to eliminate left
turns into the property. They will add $6200 in landscaping and
also increase the perennial garden.
Mr. Vock said the driveway will go from 32 ft. to 15 ft. It
would be a sharper turn than the one at Ramada.
Mr. Weith felt this was a better plan than he'd seen before.
Mr. Austin asked if it warrants this increase in traffic. Mr.
Weith said the traffic numbers he gave the Commission are from
ITE. The applicant doesn't feel there will be that much of an
increase. Mr. Bissonette said that now people who come and don't
find seats leave. With the changes, 90% of the seats will be in
view. He felt that due to the conditions of the market, he has
to provide additional seating. He didn't feel there would be
more trip ends because he felt they can't produce food fast
enough.
Mr. Teeson noted that the business is dictated by parking and he
didn't think the addition would add new business.
Mr. Weith said they other side of the argument is that people who
can find a seat with the addition will come back and will add
business. He noted it is a high turnover restaurant and that the
parking lot is never full now.
Mr. Bissonette said their peak hour for business is 11:30-2 pm.
Mr. Burgess felt there would be more traffic but it would be
offset by the access not allowing left turns in. Other members
agreed there would be a net benefit. They agreed on 20
additional peak hour trip ends.
Memorandum -- Planning
December 8, 1992 agenda items
December 4, 1992
Page 3
Bikepath: The Recreation Path Committee reviewed the last sketch
plan (see enclosed memo). The applicant is proposing a six (6)
foot Wide bike path located within the 30 foot paved roadway along
the'southerly side of the road. A painted line will be used to
separate the bike path from the traveled way.
Preliminary plat review: The following information should be
submitted for preliminary plat review:
--- proposed and existing landscaping details
--- coverage information
--- property survey of entire site
--- show property lines for Ben Franklin lot.
--- cost of new bank building
--- existing and proposed exterior lighting details
--- the loading dock change for Ben Franklin should be requested
by them and treated as an amendment to their plat, or should
be included as part of this application. If the latter, then
Ben Franklin needs to be a coapplicant.
4) SOUTHEAST SUMMIT/NOWLAND II 369 UNIT PRD - SKETCH PLAN
This project consists of a planned residential development
consisting of 369 dwelling units on two (2) parcels of land. The
Southeast Summit parcel will consist of 237 units (80 multi -family
units and 157 single family lots) and the Nowland II parcel will
consist of 132 units (92 single family lots and 40 multi -family
elderly units).
The Planning Commission reviewed a sketch plan for both these
parcels on 6/16/92 (minutes enclosed). At that meeting these two
(2) parcels were treated as separate projects. These projects have
now been combined into one (1) project due to the transfer of 40
units from the Southeast Summit parcel to the Nowland II parcel
under Section 26.604 of the zoning regulations.
3
Memorandum - Planning
December 8, 1992 agenda items
December 4, 1992
Page 4
SOUTHEAST SUMMIT
This portion of the development is located at the south end of
Dorset Street, 157 acres on the westerly side and 45 acres on the
easterly side. This project abuts the Shelburne Town line and is
located in the SEQ District. The entire development is proposed
for the westerly side.
Access: Access to the development will be via an 80 foot r.o.w.
which will bisect the project and eventually continue westerly to
connect with Allen Road. Off from the main east -west access road
will be two (2) main loops, one to the north and one to the south,
each with a smaller loop within the larger one. These loops will
provide access to all the lots and multi -family units. This
project should be conditioned on the requirement that access to all
the lots be from the secondary access roads and not from the main
access road.
Since it is proposed that there be only one (1) access from Dorset
Street until Allen Road Extension is continued to connect to Spear
Street, staff recommends using the existing barn access road to
provide emergency access in the event the main access is blocked.
The applicant at the 6/16/92 meeting indicated that the existing
farm access road would be used for emergency access and to serve as
the required second access for a development of 50 units or more
but this second access is not shown on the plan.
The plan also shows a 60 foot wide strip of land between lots 41
and 74 to provide a future connection with the Lang property to the
north.
�+
Density: The PRD provision in the proposed SEQ zoning may allow
this property to generate 222 units (base -density) plus 25$ or 278
units maximum. The maximum number of units allowed is based on the
developable area as shown on the SEQ zoning map multiplied by 4.
The developable area in this project at the last sketch plan was
64.1 acres which results in a maximum of 256 units. The applicant
is proposing 237 units. Of the 41 remaining generated units,(40 \
are being transferred to the Nowland parcel. `__.
The plan should show the development and restricted areas as shown
on the SEQ zoning map. The applicant, should provide a detailed
breakdown on the actual developable `drea for this parcel as was
done in the 11/18/92 memo (see enclosed) for the Nowland II parcel.
4
Memorandum - Planning
December 8, 1992 agenda items
December 4, 1992
Page 5
Nonbuildable area: A portion of the development is proposed
outside of the designated developable areas as shown on the SEQ
zoning map. A detailed site analysis will have to be submitted
which should include evaluations on wetlands, views, soils, etc.
before a determination can be made as to the appropriateness of
building outside of the designated areas. Applicant should review
Section 26.606 of the SEQ zoning.
Wetlands: The site to be developed contains some wetlands and
streams. These are shown differently on the sketch plan than they
are shown on the SEQ zoning map. Applicant should provide detailed
information on the location of wetlands on the site. Due to the
differences between the sketch plan and the proposed SEQ zoning
map, the applicant is proposing development within a restricted
area. The applicant should be prepared to address this issue as a
part of the discussion on developing in the nonbuildable area. A
detailed wetland delineation study should be submitted.
Recreation Path/Pedestrian Trail: The plans incorporate some
paths/trails but not exactly as recommended by the Recreation Path
Committee. Staff will be meeting with this committee on 12/7/92 to
review the proposed plans.
Sewer: Municipal sewer system will serve this development via a 4 t
inch force main to Kennedy Drive. The sewer allocation being
requested is 106,650 gpd plus 6,288 gpd for infiltration for a
total of 112,938 gpd. The Planning Commission should consider
putting a time limit on the allocation in order to prevent hoarding
of sewer capacity by one development.
i
Water: Municipal water system will serve this development via a 12
inch main and will connect with the existing CWD main adjacent to
the storage tank on Dorset Street. Applicant should submit a full
set of plans to CWD for their review and comment.
Other:
--- sheet 1 and 2 should show the 45.48 acre parcel located on the
easterly side of Dorset Street which is part -of this project.
--- note #3 on sheet 2 should explain that the total acreage is
for both lots.
--- lot numbers on sheets 2 and 7 do not correspond, i.e. # 158 and
64 on sheet 7 and #42 and 43 on sheet 2.
--- portions of lots 65, 64, 63, 62 and all of lot #37 are not
shown at 1"=40' scale.
--- Dick Ward's property line not properly shown.
5
Memorandum - Planning
December 8, 1992 agenda items
December 4, 1992
Page 6
--- matchlines should indicate on which page the match is located.
--- applicant should submit`a report indicating how the proposed
PRD meets all the PUD criteria (19. 151(a) - (n) ) and all the SEQ
criteria (26.606(a)-(c)).
--- plans do not appear to take into account the protection of the
archaeologically sensitive area as determined by the State.
Section 19.151h of the zoning regulations requires the
applicant to show that this development will not have an undue
adverse effect on and will protect rare and irreplaceable
historic sites. Applicant should address this issue.
--- indicate proposed use of existing barn.
--- all watercourses should be shown on the 1"=40' scale plans
with the corresponding C.O. zones.
--- type of line used to designate existing wetlands should be
consistent throughout the plans, i.e. the legend for "existing
wetlands" on sheet 3 is not the same as is shown on sheet 9
and the line for existing wetlands in the legend on sheet 9 is
not the same as is used in the drawing on sheet 9.
--- plan should show buffer plantings along street "C" similar to
the plantings along street "A".
--- landscaping schedule should be broken down into three (3)
parts: 1) all multi -family plantings, 2) all street trees and
3) all other landscaping.
--- applicant should provide approximate dimensions and acreage
for each lot.
--- plans should show all wooded areas on the property.
Preliminary Plat: In addition to the information requested above,
the following should be provided for preliminary plat:
--- all proposed streets should be named.
--- a complete survey of the subdivision tract by a licensed land
surveyor must be submitted.
--- list waivers the applicant desires from the zoning and
subdivision regulations i.e., reduction in lot frontage and
area requirements.
--- parking spaces for the multi -family buildings should be shown.
--- applicant should provide approximate dimensions and acreage
for each lot.
--- exterior lighting details for the multi -family buildings
should be provided.
--- dumpsters for the multi -family buildings should be shown and
screened.
--- provide size of Ginkgo trees.
N
Memorandum - Planning
December 8, 1992 agenda items
December 4, 1992
Page 7 _
NOWLAND PROPERTY II
This portion of the development is located on the easterly side of
Spear Street in the vicinity of Deerfield Drive. It is bounded on
the west by Spear Street and several single family residences, on
the north, south and east by undeveloped property. It is located
within the SEQ District.
Access: The development is proposed to be served by one (1) access
road from Spear Street. This access will be an extension of
Deerfield Drive and is part of the east -west arterial shown on the
Interim Official Map. The applicant is reserving a 60 foot r.o.w.
connecting "Street All with Spear Street for a second access. The
applicant should address the impact of this road on the adjacent
single family homes and redesign the retention basin so that no
portion of this structure lies within the street r.o.w. One of the
conditions of the 9/17/91 approval which created this lot stated
that "a development of 50 units or more shall have two separate
accesses". This application is similar to the Village at Dorset
Park and L&M Park developments where there are actually two (2)
access points to the development off a collector road which is
planned to continue as development on adjoining parcels occur.
Therefore, until such time as the collector is continued, there
will technically be only one access to the entire development.
The applicant has reserved a 60 foot strip�of land between lots #78
and 92 for a possible future connection with the Farrell property
to the north. A similar strip should be reserved between lots #13
and 14. A strip has also been reserved between lots #72 and 73 to
provide access to the multi -family development and to the Economou
property to the east. This roadway could eventually connect to the
north -south connector.
Density: The PRD provision in the SEQ zoning may allow this
property to generate 73 units (base density) plus 25% or 92 units
maximum for development. The maximum number of units allowed is
based on the developable area as shown on the SEQ zoning map
multiplied by 4. The developable area in this project is 39.5
acres which results in a maximum of 158 units allowed on this
property. The applicant is proposing 132 units. 40 units from the
Southeast Summit parcel are being transferred to tfiis parcel since
the lot size limits this development to a generation of only 92
units. The applicant has these 40 extra units which are not being
used and is using them here for elderly housing. The 132 unit
total is below the density maximum of 158 units (see enclosed memo
from applicant).
7
k
Memorandum - Planning
December 8, 1992 agenda items
December 4, 1992
Page 8
Nonbuildable area: Lots #8, 9, 10 and 11 and portions of lots
12,13,17,18,19 and 20 are within the restricted area under the SEQ
zoning. The applicant has proposed building envelopes for lots #8-
11 which are 150 feet from Spear Street. These building envelopes
should be shown on the plans. Applicant has informed staff that
the westerly boundary of the building envelopes for lots #9-11 have
been staked out should the Planning Commission members wish to view
them before the meeting.
Applicant should review Section 26.606 of the proposed SEQ zoning
and submit prior to preliminary plat review information to
substantiate conformance with the criteria contained in this
section as well as the criteria contained in Section 19.151. A
written report should be submitted.
The plans should be revised to show the development and restricted
areas as shown on the SEQ zoning map.
There are also a number of lots located within a restricted wetland
area as shown on the SEQ zoning map. The plan submitted shows the
delineated boundaries of the wetland area (discussed below) which
is smaller than that shown on the zoning map. All lots have been
located outside of the wetland except ';for small portions of lots
#79 and 92.
Wetlands: This site contains approximately five (5) acres of class
2 wetlands which is shown on the sketch plan along with a 50 foot
buffer area. The location of the wetland -on the sketch plan and
its location on the proposed SEQ zoning map are different. This
results in the sketch plan showing units in the wetland area as
shown on the proposed SEQ zoning map. Applicant should provide
information to substantiate building in this restricted area. The
Natural Resources Committee has reviewed this sketch plan (see
enclosed memo) and will again review these plans at their 12/8/92
meeting.
View protection: This property is located within the proposed
Dorset Park View Protection Zone. Applicant should provide
detailed information on the allowable height of each house within
the development. All site and street landscaping should be
evaluated and revised to be certain plantings proposed will not
exceed the height limitations.
C
Memorandum - Planning
December 8, 1992 agenda items
December 4, 1992
Page 9
Recreation Path/Pedestrian Trail: The plans do incorporate some
paths/trails but not exactly as recommended by the Recreation Path
Committee. For example, the proposed path/trail is partially
located within the wetland. Staff will be meeting with the
committee on 12/7/92 to review the proposed plans.
Sewer: Municipal sewer system will serve this development.
Applicant proposes to connect a force main to Swift Estates. The
sewer allocation requested is 53,400 gpd plus 2,455 gpd for
infiltration for a total allocation of 55,855 gpd. Planning
Commission should consider placing a time limit on sewer
allocation.
Water: Municipal water system will serve this development.
Applicant proposes to construct an 8 inch main to connect with
existing main at Deerfield Drive. Applicant should submit a
complete set of plans to CWD for their review and comment.
Other:
--- note 7 on sheet 3 should be revised to indicate that this
project also includes 40 multi -family units.
--- all lots should be numbered including the retention basin lot,
wetland lots and multi -family lot.
--- it should be noted on the plans that the wetland lots and the
retention basin lot are to be held in common.
--- list of waivers, if any, the applicant desires from the zoning
and subdivision rcguiations i.e., reduction In lot frontage
and area requirements.
--- all watercourses should be shown on the 1"=40' scale plans
with the corresponding C.O. zones.
Preliminary Plat: In addition to the information requested above,
the following should be provided for preliminary plat:
--- traffic study should be submitted as discussed at the 6/16/92
meeting.
--- applicant should provide approximate dimensions and acreage
for each lot.
--- all proposed streets should be named.
--- a complete survey of the subdivision tract by a licensed land
surveyor must be submitted.
--- 90 parking spaces are required including 4 handicapped spaces
for the multi -family buildings and only 81 spaces are provided
with no handicapped spaces.
9
Memorandum - Planning
December 8, 1992 agenda items
December 4, 1992
Page_ _ 10
--- landscaping schedule should be broken down into three (3)
parts: 1) all multi -family plantings, 2) all street trees and
3) all other landscaping.
--- exterior lighting details for the multi -family buildings
should be provided.
--- dumpsters for the multi -family buildings should be shown and
screened.
It
10
Memorandum - Planning
February 9, 1993 agenda items
February 5, 1993
Page 5
Dumpster: A new 8'x32' dumpster enclosure is proposed along the
northerly boundary. The enclosure is proposed for only three (3)
sides leaving the south side exposed to the parking area. The
applicant should consider enclosing the dumpster area on all sides
to enhance the appearance of the property and to contain windblown
debris.
6) NOWLAND II - 73 UNIT PRD - PRELIMINARY PLAT
This project consists of a planned residential development
consisting of 73 single family lots. This project was last
reviewed by the Planning Commission on 12/8/92 (minutes enclosed)
when this project was combined with the Southeast Summit project
containing a total of 369 units. The two (2) projects have again
been separated and this project reduced from 132 units (92 single
family lots and 40 multi -family elderly units) to 73 single family
lots.
This property is located on the easterly side of Spear Street in
the vicinity of. Deerfield Drive. It is bounded on the west by
Spear Street and several single family residences, on the north,
south and east by undeveloped property. It is located within the
Southeast Quadrant District.
Access: The development is proposed to be served by two (2)
accesses, one at either end of the property along Spear Street .
The southerly access will be an extension of Deerfield Drive and is
part of the east -west arterial shown on the Interim Official Map.
The applicant should address the impact of the northerly access on
the adjacent single family homes. The traffic impact analysis (see
enclosed) submitted for the project addresses the traffic impact of
this intersection but does not address the impact on the adjacent
homes. This access will intersect with Spear Street directly
opposite the home at 1455 Spear Street which will result in
headlights shining into the house. Staff recommends that the
access be relocated 150 feet to the south so that the access will
be opposite the trees between the boundary of 1455 and 1475 Spear
Street.
A cul-de-sac street is proposed on the easterly side of the
property running in a north -south direction. This street would
serve 20 lots and would provide future access to the Farrell
5
Memorandum
February 9,
February 5,
Page 6
- Planning
1993 agenda items
1993
property to the north and the Economou property to the east via
reserved r.o.w.'s. This cul-de-sac is 1,000 feet in length and
would exceed the allowable limit of 850 feet (Section 401.1(7)) of
the subdivision regulations). The Planning Commission in the past
has allowed cul-de-sac streets to exceed the limit if the street is
planned to continue as development on adjoining parcels occur.
The applicant should reserve a r.o.w. in the vicinity of lot #35
for future connection to the Farrell property.
Density: The PRD provision in the southeast Quadrant zoning may
allow this property to generate 73 units (base density) plus 25%
or 92 units maximum for development. The applicant is proposing
the base density of 73 units.
Nonbuildable area: Either all or a portion of 45 individual lots
are within the restricted area under the Southeast Quadrant zoning.
Included in this number are the lots along Spear Street (lots #7 -
10 ) for which the applicant is proposing building envelopes to keep
the houses away from Spear Street. These building envelopes should
be shown on the plan.
The applicant has submitted a written report addressing the
criteria in Section 19.151 and Section 26.606 (see enclosed).
Wetlands: This site contains approximately five (5) acres of class
2 wetlands which are shown on the plans. The applicant has
submitted a letter from the Johnson Company describing the wetland
and addressing its values and functions (see enclosed). The
delineated boundaries of the wetland and contour lines are
difficult to see because the lines on the plans are so light.
Applicant should provide better quality blueprints.
Enclosed is a copy of a memo from the Natural Resources Committee
to the Planning Commission. Their only concern was the location of
the bikepath which crossed the wetland. The current design has the
bikepath located entirely outside the wetland.
View protection: This property is located within the Dorset Park
View Protection Zone. The applicant has submitted detailed
information on the allowable height of each house within the
development (see enclosed).
The street trees and other trees proposed on the site will exceed
the height limitations at maturity. Applicant must revise
2
Memorandum - Planning
February 9, 1993 agenda items
February 5, 1993
Page 7
landscaping plan to propose only those trees which will not exceed
the height limitations at maturity.
Recreation Path/Pedestrian Trail: The path/trail has been
relocated outside of the wetland area as recommended by the Natural
Resources Committee. A 20 foot easement should be provided for
that portion of the path/trail which is not located within a future
street r.o.w.
The path/trail which is located within the Deerfield Drive r.o.w.
narrows down to five (5) feet when it connects with the north -south
segment. The path/trail should continue its original eight (8)
foot width all the way to the easterly end of Deerfield Drive.
Traffic: A traffic impact analysis is enclosed. The study
projects that at full build -out the project will generate 81 P.M.
peak hour trip ends.
The following scenarios were evaluated:
o North and south project accesses with Spear Street:
-- 1993 AM and PM DHV with Phase I build (i.e., 37
units)
-- 1998 AM and PM DHV with full -build (i.e., 73 units)
o For Spear Street/Swift Street Intersection:
-- Existing 1993 and 1998 AM and PM DHV (no -build)
-- 1993 AM and PM DHV with Phase I
-- 1998 AM and PM DHV with full -build
The results of the analysis indicate the following: 1) both
project access intersections and the Spear Street/Swift Street
intersection will operate at acceptable levels of service during
both the 1993 and 1998 build scenarios, 2) traffic safety (e.g.,
sight distances) will not be a problem, and 3) upon the completion
of Phase I, southbound left turn lanes on Spear Street for traffic
entering both project accesses will be needed.
Staff offers the following comments and observations:
o The analysis indicates that the Spear Street/Swift Street
intersection currently and in the future will operate at
an LOS of "B" (except during the 1998 PM DHV when it will
7
Memorandum - Planning
February 9, 1993 agenda items
February 5, 1993
Page 8
G
operate at LOS "C". The northbound approach is estimated
to operate currently at LOS "B" and in the future at LOS
"B" or "C". I find this surprising. I constantly hear
horror stories of northbound traffic backed up to
Stonehedge Drive during the AM peak. The turning
movements used in the analyses are slightly lower than
actual counts done in June of last year. However, the
1998 no -build analysis assumed turning count numbers that
are almost identical to the June, 1992 turning counts and
still an LOS "B" is calculated by the model.
o Tables 2 and 3 should provide an estimate of "overall
intersection" LOS.
o It would be helpful if the report included exhibits
showing all turning movements for the analysis scenarios,
not just project generated traffic turning movements.
o The final plat should include a plan showing the
improvements for southbound left turn lanes for each
project access which will be needed prior to the
construction of Phase II. Cost estimates should also be
provided. An approval of this project should include a
condition requiring the applicant to construct the
improvements prior to permits for phase II and should
include the posting of a bond to cover the costs of such
improvements.
Sewer: The sewer allocation required for this project is 43,800
gpd. The applicant should submit an estimate for infiltration
which would be expected. The applicant will be required to pay the
per gallon fee in effect at the time of permit for each house. The
Planning Commission should structure a condition which precludes
this development from hoarding reserved capacity for an extended
period of time.
Water: Municipal water system will serve this development. The
applicant has received a letter from CWD indicating that the
demand of 43,800 g.p.d. can be met.
Phasing: The applicant indicates in the PUD General Standards
narrative that Phase I will be 35 units. The traffic report
indicates that Phase I will be 37 units. Which number is correct?
Memorandum - Planning
February 9, 1993 agenda items
February 5, 1993
Page 9
Historic
sites: The applicant has received a letter from State
Division for Historic Preservation indicating that the project will
not have an adverse effect on any historic or archeological.
properties.
Recreation: The applicant will be required to pay the per unit
recreation fee at the time of permit.
School impact: The applicant has reviewed the impact of this
project on the school system with the School Board. Enclosed is a
copy of the School Board's findings and analysis for the Southeast
Summit residential project. Staff has been informed that this same
type of decision will be made for this project in the very near
future. Staff expects to have a draft copy of the decision at the
meeting. Approval of this project should include a per unit school
impact fee as addressed in the School Board's motion.
Landscaping: The landscaping plan should be revised to only
propose street trees and any other landscaping which will not
exceed the height limitations. It is suggested that the
landscaping plan be broken down into phases with separate listings
for the street trees, house lot trees and other landscaping.
The plans should show two (2) trees of at least 2.5 inch in caliper
for each lot as required under Section 19.104a. of the zoning
regulations. These trees will have to be planted before the sale
of any lot or referenced in the deeds for the individual lots.
Lighting: The applicant is proposing street lighting similar to
what is in Butler Farms and Oak creek. The lamps would be 70 watt
d 20 foot- i t�, (-„t-off
iilgii pressure Si�uiuiii fiiouii�.eu vii av ioo�. pv^.ie wi,.,a ....
luminaries. No part of any street light can exceed a height of
21.9 feet above the roadway centerline. It appears the top of the
fixture will meet this height limitation.
Street names: The proposed street names have been reviewed by the
Fire and Police Chiefs. These names are acceptable and would not
pose a problem for emergency response.
Report Addressing Criteria of Sections 19.15 and 26.606: It is
staff's opinion that the enclosed report addressing the criteria of
sections 19.15 (PUD criteria) and 26.606 is adequate except as
identified below:
19.15(a) Water and Air Pollution - The applicant should provide an
estimate of acres of wetland to be filled (i.e., road
fill, sewer line, etc.).
0
Memorandum - Planning
February 9, 1993 agenda items
February 5, 1993
Page 10
(d) Traffic - Traffic should not be a problem as long as
staff comments contained in the "traffic" discussion are
adequately addressed.
(e) Education - It is staff 's understanding that the project
will have an adverse impact on schools unless mitigation
fees are paid as recommended by Larry LeCours (i.e.,
$750/sf unit and $375/mf unit).
(g) Natural Resources - The landscape plan will need to be
revised to include species that meet the scenic view
protection height limitations.
(h) Compatibility/Aesthetics - The Commission has indicated
that the intent of the Spear Street restricted zone
setback will be met if building envelopes are shown for
lots 7 - 10. The envelopes should be shown on the plans
and referenced in the deeds.
Report should address historic sites.
(i) Housing Types - The report indicates that development
will include a "broad range of values that will provide
for the housing needs of various social and economic
groups". What does this mean? What will be the range of
values? Affordable? Moderate? What social and economic
groups is the applicant talking about?
(k) Streets - The plan does not provide for a north -south
collector/arterial as shown on the official map. Staff
agrees it is better to move this road so that it does not
go through a wetland, as is shown on the official map.
The Commission should be aware that the plan proposes
moving this roadway almost entirely onto the Economou
property.
(1) Road and Utility Extensions - Report indicates that
r.o.w.'s are being reserved for future connections to
adjoining properties. As mentioned previously in this
memo, a r.o.w. connection to the Farrell Property should
be provided near lot 34.
Other: Applicant should identify what roads and lots are in each
phase.
10
M E M O R A N D U M
To: South Burlington Planning Commission
From: Joe Weith, City Planner
r
Re: March 9, 1993 agenda items
Date: March 5, 1993
3) NOWLAND - 73 UNIT PRD - PRELIMINARY PLAT
The public hearing on this project was continued from the 2/9/93
meeting (minutes not available). Refer to the staff memo for this
meeting for our comments (see enclosed).
Street trees: The applicant has submitted a plan showing tree
height limits and the types of trees proposed. According to a
document published by the Vermont Urban and Community Forestry
Program, some of the trees proposed will exceed the height limit.
For example, Hedge Maple are proposed for the 20-25 height limit
area and they can reach a height of 35 feet, Hop Hornbeam are
proposed for the 25-35 foot limit area and they can reach a height
of 40 feet and Green Ash are proposed for the 35-45 foot height
limit area and they can reach heights of over 50 feet.
Traffic: Enclosed is an addendum to the traffic impact anaylsis.
Since the last meeting, the applicant took new traffic counts at
the Spear Street/Swift Street intersection. The counts were
adjusted to the design hour and turned out to be slightly higher
than the counts used in the original analysis. The model was rerun
with the new numbers and the results are presented in Table 3 of
the report. Table 3 indicates that the Spear Street/Swift Street
intersection will operate at an acceptable LOS with the project
fully built.
The consultant also reran the analysis for existing conditions
using existing signal timings. The previous report had assumed
optimal signal timings for existing conditions. Table 2 presents
the results of the model assuming existing signal timings. The
estimated LOS for the northbound approach during the AM peak hour
is "E". This better reflects existing conditions. It is the
consultant's opinion that the intersection LOS can be greatly
improved by simply adjusting the signal timings so that less green
time is given to Swift Street during the AM peak.
Memorandum - Planning
March 9, 1993 Agenda items
March 5, 1993
Page 2
It is staff's opinion that traffic will not be adversely: affected
if the following is done:
o Signal timings at the Spear Street/Swift Street
intersection should be adjusted as recommended in the
report.
o Applicant construct southbound left turn lanes for each
project access prior to issuance of permits for phase II.
The final plat submittal should include plans for these
improvements.
Sewer: The applicant is requesting a sewer allocation of 46,957
g.p.d. for the subdivision. He has proposed that in order for the
allocation to remain in effect, he would have to complete all the
roadways serving the development within four years of receipt of
the Act 250 permit. If all the roadways are completed within this
time frame, then the allocation would be reserved until permits
have been issued for each and every lot. If a certain roadway is
not completed within the four year period, then the allocation for
those lots served by the uncompleted portion of the roadway would
be lost. These lots would be issued permits only if capacity is
available at the time of permit application.
I am agreeable to this approach as far as reserving sewer
allocation. My only concern, however, is the amount of allocation
being requested. There is currently 72,000 gpd of unreserved
capacity at the Bartlett Bay treatment plant. If 46,957 gpd is
allocated, then only 25,043 gpd is left. The Southland project
will require 26,635 gpd which if approved will use up the remaining
capacity. Both of these projects are long term projects which will
tie up the capacity for many years. This will prevent the City
from issuing permits for smaller projects that are "ready to go".
School Impact: A question was raised at the last meeting on this
application as to the Commission's authority to impose a school
impact fee as mitigation to potential adverse impact. Enclosed is
an opinion from City Attorney, Steve Stitzel.
4) FRANK NAEF - OFFICE TO RETAIL - SITE PLAN
This project consists of converting 240 square feet of office space
to retail. The Planning Commission on 7/10/90 approved a 6,400
2
MEMORANDUM
TO: South Burlington Planning Commission
FROM: Joe Weith, City Planner
RE: March 30, 1993 Agenda Items
DATE: March 25, 1993
2) CONTINUE NOWLAND II, SPEAR STREET
Enclosed are the staff memos dated 2/5/93 and 3/5/93 regarding this
application. Also enclosed is a memo dated 3/5/93 in which I
respond to several issues raised by Mr. Gilbert in his letter dated
2/9/93. Finally, enclosed is a letter from Attorney, William
Schroeder, who is representing Fred Hackett.
Provided below is a summary of issues which staff feels are still
unresolved and which require decisions by the Commission:
Traffic: There has been a lot of discussion regarding the Spear
Street/Swift Street intersection. The City revised the signal
timings at this intersection last week. Prior to the revision, the
signal timings were set for 27 seconds of green for Spear and 25
seconds of green for Swift. The timings were revised to 35 seconds
of green for Spear and 26 seconds of green for Swift.
I observed traffic at this intersection after the signal timings
were revised (Tuesday, 3/23/93 and Thursday, 3/25/93) during the
A.M. peak (7:30 a.m. - 8:00 a.m.). In my opinion, the intersection
operated quite well. The longest queue for the northbound approach
was approximately 600 feet and all vehicles were able to get
through the intersection during one cycle.
The City is also in the process of improving the existing
controller so that different signal timings can be operated during
the a.m. peak, p.m. peak and off-peak periods. I believe the
consultant will be making a recommendation on optimal timings at
the meeting.
I also reviewed with Bill Szymanski and Sonny Audette the
suggestion of improving the radius of the southeast corner of the
intersection for northbound right turns. Both Sonny and Bill agree
that increasing the inside radius to 25 feet would improve traffic
flow. They recommend that a right turn stacking lane 50 feet in
length and 150 foot taper also be constructed. This would require
extending the culvert. Bill estimates about $10,000 to $15,000.
SEWER: The applicant is requesting 46,957 gpd of sewer allocation.
This assumes four bedrooms in each home. As stated previously,
Planning Commission Memorandum
March 30, 1993 Agenda Items
March 25, 1993
Page 2
staff is concerned that if this project and the Pomerleau project
are approved, there will be very little unreserved sewer capacity
available for other projects, particularly smaller projects which
are "ready to go". I recommend that the Commission approve a sewer
allocation of 41,557 gpd. This assumes 37 four -bedroom homes, 36
three -bedroom homes, and 3157 gpd for infiltration. This will
allow approximately 10,000 gpd of capacity to remain available
(assuming Pomerleau is approved).
SCHOOL IMPACT: Enclosed is the letter from Steve Stitzel regarding
the school impact issue (section 19.151(e) of the zoning
regulations and section 417(e) of the subdivision regulations).
Basically, the school board has determined that this development
would have an adverse impact on school services and facilities
since the K-5 schools are at capacity. They feel that based on
current studies and plans to increase school capacity in the next
2-3 years, this impact could be mitigated through the payment of a
per unit mitigation fee. An approval of this application could
include a condition that no permits be issued until the City adopts
a school impact fee or sometime this fall, whichever comes first.
LOT SIZE/DENSITY: The neighbors have testified that the proposed
density and lot sizes are incompatible with existing development in
the area. The Commission has not yet made any statements as to
whether it feels the proposed density, lot size, and layout meets
sections 19.151(h) and (n). Section 19.151(h) addresses a
proposal's impact on aesthetic compatiblity with existing buildings
and site characteristics while section 19.151(n) deals with
comformancy to the comprehensive plan.
3. CONTINUE SOUTHEAST SUMMIT
Enclosed is
application.
(mem3-25)
the staff memo dated 3/19/93 regarding this
Memorandum - Planning
August 10, 1993 agenda items
August 6, 1993
Page 3
measurements are taken from the closest point of the building to
the property line as shown on the plan. The plan does not show
some decks which project out from the side of the building. When
the decks are included in the setback measurement, the setback will
be even less than shown. These decks are shown on the landscaping
plan and should also be shown on the engineering plan.
Parking: This project requires 20 parking spaces and 33 spaces
were approved as part of the October, 1990 approval. The applicant
has constructed 10 additional parking spaces along the easterly
side of the emergency access lane. These additional spaces
eliminate a sidewalk which was proposed for that side of the access
drive, encroach into and reduce the amount of green space, and are
located where several large maple trees were to be planted.
This proposal eliminates these parking spaces but does not replace
the sidewalk that was lost.
Landscaping: The landscaping plan has been revised since the
original 1990 approval to reduce the number of plantings proposed.
The minimum landscaping requirement for this project is $19,600 and
the revised planting schedule has a value of only $9523, a $10,077
shortfall. The applicant is requesting a credit for existing trees
to make up the shortfall (see enclosed letter from Greg Rabideau).
Retention basin: The retention
its original location. It had
north at the 6/8/93 meeting.
basin is now proposed to remain at
been proposed to be relocated to
Other: The dumpster shown on the landscaping plan should be shown
as screened.
5) NOWLAND II - 73 UNIT PRD - FINAL PLAT
This project consists of a planned residential development
consisting of 73 single family lots. Preliminary plat approval was
granted on 3/30/93 (see enclosed minutes).
This property is located on the easterly side of Spear Street in
the vicinity of Deerfield Drive. It is bounded on the west by
Spear Street and several single family residences, on the north,
south and east by undeveloped property. It is located within the
Southeast Quadrant District.
3
Memorandum - Planning
August 10, 1993 agenda items
August 6, 1993
Page 4
The applicant has reduced the number of lots located to the east of
the Meridith, Gagnon, Chiu and IBIS properties in order to increase
the size of the lots in this area. The number of lots has been
reduced from six (6) to four (4). The two (2) lots were relocated
to the end of the cul-de-sac and its length increased by 100 feet
to 1100 feet.
Access: The development is proposed to be served by two (2)
accesses, one at either end of the property along Spear Street.
The southerly access will be an extension of Deerfield Drive and is
part of the east -west arterial shown on the Interim Official Map.
The northerly access was relocated approximately 150 feet to the
south to minimize the impact on the houses located on the west side
of Spear Street with headlight glare. This was a requirement of
the preliminary plat approval.
A cul-de-sac street is proposed on the easterly side of the
property running in a north -south direction. This street would
serve 20 lots and would provide future access to the Farrell
property to the north and the Economou property to the east via
reserved r.o.w.'s. This cul-de-sac is 1,100 feet in length and
would exceed the allowable limit of 850 feet (Section 401.1(7) of
the subdivision regulations). The Planning Commission approved the
length of the cul-de-sac as part of its preliminary plat approval.
Density: The PRD provision in the Southeast Quadrant zoning may
allow this property to generate 73 units (maximum base density)
plus 25% or 92 units maximum for development. The applicant is
proposing the maximum base density of 73 units.
Nonbuildable area: Either all or a portion of 45 individual lots
are within the restricted area under the Southeast Quadrant zoning.
Included in this number are the lots along Spear Street (lots 5 -
8) for which the applicant is proposing building envelopes to keep
the houses away from Spear Street. These building envelopes are
shown on the plan.
Wetlands: The site contains approximately five (5) acres of class
2 wetlands which are shown on the plans. The applicant should
provide an estimate of acres of wetland to be filled (i.e., road
fill, sewer line, etc.).
View protection: This property is located within the Dorset Park
View Protection Zone. The applicant has submitted detailed
In
Memorandum - Planning
August 10, 1993 agenda itesm
August 6, 1993
Page 5
information on the allowable height of each house within
development (see enclosed plan). Allowable heights for structures
and landscaping will range from 17.6 feet to 41 feet.
Recreation Path/Pedestrian Trail: The path/trail has been
relocated outside of the wetland area as recommended by the Natural
Resources Committee. A 20 foot easement is being provided for that
portion of the path/trail which is not located within a future
street r.o.w. The path/trail has been widened to eight (8) feet
for the entire length of Deerfield Drive as required under
preliminary plat approval.
The survey plat should be revised to provide survey data on the
location of the path/trail easement. This should include the same
type of information provided for a City street.
Traffic: A traffic impact analysis was conducted. The study
projects that at full build -out the project will generate 81 P.M.
peak hour trip ends.
The following scenarios were evaluated:
o North and south project access with Spear Street:
--- 1993 A.M. and P.M. DHV with Phase I build (i.e., 37 units)
--- 1988 A.M. and PM DHV with full -build (i.e., 73 units)
o For Spear Street/Swift Street Intersection:
--- Existing 1993 and 1998 A.M. and P.M. DHV (no -build)
--- 1993 A.M. and P.M. DHV with Phase I
--- 1998 A.M. and P.M. DHV with full -build
The results of the analysis indicate the following: 1) both
project access intersections and the Spear Street/Swift Street
intersection will operate at acceptable levels of service during
both the 1993 and 1998 build scenarios, 2) traffic safety (e.g.,
sight distances) will not be a problem, and 3) upon the completion
of Phase I, southbound left turn lanes on Spear Street for traffic
entering both project accesses will be needed.
An addendum to the traffic impact analysis was prepared in response
to concerns expressed by staff. The applicant took new traffic
counts at the Spear/Swift Street intersection. The counts were
adjusted to the design hour and turned out to be slightly higher
5
Memorandum - Planning
August 10, 1993 agenda items
August 6, 1993
Page 6
than the counts used in the original analysis. The model was rerun
with the new numbers and the results were presented in Table 3 in
the addendum indicates that the Spear Street/Swift Street
intersection will operate at an acceptable LOS with the project
fully built.
The consultant also reran the analysis for existing conditions
using existing signal timings. The previous report had assumed
optimal signal timings for existing conditions. Table 2 in the
addendum presents the results of the model assuming existing signal
timings. The estimated LOS for the northbound approach during the
A.M. peak hour is "E". This better reflects existing conditions.
It is the consultant's opinion that the intersection LOS can be
greatly improved by simply adjusting the signal timings so that
less green time is given to Swift Street during the A.M. peak.
Signal timings have been adjusted and the intersection is working
much better than before.
The applicant has submitted a plan for proposed improvements to the
corner radius for northbound right -turns at the Spear Street/Swift
Street intersection. This was a requirement for preliminary plat
approval.
Sewer: The Planning Commission at preliminary plat approval
granted a sewer allocation of 46,957 g.p.d. based on the following
conditions: "The length of time that this sewer allocation
approval shall remain in effect shall be tied to roadway
construction. The roadways serving this development shall be
completed within four years of final plat approval. The sewer
allocation for any lots served by roadways which are not competed
within this four year time limit shall be lost unless reapproved by
the Planning Commission. In addition, if at the end of three years
no more than 50% of the roads have been completed, 25% of the total
sewer allocation shall be lost unless reapproved by the Planning
Commission".
Historic sites: The applicant has received a letter from State
Division for Historic Preservation indicating that the project will
not have an adverse effect on any historic or archeological
properties.
Recreation: A credit of $22,000 should be given the applicant for
construction of the portion of the proposed recreation path located
outside of any public street r.o.w. This value is based on $11 per
linear foot for a distance of 2,000 feet. This translates to $301
A
Memorandum - Planning
August 10, 1993 agenda items
August 6, 1993
Page 7
per lot. Based on the current recreation impact fee of $200, the
applicant would not pay a recreation fee since the credit is more
than the actual fee. If in the future the City adopts a recreation
fee of more than $301 per lot, then the applicant would be required
to pad, the difforanca_ The issue of when the recreation path
r-1
should be constructed needs to be resolved.
Landscaping/Street trees: The landscaping plan has been revised
since preliminary plat to propose trees appropriate to the tree
height limits. The landscaping plan has also been revised to add
a note addressing the requirement for two (2) trees on each lot.
The total value of street trees and common areas is $130,366 and
the value for the two (2) trees per lot is $65,335.
School impact: The Planning Commission as part of the preliminary
plat approval imposed a condition (#16) which prevents a
zoning/building permit from being issued until after the City
adopts an education impact fee ordinance or September 1, 1993,
whichever first occurs. This condition should also be made a part
of the final plat approval.
Lighting: The applicant is proposing street lighting similar to
what is in Butler Farms and Oak Creek. The lamps would be 70 watt
high pressure sodium amounted on 20 foot poles with cut-off
luminaries. It appears the top of the fixtures will meet the
height limitation.
Water: Municipal water system will serve this development. The
applicant has received a letter from CWD indicating that the demand
of 43,800 g.p.d. can be met.
Legal documents:
o applicant should submit a "Notice of Condition"
addressing the requirement of two (2) trees on each lot,
addressing the height limitations for structures and
landscaping on each lot, and addressing the requirement
of the homeowner's association to maintain the community
mailbox area and all drainage ditches for review by the
City Attorney.
o the applicant should submit the legal documents for all
public streets and easements for review by the City
Attorney.
o applicant should submit a "Notice of Decision" addressing
the building envelopes on lots #8-11 (now lots #5-8) and
7
Memorandum - Planning
August 10, 1993 agenda items
August 6, 1993
Page 8
purpose and restrictions thereof for review by the City
Attorney.
Subdivision plat:
--- survey data for the recreation path/pedestrian trail easement
and the utility easement between lots 41-42 and 57-58 should
be provided.
Other:
--- lot numbers not correctly shown on sheet 2.
--- the plans should show a 20 foot drainage easement across the
Ratkus property for the drainage pipe. This easement should
be included in the legal documents.
6)
LELAND & PATRICIA CALKINS - PARKING CHANGES - SITE PLAN
This project consist of expanding the parking area, adding a
sidewalk and relocating the main entry to a building used for
wholesale distribution.
This property located at 3 Calkins Court lies within the IC
District. It is bounded on the south by an office building, on the
west by Calkins Court, on the east by a multiple use commercial
building and on the north by a burial vault manufacturer.
Access/circulation: The main access is via a shared curb cut on
Calkins Court with a 22 foot access drive. A secondary access to
the rear of the building is provided by a 28 foot curb cut also on
Calkins Court. An unpaved drive connects the rear access drive to
the adjoining lot to the north. No access changes proposed.
Circulation is adequate.
Coverage/setbacks: Building coverage is 15.4% (maximum allowed is
30%). Overall coverage is 39.9% (maximum allowed is 70%). Front
yard coverage is 22% (maximum allowed is 30%).
Setback requirements are met.
Parking: The current use requires a total of five (5) parking
spaces and five (5) are shown on the plan. A handicapped space
should be designated.
Memorandum - Planning
October 25, 1994 agenda items
October 21, 1994
Page 9
one half of lot #10 lies within this buffer strip. This lot has
multiple detached farm buildings, some of which lie either
partially or entirely within the buffer strip. The applicant
represented at the sketch plan meeting that he will be able to
develop lot #10 in accordance with the buffer zone requirement and
other standards of the zoning requlations. Access to lot #10 will
not be allowed from Hinesburg Road and must be provided from Swift
Street Extension. Since preliminary plat approval, lot #10 has
increased in size from 3.97 acres to 5.52 acres.
View protection zone: Portions of proposed lots #1 and #10 are
located within the Hinesburg Road - North View Protection Zone.
Other:
--- all plans were revised to reflect that the current owner of
this property is now Marble Bank.
--- note #2 on sheet SP3A was revised to indicate the revised lot
numbers.
LARKIN MILOT PARTNERSHIP - NOWLAND II REVISION - REVISED FINAL
PLAT
This project consists of amending the landscape plan for the 73 lot
Nowland II PRD approved on 8/10/93 (minutes enclosed). This
amendment is to comply with a condition of approval from the Vt
Agency of Natural Resources to construct a roadway through a Class
Two wetland and construct a bike path and stormwater pond in the 50
foot buffer zone. This decision required the applicant to plant a
line of northern white cedar along the 50 foot wetland buffer zone
on the western side of the wetland adjacent to lots #33 - 45. In
addition, the applicant is required to install a four (4) foot high
wooden fence along the buffer zone adjacent to these lots on the
western side of the planted cedars.
Landscaping: This is the only aspect of the project that is
changing. The landscape bond should be increased to $133,779 for
street trees and common area trees.
0
PLANNING COMMISSION
27 OCTOBER 1998
Ms. Barone seconded. Motion passed unanimously.
5. Public hearing: Final Plat application of L&M Partnership to amend a condition of approval granted
on 8/ 14/97 for a planned residential development consisting of 80 single family lots, Pinnacle @
Spear, Spear Street. The amendment is to extend by two years the date by which the roadways serving
the development must be completed which, in turn, extend by 2 years the approved reserved sewer
allocation for the development:
Mr. Llewellyn said they are submitting an Act 250 permit for the additional lots. They would rather
not build the road until they have Act 250 approval. Mr. Larkin wants to build next summer.
Mr. Weith said they are at capacity for sewer allocation and if the applicant loses this, the capacity
would go to Mr. Larkin's extended stay hotel.
Members had no problem with this.
Mr. O'Rourke moved the Planning Commission approve the final plat application of L&M Partnership
t amend a condition of approval granted on 10/13/98 for a planned residential development consisting
of 80 single family lots Pinnacle n Spear, Spear Street. The amendment is to extend, by two years,
the date by which the roadways serving the development must be completed, which will in turn
extend, by two years, the approved reserved sewer allocation for the development. This approval is
based on the following stipulation:
Condition H6 of the 10/13/98 approval shall be revised to read as follows: "The Commission approves
a total sewer allocation of 50,576 gpd for this development. The length of time that this sewer
allocation approval shall remain in effect shall be tied to roadway construction. The sewer allocation
for any lots served by roadways which are not completed by 12/21/00 shall be lost unless reapproved
by the Planning Commission.
Ms. Barone seconded. Motion passed unanimously.
6. Site plan application of Real Charlebois to convert a vacant lot into a contractor's yard not including
retail, 90 Ethan Allen Drive:
Mr. Burgess noted this work has already been done.
Mr. Weith noted the fuel tank and enclosure don't meet the setbacks and will have to be moved. Mr.
Burgess noted that staff recommends plantings to screen.
0
LLEWELLYN
INCORPORATED
November 5, 1998
Greg Bostock
Department of Environmental Conservation
Water Supply Division
The Old Pantry Building
103 South Main Street
Waterbury, Vermont 05671
RE: Pinnacle @ Spear
File: 97024
Dear Greg:
Please find enclosed a revised overall site plan and a revised plan and profile sheet (sheets 1 of 9 and 4
of 9 respectively) for the above referenced project. After talking to you recently, it is my understanding
that you can complete your permit review upon approval of the revisions made to these two plans.
Two of your comments pertained to water service locations. Specifically, you requested that we relocate
the service to Lot 62 to avoid the roadway catch basins and relocate the service to Lot 67 to be before
the hydrant rather than after it. As shown on the enclosed plans, these changes have been made. Also,
a note has been modified on sheet 1 (see note 2) which reminds the reader that this plan set supercedes
all previous plans with regards to the Vale Drive area (29 lots, utilities and infrastructure).
Thank you very much for your help with this project. Please feel free to call me with any questions or
if you need any additional information.
Sincerely,
LLEWELLYN INCORPORATED
!Scott
A. Rogers, P.E.
cc: Ray Belair, City of South Burlington
Brent Desranleau, South Burlington Water Department
John Larkin
enclosure
4049 Williston Road • South Burlington • Vermont • 05403
T 802.658.2100 • F 802.658.2882 • e-mail: Ilewellinc@aol.com
Engineering • Permitting • Consulting Services
PLANNING COMMISSION
8 J` LY 1997
PAGE 2
memo dated 3 July 1997. Ms. Barone seconded. Motion passed unanimously.
4. Public hearing: Revised Final Plat application of Century Partners to amend an approved
planned unit development consisting of 96,800 sq. ft. of general office and shopping center use in
4 buildings, 100 Dorset Street and 2 Corporate Way. The amendment consists of minor site
modifications to accommodate an outdoor plaza area:
Ms. Lindsay explained that Dakin Farms will be a tenant and they want the plaza area.
Landscaping will be relocated to the area around the Barnes & Noble sign and to other locations
on the site. There will be no coverage changes.
No issues were raised.
Mr. Teeson moved the Planning Commission approve the revised final plat application of Century
Partners to amend an approved planned unit development consisting of 96,800 square feet of
general office and shopping center use in four buildings 100 Dorset Street and 2 Corporate Way.
The amendment consists of minor site modifications to accommodate an outdoor plaza area, as
depicted in a plan entitled "100 Dorset Street Complex 100 Dorset Street South Burlington VT,"
prepared by Trudell Consulting Engineers Inc dated 10/31/95 last revised 3/10/97 with the
following stipulations:
1. All previous approvals and stipulations which are not superseded by this approval shall remain
in effect.
2. Prior to recording, the plan shall be revised to accurately show the limits of landscaped areas
and paved areas in front of the 100 Dorset Street building
3. The final plat Dian shall be recorded in the land records within 90 days or this approval is null
and void. The plan shall be signed ed by the Planning Commission Chair or Clerk prior to recording_
Ms. Barone seconded. Motion passed unanimously.
5. Public Hearing: Revised final plat application of John Larkin and Gerald Milot to amend a
condition of approval for a planned residential development consisting of 73 single family lots,
Pinnacle at Spear, Spear Street. The amendment is to extend, by one year, the date by which the
roadways serving the development must be completed. This will in turn extend, by one year, the
approved reserved sewer allocation for the development:
Mr. Weith said that once the road is completed, the applicant will have their sewer allocation
forever.
PLANNING COMMISSION
8 JULY 1997
PAGE 3
Mr. Larkin said the work was set back by an appeal. The road will be built next summer.
The Commission raised no issues.
Ms. Barone moved the Planning Commission approve the revised final plat application of John
Larkin and Gerald Milot to amend a condition of approval for a planned residential development
consisting of 73 single family lots, Pinnacle at Spear, Spear Street. The amendment is to extend,
by one year, the date by which the roadways serving the development must be completed. This
will in turn extend, by one year, the approved reserved sewer allocation for the development.
This approval is based on the following, stipulations:
1. Condition #15 of the 8/10/93 approval shall be revised to read as follows. -
"The Commission approves a total sewer allocation of 46,957 gpd for this
development. The length of time that this sewer allocation approval shall
remain in effect shall be tied to roadway construction. The roadway
serving_this development shall be completed by December 21, 1998. The
sewer allocation for any lots served by roadways which are not completed
by 12/21/98 shall be lost unless reapproved by the Planning Commission.
Mr. Dinklage seconded. The motion was passed unanimous.
6. Site plan application of Patrick & Terese Ayer to construct 62 auto storage spaces on a lot
containing a 9761 sq. ft. Building consisting of 3200 sq. ft. Of printing use and 6561 sq. ft. Of
auto repair and service use, 4 Berard Drive:
Mr. Llewellyn said the space is for cars being worked on. There is a gate between this property
and the Pizza Putt property and there has been a request to remove it. The applicant would rather
leave it.
Mr. Weith said he had no problem with the access but it will have to be shown on both site plans.
Pizza Putt said this would be a landscaped area with no access.
Mr. Kleh of Pizza Putt said that the Ayers had been using the access. He sat down with Mr. Ayer
and worked out an agreement. When his lawyer drafted the paper work, Mr. Ayer refused to sign
the agreement. Mr. Ayer also had the area paved without Mr. Kleh's approval. The gate is on
the Kleh property but the Ayers are using the gate to move cars back and forth all the time.
Mr. Kleh also said the Ayers have a "junkyard" in the back and he wants the area back the way
the Planning Commission approved it.
Mr. Llewellyn said he was not aware of this situation and will go back and talk with Mr. Ayer.
JqN-11-1998 MON 02; 39 DN ST TZEI-J: CE & FLETCHER FAX NO. 80266K552 F, 03
JAN-06-99 FRI 15:49 ' lap & Lismai FAX N0. E02-F''J629 a.02/C9
KN NACLE AT SPEAR
N TICE OF DEV ET-ODNMIST CONDITIONS
THIS NOTICE is made ties _— day of Junuary, 1999, by trrald C. Milot ar4 Jobn P.
Larkin, doing business as Larkin tiiilot Partnership, a Vermont general partnership (the "Declarrent' ).
RECITALS
I. The Declarant was the original gviL r of the subdivision located on tie easterly side of
Spear Street in the City of South Burlington known as ",Pinnacle at Spear." The lands comprising
the subdivision were conveyed to Card C. Milot and John P. Larkin pursuant to a warranty dead,
dated July 871990, from Rhcnl C. Gagnon and Idclon N. Gagnon, recorded in Volume 296, Page 53 9
of the Land Reczrds of the City of South Burlington. and p=wnt to a warranty deed, dated March
17, 1992, from Marie Urv-'crowd, recorded in Volume 322, Page 188 of the Land Rccords of the
City of South Burlington (the "Property",.
2, The 1eclarant initially received approval from, the South Burlington PLuuiing
[,omrnission to subdivide the Property into 73 ample -family loss, common area and roads, as
depicted on the Plan, T =pafter, the Declarant r=ivcd approval to craftte 7 additional single-faamily
lots m. d xecmfigure a portion of'the common srea!i,.
3, The subdivision, as originally approved, is showm and depicted on a plan entitled
Now°ltand Two
South Burlington Yermont
Plat of Subdivision of Lards
of
(Jerald C. Wot, at. al.
dated ,l4!y 1992, prepared by Fitzpatrick -Llewellyn Incorporated, recorded in Map Volume 286,
Pagos I I I and 112 of the Land Pwcotds of the City of South Burlington, The subdivision, with Lots
74 through 94, is shown and. depicted on a plan entitled
Final flat for SuMiviginn
of ?roperty of Cicrrald Milot and John Lark
Pinnacle @a Spear
(Fotr.Yerly Nowland Two)
dated Augwt 21,1998, last reyUed January 5,1999, prapared by Vaughn C. Mutton. L.S., recorded
hi Map Volume_, Pages _._ and of the Land Records of the City of South Durlinngton.
JAN-11-1999 MON 02:40 'N STITZEL,PACE � FLETCHER FAX 110, 30236021552
P. 04
JAN-08-03 FRI 15:50 rnan Lisman FAX NO, E02- r36201 ?,03I08
4, It is a condition to the subdivision approval, as amended, by the Plaimiag Coimuimior.
thnt the Doclamt m ;ice certain undertaking and promises.
5. This document supplements prior Noticcs of Development Conditions, dated November
5,1993, recorded in' ahme 353, Page 595 and dated. _ ^, 1995, recorded in Volume
Page of the sand Records of the City of South Burlingtorn.
AGREEMENT
In consideration of Tc.a Dollars and foe other good and valuable consideration, the receipt
and sufficiency of which is acknowledges the Declarant hereby declares that the Property is and
confirms that the Proptrty shalt be held, sold and coaveyed subjecl to the following covenants,
apeemments, easements and restrictions, all of which are for the pruposo of proteufi g the va!uc and
d;usirability of, and which shall run with, the PropeM and be binding on. all parties having any right,
title or interest therein or any part thereof and their heirs, swccssors and assigns;
6, The maximum height of any building and any land_Scgping on eacli Lot shall be as set,
forth ozI the Attachment hereto. No building shall be constuctcd or landscaping pcnztittcd whirl:
shall oxcood such limits.
IN'WITNESS WTIEREOF, tho Declarant has executed this LDacla-4on this ____ day of
January, 1999.
WITNESSES
S'TATF rip VERMONT
CHlT'MNDEN COUNTY, 53.
LAWN MILOT PARTNERSHIP
BY _
Gerald �. Milat, general partner and duly amhoriwd
agent
BY
John P. Larldn, general parmer and duly authoziex�i
agent
At: Burlington in said County and State; can this day of January, 1999, personally
appeared John P. Larkin, gaawral partner and duly authorlzed agant of Larkin Milot Partrae7z6ip, and
he acknowledged this itYSt =ent by him signed and sealed to be his froe act and dcrd and the trot
act and deed of Larkin Milot 3Pwtnership.
Before rxmc
2
Notary Public
JAN-11-1999 MON 02:41 PM ST?TZEL,PAGE & FLETGHER
JAN-08-99 FRI 15*0 �aaa & l.issan
FAX
NO,
8026602552
P. 05
FAX
NO.
802- P629
P. 04/09
STATE OF FLORIDA
COUNW, SS,
At in aid County and State oil this day of January, 1999, personaUy
appeared Gerald C. Milot, general partner and duly authorize agent of Larkin Mlot Partnership, and
he acknoWledged this instrwnent by him signed and sealed to be his free act and deed and the free
act and doed of Larkin Milot Partnership,
OZ12o�? �n i �+�csrpm nt, eos
Before me
Notary Public
3
J,AN-11-1999 MON 02: 41 PM STITZEL, PAGE & FLETGHER FAX NO, 8026602552 P. 06
JAN-C9-89 FRI 15�50 }ar, & U smaa FAX N0, 802- )3829 P,C5109
PTNNACL,E @ SPEAR
Lets 1 throuugh 51
South Burlington, 'Vermont
The following information was obtained from a document tntitled "Tabic of Height Limitations
For Structures within the Dorset Pack View Protection Zones" prepared by Fitzpatrick -Llewellyn
Incorporated in July 1993
Table of height limitations for Dorset Park View Protection Zones
Zone A . Section 25.401
Zone D - Section 25.407
Nam Mfor to Table holo)�
Column 1, Lot numbers according to Fitzpatrick -Llewellyn Incorporated, Drawing D-4382
Colin 2. Dorset Park View Protection Zone (VPZ), A or D
Column 3. Distances scaled from Dorset park VPZ baseline to center of house lot - feet
Column 4. Existing house lot grade
Column 5. Ceiling Height relative to Dorset Park VPZ Baseline
VPZ A., ceiling height - 435' - 3.1(diytance11000)
VPZ D., ceiling height = 435' - .7 (distance/1000)
Column 6. Road Centerline Grade aci<jacent to house lot
Column 7, First Floor Elcvation (mad centerline grad plus 5 feet)
Column 8. Maximum height of structures, first floor elevation to ridgeline (coiling height
minus ]; FE).
TARIS I
1
Lot #
2
View
Protect
Zone
3
Distance
from VPZ
Bast
Line
4
Existing
Grade
5
Ceiling
Height
6
Road
Centerline
grade
7
I" Floor
Elevation
8
Max
Hei t
1
A
5900
391.0
416.7
390.5
395.5
21.2
2
A
5900
390.0
416.7
389.5
394.5
22,2
3
A
5850
387.0
416.9
387.9
392.9
24.0
4
A
5850
39610
416.9
397.0
392.0
24.9
5
D
5900
384.0
430.9
386,0
391.0
39.9
6
D
6000
38210
430.9
385.2
390.2
40.6
7
D
6000
390.0
430.9
334.2
399.2
41.6
8
D
61(M
380.0
430.7
384.1
1991
41.6
LLEWM.YN
INaellroAArap
JAN-11-1999 MON 02;42 PM STTTZEL,PAGE 9. FLETCHER
jAN-08-99 FRI 15:60 ° )an & Lisman
FAX NO. 8026602552
FAX NO, Dr-r �629
1
Let 4
2
Vi"
Protect
Zone
3
Distance
from VPZ
Ease
Line
4
Existing
Grade
5
Coiling
Height
i
6
Road
Centerline
grade
7
1' Floor
EIavatiom
$ 1
Max
He q it
9
1c
D
D
5900
5850
3;
386.0
430.9
430.9
387.0
384.0
392.0
369.0
3KS
41.9
1 k
I7
5850
386.0
430.9
383.8
389.9
42.1
12
D
5800
386.0
430,9
384.4
389.4
41.5
13
D
5800
386.0
430.9
384.8
389.9
41.1
14
D
5750
387.0
431.0
385.4
390.4
40.6
15
D
5720
388,0
431.0
385.9
390.9
40-1
16
A
5650
390,0
417.5
386,8
391.8
25,7
" 17
18
A
A
5650
5650
390.0
390.0
417.5
417.5
396_9
397.4
191.8
392.4
25.7
25.1
19
A
5600
;90.0
417.6
397.8
392.8
24.9
20
A
5620
189.5
417.6
383.3
M.3
243
21
A I
5500
392.0
417,9
390.5
395.5
22..4
22
A
5500
392,0
417.9
391.5
396.5
21.4
23
A
5500
392.0
417.9
392.2
397.2
20.7
24
D
5550
392.5
431.1
393.0
398.0
33,1
25
D
5550
392.5
431,1
393.0
398.0
33.1
26
D
5560
393.0
431.1
393,2
398.2
32.9
27
D
Y 55600
093.0
431.1
393.5
398.5
32.6
28
D
5610
391.0
431.1
393.3
398.3
32,$
29
D
5650
392.0
431,0
3930
398.0 -
33.0
30
D
5680
392.0
431,0
392.5
397.5
32.5
31
i7 5720
391.0
431.0
391.0
39<_0
35.0
32
1) 5780
391,5
431.0
389,5
394.5
36.5
Page 2 of 3
SUE - LLYH
INCOwpaIRAT19b
JAN-11-1999 MON 02:42 PM STITZEL,PAGE & FLETCHER
JAN-03-99 FRI 15:51 �at & Lisman
FAX NO, 8026602552
FAX NO, 802-` 0629
P, 08
P. 0 7 008
1 2
3
4
5
b
?
8
Lot # View
Distant
Existing
Ceiling
Road
1 `` Floor
Max
Protect
Sbaa VPZ
Grade
Haight
Coatorlinc
Elavatiom
Height
Zone
Hass
grade
Lino
33 D
500
391.0
431.0
390.5
T395.5
35.5
34 D
5560
390.0
431.1
391.5
396.5
34.6
35 3?
5520
391.0
431.2
392.2
397.2
34,0
36 D
$500
390,5
431.2
393.8
398.8
32.4
37 D
5460
391.0
431.2
393.2
398.2
33.0
38 D
5420
39110
431.2
3934
398.4
32,8
39 D
5406
391 A
4431.2
393,3
398.3
32.9
40 D
5370
391.0
431.3
393.1
398.1
33.2
41 n
5350
391.0
431.3
392.8
397.9
33.5
42 A
5330
391.5
418.5
392.3
397.3
21.2
43 A
5300
390.5
412.6
392.0
397,0
21.6
44 A
5290
390.0
419.6
392.2
397.2
21.4
45 A
5300
390.0
419.6
390.6
395.6
23.0
46 A
5340
390.5
418.5
390.2
395.2
23.3
47 A
5420
391.5
419.2
389.9
394.9
23.3
48 A
5540
390.5
417.8
389.4
394.4
23.4
49 A
5650
399.0
4175
389.0
394.0
23.5
50 A
5660
389.5
417.5
399.8
394.$
22.7
L51 A
$660
399.5
417,5
390.5
395.5
22.0
Page 3 of 3
LLewgLLYN
INCO PONArsa
JAN-11-1993 MON 02:43 PM STITZEL,PACE &. FLETCHER FAX NO. 8026602552
AN-"08--99 FR1 15151 ran & Lismar FAX N0, 802-" )3628
LLEWELLYN
INCORPORATED
PINNACLE @ SPEAR
Lots 52 through 80
"Wale drive
South Burlington, Vermont
July 28,1998(rev)
Table of height limitations for Dorset Park View Protection Zones
Zoa r A - Section 22.401
Zone D - Sectinn 22.407
Notes refer to Table below
Cohunn 1. Lot nttnbcrs according to L1ewtllyn incorporated, Drawing 0067-D
Column 2, Dorset Paris View protection Zone (VPZ), A or D
Column 3. Distance scaled from Dorset Park VPZ baseline to center of house lot - fiwt
Cnlumn 4. Ridge Line Elevation telative to Dorset Park VPZ Baseline
VFZ A: Ridgc line d 441 - 4.3 (Distmcc / 1000)
VPy D. Ridge line = 441 -2.0 (Distance / 1000)
Column 5. Roadway =niorlina clevud,on at center of house lot
Colman d. Assumed Fiat Floor Elevation (based on footing drains discharging to storm
sewers)
Column 7, Height of house (First Floor Elovation to Ridge Line Elevttion)
Column 9, height of Housc (Roadway centerline elevation to ridge lint elevation)
TABLE V
P. 09
P. VOR
1
Lot #
2
Vicw
Prow
Zome
3
Distance
from VFZ
Basc
Lane
4
`` Ridge
f Line
Elcvatior.
5
Roadway
Elevation
6
Assumed
FFE
7
Height of
House
above
FFE
8
Height of
House
above
Roadway
52
A
4650
421,0
394.9
398.1
22.9
26.1
53
A
4685
420.9
395.0
398.3
22.6
25.9
54
A
4710
420.8
394.9
399.5
22.3
25,9
55
A
4725
420.7
394.6
398.7
2210
26.1
56
A
4735
420.6
394.5
398.9
21.7
26.1
57
4740
4?A4
394.4
399.0
21.6
z6,2
58
A
rt750
420.6
394.4
--[::::
399.3
21.3
26.2
4049 Whiston NOW - soUrn UMIM ion , ver,nora • W403
T 802.658.2100 . F 802-658.2$82 ^ e-mail: 11ew0Tnc@ao1xom
Fnglri"HriE • OarrOting + CtAw k % Serviras
JAN-11-1999
MON
0243
PN ST?TZEI.JKE 8 FLETCHER.
FAX
NO,
8026602552
JAN-08-99
FRI
15:51
)an & Lipman
FAX
N0.
802-' 136229
P. 10
F. 03f 09
fA.BLE V (continued) Pinnacle �& Spear
July 28, 1.998
I
Lot #
2
VPZ
3
Distance
from Base
4
Ridge
Line
Elevation
S
Roadway
Elevation
� 5
Proposed
FFE
7
Height
of
House
7
Hei�ht of
Ylausc
59
D
4755
431.5
393.6
399.4
32.1
37.9
60
D
4760
0 ? .5
394.3
394,8
31.7
37.2
61
D
4765
431.5
394.5
399.;7
3L6
37.0
G?
A
4750
431.5
394.7
400.0
31.5
36.8
63
D
4735
431.5
394.9
400.3
31.2
36.6
64
D
4750
431.5
395.2
400.5
31.0
36.3
65
D
4745
431.5
395.5
1 400.7
30.3
36,0
66
D
4790
431A
396A
401.0
30.4
35.0
67
D
4850
431.3
396.5
401.9
29.4
34.8
68
D
4600
431.€
396.4
402.0-
29.8
3 5. 4
69
D
4580
431.8
395.3
401.8
36
70
D
4575
431.9
394.9
-
400.6
--30.0 -_ -
31.3
-
37.1
71 '
-- D
4590
431.8
394.6
4X.11
37.2
72
D
4580
431.8
394A
4QQ.Q
-31.7
31.8
37A
73
D
4595
431.8
393.6
349.7
32.I
38.2
74
D
4590
431.&
394.4
399.6
32-',>.
37.4
75
A
4$80
421,3
394.4
399.5
22.8
26.9
76
A
4615
421.2
394.5
399.2
22.0
26.7
77
A
4555
421.4
r 94,6
399.0
22.4
26,8
78
A
4550
421.4
394.9
398.6
22.9
26.5
79
A
4525
4215
394.9
398.5
23.0
26.6
80
A
4500
421.7
394.9
'98.4
73.3
26.9
Rev.12-04-98
----- -- ----
Pie 2 of 2
11 6V W
INOORPOKATip
LLEWELLYN
INCORPORATED
January 6, 1999
Ray Belair
575 Dorset Street
South Burlington, Vermont 05403
RE: Pinnacle @ Spear (formerly Nowland Two)
File: 97024
Dear Ray:
Enclosed please find revised recordable mylars for the above referenced project. We have
included an 18" x 24" recordable for both survey plats as well as sheets 1 and 2 of our plan set as
you requested. Also enclosed are 3 bond copies of sheets 1, 2, 4 and 5 of 9, as well as 3 bond
copies of the overall site plan (sheet 1 of 1) and 3 bond copies of the survey plats. The changes
made include the revision of the property lines for lots 68, 69 and common land "C", as well as
some contour revisions around the detention pond.
Please feel free to call with any questions, or if you need any additional information.
Thank you for your help with this project.
Sincerely,
LLEWE��LrrLYN INCORPORATED
Scott A. Rogers, P.E. —A
cc: L & M Partnership
Button Associates
4049 Williston Road • South Burlington • Vermont • 05403
T 802.658.2100 • F 802.658.2882 • e-mail: Ilewellinc@aol.com
Engineering • Permitting • Consulting Services
PINNACLE @ SPEAR
Lots 52 through 80
Vale Drive
South Burlington, Vermont
July 28, 1998
Table of height limitations for Dorset Park View Protection Zones
Zone A - Section 22.401
Zone D - Section 22.407
Notes refer to Table below
Column 1. Lot numbers according to Llewellyn Incorporated, Drawing 0067-D
Column 2. Dorset Park View Protection Zone (VPZ), A or D
Column 3. Distances scaled from Dorset Park VPZ baseline to center of house lot - feet
Column 4. Ridge Line Elevation relative to Dorset Park VPZ Baseline
VPZ A: Ridge line = 441 - 4.3 (Distance / 1000)
VPZ D: Ridge line = 441 - 2.0 (Distance / 1000)
Column 5. Road centerline elevation adjacent to house lot
Column 6. Proposed First Floor Elevation (based on footing drains discharging to storm
sewers)
Column 7. Height of house (First Floor Elevation to Ridge Line)
TABLE V
1
Lot #
2
VPZ
3
Distance
from Base
4
Ridge Line
Elevation
5
Roadway
Elevation
6
Proposed
FFE
7
Height of
House
52
A
4650
421.0
394.2
398.3
22.7
53
A
4685
420.9
393.9
398.5
22.4
54
A
4710
420.8
393.6
398.7
22.1
55
A
4725
420.7
393A
399.0
21.7
56
A
4735
420.6
393.1
399.2
21.4
57
A
4740
420.6
392.8
399.3
21.3
58
A
4750
420.6
392.5
399.5
21.1
LLEWELLYN
INCORPORATED
TABLE V (continued) Pinnacle @ Spear July 28, 1998
1
Lot #
2
VPZ
3
Distance
from Base
4
Ridge Line
Elevation
5
Roadway
Elevation
6
Proposed
FFE
7
Height of
House
59
D
4755
431.5
392.3
399.6
31.9
60
D
4760
431.5
392.2
399.7
31.8
61
D
4765
431.5
392.6
400.0
31.5
62
D
4750
431.5
393.1
400.1
31.4
63
D
4735
431.5
393.4
400.5
31.0
64
D
4750
431.5
393.8
400.6
30.9
65
D
4745
431.5
394.4
400.7
30.8
66
D
4780
431.4
395.0
400.9
30.5
67
D
4850
431.3
395.3
401.2
30.1
68
D
4600
431.8
394.8
400.9
30.9
69
D
4580
431.8
394.2
400.7
31.1
70
D
4575
431.9
393.5
400.5
31.4
71
D
4590
431.8
393.1
400.2
31.6
72
D
4580
431.8
392.5
400.0
31.8
73
D
4585
431.8
392.1
399.7
32.1
74
D
4590
431.8
392.4
399.6
32.2
75
A
4580
421.3
392.7
399.2
22.1
76
A
4615
421.2
393.1
399.3
21.9
77
A
4555
421.4
393.4
399.0
22.4
78
A
4550
421.4
393.6
398.7
22.7
79
A
4525
421.5
393.9
398.5
23.0
80
A
4500
421.7
394.2
398.4
23.3
Page 2 of 2 LLEWELLYN
INCORPORATED
LLEWELLYN
INCORPORATED
January 4, 1999
Ray Belair
575 Dorset Street
South Burlington, Vermont 05403
RE: Pinnacle @ Spear (formerly Nowland Two)
File: 97024
Dear Ray:
Enclosed please find recordable mylars for the above referenced project as per our discussion last
Wednesday. We have included an 18" x 24" recordable for both survey plats as well as sheets 1
and 2 of our plan set as you requested. Also enclosed are 3 bond copies of each sheet, as there
was one small change to the plans. The proposed 20' recreation easement was relocated as
shown.
Please feel free to call with any questions, or if you need any additional information.
Thank you for your help with this project.
Sincerely,
LLEWE�LLYNN INCORPORATED
Scott A. Rogers, P.E.
cc: L & M Partnership
Button Associates
4049 Williston Road • South Burlington • Vermont • 05403
T 802.658.2100 • F 802.6582882 • e-mail: Ilewellinc@aol.com
Engineering • Permitting • Consulting Services
In the interest of maintaining oustan-.
dards of accuracy and good tastr e, we
reserve the right to refuse, cancel or
edit advertising at any time.
J The 3plItIr[ingtoll ref jkta
SALES 1OPTION.
SONALS 6
CHESTER Loving
SALE . Fri, Sat married couple, Cathy
5. 11 Canyon and Ken, hes to
adopt, sharersendless
�r-=--- love, house full of
otter to cash with laughter & forever
ess Classified ad, sunshine with a baby.
11658.3321. Legal/medical paid-
STER Furniture. 927collect (516) 1a64-
s, linens, j
(12-16) clothes,
:atterns, books,
10, 9-4, 23 Bon-
rk. Rai_ n o�_
LCHESTER
lt'y sale!!!
,ircle/Sunderland
off Route 7. Sat-
3/10. 9_ to 3_- -
--Pinewood--
mily-Rustic Dr.-
;ze 17 sneakers -
at'] Geo's & VT
ildren's clothing &
ent-bikes-jewelry-
�-frames-glass,
lore. 9-4 Sat.
JCT furniture,
-- VT
bear collec-
usewares, cam-
lothing, and much
52 Old Colchester
-Sat 10-4.
JCT Sat & Sun 8-
Venonah Ave., off
St. The last hurra,
s coming, enjoy
:e. Chairs & more
SBURG/MONK-
Today only!!19-3. 3
Alectlon. Furniture
,hold items. Pas
s Orchard on left.
HO CENTER Y
Many kids cos
Land's End 2nd
)bes, beach jacket
ure, Antiques, Mis
skiis. Fri & Sa
& 10. loam-3pm. N
birds. 18 Leary Rd
ashville Rd. 899-418
RISVILLE Sat.
10/17 & 10/18.
4. Antiques, collet
tools & much mor
`fee Road, off
Hill Road, 4 mil
Morristown C
Follow signs.
ab�J
RTM
10/10. 7 - 5.
Old Hollow Rd.
HMOND Busine
uidation & Est
e. Sat 9-4. Spa the
& access, plumbi
)ffice supplies, ab
and pool. Plus fu
housewares, line
!elry, cookbooks, to
Indoors. 920 W M
-n. east of Exit 11
fur
RICHMOND
;huge three family
,!door tag sale an
estate sale:
beds, shelves,
kitchenware,
edding, cookboo
electronics,
Cbristtt-a
decorations,
garden equipm
lamps, toyys,
coBectabba,
pictures frames
kitchen cabinet
spa and pool
chemicals
and AnUiDment
SOUTH BURLINGTON
PLAnn.rtNG
COM ION
The Sou urlingto
Planning Qommissio
will hold a public hearin
at the South Burlingt
City Hall, Conferend
Room, 575 Dorse
Street, South Burlingtor
Vermont on Tuesda
October 27. 19911, at 7:�
P.M. to consider the
following:
1. Final Plat applicatic
of L & M Partnership 1
amend a condition of
approval granted c
8/14/97 for a plannc
residential developme
ADOPTION A bright fu- consisting of 80 sing
ture with lots of love family lots. Pinnac
awaits your child in our (n� Spear, Spear Strec
New England home. Lov- file amendment is to e
ing, happily married, and tend, by two (2) year
financially secure couple the date by which tl
with one daughter wish to roadways serving the d
share our lives with a velopment must be ca
newborn/toddler. Call pleted, which will in tL
Denise collect at (603)228- extend, by two (2) yea
1614, M-F 8:30am-5:OOpm the approved resery
or Anne & Brad at (800) sewer allocation for t
753-1503 eve/wknd. development.
adoption
A MARRIED COUPLE 2.
are eager & ready NOW o
to open our hearts to a
your infant forever. We p
will provide love & secu- ti
rity in our happy home. ti
Expenses paid. Call Su- u
san & Jacobus TOLL c
FREE (888) 878-9158
ADOPTION
Two young hearts full of
love, happiness. Full time
mom, self-employed dad
promise warm, loving up-
bringing for your baby. t
Legal. Confidential. Ex-
0 penses ppaid. Traceyy/
Evan 1-800-651-6550.
t adoption
WE'RE a childless cou-
d pile longing to share
love/secure home w/ a
s: baby. If consider
s. adoption, pis. call (888�
c. 260-8686 Sharon & Brad.
I.
AEROSMITH TICKET
Montreal October 101h.
pRound trip bus travel,
pre boarding party, red
& section seating, $95, firm.
Call 865-4496.
t- AIRLINE TICKETS
el (2). Round trip to Hawaii.
of $500. Cell 878-1929.
es
or- CARIB13EAN VACA-
TIONS 2 vacation pack-
ages to Caribbean desti-
nations. 5 days, 4 nights,
$800. All inclusive, 3
days, 2 nights, $750. Air-
rm fare not included. No ex-
piration dais.--
7609, leave message.
ss NEVILLE BROTHERS
ate TICKETS
mi- 2 tickets for Oct. 30 at
ng the Flynn. $72 for pair.
ove Call802-482-4223.
TICKETS
ns, 1 way ticket to Ireland
ys for October 7th, $50. Call
alit 802-654-6825.
WANTED: GREEK LAW
GUAGE TEACHER for
private instruction.
Please call 802-454-8610
ADULT 8
ENTERTAINMENT -
ESCORT EXCELLENCE
Outcail onlyy.
ks, Call863-9510
Now hiring.
Mt, )
s,
www.fanUsyant�rPrlss.eaw
HARD, BODIES
Final Plat applicauc
f JAM Golf LLC
mend a previously al
roved planned reside
at development consl
ng of 244 resident!
nits and an 18 hole g(
ourse, Dorset Stro
The amendment consis
of modifying the golf cl
area by: 1) razing a s
gle family dwelling,
constructing a 14,0
square foot clubhou!
3) constructing two
ennis courts, 4) cc
strutting a swimmi
pool, 5) converting t
temporary clubhouse
a pool changing an
tennis pro shop, and
expanding the park
area.
BENEFITS ASSISTANT
experience in A,/R, A/P,
and payroll required.
Also assists in adminis-
tering benefits and vari-
ous other duties. Apply
TV,TerwWVNY
10Market Square,
Burlington, VT 05401.
802-658-8622. EOE.
ACCOUNTING
STAFFERS
NEEDED NOW!
Both full and part time.
A/R, and A/P experience.
Stop by today,
19 Commerce St, Williston
Call (802) 864-8255 OR:
check out our website
www.triadtemp.com
N
r�
`Temporary jervices
864-8255
ACCOUNTANT/BUSI-
NESS MGR w/ progres-
sive non-profit arts orga-
nization in Lamoille
Country. Req.approx. 2
hrs per/wk. Must Pos-
sess excellent admin.
and financial skills. Must
have mgr. exper. Ir
charge of ledger, report
ing, budgeting, payroll
cash m9t., etc. Must be
detail orientated and pro
active. Knowledge o
Windows 95, window
based accounting pack
Iages and MSOffcce
must. Blackbaud expert
ence a plus. Please fa
resume, salary req, an
cover letter to Nichola
at (802)635-2730.
Aetivlst
CAMPAIGN JOB!
for the
ENVIRONMENT
Copies of the appuc
tions are available f
public inspection at th
South Burlington Ci
Hall.
William Burgess
Chairman
South Burlington
Planning Commission
October 10, 1998
REQUEST FOR BIDS
IMPROVEMENTS TO
INTERSECTION OF
MOUNTAIN VIEW RD.!
& REDMOND RD
WILLISTON, VT
The Town of Williston, i
conjunction with the Chi
tenden Solid Waste Dif
u ici i� -1tritino bid
from qualified contras
tors for the reconstrui
tion and widening of tt'
intersection of Mounta
View Road and Reg
mond Road in the Tov,
of Williston. The work i
eludes grading, drainag
subbase; base coax:
pavement, and signag
q pre -bid meeting will I
held at the site on
October 14, 1998 at 2:
p.m. Sealed bids will
accepted at the Town
Williston Office located
722 Williston Road, V1
iston, VT 05495 until 1
p.m. October 23. 19'
Copies of the Contr
Documents can be
amined and obtained
the Williston Put
Works Dept. at
above address.
October 8, 9 & 10, 199
AUTO BODY
TECHNICIAN
Under New Man" ment
Qualified and gted
Auto Body Tea sled
to join our repair team.
We offer either a strong
flat rate pay plan or a
very competitive hourly
wage, along with a com-
prehensive benefit pack-
age including 401(k) re-
tirement, insurance and
paid vacations. Qualified
applicant should have
auto body repair experi-
ence and be able to com-
plete all phases of colli-
sion repair. Frame and
Unibody experience
highly desirable. Addi-
tional training available.
Must have own tools.
Shop has clean, modern
environment with Down -
draft booth and Chief
Frame machine.
Under New Management
Contact Peter Haskell,
Shop Manager,
For confidential interview:
Lewis Motors-
4 Lewis Acura
1325 Shelburne Rd
So Burlington, VT
Days:802-658-1130
AUTO TECHNICIANS
Heritage Ford...
Needs full time Techni-
cians to diagnose, repair
& service domestic vehi-
cles. We are offering a
$2000 hiring bonus and
the opportunity to work
in a flat rate shop that is
always busy. If you are
an experienced Techni-
cian with either ASE or
manufacturer's certifica-
tions or have extensive
dealership experience,
give us a call. Heritage
offers top pay, paid holl-
days & vacation, med-
ical/dental/life nsur-
ance, 401(k) plan &
flexible spending ac-
counts (cafeteria plan).
Contact Paul for a confi-
dential interview or ap-
ply in person during reg-
ular business hours.
Auto
FINANCE MANAGER
Experienced Finance
Managger for expanding
new & used car dealer-
ship. Must be a moti-
vated team player with
strong customer skills.
Excellent wage & benefit
package. Please reply to
Free Press Box # 55. _
Automotive
RECEPTIONIST/
CASHIER
$250-$400/wk Enthusiastic person
Work w/ the Sierra Club, needed for busy automo-
FT/PT and career posi- five dealership. Duties in-
tions. Burlington. Call elude answering and di-
Sandy:862-1600 ratting calls, greeting
walk-in visitors, typing, fil-
ng and other administra-
tive duties. Prior switch-
board experience
preferred along with com-
puter experience. Must
have a positive attitude,
willingness to learn, and a
high energy level. Com-
pete benefits package in-
cluding 401(k). Weekday
hours Monday through
Friday 1:30pm to 7:00pm
& Sat 8:00am to 5:OOpm.
Please forward a
resume or stop by.
ADMINISTRATIVE
COORDINATOR «
senior organization
seeks individual to in-
crease advocacy and ed-
ucation capacity of
group. Good communi-
cation skills, policy or so-
cial service experience,
database/financial com-
puter skills required. Lo-
cated in Montpelier.
Cover letter & resume to
COVE, PO Box 366, Lyn-
don Center, VT 05850 by
October 19.
ADMINISTRATIvc
ASSISTANTS
Needed
Immediately
P/T and F/T
Must be computer literate.
Familiarity with
MS Office helpful.
Apply in person at
19 Commerce St, Williston
or on our website
it www.triadtemp.com
Ij
864-8255
A DREAM
COMES TRUE
Join the #1 team in our
geld and make your
every dream a reality!
We offer
Established accounts
Expense -paid training
.terit promotions
Fantastic first -year
r FORD
865-8100
1580-1600 Shelburne Rd
South Burlington
®� 6r,glaod
Federal Credit Union
Banking
MORTGAGE
LOAN
OFFICER
Shearer Oldsmobile
uadiiiac w„ t,ac
1030 Shelburne Rd
So Burlington, VT 05403
AUTOMOTIVE SALES
Wanted: New & Used
Automotive Sales. Self
motivated individual with
ambition & drive. Excellent
income potential for the
right candidate. Call for
appointment Dan or for
Monday -Friday 9am to
5pm at 802-524-9,
AUTO SALES TRAINER
Auto sales background
preferred. Earnings up to
140K. Burlington based.
1-800-722-8482.
Automotive
SERVICE ADVISOR
Busy, growing sports
utility vehicle dealership
needs an experienced
Service Writer. We offer
a 5 day work week, out-
standing benefit pack-
age & the opportunity tc
Blodgett Supply and
3odgett Distributors are
ooking for experienced
>ales professionals with
lrive, and the knowledge
and skills to help the
pest customers in the
,vorld. Plumbing and
heating experience is re-
quired for 2 current
openings. We're alsc
looking for people expe
rienced in major apph
antes or television sales
We can offer you a chat
lenge and the opportu
nity to work with a grea
team who value you
contribution to our com
pany's success. Send re
sume to: President, O B75
gett Supp y,
Williston, 05495.
BREAD BAKER
experienced Brea
Baker wanted. Part-tirr
& full-time positions. C,
253-4733.
New England Federal
Credit Union has an open-
ing for a Mortgage Loan
Officer in their subsidiary'
company, Direct Financial
Services, Inc. The Mort-
gage Loan Officer is re-
sponsible for the origina-
tion of quality residential
mortgages. Strong candi-
dates will have a knowl-
edge of resdiential regula-
tory & secondary market
compliance to insure that
the customer is given ac-
curate information. Must
have demonstrated com-
munication skills and 2 ye-
ras experience in a lend-
ing function. Willing tc
work evenings and week,
ends as needed. Nev,
England Federal offer
exceptional benefits in
cluding: employer paic
medical, dental and life in
surance, two week paic
cation, 12 paid holiday!
pension plan, 401k, tut
tion reimbursement an:
on -site exercise facility.
you are interested an
qualified, please stop b
our One Harvest Lane o
fices to fill out an applict
tion, or send your resum
to: New England Feder!
Credit Union, PO Box 52'
Williston, VT 05495, A
tention: HR. EOE
®Now Englari
Fe" I Cre dQredit Unix
Banking
MORTGAGE
LOAN
PROCESSOF
New England Fede
Credit Union has an opt
ing for a Mortgage Lc
Processor to work in c
Williston branch. T
Mortgaoe Luar, Proces,
US DRIVER CDL ar
pus license required. Pi
,ate: $50.00 per day, wi
extra bus runs and fie
trips available. Please r
spond by mailing letter
interest, resume ai
three current work i
lated references: Me
Greenia, Principal, W
Cott Elementary Scho
PO Box 179, Wolcott,
05680. 802-472-6551.
CABINETMAKER 5
exper. for a shop
Monkton. Own transp
tation. 985-8208 for ap
CABINET MAKER M
vated & skilled for h
end custom woodsh
Minimum 2 yrs exi
Fax resumes to: 8
6615. Or mail to:
Joinery, 118 Sheperd
Hollow Rd, Ce
bridge,VT 05444.
•
CAD OPERATO
Excellent full-time
opportunity with HD
dynamic design/built
company located in
Burlington, Vermont a
Responsibilities will
clude architectural d
ing and design. Mus
well versed m Auto'
14. Architectural an
building background
necessary. Salary n
tiable based on qual
tions. Benefits incluc
Submit resumes v
HDI
183 Talcott Roac
Suite 301
WillistonkVT 054t
f
I
CAFETERIA PLAN
MINISTRATION
Word Processing
i1 keeping and be
background des
excellent benefits.
_ Planning Assoc., If
Box 905, Willisto
05495.
n CAFETERIA UVN
worker for night;
P.M. 10:00 P M.,
ends required.
Cook, . Mon -Fri
A.M. 8:00 P.Iv
Cathy at 656-0805
i
CAREGIVER Es
Woman with strok
al abates needs 11
n- Barn care. Mon.-T
an aspects of person
yr Sound judggamen
he ect Home, 863-56
;or CARPENTER I
BARTLETTS BAY SEWERAGE TREATMENT PLANT
UNCOMMITTED RESERVE CAPACITY
Design/Permitted Flow
12 Month Average Flow
Committments Against Reserve (State List)
Committments Against Reserve (Municipal List)
UNCOMMITTED RESERVE CAPACITY
Date: 12/21 /92
tg t 4
V/ ttq 1? - qz x
800000
G.P.D.
630000
G.P.D.
78578
G.P.D.
27417
G.P.D.
64005 G.P.D.
COMMITTMENTS AGAINST RESERVE
Action/ Applicant
Approval
Date
STATE LIST: DATE: 8/20/92
Project
6/19/79
LOZON ESTATE
2 COMM LOTS NOT BUILT
9/23/82
LTH ASSOC & BARTLETT(**)
5 DUPLEX, 2 LOTS NOT BUILT
9/24/87
THOMAS & CAROL DROLETTE
2 LOT SUBD
9/24/87
DAVIS DEVEL. CORP.
10,000 SF OFFICE BLDG
6/90
BLODGETT(*)
18 UNIT PRD
5/1/91
JAMES FAYETTE/L&M PARK(*
RES/RETAIL/THEATRE PCD
(THEATRE HOOKED ON)
9/25/91
BDP REALTY ASSOC
PHASE 2 OFFICE BLDG
7/28/92
JWJ REALTY - SATURN
CAR DEALERSHIP
MUNICIPAL LIST: DATE: 12/21/92
NOWLAND SUBD
H. MARK BOLTON
MEADOWBROOK CONDOS
BLODGETT(*)
4/16/91 LOCHMORE ASSOC
5/12/92 O'BRIENS TRAINING CTR
6/9/92 HANDY
TOTAL COMMITTMENT
5 LOTS NOT BUILT
1 LOT SUBD
11 MF UNITS NOT BUILT
18 UNIT PRD
HOTEL & RET/OFFICE-LAKEWD C
ADDITION -VOCATIONAL
MOTEL/RESTAURANT
TOTAL COMMITTMENT
G.P.D.
1650
5400
900
1000
7625
58028
3825
150
78578
2250
300
4950
475
14300
342
4800
27417
(*) INDICATES ADDITIONAL ALLOCATION GRANTED BY CITY ABOVE THAT GRANTED BY STATE.
(**) INDICATES EXCHANGE OF RESERVED SEWER ALLOCATION
(#) INDICATES PLACE ON EARLIER WAITING LIST FOR SEWER ALLOCATION
VERMONT AGEICI Of NATURAL RESOURCES 18/21192
Peraits Cospliaace & Protection Division PAGE 1
KURICIPAL CORNECTIOI DATA FOR BARTLETTS BAY -- UNCORRECTED PROJECTS
Action Application flow Connect'a
Date latber , Rate of Applicant Description G.P.D. Status Reclo
06/19/79
4C0392
LOi0l ESTATE
2 LOTS 10T ELY 4/92
1,116
lotconn
73
19/23/82
4CIS26
LTH ASSOC & BARTLETT If AL
5 DUPLEIES,2 LOTS 107 BLT 5/88
5,401
lotconn
74
..88/111181
--P8-t-m6 --
ROBERT- STEYEIS SR- -__ ---
- - 6000 ADD'N TO COMMERCIAL BLDG
186
1'dravn
1663 t=
-o9t31t8ir-4E/339-4--DALE
IRAII&II 4 ROIARD SHERMAN-
PAR TIER -11RUf-SERVIFS-BLDG---18g`
I'drawn__
1742
09/24/87
EC-4-1212
THOMAS & CAROL DROLET11
2 LOT SUBDIVISION
906
Notcoon
2280
19/24/87
PB-4-1375
DAVIS DEVELOPMEIT CORP
10,108 S.l. OIIICB BUILDIIG
1,000
Notcona
2283
12/01/89
11-4-0184
DEIIIS BLODGETT
BOLUS ROAD EITEISIOI
7,290
NotCono
3614
12/11/89
11-4-0184
DENNIS BLODGETT
HOLMES ROAD EITENSION
335
lotCoun
3615
-
SSOCIkTES-----ADB-7$-CHILD;--IS-,STA�I--DAICAR�-fiti0-1f'-drawn---3tQ1--
Ac
—&f i"A$ELMI --SIR; iMfERi-kb-DR-
-;So
—lotEenn
RI6RT-/C K0R&YSS6i-INC--- 3-SlORF�IIICE BLDG,-SRIIT ST-1rU}-
lotCoun—
4%1_ C
-48tf#bF 8---RR-4--fftZ----1&IGHT
&- MORRISSEY, -IIC. --
INFILTRATION ----- -
-11}-
lotConff-3�6A--
r 0101/91
11-4-4384
JAMBS IATETTE / L&K PARK
BLDG 5
7,501
lotConn
C
4293
65//1/91
11-4-0384
JAMBS LAYETTE / L&M PARK
BLDG 6
7,506
lotCona
4294
05/81/91
11-4-4384
JANES FA19TT6 / L&M PARK
BLDG 7
5,710
IotConn
4295
05/01/91
11-4-1834
JAMBS FATETTS / L&K PARK
COKMUIITT BLDG
506
lotconn
4296
/5/11/91
11-44384
JAMBS LAYETTE / L&K PARK
INFILTRATION
1,401_
Notconn
1299
17/93/91
11-4-0384
JAMBS IATETTE / L&M PARE
RETAIL COMMERCIAL BLDG
6,525
lotCona
4297
19/25/91
11-44442
EDP REALTY ASSOCS
60,600 SQ IT ADDITION
3,825
NotConu
4489
-IiAR€Bl, TARRAI1L i-HOEHL--
}7} -
pottoae--4fr44-
95/21/92
EC-4-1658
I1Y1TT1/L1RIIN/L&M PARK
115 SEAT IAST FOOD RESTAURAIT
5,750
lotCoun
4704
05/20/92
EC-4-1658
IATETTE/LAREIkIL&K PARK
RESIDENTIAL BLDG 1-4 209 BURN
23,153
lotCona
4715
�t �5t31f4?—if1=#�8f11—
tAL-t n"O#-HOMES-FOR -T m- ie--
cmD-€1RE-I-A I-
�if1'4=151i-
--ARBNBROOI-HOM"#IODIH-IIC
III3LT&AT101
--}}l---lotcone-
--#748-
C
07/28/92
11-4-/512
JIJ REALTY
CAR DEALERSHIP
IS1
lotconn
4792
Total Outstanding Couitaents ,
86,088 G.I.D.
STATUS CODES
lotCoun • Project Not Yet Discharging to Municipal Sever Systes (cmitsent)
Connect - Project Coipleted, Discharging to sunicipal sever
Denied = Request for Connection Denied
I'dravn • Approval for Connection Withdrawn by Municipality (Coiiitteat)
Revoke - Petitioned for Revocation of Persit
EPP82251.
G loc�1_ �kPrg2oVaC_XrI 1LE0
= CbtJNe C(D
r r
State of Vermont
Department of Fish and Wildlife
Department of Forests, Parks and Recreation
Department of Environmental Conservation
State Geologist
Natural Resources Conservation Council
Mr. John Steele
Fitzpatrick -Llewellyn Inc.
1 Wentworth Drive
Williston, VT 05495
4 . AGENCY OF NATURAL RESOURCES
Department of Environmental Conservation
WATER QUALITY DIVISION
103 South Main Street
`p d I� ;4 T: Building 10 North
Waterbury, VT 05671-0408
s 802-244-6951
August 18, 1992
R
fj a�W�rA �!}�'iII:-'JR•V�.w.••. •; ;,wSyo,I9�,MoM w6t
RE: Southeast Summit and Nowland II Subdivisions,
South Burlington, Vermont
Dear Mr. Steele:
Upon receiving your July 7, 1992 request for a wetland
review for the two above referenced projects, I recalled that
Lisa Borre, former Wetlands Specialist with the Wetlands Office,
had reviewed the Nowland II Subdivision project in 1990. While
looking for that file, I found that she had also reviewed and
commented on the Southeast Summit project. Enclosed are the
letters she had written regarding these projects. One of the
letters had even been written to yourself in 1991.
I'm am not clear why you are again asking for comments from
the Wetlands Office when it seems the questions she has raised
have not yet been answered and you have not applied for a
Conditional Use Determination. Lisa's comments and inquiries for
both projects are still applicable today. Please call me to
clarify what I find to be a confusing situation.
If you have any questions or comments, please feel free to
call me at 244-6951.
Sincerely,
Catherine L. O'Brien
Assistant Wetlands Coordinator
enclosures
cc: Lou Borie, District Coordinator
co\jsteele.let
iZc1c fil�G t
134TF.
DIVISION OF WATER QUALITY
10 North Building
802-244-6951
January 15, 1991
John Steel
Fitzpatrick -Llewellyn Incorporated
One Wentworth Drive
Williston, VT 05676
Subject: Nowland Property II, Spear St., South Burlington
Pre -conditional Use Review
Dear John:
Thank you for sending me the sketch plan by Fitzpatrick -
Llewellyn, Inc., dated August 1990, for the above referenced
project. I appreciate the opportunity to comment on the project
during the early planning stages.
Last year I conducted a preliminary site visit with Lance
Llewellyn to determine whether there would be any negative
impacts to wetlands from proposed development on the property.
Since that site visit, the wetlands on the property have been
accurately delineated by Brad Wheeler of the Johnson Company.
Based on my preliminary evaluation, this wetland is important for
at least the following functions: improving water quality through
chemical action and storing stormwater.
The wetland has been identified as a palustrine scrub shrub
wetland on the National Wetlands Inventory (NWI) maps. The
Vermont Wetland Rules designate all palustrine wetlands
identified on NWI maps and contiguous wetland areas as
significant (Class Two) wetlands. Any activity in a Class Two
wetland or associated 50' buffer zone, other than allowed uses
specified in Section 6.2 of the Wetland Rules, requires a
Conditional Use Determination (C.U.D.) from the Agency of Natural
Resources (Vermont Wetland Rules, Section 6.3 and 8). Such a
determination may only be granted if it is shown that the
proposed activity will not have undue adverse impacts on
protected wetland functions [Vermont Wetland Rules, Section
8.5(a)].
A C.U.D. will be necessary for any proposed activities in
the wetland of 50' buffer zone as identified on the plans. A
John Steel
Page 2
copy of the application and a fact sheet explaining Conditional
Uses is enclosed.
I have several comments/concerns about the project as
proposed in the sketch plans that will need to be addressed as
the project plans progress. In general, it appears as though you
have attempted to keep development from encroaching on the
wetland or buffer zone. My specific comments are described
below:
1. Why is it necessary to have two road crossings? How
much fill/impact will be involved? My main concern is
whether the second crossing can pass the alternatives
test as outlined in the mitigation section of the
Wetland Rules. I need more information about the
extent of impact to make an determination whether the
second crossing constitutes a "minimal" impact or an
"undue adverse" impact.
2. What are the stormwater plans? Stormwater should be
pre-treated before discharging into the wetland or
buffer zone.
3. Can the encroachment on lot #73 and the tennis courts
be avoided? I recommend eliminating any encroachments
on the buffer zone except for the road crossing.
4. Will the wetlands in the Open Space/Common Land and on
individual lots be protected by restrictive covenants?
Because of the number of lots that contain wetland or
buffer zone, I recommend that restrictions be placed on
individual lots that contain either wetland or buffer
zone. A Declaration of Restrictions should be filed
with the town land records and should carry with the
land for the common land and the affected lots. There
should be no dredging, draining, filling, grading or
alteration of the water level in the wetland. Grading
and mowing is allowable in the buffer zone.
If you have any questions about these comments or the
application process, please do not hesitate to call me at 244-
6951. Please keep me informed as plans progress.
Sincerely,
Lisa Borre
Assistant Wetlands Coordinator
cc: Lou Borie, District Coordinator
Kurt Janson, Land Use Attorney
February 9, 1993
Mr. Bill Burgess,
South Burlington
South Burlington,
Dear Bill:
City of South Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT 05403
TEL. (802) 658-7953
FAX (802) 658-4748
Chairman
Planning Commission
VT 05403
OFFICE OF
CITY MANAGER
CHARLES E. HAFTER
I have noted that the Planning Commission agenda for February 9,
1993 includes the review of a preliminary plat of Larkin-Milot
for a planned residential development on Spear Street. (Item #6)
In December, the City Council expressed concern about the future
development of infrastructure, particularly sanitary sewer, in
the Southeast Quadrant. The Council requested a staff review of
the use of dedicated force mains and gravity collection systems
in order to create a comprehensive and coordinated guide for
future infrastructure improvements and extensions in the
Quadrant.
Bill Szymanski has been working towards this aim. Staff will
have a plan to present to Council at the March 1, 1993 meeting.
I do not know how far along your Commission will get in your
review of the proposed development, but I wanted to make you
aware of this study in case it impacted on your review process.
Please contact Joe Weith or myself if you have any questions.
Sincerely,
k�
Chuck Hafte
City Manager
CH/peh
SOUTh LURLINGTON SCHOOL DISTRICT
OFFICE: South Burlington High School
Lawrence E. LeCours
Superintendent SOUTH BURLINGTON, VERMONT 05403-6296
550 DORSET STREET
Tel. 802/658-9050 FAX 802/658-9029
February 11, 1993
Mr. Joe Weith
South Burlington City Planner
Dorset Street
South Burlington, Vermont 05403
Dear Joe,
The South Burlington Board of School Directors, at its meeting on February 10,
1993, unanimously approved a motion based upon the recommendation of the
Superintendent of Schools regarding Nowland Two Residential Subdivision, File
#92045.
The action taken incorporates all of the provisions of number 45 in the attached
document. I have forwarded copies of this action to the Act 250 Office as well as to
John Steele of Fitzpatrick Llewellyn Incorporated.
Please give me a call if you have questions regarding any aspect of the above.
Sincerely,
nLawrencE. LeCours
dent of Schools
LEL:sc
Attachment
SOUTH BURLINGTON SCHOOL DISTRICT
South Burlington, Vermont
45. Nowland Two Residential Subdivision on Spear Street (File #92045),
Fitzpatrick -Llewellyn Incorporated: 73 single family units to be
constructed.
I have reviewed the above project as presented to the School Board on January 27,
1993, and have determined the following:
A. Based on historical data, the project will generate school students at the
rate of 0.5 per single family dwelling, for a total of 36.5 students. (Note
that this is considerably lower than estimated by the developer.)
B. Based on historical data, these students will be distributed among the
school levels as shown below:
K-5
16 students
(44%)
6-8
7.7 students
(21 %)
9-12
12.8 students
(35%)
C. The district's middle school and high school facilities are presently
operating sufficiently below the "action point capacity" that the anticipated
new students in these levels can be accommodated without problems.
D. The district's elementary school facilities are presently operating at or
slightly above the "action point capacity" and cannot readily accept
additional students without overcrowding and/or programmatic
limitations. The district is presently planning on additions to these
facilities to alleviate crowding and to accommodate additional students.
E. The district has undertaken a preliminary analysis of the cost of the
planned additions and determined that such costs, including state
contributions, bond interest and principal payments will amount to
$2,609.25 per K-5 student space (see attached analysis summary). With
the K-5 student generation rates described above, this yields a typical
cost per dwelling as shown below:
$750 per single family dwelling
$375 per multi -family dwelling
Approved unanimously at a regular School Board meeting of the South Burlington
Board of School Directors on February 10, 1993.
Based on the above, it is my opinion that the proposed Nowland Two Residential
Subdivision will create a burden on this municipality's ability to provide elementary
school services. Further, it is my recommendation that such burden be mitigated by
payment of a fee by the developer to the school district in the amount of $750 for
each single family dwelling, for a total fee of $54,750. The fee will be placed in an
account dedicated to expansion of elementary school facilities. I recommend that
payment of said fee be considered as a condition of the State Land Use Permit.
If construction of the project is phased, the fee may be paid in installments
corresponding to the phases, provided that payment of the installment for each phase
is made prior to commencement of any construction related to that phase.
The South Burlington School District is currently working to establish a school impact
fee program under the provisions of 24 V.S.A., Chapter 131, and expects to implement
such a program before the end of this year. If such an impact fee program is
implemented, it is understood that:
a. For any fees paid on the above described project prior to
the implementation of the impact fee program under 24
V.S.A., Chapter 131, if the paid fees differ from those
established under the impact fee program by more than 10
(ten) percent, the difference between the fees actually paid
and the fees due under the impact fee program will be
addressed as follows:
1. The school district, within thirty
(30) days of receipt of a request
from the developer, will refund
any excess payments, or
2. The developer will submit
payment to the district of any
balance due within thirty (30)
days of receipt of a request for
payment by the district.
b. For any dwellings or phases of the above described project
for which fees have not been paid prior to the adoption of
the impact fee program under 24 V.S.A., Chapter 131, the
fees established under the impact fee program shall apply.
Lawrence E. LeCours
Superintendent of Schools
Approved unanimously at a regular School Board meeting of the South Burlington
Board of School Directors on February 10, 1993.
EXPANSION COST ANALYSIS
FOUR
CLASSROOMS
ADDITIONAL STUDENT CAPACITY
_SCHOOL
96 J SCHOOL
S.F. PER CLASSROOM
1,000
TOTAL CLASSROOM S.F.
4,000
SUPPORT FLOOR AREA {%)
20.00%
SUPPORT FLOOR AREA
600
TOTAL FLOOR AREA
4,800
COST PER SQUARE FOOT
$70
TOTAL COSTRUCTION COST
$336 000
STATE SHARE (30%)
$100, 800
SCHOOL DISTRICT SHARE
$235,200
ASSUME 20 YEAR BOND ISSUE AT
4 %, LEVEL PRINCIPAL
PAYMENTS: TOTAL INTEREST
AND PRINCIPAL PAYMENTS
$332,984
TOTAL COST PER STUDENT
$3 468.58
--- MITIGATION COST ANALYSIS
FOUR
CLASSROOMS j SCHOOL
COST PE R K— 5 STU DE NT
$3,468.58
STUDENTS PER S.F. DWELLING
0.5
K-5 STUDENTS AS PERCENT OF
ALL STUDENTS
44.02%
K-5 STUDENTS PER S.F. DWELLING
0.220080748
STUDENTS PER M.F DWELLING
0.25
K-5 STUDENTS PER M.F. DWELLINC
0.110040374
(COST PER S.F. DWELLING
763.37
COST PER M. F. DWELLING
$381.68
MITIGATION FEE PER S.F.
DWELLING
$750.00
MITIGATION FEE PER M.F.
DWELLING
$375.00
Approved unanimously at a regular School Board meeting of the South Burlington
Board of School Directors on February 10, 1993.
MEMORANDUM
TO: CITY OF SOUTH BURLINGTON PLANNING COMMISSION
FROM: WILLIAM A. GILBERT
DATE: February 10, 1993
RE: NOWLAND TWO PARCEL
Thank you for taking the time to consider my comments and
receive my memorandum with respect to the Nowland Two parcel on
Tuesday evening, February 9th. I believe that my memo made
clear what I also thought was clear in my oral presentation. I
am not representing any other person than myself in connection
with this proceeding. The attached clipping suggests otherwise
and I just want to be sure that the Planning Commission
understands that I am representing myself in this matter.
Once again, thank you for your consideration of the difficult
issues in this matter.
• THE BUR LINGTON FREE PRESS S WEDNESDAY, FEBRUARY_10, 1993
VERMONT ,
Developers' plans anger Spear St. residents
By Sandy Greiner
Free Press Correvnondent
SOUTH BURLINGTON —
Neighbors reacted angrily during
Tuesday night's planning com-
mission meeting to a proposal by
two developers to build 73 houses
on land off Spear Street.
William Gilbert, representing
Spear Street property owners,
said the developers are proposing
to build 73 houses on an area of
land that should only support 18
houses as he interprets the south-
east quadrant zoning laws.
Gilbert said the southeast
quadrant measure allows for 1.1
units or dwellings per acre of
eligible land. Becase the quadrant
rules govern wetlands and open
space, only 16 acres are eligible
for development, he said.
Developers Gerald Milot and
John Larkin attended Tuesday's
meeting. The two want to build
luxury houses on 66.7 acres east
of Spear Street opposite Deerfield
Drive. Milot said the prices
would range from $ l 75,000 to
$400,000.
"Property values will be ad-
versely affected by the devel-
opment," resident Arthur Boyd
said. "I request that the planning
commission deny this application.
until the property owners have at
least. several months for rebut-
tal."
Commission members said
the matter will be discussed fur-
ther at next week's planning com-
mission meeting, which is
scheduled for 7:30 p.m. Tuesday
in the town hall. .
Town planner Joe Weith said
he was concerned about the ca-
pacity of Bartlett Bay Sewage
Treatment Facility. . .
"The 73 four -bedroom dwell-
1I
ing units might eat up the avail-"
ability for sewage treatment at,
the Bartlett Bay facility," he said. �
Commission member David'
Austin, responding to Milot's;�-
contention that traffic congestion
on Spear. Street was ,a; result of
motorists from other towns said:.
"We can't ignore traffic problems '
T
just because they're caused by'
drivers from other municipali-
ties." •!
El
No Text
0
WMA
ct G is
�neuPQ A.. l9 00
17
�e�, Argo S��,M yoce
PUBLIC HEARING
SOUTH BURLINGTON PLANNING COMMISSION
The South Burlington Planning Commission will hold a public hearing
at the South Burlington City Hall, Conference Room, 575 Dorset
Street, South Burlington, Vermont on Tuesday, February 9, 1993 at
7:30 P.M. to consider the following:
1) Preliminary Plat application of Larkin-Milot Partnership for a
planned residential development consisting of 73 single-family lots
on 66.7 acres of land located on the east side of Spear Street
opposite Deerfield Drive.
2) Appeal by J.W.J. Realty, Inc. of decision by the South
Burlington Zoning Administrator denying applicant's request to
install two (2) freestanding pylon signs at 1095 Shelburne Road.
Copies of the applications are available for public inspection at
the South Burlington City Hall.
William Burgess
Chairman,
Z� South Burlington Planning Commission
January ,,I�, 1993
�o �it, t6Ai q
)
Jed 1,
43, 8ow
26�
...
F-AU,. Ic�53 - 13�N� -}m c�t s��,�.. -� 'Exivs,4 r- if
lLt? I ro,..► $k 1
-G1' �lcae T - �% `a1�1�► t ��
X vo = 7-2� Zv o 5(tJ
8 o z)
ftL
101�Uu
W
WS'r� 1u�IC-14�rL I
F{ N Z
VA) I T� TC�
G L� N SCR .� t_
N)
1/(/1plll Q
0 G ► SS.,
j._i'
uN 1.
) h
Av A I L4 /v L E
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
One Wentworth Drive • Williston • Vermont • 05495 • (802) 878-3000
February 9, 1993
Mr. Joe Weith
South Burlington City Planner
575 Dorset Street
South Burlington, Vermont 05403
RE: Nowland II Traffic Impact Analysis
FILE: 92075
Dear Mr. Weith:
The Planning Commission Agenda Items dated February 5, 1993 for the
Preliminary Plat Application for the Nowland II subdivision have been
reviewed. The following are responses to comments relating to
traffic items listed in the Agenda. For clarity, each comment is
addressed in the order as listed in the Agenda:
1. Spear Street/Swift Street
Traffic count data for the Spear Street/Swift Street intersection
for June 1992 is greater than the volumes listed in the study for
1993 existing conditions. This difference is due to the monthly
variation in traffic at this intersection.
Variations in the amount of traffic occur during different months
of the year. Those variations are accounted for by applying
monthly group factors from the VAOT. For the Spear Street/Swift
Street intersection, weekday June traffic counts are considered
to be 112% of the annual average daily traffic volume. As an
example, if 1,120 vehicles were counted on a weekday in June at
this intersection, the actual annual average daily traffic volume
would equal 1,000 vehicles.
We are confident that the design hour traffic volumes that were
developed in the Traffic Impact Analysis (dated January 15, 1993
by Fitzpatrick -Llewellyn) are a sufficient estimation of future
design hour conditions.
The level of service analysis of the Traffic Impact Analysis
indicates good levels of service at the Spear Street/Swift Street
intersection during both AM and PM peak hours, both with and
without this project.
Concern has been expressed that good levels of service do not
currently exist during the AM peak hour.
Design • Inspection • Studies • Permitting • Surveying
Mr. Joe Weith
FILE: 92075
February 9, 1993
Page Two
The capacity analyses that were performed at this location for
existing conditions included the provision for optimum traffic
signal operation. To accomplish this, the cycle length and
signal timing was based on providing the best overall level of
service. It is highly probable that existing traffic signal
timings could be refined to allow for an overall increase in
capacity at this intersection, thereby reducing or eliminating
existing queues.
2. Overall Intersection Level of Service
Tables 2 and 3 of the Traffic Impact Analysis list the levels of
service for the two unsignalized intersections that are proposed
to serve the project.
The "Highway Capacity Manual, Special Report 209, 1985" does
define the overall level of service for signalized intersections,
but does not list overall level of service for unsignalized
intersections.
3. Turning Movement Exhibits
All traffic volumes are included in the traffic volume tables of
the capacity analyses.
It was agreed that future traffic impact analyses to be submitted
for review by City of South Burlington officials will include
sketches of all turning movements.
4. Final Plat, Cost Estimate and Bonding
The final plat will show all roadway improvements. Cost
estimates could be developed and conditions could be set
regarding the sequence of construction and bonding.
Should you have any questions regarding the above, please contact us.
Sincerely,
FI'TZPATRICK-LLEWELLYN INCORPORATED
Brendan Kelly, P.E.
cc: Gerald Milot
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
*` lZo(4S
rnviroamifi'ta'l Sciences and, Engt'neering
December 16, 1992
REC�Njr
DEC 2 1 1992
Mr. John Steele FITZPATRICF-LI
r , t'Ll.Y1J
Fitzpatrick -Llewellyn, Inc. INCOf1POl,"I"flta
One Wentworth Drive oonsulftng Eng
Williston, Vermont 05495
Re: Wetlands at the Nowland Two Property, Spear Street, South Burlington, Vermont
JCO # 1-0616-3 (048)
Dear John:
The wetland delineation at the referenced property was completed on June 15, 1990. The methodology
used to delineate the wetland boundary was from the 1989 Federal Manual for the Identification and
Delineation of Jurisdictional Wetlands. My field notes indicate that I hung 123 flags along the boundary
of three separate wetland areas on the property. Two of those areas appear to be south of the area shown
on the plan for the proposed subdivision (Overall Site Plan) which you recently sent to me. The third
area, which was the largest of the three areas, is shown on the Overall Site Plan. Based on my recollection
of the site and the general configuration of this wetland area, it appears that the wetland boundary is
accurately represented on this plan.
This wetland area is associated with a drainage system that flows through the property to the north. My
recollection of it is that it is a mixture of wet meadow and scrub/shrub vegetation. The Geld data sheets
that were completed for documentation of this boundary list reed canarygrass and several sedge species as
the dominant vegetation near the boundary of the wetland. The shrub type vegetation was typically
located at lower landscape positions, closer to the stream, probably due to the fact that the wetland edge is
occasionally mowed during farming operations. The soils in this area are clayey sediments that were laid
down when this area was inundated by the glacial Lake Vermont. These soils have a very high water
holding capacity. The area slopes gently from both edges towards the drainage flow in the center of the
wetland. The moisture regime gets increasingly wetter towards the stream itself. The National Wetland
Inventory Map for this site supports my recollection of this area with its classification of the wetland. It
basically describes it as a wetland with scrub/shrub and emergent vegetation with a moisture regime that
varies from seasonal to semipermanent to permanent saturation. The emergent vegetation refers to
herbaceous plants such as grasses and sedges. ,
Functionally, the main values of this area are for the enhancement of surface water quality and wildlife
habitat. The function of surface water quality enhancement is particularly important at this site due to the
proposed subdivision, which could potentially increase surface water flow into this drainage system. The
wetlands present along this stream will help to reduce any increased sediment and nutrient loading of this
small stream that may occur. Wildlife habitat for songbirds and small mammals is provided especially by
the scrub/shrub areas within this wetland.
If you have questions about any of the information in this letter, please do not hesitate to call.
Sincerely,
THE JOHNSON /OMMPANY, C.
By / T'
Bradley k Wheeler, CPSS
Senior Scientist
Reviewed by: SAS/G:\USERS\BAW\FITZLLEW.LTR December 16, 1992 14.26 BAW
07411Fni,b n mental EngineeruW llydrogeolo:y Water Sullrh/ U Wash•uvder Oianr,rd 11atanbus Waste Renediation llydroltNy Coulaminant lille Analysis
Soil ,r Witter Science CeuloNy & Geoj,hip r:s Rimers and Rims Solid Wioe llomitfi)W
5 State Street Montpelier, VT 05602 ■ (802) 229-4600 fax: (802) 229-5876
SG., i H BURLINGTON SCHOOL DISTK..'T
South Burlington, Vermont
44. Southeast Summit Residential Subdivision (File #92039), Fitzpatrick -
Llewellyn Incorporated: 157 single family units and 64 multi -family units
to be constructed.
I have reviewed the above project as presented to the School Board on December 21,
1992, and have determined the following:
A. Based on historical data, the project will generate school students at the
rate of 0.5 per single family dwelling and 0.25 per multi -family dwelling,
for a total of 95 students. (Note that this is considerably lower than
estimated by the developer.)
B. Based on historical data, these students will be distributed among the
school levels as shown below:
K-5
42 students
(44%)
6-8
20 students
(21 %)
9-12
33 students
(35%)
C. The district's middle school and high school facilities are presently
operating sufficiently below the "action point capacity" that the anticipated
new students in these levels can be accommodated without problems.
D. The district's elementary school facilities are presently operating at or
slightly above the "action point capacity" and cannot readily accept
additional students without overcrowding and/or programmatic
limitations. The district is presently planning on additions to these
facilities to alleviate crowding and to accommodate additional students.
E. The district has undertaken a preliminary analysis of the cost of the
planned additions and determined that such costs, including state
contributions, bond interest and principal payments will amount to
$2,609.25 per K-5 student space (see attached analysis summary). With
the K-5 student generation rates described above, this yields a typical
cost per dwelling as shown below:
$750 per single family dwelling
$375 per multi -family dwelling
Approved unanimously at a regular School Board meeting of the South Burlington
Board of School Directors on January 27, 1993.
Based on the above, it is my opinion that the proposed Southeast Summit Residential
Subdivision will create a burden on this municipality's ability to provide elementary
school services. Further, it is my recommendation that such burden be mitigated by
payment of a fee by the developer to the school district in the amount of $750 for
each single family dwelling and $375 for each multi -family dwelling, for a total fee of
$141,750. The fee will be placed in an account dedicated to expansion of elementary
school facilities. I recommend that payment of said fee be considered as a condition
of the State Land Use Permit.
If construction of the project is phased, the fee may be paid in installments
corresponding to the phases, provided that payment of the installment for each phase
is made prior to commencement of any construction related to that phase.
The South Burlington School District is currently working to establish a school impact
fee program under the provisions of 24 V.S.A., Chapter 131, and expects to implement
such a program before the end of this year. If such an impact fee program is
implemented, it is understood that:
a. For any fees paid on the above described project prior to
the implementation of the impact fee program under 24
V.S.A., Chapter 131, if the paid fees differ from those
established under the impact fee program by more than 10
(ten) percent, the difference between the fees actually paid
and the fees due under the impact fee program will be
addressed as follows:
1. The school district, within thirty
(30) days of receipt of a request
from the developer, will refund
any excess payments, or
2. The developer will submit
payment to the district of any
balance due within thirty (30)
days of receipt of a request for
payment by the district.
b. For any dwellings or phases of the above described project
for which fees have not been paid prior to the adoption of
the impact fee program under 24 V.S.A., Chapter 131, the
fees established under the impact fee program shall apply.
C
awrence E. LeCours
Superintendent of Schools
Approved unanimously at a regular School Board meeting of the South Burlington
Board of School Directors on January 27, 1993.
EXPANSION COST ANALYSIS
FOUR
CLASSROOMS SCHOOL
ADDITIONAL STUDENT CAPACITY
96 / SC OOL
S.F. PER CLASSROOM
1,000
TOTAL CLASSROOM S.F.
4,000
SUPPORT FLOOR AREA (%)
20.00%
SUPPORT FLOOR AREA
800
TOTAL FLOOR AREA
4,800
COST PER SQUARE FOOT
$70
TOTAL COSTRUCTION COST
$336 000
STATE SHARE (30%)
$100, 800
SCHOOL DISTRICT SHARE
$235,200
ASSUME 20 YEAR BOND ISSUE AT
4 %, LEVEL PRINCIPAL
PAYMENTS: TOTAL INTEREST
AND PRINCIPAL PAYMENTS
$332,984
TOTAL COST PER STUDENT
$3 468.58
MITIGATION COST ANALYSIS
FOUR
CLASSROOMSJ SCHOOL
COST PE R K— 5 STU DE NT
$3,468.58
STUDENTS PER S.F. DWELLING
0.5
K-5 STUDENTS AS PERCENT OF
ALL STUDENTS
44.02%
K-5 STUDENTS PER S.F. DWELLING
0.220080748
STUDENTS PER M.F DWELLING
0.25
K-5 STUDENTS PER M.F. DWELLINC
0.110040374
COST PER S.F. DWELLING
763.37
COST PER M.F. DWELLING
$381.68
MITIGATION FEE PER S.F.
DWELLING
$750.00
MITIGATION FEE PER M.F.
DWELLING
$375.00
Approved unanimously at a regular School Board meeting of the South Burlington
Board of School Directors on January 27, 1993.
File: 92045
Nowland Two Subdivision,
Spear Street, South Burlington
26.606 Criteria for Development within Restricted Areas of the
Southeast Quadrant District
A. More than 27 acres or 41% of the 66.7 acre site will remain as
open space including 5 acres of designated Class II wetlands.
The majority of the open space is in the center of the project
and separates the two developed portions of the site. This
space includes a north -south segment of bicycle path and,
combined with the 6 acres east of street B, provides
significant recreational opportunities to the adjacent
homeowners and City residents. The open space provides
substantial buffers along Deerfield Drive extension, the
Economu parcel on the east, and the Farrell property to the
north.
B. The general orientation of the Project is north -south. The
street and lot layout parallel the wetlands and follow the
natural topography. This layout maximized open space and
preserves the wetland resources. On site scenic views will be
maintained wherever possible, and off sight views will be
maintained by the height limitations imposed by the Dorset Park
Scenic View Protection District. The undeveloped 10 acres east
of the wetlands and bicycle path remains open for agriculture
use.
C. The placement of buildings, lots, streets and utilities
conforms with planned public facilities. The Project preserves
significant amounts of open space, provides recreational
opportunities including bicycle paths, and conforms to the
City's standards for dedicated streets, water, and sewer
connections. Deerfield Drive will be extended eastward as
recommended by the S.E. Quadrant Study, and portions of an 80'
north -south arterial will be set aside along the east side.
D. The Preliminary Plat drawings reflect the southeast Quadrant
Study and subsequent zoning district regulations including:
open space provisions, recreational needs, developable areas,
arterial right-of-ways, wetland resources, and height
limitations based on the Dorset Park Scenic View Protection
Overlay District.
2-3-93
JAS#5:92045-1
PLANNING COMMISSION
8 December 1992
page 5
Weith to get comments on the bike path from those concerned.
Mr. Weith noted that parking for Ben Franklin is proposed to be
on Farrell land., and he will ask the City Attorney if this will
require Ben Franklin to be an applicant as well.
Mr. Burgess summarized the concerns of the Commission:
a. 60 foot right of way
b. possibility of parking in the triangular area (instead of
landscaping)
c. continuation of right of way to Farrell Dr.
d. concern with curb cuts and access to adjacent properties, es-
pecially Heathcote
e. drainage
f. screening, fencing, lighting
g. issues raised by Heathcote regarding the safety of the rec
path
Members agreed to make independent site visits.
4. Sketch plan application of MBL Associates, Gerald Milot, and
John Larkin for a 237 unit planned residential development on
202.2 acres of land located on Dorset St. near the Shelburne town
line and a 132 unit planned residential development on 66.7 acres
of land located on the east side of Spear St. across from Deer-
field Drive. This application involves a transfer of density of
40 residential units from the Dorset St. parcel to the Spear St.
parcel: ---
Mr. Steele said they are proposing 92 single family units on the
Nowland piece and 40 units of elderly housing in 3 multi -unit
buildings. Primary access to the Nowland land is off Deerfield
Dr. They have reserved a 60 foot right of way at the north end
of the project to tie into Spear St.
On the eastern cul de sac, they show a right of way to connect to
the Farrell property. They feel this is sufficient. They have
chosen not to show a connection off the second cul de sac.
Regarding buildable area, Mr. Steele showed what was taken out
for wetlands, buffers, roads, etc. The developable acreage is 40
acres which would allow them 160 units. They propose 132. They
will submit a formal wetlands report. They are also developing a
table that will show each lot with the ceiling height in order to
meet view protection standards.
Meetings have been held regarding recreation and pedestrian
trails, and more meetings will be held before a decision is made.
The paths will extend along the wetlands but will not enter the
wetlands. Mrs. Maher asked if there is proposed any play area
PLANNING COMMISSION
8 December 1992
Page 6
for children in the development. Mr. Steele showed an area near
the elderly housing and other possible areas.
The Southeast Summit site will have an 80 foot right of way with
a series of loop roads. For the time being, they will use the
existing farm road for emergency purposes only (to satisfy the
requirement for a second access). They are asking for a density
increase to the fullest extent and propose 237 units here. This
will be a mix between single family and multi -units.
The applicant is also asking to switch some "developable" and
"non -developable" lands. Mr. Milot said this is because a piece
that was thought to be wetlands is not wetlands according to
their experts. Mr. Weith said he has asked for a copy of this
study.
Question arose as to whether this plan meets the requirements for
a p.u.d. Mr. Milot said they feel there are standards by which a
p.u.d. is measured. He noted that Mr. Craig had said there had
to be something "special" for the Commission to cprant a p.r.d.,
but it was their feeling that if they meet the criteria , this
cannot be an arbitrary decision. Mr. Austin asked where in the
regulations it says the Planning Commission has to grant a p.r.d.
and bonus. Mr. Milot repeated that he didn't feel the Commission
•can make an arbitrary decision. He felt if they meet the
criteria, the Commission has to grant the bonus. He stressed
that they had originally come in with a much larger development
proposal but have been trying to comply with the city's efforts
over the last 3 years and still make something that is
economically viable. Mr. Austin emphasized that nowhere does it
say that if you get a p.r.d. you automatically get a density
bonus. Mr. Milot asked what the criteria are for the 25% bonus
so they can apply for it.
Mr. Weith asked for a report from the applicant as to how they
feel they meet the p.r.d. requirements. He noted that he had
asked for this in writing, but Mr. Milot had chosen to make a
report orally tonight. Mr. Weith noted that 222 units are
allowed as base density on the S. Summit property.
Mr. Milot said they are proposing these be affordable housing
units and feel this alone is worth of the bonus. He then went
through the p.r.d. criteria and stated that for each one they
felt they were meeting what was required.
Mr. Milot noted that some of the S. Summit land may be gifted to
UVM for agricultural research. There may also be several farmers
farming some of the land.
It was noted that CWD wants a 12" water line. The project needs
PLANNING COM_MISSI.O_N_
8 December 1992
page 7
only an 8" line but they are willing to put in the 12". Mr.
Milot asked that they be allowed to recover costs from people who
hook onto `his line and cited a precedent for this.
Mr. Steele noted that there is a possibility of an architectur-
ally sensitive area which Mr. Milot said they will address.
'
Mr. Steele then addressed staff written comments. Regarding
access at Southeast Summit, they will study the improvements
nee e o make Xld Aearm Xd. usable. On the Nowland property,
he showed the temporary access but noted there is a retention
pond in the temporary access location. He said they will deal
with this. He noted a problem with the possibility of headlights
shining into a house across the road. He said they will do what
the Commission wants regarding the location of this road.
Regarding the non -buildable area and why they feel it should be
buildable, Mr Steele said they will provide documentation for
this.
Mr. Gilbert said he didn't feel the applicant could transfer
rights as they don't meet enabling legislation. Mr. Milot said
they are not transfering development but only density. Mr. Weith
said he didn't feel the transfer rules allowed transfer of bonus
density, only base density calculation. Mr. Milot agreed with
this but asked how he could get a 25% bonus on Southeast Summit
and where that density could be put. He said they will go back
and try to do a p.r.d. on each site then try to convince the
Commission they deserve the density bonus.
Mr. Cimonetti said that changes in "buildable" sites will in-
volve substantial study and is not a "given." It will involve
a lot of public airing.
Mr. Boyd said there are some criteria you can't spell out in
words such as input from abutting land owners. He noted that on
Spear St. the applicant will be going from existing 2 acre lots
to 1/2 acre lots which will change the character of the area. He
felt this should not be done abruptly.
Mr. Farrell, a neighbor, said he would like to comment at the ap-
propriate time about traffic concerns.
Mr. Bolduc noted a financial implication for neighbors who may be
forced to hook on to the sewer and water which will be very
costly. Mr. Milot said they propose a force main sewer to which
neighbors wouldn't be required to hook up. Mr. Bolduc felt there
was a question of efficiency with a force main system.
There were no further comments regarding this developments, and
as there was no further business to come before the Commission
N/F
UND£RWO
NOTES
N/F 18/S / j / p `� I. OWNER / APPLICANT. LARKIN MILOT PARTNERSHIP
�\ 410 SHELBURNE ROAD
BURLINGTON, WRA40NT
/ N/F IBIS �� S \ •`••��,, 2. ZONED: SOUTHEAST OUADRANT
J. TOTAL PARCEL AREA: 66.7 ACRES
/ N/F CHID >�` �` 4. PERIMETER PROPERTY LINE INFORMATION TAKEN FROM PLAN ENTITLED
NOWLAND PROPERTY !I - SUBDINSION PLAN' BY FITZPA%RICK -
LLEWELLYN INC. NUMBER D-3879 / 0-J880, DATED MARCH 1991.
N/F GA GNON � � ��••
/' T ,�� 5. TOPOGRAPHIC AND EXIS77NG FEATURES /NFORMA77ON BY FITZPATRICK-LL£WELLYN
N ATKINS i ! �. 6. PROPERTY LINE INFORMATION FOR SWIFT ESTATES TAKEN FROM TAX
i
N/F MEREDITN i\• MAPS PROVIDED BY THE C17-Y OF SOUTH BURLINGTON.
1 /•,�"•• ', �• y� ,` / �•�� ��.,, 7 PROJECT DESCRIPAAN:
2 %I 1\••�• 7J SINGLE FAMILY LOTS ON 66.7 ACRES ON THE EAST SIDE OF SPEAR
3 8 STREET /N SOUTH BURLINGTON, WRA40NT.
OD
HANSON
52 f -
10
,,
/ -C [TAMOUNT LANE) STREET A.
\• � "'��-- I � i ' M pNjNAI I 21 T
/ CCATpN
r ` 21 I16; 15 14 /
1 50 20 19 18; I :17 I I I ' .43„ / 2�
/ 12 J
23 I 1 I -
49 24 {
1 25 26 27
-� 28 10' U77LI £AS£MENr Ira.) 29 30 31 32 33
34
I48 (FALL LINE DRIVE) STREET A'
\ 1
�(4645 44 43 42 41 40 39
\ i
I \ 38 37 36
N/F FARRELL ET. At.
COMMON LAND I
W !' B ,
� I
r}1jDlCl1 - -�-- I --�- - I • -T DELINEATED M£TLAND UMITS
54 55 56- 57 5860y T
62
( CASTLEROCK CIRCLE % ---C 63 \
'STREET 9• -"- � � 10• U71UTY EASEMENT
73 72 71 70 69 68 \\
—� -- --L__ 67 / 65
COMMON LAND
0 i
N/F ECONOMOU FARMS INC.
U)
/ -\ 64
65
COMMON LAND
�/ C
N/F ISHAM
(+/-) L A ROADWAY WITH CURBS BOTH
SIDES AND SIDEWALK ONE SIDE WITHIN A PROPOSED CITY R.O.W.
6500 (+/-) LINEAR FEET OF 8- WATER MAIN FROM EXIS77NG
WATER MAIN ON SPEAR STREET AT THE DEERFIELD DRIVE INTERSECTION.
5500 (+-) LINEAR FEET OF STORM COLLEC71ON SEWER DISCHARGING
TO THREE PROPOSED DETENTION BASINS.
8. STREET NAMES SHOWN IN PARENTHESIS ARE PROPOSED ONLY AND
ARE SUBJECT TO OWNER / CITY APPROVAL.
RECENVED
JAN 0 5 1993
City of So. Burlington
n rr.0
I
i
I R£NS£D ROADWAY AND SOME LOTS
VO.
RE-NSlONS DATE
IT IS THE USERS RESPONSIBILITY TO ENSURE THESE DRAWINGS INCLUDE
THE LATEST R£NSIONS.
PR£UMINARY PLAT
ACT 250
FINAL PLAT
CONSTRUCTION
[NO UPLAND
TWO
OVERALL SITE PLAN
92045
FH
LLE w am
INCORPORATED
NILY 1992
BWD
D - 4362
31N1t� J!;(i
MLLISTON VERMONT
J /9
,rt,94-1
.........
41le
Y 7/
City of South Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT05403
FAX 658-4748
PLANNER
658-7955
February 5, 1993
John Steele
FitzPatrick-Llewellyn, Inc.
One Wentworth Drive
Williston, Vermont 05495
Re: Nowland II PRD, Spear Street
Dear Mr. Steele:
ZONING ADMINISTRATOR
658-7958
Enclosed is the agenda for next Tuesday's Planning Commission
meeting and my comments to the Planning Commission. Comments from
City Engineer Bill Szymanski and Fire Chief Jim Goddette were
forwarded at an earlier date. Please be sure someone is present on
Tuesday, February 9, 1993 at 7:30 P.M. to represent your request.
If you have any questions, please give me a call.
Si c rely,
oe Weith,
City Planner
Encls
JW/mcp
cc: Gerald Milot
John Larkin
January 1993
Nowland Two Subdivision, Spear Street, South Burlington
92045
Table of height limitations for structures within the Dorset Park View
Protection Zones (VPZ) A and D
L
KeV Notes
1. Lot number according to drawing: D 4382S/-�-
2. Dorset Park View Protection Zone, A or D
3. Distance from Dorset Park VPZ baseline to house lot
4. Existing house lot grade
5. Ceiling height relative to Dorset Park VPZ Baseline
6. Road centerline grade adjacent to house lot
7. First floor elevation (road centerline grade plus 5 feet)
8. Maximum height of structures, first floor elevation to ridgeline
(ceiling height minus FFE).
1 2 3 4 5 6 7 8
(6)+.5.0' (5)-(7)
Lot #
VPZ
Dist.
Exist
Grade
Ceiling
Height
Rd. C.L.
Grade
1st Fl.
Elev.
Max.
Height
1
p,
5600
391.0
417.6
390.5
395.5
22.1
2
`A
56 0�
390.0
417.6
389.5
394.5
23.1
3
IAl
5600
389.0
417.
388.8
393.4
23.8
4
A ,
5 09
388.0
417.§
388.4
393.4
24.2
5
A
5600
387.0
417.6
387.9
392.9
24.7
6
A
56,OQ,
386.0
417.q
387.0
392.0
25.6
7
5600
384.0
417.
3o.
386.0
391.0
26.6
8
5600
382.0
41
385.7
390.2
27.4
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
• i
File: 92045 cont.
Table of height limitations for structures, within the Dorset Park
View Protection Zone (VPZ)
1 2 3 4 5 6 7 8
(6)+5.0' (5)-(7)
Lot #
VPZ
Dist.
Exist
Grade
Ceiling
Height
Rd. C.L.
Grade
1st Fl.
Elev�
Max.
Height
9
5600
380.0
431.1
�+�0.
384.2
389.2
41.9
10
D
�60a0o
380.0
4 310, 1
384.1
389.1
42.0
11
D3
5q)0
388.0
4 1.
�.
�R7.0
392.0
39.1
12
�A�
5.60 p
386.0
4311.1
384.0
389.0
42.1
13
D��
5 OQa
386.0
4311
383.8
388.8
42.3
14
ADD`
5600p
386.0
4311.9
384.4
389.4
41.7
15
Dob
56 0-
386.0
431.
384.8
389.8
41.3
16
4_05S60A�
387.0
417.6
385.4
390.4
27.2
17
56QQ
388.0
4 7.6
385.9
390.9
26.7
18
560n
389.0
417.06
386.5
391.5
26.1
19
A
5 609
390.0
.6
386.8
391.8
25.8
20
A
560Q
390.0
417.�
387.4
392.4
25.2
21
5600
390.0
417.6
387.8
392.8
24.8
22
�IAV�a
56G00�
389.5
417.6
388.3
393.3
24.3 _
23
�Ao
53_00
392.0
41
390.5
395.5
23.1
24
A _
c;,
5 QO
mac^
392.0
418.p
U i
391.5
396.5
22.1
25
0�.
53Qc0
392.0
41
392.2
397.2
21.4
26
�A
53 -0
392.0
4,18.6
392.6
397.6
21.0
27
A,
530A.,
392.5
a4106
393.0
398.0
20.6
28
3� �
53013
393.0
418.6
393.2
398.2
20.4
29
;�7��
5300�
393.0
418,
Lf
393.5
398.5
20.1
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
File: 92045 cont.
Table of height limitations for structures, within the Dorset Park
View Protection Zone (VPZ)
1 2 3 4 5 6 7 8
(6)+5.0' (5)-(7)
Exist
Ceiling
Rd. C.L.
1st F1.
Max.
Lot #
VPZ
Dist.
Grade
Height
Grade
Elew.
Height
30
530
391.0
431.
393.3
398.3
33.0
31
D
53P0�
392.5
431.3
393.0
398.0
33.3
32
D
5300
392.0
431.3
392.5
397.5
33.8
33
D
5j3 0'�>
391.0
431.�3
391.0
396.0
35.3
34
D
5300
391.5
431.3
389.5
394.5
36.8
57 PO
/-I,,.C>
35
D
530,0
391.0
431.;
390.5
395.5
35.8
36
-6D
5300_
390.0
431.?
391.5
396.5
34.8
37
3gD
5`Qpp
391.0
431Lj .3
392.2
397.2
34.1
38
z D
53 0
390.5
431.3
393.8
398.8
32.5
39
�$D
530
391.0
4313
393.2
398.2
33.1
0
40
D
530.0
391.0
431.3
393.4
398.4
32.9
41
A J
5300,
391.0
418.
393.3
398.3
20.3
42
1OQ
391.0
418.6
393.1
398.1
20.5
43
A
5300
391.0
418.6
392.8
397.8
20.8
3
•q
3 JO
q ,) 1, 3
44
A
5� 0
391.5
41 .6
392.3
397.3
21.3
m.
n
i
45
A
5300
390.5
418.6
392.0
397.0
21.6
46
A
5300
390.0
418.6
392.2
397.2
21.4
47
A
5300
390.0
418.6
390.6
395.6
23.0
48 �i�A
5
390.5
41Q 6
390.2
395.2
23.4
b
i �.
49 /t
A
5 00
391.5
41 .¢
389.9
394.9
23.7
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
File: 92045 cont.
Table of height limitations for structures, within the Dorset Park
View Protection Zone (VPZ)
1 2 3 4 5 6 7 8
(6)+5.0' (5)-(7)
Exist
Ceiling
Rd. C.L.
1st Fl.
Max.
Lot #
VPZ
Dist.
Grade
Height
Grade
Elev.
Height
50
A
5.J Oo
390.5
418.6
389.4
394.4
24.2
51
A
5.6,00
389.0
417.6
389.0
394.0
23.6
52
A
56,00
389.5
417.E
389.8
394.8
22.8
53
569P
389.5
417.6
390.5
395.5
22.1
54
4�%
392. 0
42(�. �
394.5
399.5
20.6
aA
55
A
4800,
392.0
420.;
395.2
400.2
19.9
56
A
489,F�
392.0
429.�1
395.6
400.6
19.5
/T
57
A
4 ,,0 0
392.0
42Q.1
396.2
401.2
18.9_
/
58
A
4
393.5
420.1
396.8
401.8
18.3
59
48,00
392.0
�.
397.2
402.2
17.9
'S
60
�A,,
4$Og
391.5
0�}
L44
397.6
402.6
17.5
J .
61
�
4800
391.0
420.j
398.1
403.1
17.0
3�A
- . _-,
62
4,$OQ�
391.0
431.6
398.1
403.1
28.5
3-
� (yc�
N 3: _ ,
63
D
4800,
391.0
43
398.1
403.1
28.5
64
D
3,4
4 g
393.0
431.6
398.1
403.1
28.5
65
D
4800
393.5
4331.6
398.1
403.1
28.5
66
4800
392.5
420.1
398.1
403.1
17.0
67
4800
392.5
420.1
397.5
402.5
17.6
68
4800
392.5
420.1
397.0
402.0
18.1
69
A
4800
392.5
4 0.
396.5
401.5
18.6
a�.
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
File: 92045 cont.
Table of height limitations for structures, within the Dorset Park
View Protection Zone (VPZ)
1 2 3 4 5 6 7 8
(6)+5.0' (5)-(7)
Lot #
VPZ
Dist.
Exist
Grade
Ceiling
Height
Rd. C.L.
Grade
1st Fl.
Elev.
Max.
Height
70
14A
4800�
392.5
420;1
ao -
396.0
401.0
19.1
71
A
4809
ti
392.5
420.1
395.5
400.5
19.5
72
7
4800
392.5
420.1
395.0
400.0
20.1
73
�� A
o
4800
393.0
42�0.1
'4o.
394.5
399.5
20.6
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
SOUTH �URLINGTON SCHOOL DISTRICT
OFFICE: South Burlington High School
Lawrence E. LeCours
Superintendent SOUTH BURLINGTON, VERMONT 05403-6296
550 DORSET STREET
Tel. 802/658-9050 FAX 802/658-9029
January 29, 1993
Mr. Joe Weith
South Burlington City Planner
Dorset Street
South Burlington, Vermont 05403
Dear Joe,
The South Burlington Board of School Directors, at its meeting on January 27,
1993, unanimously approved a motion based upon the recommendation of the
Superintendent of Schools regarding Southeast Summit Residential Subdivision, File
#95039.
The action taken incorporates all of the provisions of number 44 in the attached
document. I have forwarded copies of this action to the Act 250 Office as well as to
John Steele of Fitzpatrick Llewellyn Incorporated.
Please give me a call if you have questions regarding any aspect of the above.
Sincerely,
Lawrenc E. LeCours
�u iiu�i iL ui .�� i ita
LEL:sc
Attachment
AGENDA
1
2.
3.
4
5
1
7
SOUTH BURLINGTON SCHOOL BOARD MEETING
February 10, 1993 7:30 P.M.
FREDERICK H. TUTTLE MIDDLE SCHOOL LIBRARY
REGULAR MEETING
Comments and questions from the public
Consider the proposed 1993-94 budget for presentation to the Steering Committee -
Lawrence LeCours
a. Discussion
b. The Board is requested to take ACTION.
Consider pilot program for students with emotional and behavioral disabilities --
Robert DiFerdinando
a. Discussion
Consider the impact of the proposed Nowland Two Residential Subdivision on
Spear Street, (File #92045) project on the school district -- Lawrence LeCours
a. Discussion
b. The Board is requested to take ACTION.
Receive preliminary outline of School Director's Objective #5, Plan for
communicating with the public regarding budget ballot item in May -- Frank Murray
a. Discussion
Consider Accounts Payable Orders #31 and #32 -- Leo Brown
a. Discussion
b. The Board is requested to take ACTION.
Consider the minutes of the Special Meetings of January 20, 26 and the Regular
Meeting of January 27, 1993 -- Theodore Manazir
a. Discussion
b. The Board is requested to take ACTION.
-Over-
8. Correspondence
9. Old Business
10. New Business
11. Executive Session -- Theodore Manazir
a. To consider matters pertaining to negotiations
b. To continue with superintendent's search deliberations (if necessary)
12. Adjournment
Please contact the superintendent's office to place items on future agendas.
I i
SOS M BURLINGTON SCHOOL DISTRICT
South Burlington, Vermont
45. Nowland Two Residential Subdivision on Spear Street (File #92045),
Fitzpatrick -Llewellyn Incorporated: 73 single family units to be
constructed.
I have reviewed the above project as presented to the School Board on January 27,
1993, and have determined the following:
A. Based on historical data, the project will generate school students at the
rate of 0.5 per single family dwelling, for a total of 36.5 students. (Note
that this is considerably lower than estimated by the developer.)
B. Based on historical data, these students will be distributed among the
school levels as shown below:
K-5 16 students (44%)
6-8 7.7 students (21 %)
9-12 12.8 students (35%)
C. The district's middle school and high school facilities are presently
operating sufficiently below the "action point capacity" that the anticipated
new students in these levels can be accommodated without problems.
D. The district's elementary school facilities are presently operating at or
slightly above the "action point capacity" and cannot readily accept
additional students without overcrowding and/or programmatic
limitations. The district is presently planning on additions to these
facilities to alleviate crowding and to accommodate additional students.
E. The district has undertaken a preliminary analysis of the cost of the
planned additions and determined that such costs, including state
contributions, bond interest and principal payments will amount to
$2,609.25 per K-5 student space (see attached analysis summary). With
the K-5 student generation rates described above, this yields a typical
cost per dwelling as shown below:
$750 per single family dwelling
$375 per multi -family dwelling
Based on the above, it is my opinion that the proposed Nowland Two Residential
Subdivision will create a burden on this municipality's ability to provide elementary
school services. Further, it is my recommendation that such burden be mitigated by
payment of a fee by the developer to the school district in the amount of $750 for
each single family dwelling, for a total fee of $54,750. The fee will be placed in an
account dedicated to expansion of elementary school facilities. I recommend that
payment of said fee be considered as a condition of the State Land Use Permit.
If construction of the project is phased, the fee may be paid in installments
corresponding to the phases, provided that payment of the installment for each phase
is made prior to commencement of any construction related to that phase.
The South Burlington School District is currently working to establish a school impact
fee program under the provisions of 24 V.S.A., Chapter 131, and expects to implement
such a program before the end of this year. If such an impact fee program is
implemented, it is understood that:
a. For any fees paid on the above described project prior to
the implementation of the impact fee program under 24
V.S.A., Chapter 131, if the paid fees differ from those
established under the impact fee program by more than 10
(ten) percent, the difference between the fees actually paid
and the fees due under the impact fee program will be
addressed as follows:
1. The school district, within thirty
(30) days of receipt of a request
from the developer, will refund
any excess payments, or
2. The developer will submit
payment to the district of any
balance due within thirty (30)
days of receipt of a request for
payment by the district.
b. For any dwellings or phases of the above described project
for which fees have not been paid prior to the adoption of
the impact fee program under 24 V.S.A., Chapter 131, the
fees established under the impact fee program shall apply.
- CAI►099::%a
Lawrence E. LeCours
Superintendent of Schools
EXPANSION COST ANALYSIS
FOUR
CLASSROOMS SCHOOL
ADDITIONAL STUDENT CAPACITY
96 / SCHOO
S.F. PER CLASSROOM
1,000
TOTAL CLASSROOM S.F.
4,000
SUPPORT FLOOR AREA (%)
20.00%
SUPPORT FLOOR AREA
800
TOTAL FLOOR AREA
4,800
COST PER SQUARE FOOT
$70
TOTAL COSTRUCTION COST
$336 000
STATE SHARE (30%)
$100, 800
SCHOOL DISTRICT SHARE
$235,200
ASSUME 20 YEAR BOND ISSUE AT
4 %, LEVEL PRINCIPAL
PAYMENTS: TOTAL INTEREST
AND PRINCIPAL PAYMENTS
$332,984
TOTAL COST PER STUDENT
$3,468.56
MITIGATION COST ANALYSIS
FOUR
CLASSROOMS SCHOOL
COST PER K-5 STUDENT
$3,468.58
STUDENTS PER S.F. DWELLING
0.5
K-5 STUDENTS AS PERCENT OF
ALL STUDENTS
44.02%
K-5 STUDENTS PER S.F. DWELLING
0.220080748
STUDENTS PER M.F DWELLING
0.25
K-5 STUDENTS PER M.F. DWELLINC
0.110040374
COST PER S.F. DWELLING
-$763.37
COST PER M.F. DWELLING
$381.68
MITIGATION FEE PER S.F.
DWELLING
$750.00
MITIGATION FEE PER M.F.
DWELLING
$375.00
ALL W14t 0 dA OSO
139: Ado Jr -x. - klT "(,OLJ r-l000e 6Ur,-V.
s- 4-C-0-
42-
FITZPATRICK-LLEWELLYN INCORpI)RATED
Engineering and Planning S, �es
One Wentworth Drive
WILLISTON, VERMONT 05495
(802) 878-3000
TO 27
LCEUM L ) OF UQOZE DUUM
�i. 0-i /
> WE ARE SENDING YOU ❑ Attached ❑ Under separate cover via the following items:
❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications
❑ Copy of letter ❑ Change order ❑
COPIES
DATE
NO.
DESCRIPTION
� �
�j
✓�
++!✓7 ! �plj
�y
THESE ARE TRANSMITTED as checked below:
❑ For approval ❑ Approved as submitted
❑ For your use ❑ Approved as noted
❑ As requested ❑ Returned for corrections
❑ For review and comment ❑
❑ FOR —BIDS DUE 19
REMARKS
❑ Resubmit copies for approval
❑ Submit copies for distribution
❑ Return corrected prints
❑ PRINTS RETURNED AFTER LOAN TO US
0
M E M O R A N D U M
To: Project Files
From: Raymond J. Belair, Zoning and Planning ]assistant
Re: Preliminary Comments - February 9, 1993 agenda items
Date: January 11, 1993
NOWLAND II - 73 UNIT PRD - PRELIMINARY PLAT
--- a complete survey of the subdivision tract by a licensed land
'\surveyor must be submitted.
--- plans should show limits of developable area as shown on the
A)a SEQ zoning map.
--- building envelopes for lots 7-10 must be shown.
--- applicant should address the impact of street "C" on the
adjacent single family houses on Spear Street.
--- this property is located within the Dorset Park View
Protection Zone. All site and street landscaping should be
evaluated and evidence submitted to show that the proposed
plantings will not exceed the height limitations. This also
applies to all street lighting.
--- landscaping schedule should be broken down into two (2) parts:
1) all street trees and 2) all other landscaping.
--- plan should show a reserved r.o.w. in the vicinity of lot #35
�. for future connection to the Farrell property.
--- provide Champlain Water District with copy of water line plans
and details for their review and comment.
--- a portion of the development is proposed outside of the
designated development areas as shown on the SEQ zoning map.
Section 26.606 of the zoning regulations allows the Planning
Commission to review proposed developments in a restricted
area according to certain criteria contained in this section.
The applicant should submit a report which addresses these
criteria.
--- a copy of the wetland study should be submitted. This is
needed to allow a variation from the SEQ zoning map.
--- all watercourses should be shown on the 1"=40' scale plans
with the corresponding C.O. zones.
Preliminary Memo - Planning
February 9, 1993 agenda items
January 11, 1993
Page 2
--- the eight (8) foot recreation path on the north side of
Deerfield Drive reduces to five (5) feet in width when it
changes from sheet 4 to sheet 5, this recreation path should
continue to be eight (8) feet in width all the way to the end
of Deerfield Drive.
--- a 20 foot easement should be provided for the proposed
bike/pedestrian path which runs north -south through the
development.
19.104 of the zoning regulations require that in
addition to the street trees, two(2) trees per single family
lot be provided.
--- in the type of street light proposed provided and maintained
by GMP?
--- street trees can not be allowed which will exceed the height
limit, applicant is proposing "Zelcova' trees along "Street B"
which has a height limitation of 17-20 feet. The "Zelcova"
can reach a height of 50 feet. Trees must be chosen which
will not exceed height limit (i.e. Gray Dogwood, Amur Maple).
--- need letter from CWD that water details are acceptable.
--- provide number of bedrooms in development for sewer allocation
purposes. �r
y //v
r
r f'• 41
l'rlCORPOR A7n ors
STATE OF VERMONT Consult�n41 3
AGENCY OF DEVELOPMENT AND COMMUNITY AFFAIRS
DIVISION FOR HISTORIC PRESERVATION
Preserving Vermont's historic, architectural and archeological resources
July 15, 1992
John Steele
Fitzpatrick -Llewellyn, Inc.
1 Wentworth Drive
Williston, VT 05495
Re: Nowland II Property, So. Burlington. Pre -Act 250.
Dear Mr. Steele:
Thank you for the opportunity to comment on the
above -referenced project.
The Division has reviewed this undertaking for purposes of
Criterion 8, 10 V.S.A. Chapter 151 (Act 250). Project review
consists of identifying the project's potential impacts to
historic buildings, structures, historic districts, historic
landscapes and settings, and known or potential archeological
resources. The purpose of our review is to provide the
Environmental District Commission with the necessary
information for them to make a positive finding under the
"historic sites" aspect of Criterion 8.
David Skinas, on our staff, conducted a field inspection of the
project area on July 8, 1992. Based on available environmental
information, the project area was believed to be
archeologically sensitive.
The field inspection revealed that the drainage that flows
through the project area was man-made. Therefore, we have no
further concerns with archeological resources in relation to
this project.
Office location: 135 State Street. (802) 828-3226
Mailing address: 109 State Street, Pavilion Building Montpelier, Vermont 05609-1201
Mr. Steele
Page 2
July 15, 1992
We conclude that the proposed project will not have an adverse
effect on any historic or archeological properties that are
listed on or eligible for inclusion in either the State or
National Registers of Historic Places.
SiC-, rely,
Eric Gilbertson
Director/ Deputy State Historic Preservation Officer
EG/SCJ
cc: South Burlington Planning Commission
Chittenden County Regional Planning Commission
CHAMPLAIN WATER DISTRICT
Dedicated to Quality Water & Service
Mr. John Steele
Fitzpatrick -Llewellyn
One Wentworth Drive
Williston, VT 05405
RE: Act 250 Review:
Dear Sir,
January 18, 1993
403 Queen City Park Road
South Burlington, VT 05403
(80022j)��88�'6'' 4((--'77454 !� /
,! ?HIV 2 5 1993
�' ii'�fy',�;1'Ti3CF:-l-�:.C'•`,!::I.LYhi
c.;ans:y!,tltt� ��yr�irzu►r�rs
Nowland Two Subdivision
Spear Street, South Burlington, VT
In response to your request for information regarding the
Champlain Water District's capability to supply water to the
referenced project we submit the following:
1. Water is supplied to the referenced area via a 24"
transmission main.
2. Adequate water storage is located and maintained
south of the Dorset Street and Swift Street
intersection as provided by a 1,500,000 gallon
storage tank.
3. Your estimated demand of 43,800 gallons per day for
the above referenced proposed project can be
furnished by the Champlain Water District without
restricting or encumbering its present users on the
CWD supply system.
4. Capability of the local water distribution system
must be verified by the local water system official.
If you have any questions, please do not hesitate to call.
Sincerely,
CHAMPLAIN WATER DISTRICT
James W. Fay
Operations Manager
cc: E. Blake
R. Pratt
R. Gardner
C. Hafter
P. Jacob
S. Burlington
school -`-cuts
N considered
By..Sandy Grelner
Free Press Correspondent
The South Burl ington,.School
Board on Wednesday discussed
reductions in the ] 993-94 district
budget that would be necessary if
voters reject a tax increase to
offset a deficit in operating funds.
If voters in -May reject the 3.7
percent taxincrcase,,which would.
add $374,662 to next year's oper-,
sting budget, cuts.,;aotaling that,
amout�f ;would ?result' in rcduc-
tions ,irleluding personnel, sup--
` plies,"' ' ' todial services, athletics,:-;
field trips and library funding.
'If the referendum fails, the
proposed budget says:
' ■ Twelve staff members and
teachers would receive reduction -
in -force notifications. None
j would be terminated, but all
would face a . reduction in work
loads and pay. Each of the three
elementary schools would lose a
part-time custodian, and the mid-
dle school would lose a half-time
custodian.
■ Special education funding
would be reduced by $44,125,
resulting in the loss of aides.
0 The largest cut
{ $124,374 — would come from
the high school budget. The el-
ementary schools would lose a
total of $113,350, and the middle
school $46,450.
■ Central office cutbacks
would total $46,363.
Reductions planned regard-
less of the outcome of the May
vote arc elimination of sabbati-
cals, at a savings of $60,000; the
loss of one high school custodian,
$24,000; a reduction of $20,000
in the middle school guidance
administration budget; and
$45,000 in salary savings through
the retirement of a staff member.
The board will prescni a final
version of the proposed reduc-
tions to the City Council when
the two boards meet at 7:30 p.m.
Feb. 10 in City Hall.
In other action
In other business Wednes-
day night, the board approved
an interim Impact fee rate,
which would be charged to
developers who propose hous-
ing projects that would signifi-
cantly increase school'
enrollments.
The board approved a fee
of $750 for each single-family
dwelling and $375 for each
multi -family dwelling.
The impact fee is designed
to offset the cost of school
expansion.
The board acted on the
impact fees In response to
proposed developments, in-
cluding 73 single-family units
off Spear Street In the Over-
look Park area, and a Dorset
street development that would
include 157 single-family units
and 64 multi -family units.
SC ►H BURLINGTON SCHOOL DISM..,i :4'4
South Burlington, Vermont
44. Southeast Summit Residential Subdivision (File #92039), Fitzpatrick -
Llewellyn Incorporated: 157 single family units and 64 multi -family units
to be constructed.
have reviewed the above project as presented to the School Board on December 21,
1992, and have determined the following:
A. Based on historical data, the project will generate school students at the
rate of 0.5 per single family dwelling and 0.25 per multi -family dwelling,
for a total of 95 students. (Note that this is considerably lower than
estimated by the developer.)
B. Based on historical data, these students will be distributed among the
school levels as shown below:
K-5
42 students
(44%)
6-8
20 students
(21 %)
9-12
33 students
(35%)
C. The district's middle school and high school facilities are presently
operating sufficiently below the "action point capacity" that the anticipated
new students in these levels can be accommodated without problems.
D. The district's elementary school facilities are presently operating at or
slightly above the "action point capacity" and cannot readily accept
additional students without overcrowding and/or programmatic
limitations. The district is presently planning on additions to these
facilities to alleviate crowding and to accommodate additional students.
E. The district has undertaken a preliminary analysis of the cost of the
planned additions and determined that such costs, including state
contributions, bond interest and principal payments will amount to
$2,609.25 per K-5 student space (see attached analysis summary). With
the K-5 student generation rates described above, this yields a typical
cost per dwelling as shown below:
$750 per single family dwelling
$375 per multi -family dwelling
Based on the above, it is my opinion that the proposed Southeast Summit Residential
Subdivision will create a burden on this municipality's ability to provide elementary
school services. Further, it is my recommendation that such burden be mitigated by
payment of a fee by the developer to the school district in the amount of $750 for
each single family dwelling and $375 for each multi -family dwelling, for a total fee of
$141,750. The fee will be placed in an account dedicated to expansion of elementary
school facilities. I recommend that payment of said fee be considered as a condition
of the State Land Use Permit.
If construction of the project is phased, the fee may be paid in installments
corresponding to the phases, provided that payment of the installment for each phase
is made prior to commencement of any construction related to that phase.
The South Burlington School District is currently working to establish a school impact
fee program under the provisions of 24 V.S.A., Chapter 131, and expects to implement
such a program before the end of this year. If such an impact fee program is
implemented, it is understood that:
a. For any fees paid on the above described project prior to
the implementation of the impact fee program under 24
V.S.A., Chapter 131, if the paid fees differ from those
established under the impact fee program by more than 10
(ten) percent, the difference between the fees actually paid
and the fees due under the impact fee program will be
addressed as follows:
1. The school district, within thirty
(30) days of receipt of a request
from the developer, will refund
any excess payments, or
2. The developer will submit
payment to the district of any
balance due within thirty (30)
days of receipt of a request for
payment by the district.
b. For any dwellings or phases of the above described project
for which fees have not been paid prior to the adoption of
the impact fee program under 24 V.S.A., Chapter 131, the
fees established under the impact fee program shall apply.
04�?4�A-x ..
Lawrence E. LeCours
Superintendent of Schools
January 27, 1993
EXPANSION COST ANALYSIS
FOUR
CLASSROOMS SCHOOL
CAPACITh
9�PER
rADDMGNAL-s-TIJfD-ENI
CLASSROOM
AL CLASSROOM S.F.
1,000
4,000
PORT FLOOR AREA (%)
20.00%
SUPPORT FLOOR AREA
800
TOTAL FLOOR AREA
COST PER SQUARE FOOT
4,800
$70
TOTAL COSTRUCTION COST
$336 000
STATE SHARE (30%)
$100, 800
SCHOOL DISTRICT SHARE
$235,200
ASSUME 20 YEAR BOND ISSUff AT
4 %, LEVEL PRINCIPAL
PAYMENTS: TOTAL INTEREST
AND PRINCIPAL PAYMENTS
$332,984
TOTAL COST PER STUDENT
$3 468.58
MITIGATION COST ANALYSIS
FOUR
CLASSROOMS SCHOOL
COST PER K-5 STUDENT
3,468.58
STUDENTS PER S.F. DWELLING
0.5
K-5 STUDENTS AS PERCENT OF
ALL STUDENTS
44.02%
K-5 STUDENTS PER S.F. DWELLING
0.220080748
STUDENTS PER M.F DWELLING
0.25
K-5 STUDENTS PER M.F. DWELLINJ
0.110040374
COST PER S.F. DWELLING
$763.37
COST PER M.F. DWELLING
� $381.68
MITIGATION FEE PER S.F.
DWELLING
$750.00
MITIGATION FEE PER M.F.
DWELLING
$375.00
EXPANSION COST ANALYSIS
FIVE
CLASSROOMS SCHOOL
DDIT 0 "fDOC N AP C
100 SC 00
S.F. PER CLASSROOM
1,000
TOTAL CLASSROOM S.F.
5,000
SUPPORT FLOOR AREA (%)
20.00%
PPORT FLOOR AREA
1000
AL FLOOR AREA
6,000
T PER SQUARE FOOT
E
$70
AL COSTRUCTION COST
$420 000
STATE. SHARE (30%)
$126,000
SCHOOL DISTRICT SHARE
$294,000
ASSUME 20 YEAR BOND ISSUE AT
4%, LEVEL PRINCIPAL
-PAYMENTS: TOTAL INTEREST
AND PRINCIPAL PAYMENTS
$417,480
TOTAL COST PER STUDENT 1
$4 174.Q0
�- MITIGATION COST ANALYSIS
FIVE
CLASSROOMS SCHOOL
COST PE R K- 5 STU DE NT
4,174.80
STUDENTS PER S.F. DWELLING
0.5
K-5 STUDENTS AS PERCENT OF
ALL STUDENTS
44.02%
K-5 STUDENTS PER S.F. DWELLING
0.220080748 '
STUDENTS PER M.F DWELLING
0.25
K-5 STUDENTS PER M.F. DWELLINC
0.110040374
COST ('ER S,F. - CLLING
$918.79
COST PER M.F. DWELLING
$459 40
MITIGAW FEE PLR S.F.
DWELLING
$900.00
MITIGATION FEE PER M.F.
DWELLING
$450.00
January 1993
Nowland Two Subdivision, Spear Street, South Burlington
92045
Table of height limitations for structures within the Dorset Park View
Protection Zones (VPZ) A and D
Key Notes
1. Lot number according to drawing: D 4382
2. Dorset Park View Protection Zone, A or D
3. Distance from Dorset Park VPZ baseline to house lot
4. Existing house lot grade
5. Ceiling height relative to Dorset Park VPZ Baseline
6. Road centerline grade adjacent to house lot
7. First floor elevation (road centerline grade plus 5 feet)
8. Maximum height of structures, first floor elevation to ridgeline
(ceiling height minus FFE).
1 2 3 4 5 6 7 8
(6)+5.0' (5)-(7)
Lot #
VPZ
Dist.
Exist
Grade
Ceiling
Height
Rd. C.L.
Grade
1st Fl.
Elev.
Max.
Height
1
A
5600
391.0
417.6
390.5
395.5
22.1
2
A
5600
390.0
417.6
389.5
394.5
23.1
3
A
5600
389.0
417.6
388.8
393.4
23.8
4
A
5600
388.0
417.6
388.4
393.4
24.2
5
A
5600
387.0
417.6
387.9
392.9
24.7
6
A
5600
386.0
417.6
387.0
392.0
25.6
7
A
5600
384.0
417.6
386.0
391.0
26.6
8
A
5600
382.0
417.6
385.2
390.2
27.4
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
File: 92045 cont.
Table of height limitations for structures, within the Dorset Park
View Protection Zone (VPZ)
1 2 3 4 5 6 7 8
(6)+5.0' (5)-(7)
Lot #
VPZ
Dist.
Exist
Grade
Ceiling
Height
Rd. C.L.
Grade
1st F1.
Elev.
Max.
Height
9
D
5600
380.0
431.1
384.2
389.2
41.9
10
D
5600
380.0
431.1
384.1
389.1
42.0
11
D
5600
388.0
431.1
387.0
392.0
39.1
12
D
5600
386.0
431.1
384.0
389.0
42.1
13
D
5600
386.0
431.1
383.8
388.8
42.3
14
D
5600
386.0
431.1
384.4
389.4
41.7
15
D
5600
386.0
431.1
384.8
389.8
41.3
16
A
5600
387.0
417.6
385.4
390.4
27.2
17
A
5600
388.0
417.6
385.9
390.9
26.7
18
A
5600
389.0
417.6
386.5
391.5
26.1
19
A
5600
390.0
417.6
386.8
391.8
25.8
20
A
5600
390.0
417.6
387.4
392.4
25.2
21
A
5600
390.0
417.6
387.8
392.8
24.8
22
A
5600
389.5
417.6
388.3
393.3
24.3
23
A
5300
392.0
418.6
390.5
395.5
23.1
24
A
5300
392.0
418.6
391.5
396.5
22.1
25
A
5300
392.0
418.6
392.2
397.2
21.4
26
A
5300
392.0
418.6
392.6
397.6
21.0
27
A
5300
392.5
418.6
393.0
398.0
20.6
28
A
5300
393.0
418.6
393.2
398.2
20.4
29
A
5300
393.0
418.6
393.5
398.5
20.1
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
File: 92045 cont.
Table of height limitations for structures, within the Dorset Park
View Protection Zone (VPZ)
1 2 3 4 5 6 7 8
(6)+5.0' (5)-(7)
Lot #
VPZ
Dist.
Exist
Grade
Ceiling
Height
Rd. C.L.
Grade
lst F1.
Elev.
Max.
Height
30
D
5300
391.0
431.3
393.3
398.3
33.0
31
D
5300
392.5
431.3
393.0
398.0
33.3
32
D
5300
392.0
431.3
392.5
397.5
33.8
33
D
5300
391.0
431.3
391.0
396.0
35.3
34
D
5300
391.5
431.3
389.5
394.5
36.8
35
D
5300
391.0
431.3
390.5
395.5
35.8
36
D
5300
390.0
431.3
391.5
396.5
34.8
37
D
5300
391.0
431.3
392.2
397.2
34.1
38
D
5300
390.5
431.3
393.8
398.8
32.5
39
D
5300
391.0
431.3
393.2
398.2
33.1
40
D
5300
391.0
431.3
393.4
398.4
32.9
41
A
5300
391.0
418.6
393.3
398.3
20.3
42
A
5300
391.0
418.6
393.1
398.1
20.5
43
A
5300
391.0
418.6
392.8
397.8
20.8
44
A
5300
391.5
418.6
392.3
397.3
21.3
45
A
5300
390.5
418.6
392.0
397.0
21.6
46
A
5300
390.0
418.6
392.2
397.2
21.4
47
A
5300
390.0
418.6
390.6
395.6
23.0
48
A
5300
390.5
418.6
390.2
395.2
23.4
49
A
5300
391.5
418.6
389.9
394.9
23.7
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
File: 92045 cont.
Table of height limitations for structures, within the Dorset Park
View Protection Zone (VPZ)
1 2 3 4 5 6 7 8
(6)+5.0' (5)-(7)
Lot #
VPZ
Dist.
Exist
Grade
Ceiling
Height
Rd. C.L.
Grade
1st F1.
Elev.
Max.
Height
50
A
5300
390.5
418.6
389.4
394.4
24.2
51
A
5600
389.0
417.6
389.0
394.0
23.6
52
A
5600
389.5
417.6
389.8
394.8
22.8
53
A
5600
389.5
417.6
390.5
395.5
22.1
54
A
4800
392.0
420.1
394.5
399.5
20.6
55
A
4800
392.0
420.1
395.2
400.2
19.9
56
A
4800
392.0
420.1
395.6
400.6
19.5
57
A
4800
392.0
420.1
396.2
401.2
18.9
58
A
4800
393.5
420.1
396.8
401.8
18.3
59
A
4800
392.0
420.1
397.2
402.2
17.9
60
A
4800
391.5
420.1
397.6
402.6
17.5
61
A
4800
391.0
420.1
398.1
403.1
17.0
62
D
4800
391.0
431.6
398.1
403.1
28.5
63
D
4800
391.0
431.6
398.1
403.1
28.5
64
D
4800
393.0
431.6
398.1
403.1
28.5
65
D
4800
393.5
431.6
398.1
403.1
28.5
66
A
4800
392.5
420.1
398.1
403.1
17.0
67
A
4800
392.5
420.1
397.5
402.5
17.6
68
A
4800
392.5
420.1
397.0
402.0
18.1
69
A
4800
392.5
420.1
396.5
401.5
18.6
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
File: 92045 cont.
Table of height limitations for structures, within the Dorset Park
View Protection Zone (VPZ)
1 2 3 4 5 6 7 8
(6)+5.0' (5)-(7)
Lot #
VPZ
Dist.
Exist
Grade
Ceiling
Height
Rd. C.L.
Grade
1st Fl.
Elev.
Max.
Height
70
A
4800
392.5
420.1
396.0
401.0
19.1
71
A
4800
392.5
420.1
395.5
400.5
19.5
72
A
4800
392.5
420.1
395.0
400.0
20.1
73
A
4800
393.0
420.1
394.5
399.5
20.6
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
aeA-Id'�wra 'to VcoeseT 10Al2K- ulev ep-4�17e.G'ft0p -i5Our-,
NOTES
1, N/FIS/5...
N/F IBIS
� N/F CNlU � /• T � i �� � L..
/ • N/F GAGNON ` \��- •l
/ .�• , ��. J 1 N/F MEREOITH %I N/E ATKINS-/,'
% • I •\' `
N/F _ _ /
i �
UNDERWOOD
El
I l 52 _ - I S7Rff 'A'
Fl
CATAMOUNT LANE
/51)
J 22:
COMM plvi : N/F HANSON
50 :
21 .20 19 18 171 i ' 16 ! }5 i Gl
.13 . 1? • �� ! A
! L _ L
A` 24 25 Q27
mI . Q
26 J '
ro' uEASEuENr rrn.) 28 y (,
70 I -c
32 77 34
I' 48 _ (FALL LINE DRIVE) STREET 'A'-- — - --=
I �( A. 45 44 43; 42 4 /
40; 39 (S 37_
1.
OWNER / APPUCANT: LARKIN MILOT PARTNERSHIP
410 STiELBURNE ROAD
BURLINGTCK VER,l10NT
2
ZONED: SOUTHEAST QUADRANT
S
TOTAL PARCEL AREA: 56.7 ACRES
4.
PERIMETER PROPERTY LINE INFORMATION TAKEN FROM PLAN ENTITLED
' NOWLAND PROPERTY 11 - SUBDIN90N PLAN' BY F777PAmCK -
LL£WELLYN INC. NUMBER 0-3879 / D-JMO. DATED MARCH 1991.
S
TOPOGRAPHIC AND EXISTING FEATURES INFORMATION BY i7TZPATRICK-LLFWELLYN
6.
PROPERTY LINE INFORMATION FOR SWIFT ESTATES TAKEN FROM TAX
MAPS PROVIDED BY THE OTY OF SOUTH BURUNGTON.
7.
• PROJECT DESCRIPTION:
73 SINGLE FAMILY LOIS ON 65.7 ACRES ON THE EAST SIDE OF SPEAR
SIREET IN SOUTH BURUNGTOM, VERMONT.
7068 (+/-) LINEAR FEET OF ROADWAY WITH CURBS 807H
SIDES AND 9DEWALK ONE SIDE WITHIN A PROPOSED OTY R 0. If
5500 (+/-) LINEAR FEET OF 8- WATER MAIN FROM EA7577NG
WATER MAIN ON SPEAR STREET AT THE DEERFIELD DRIVE INTERSECTION.
5500 (+-) LINEAR FEET OF STORM COLLEC770M SEWER DISCHARGINC
TO 7HREE PROPOSED DETENTION BASINS
8.
STREET NAMES SHOWN IN PARENTHESIS ARE PROPOSED ONLY AND
ARE SUBJECT TO OWNER / CITY APPROVAL.
0
> -T-<M*
3Z1 "o um(Taw RoucvC-�
--- --�-----� I I - F RREL T
i COMMON LAND
ve B
54 55 56 57 58 59 T
O 60
61
• S_-_ B.
- (CAS7LfROCX
-TOT
72 71 70 69 68
73 �O �O OHO 67
G66
COMMON LAND
O 65
'N/F ECONOMOU FARMS INC.
DEUNEA 70 WE7LAN0 UAIIM
10' uTwrY EAsa&Nr (rm)
COMMON LAND
C
N/F A C E . AL.
❑ rL`� 3 I GD1.01-� I D 12 G' �•1��
0
0 9,
I.1ZAPhIC rt' 11 1
too r a too Zoo yoo
'T101.�1 TO le I l�Gr � t✓1 t-� � � � 11��-'� .
Flpp��o ►� To
1 R".SED ROADWAY AND SOW£ LOTS TI/iy�07
Na REWSIONS DA 7E
IT is THE USER'S RESPONSIBILITY TO ENSURE THESE DRAWINGS 1NCLUDf
THE LATEST REW90NS:
PRELIMINARY PLAT ACT 250
FINAL PLAT CONSTRUCTION
NO W L A N D T WO
D VERALL SITE PLAN
FO��pQ�QOQG��
n �%% n n �% (�j�
�_- _'-----------i �LS � W � AX Y �1992
INCORPORATED
O - 4382
N/F ISHAM IN1L, J1.71 .. 1 YALLISTON VERIAONT 3 19
(802) 658-7955
575 DORSET STREET
SOUTH BURLINGTON
VERMONT, 05403
TO: South Burlington Planning Commission
DATE: 9 December 1992
RE: Proposed Bike Path on Nowland Development
After reviewing the sketch plans for the Nowland property the
Natural Resources Committee recommends that the proposed bicyle
path be moved.
As currently proposed the bike path would cross a wetland area on
the property's east side. The alternative route on the property's
west side does not cross any wetland so would be a more
appropriate site for the bike path.
Since an acceptable alternative to the currently proposed path
exists this committee sees no compelling reason why the wetland on
the property's east side should be disturbed.
For the Committee:
Respectfully Submitted,
Wm Laliberte
cc Gerald Milot
John Larkin
John Steele
a
%,
`
;'� . 1
,dsrj M
LOMItitUM
MA5—r A.q"
�� G LA53 uG �-rr RDL�.
%.v ZA' rJDM ! NA L
N ; G M-n- - Ao.A4A KF--5 PaAFZ4--
c wL oyz, (.icy-} 6►r-4y
TYPICAL STREET LIGHT
N T 0
City of South Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT 05403
FAX 658-4748
PLANNER
658-7955
January 29, 1993
John Steele
FitzPatrick-Llewellyn, Inc.
One Wentworth Drive
Williston, Vermont 05495
Re: Nowland II PRD, Spear Street
Dear Mr. Steele:
ZONING ADMINISTRATOR
658-7958
Enclosed please find a copy of some additional comments submitted
by City Engineer Bill Szymanski regarding the above project. �f
you have any questions, please let me know.
Sincerely,
Raymond J. Belair,
Zoning and Planning Assistant
1 Encl
RJB/mcp
City of South Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT 05403
FAX 658-4748
PLANNER
658-7955
January 29, 1993
John Steele
FitzPatrick-Llewellyn, Inc.
One Wentworth Drive
Williston, Vermont 05495
Re: Southeast Summit and Nowland II PRD
Dear Mr. Steele:
ZONING ADMINISTRATOR
658-7958
Enclosed is a copy of the December 8, 1992 Planning Commission
meeting minutes. If you have any questions, please let me know.
S' n erely,,
j r z-
JJ e Weith,
City Planner
1 Encl
RW/mcp
cc: Gerald Milot
John Larkin
City of South Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT05403
FAX 658-4748
PLANNER
658-7955
January 25, 1993
John Steele
FitzPatrick-Llewellyn, Inc.
One Wentworth Drive
Williston, Vermont 05495
Re: Nowland II PRD, Spear Street
Dear Mr. Steele:
ZONING ADMINISTRATOR
658-7958
Enclosed please find some preliminary comments on the above
referenced project from City Engineer Bill Szymanski, Fire Chief
Jim Goddette and myself. Please respond to these comments by no
later than Friday, January 29, 1993.
If you have any questions, please give me a call.
Since ly,
R ym d J. Belair,
Zoning and Planning Assistant
Encls
RJB/mcp
cc: Gerald Milot
John Larkin
vatb N urlingtnn +Rine :43 cpartutrnt
575 +Bnrset ` treet
�anth TSurlington, 'Vermont 054113
FAX: (802) 658-4748
TO: SO. BURLINGTON PLANNING COMMISSION
FROM:
RE:
DATE:
1.
CHIEF GODDETTE
TUESDAY FEBRUARY 9,1993 AGENDA ITEM
MONDAY JANUARY 11,1993
NOG/LAND TWO
DATED OCT. 1992
PROJECT # 92045
PLANS WERE REVIEWED ON THE CHANGES TO THIS PROJECT
AND AT THIS TIME I DO NOT FEEL THEY WILL EFFECT
US IN GIVEN EMERGENCY PROTECTION.
(802)658-7960
PLANNER
658-7955
Michael Oman
Chittenden County
P.O. Box 108
City of South Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT 05403
FAX 658-4748
January 20, 1993
Regional Planning Commission
Essex Junction, Vermont 05453
Re: Southland PCD & Nowland II Residential Subdivision
Dear Mr. Oman:
Enclosed please find copies of the following documents:
ZONING ADMINISTRATOR
658-7958
1) Traffic Evaluation for Southland Planned Commercial
Development, and
2) Traffic Impact Analysis, Proposed Nowland Two
Residential Subdivision
The City requests your assistance in reviewing these reports from
a technical standpoint. I would greatly appreciate it if you would
provide me with any comments, concerns, and recommendations you
may have in regards to these traffic impact analyses. If at all
possible, I would appreciate a response on the Nowland project by
February 9, 1993 and on the Southland project within three (3)
weeks.
If you unable to meet this schedule or if you have any questions,
please give me a call. Thank you for your assistance.
n erely,
J e Weith,
City Planner
Encls
JW/mcp
M E M O R A N D U M
To: Brian Searles, Police Chief
James Goddette, Fire Chief
From: Raymond J. Belair,� oning and Planning Assistant
Re: Proposed Street Names
Date: January 20, 1993
The following street names are being proposed as part of a 73 lot
residential subdivision on Spear Street:
1. Catamount Lane
2. Fall Line Drive
3. Castlerock Circle
Please let me know if these names would or would not create a
problem for emergency response.
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
One Wentworth Drive • Williston • Vermont • 05495 • (802) 878-3000
15 January 1993
Mr. Joseph Weith, City Planner
575 Dorset Street
South Burlington, Vermont 05403
RE: Nowland Two
FILE: 92045
Dear Mr. Weith:
In response to the Planning Commissions request for more
information we are submitting the attached letters and reports for
your consideration and to assist the commission in its review of
the following issues:
1) PRD Criteria - See attached responses prepared by Gerry Milot.
2) Water Availability - We have requested reviews from both the
City and CWD; no response to date. See attached letters.
3) Traffic Report - See attached report prepared by Brendan Kelly.
4) Education - We presented S.E. Summit to the School Board on
12/21/92 and have submitted Nowland. The School Board will
make a decision on S.E. Summit at its 1/27/93 meeting and
review Nowland Two. The Board is currently working with its
consultants to develop a formula for determining impact fee.
5) Scenic View Protection - Based on existing and proposed grades
shown on the Preliminary Plat Drawings, we prepared the
attached table indicating the maximum height of structures for
each lot.
6) Wetlands - See attached wetlands verification submitted by Brad
Wheeler of the Johnson Company.
Design 0 Inspection 0 Studies 0 Permitting 0 Surveying
Mr. Joseph Weith
FILE: 92045
15 January 1993
Page Two
7) Historical Sites - See attached letter from the State
indicating no adverse impact.
We look forward to meeting with the Commission on the 26th.
Sincerely,
FITZPATRICK-LLEWELLYN INCORPORATED
7hneele
cc: Gerry Milot
John Larkin
Enclosure
JAS#5/baf:92045
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
reek 'i 1
Spear MAO
S t-Overlook,: 1,
t,�: 1 Park •
� VPZ
�0J, P VPZ
•'� Z Dorset ark
Hines
1•�
Spear St, ;. '. = � ' Him
Ridge VPZ t• =�'__
Spear St. -Al en Rd. VPZ
J �z',.4
SCENIC VIEW PROTECTION
f• ' 1�1 + i •'�` * A more detailed map i
angles, distances, E
�\•/
inspection at the Sc
MEMORANDUM
TO: South Burlington Planning Commission
FROM: Joe Weith, City Planner
RE: Farrell, MBL and Milot/Larkin applications
DATE: December 15, 1992
I met with City Attorney, Steve Stitzel, to discuss several
questions raised by the Commission in regards to the Farrell
(Chittenden Bank), MBL (Ramsey Farm), and Milot/Larkin (Nowland
parcel) applications. Steve offers the following advice:
Farrell: A question was raised regarding whether the Commission
can require dedication of a 60 foot r.o.w. connecting Shelburne
Street to Farrell Drive even though the r.o.w. would not be opened
at this time with the construction of a City street. It is Steve's
opinion that the Commission can require such dedication. The
street is shown on the official map and subdivisions are required
to comply with all bylaws of the City.
In regards to interests which other parties (i.e., Heathcote,
Davis, etc.) have in the so called Odell Parkway r.o.w., Steve does
not anticipate any complications with a dedication since the City's
plans for a public street would be consistent with the parties'
current interests. As long as the rights of the parties to use
Odell Parkway are not interfered with, there should not be a
problem with dedication. However, the City should make sure that
legal documents allow parties to continue use of this r.o.w. until
such time as the r.o.w. is actually taken over by the City.
Co -applicants - Steve has recommended that Ben Franklin be a co -
applicant in this project since Farrell is proposing to amend a
previously approved site plan for Ben Franklin. Similarly, Steve
feels that Heathcote Associates should be a co -applicant since
access and circulation changes are being proposed on the Heathcote
property. This project should also include the submittal of a
revised Heathcote site plan/subdivision plat showing these changes.
This revised plan would have to be approved by the Commission and
recorded in the land records.
Southeast Summit and Nowland Property II• A couple of questions
were raised in regards to interpreting the City's new SEQ zoning
amendments. The first question related to what criteria the
Commission should use in deciding whether or not to grant a 25%
density bonus for a PRD. It is Steve's opinion that the additional
25% is not really a bonus but is in effect a higher maximum density
which is allowed for a PRD, as opposed to a standard subdivision.
Therefore, if an applicant is proposing a development at the max
1.375 units per acre density (1.1 u/a x 1.25 = 1.375 u/a) and can
show that the development satisfactorily meets all the PRD criteria
and criteria of the SEQ district, then the applicant is entitled to
the max density. If the applicant can not demonstrate compliance
with the criteria, then the application should be denied. It is
important to keep in mind that an applicant is not entitled to the
max 1.375 u/a density or even the base density of 1.1 u/a. The
applicant is entitled to only whatever density satisfies the
criteria, not to exceed 1.375 u/a.
A similar question was raised as to the criteria which the
Commission should use when deciding whether or not to approve a
transfer of density. Steve's opinion is the same. The transfer of
density can only be done as a PRD and under one application.
Therefore, as long as the applicant can demonstrate that whatever
he/she is proposing (not to exceed 1.375 u/a) successfully
satisfies the PRD and SEQ criteria, then the applicant is entitled
to an approval. Steve suggested that Section 26.604(b) be revised
to make this more clear as follows, "...calculated for one parcel
in the PRD pursuant to Sections 26.401 and 26.603 above to another
parcel in the PRD. Any such .."
Another question was raised in regards to water and sewer hook-up
requirements. Steve -says existing homes along the proposed route
for the water and sewer line extensions are not required to hook-up
to the new lines. However, Steve says that if the City or
applicant want to oversize the facilities to accommodate future
development or hook-ons, the City needs to adopt an impact fee in
order to collect fees to reimburse the developer or City for the
extra cost of the oversized lines.
DEC92.MEM
TO: Planning Commission
FROM: Recreation Path Committee
RE: proposed developments
DATE: December 8, 1992
The South Burlington Recreation Path Committee met Monday evening,
December 7, 1992. The committee reviewed sketch plans and other
materials presented for the Southeast Summit and the Nowland II
Developments and the most recent plan for O'Dell Parkway. The
committee recommends the following:
Southeast Summit
1. The developer should build an 8' wide paved recreation path on
the north side of the major east -west road running through the
development. This will provide a potential link to a future
extension of Allen Street and to a future extension of the
existing recreation path along Dorset Street.
2. The developer should build an 8' wide paved recreation path
more or less paralleling Dorset Street on the portion of the
property to the east of Dorset Street. This will provide a
continuation of the existing recreation path along Dorset
Street as it is extended south. This section of the path
should be as far from Dorset St. as is practical; considering
site limitations and the necessity of connecting to the path
on the north side of the property.
a 3. The developer should donate a 20' wide easement running north -
south along the back of lots numbered 1 - 13. This will give
the City the possibility of"linking other neighborhoods via a
recreation path in the future.
4. The developer should donate a 20' wide easement running
roughly north -south along the western edge of the property.
This will give the City flexibility in "meeting" any Shelburne
path in the future.
1
DEC92.MEM
Nowland II
1. The developer should build an 8' wide paved recreation path on
the north side of the proposed extension of Deerfield Drive.
This will provide access from the development to the existing
recreation path via the sidewalk along the existing section of
Deerfield Drive.
2. The developer should build an 8' wide paved recreation path
running north -south along the backs of lots 58 - 92 or along
the backs of lots 57 - 14. This will provide a link to future
neighborhoods to the south and a`possible link to Meadowood
Drive or Swift Street.
3. The developer should assume the cost of a pedestrian activated
traffic light at the Spear St./Deerfield Drive intersection
even though it may not be needed immediately. Traffic on
Spear St. is often heavy and fast, making a pedestrian
crossing at this intersection potentially dangerous. This
situation will be made worse as the development becomes
inhabited.
O'Dell Parkway
A 6' wide bike lane should be marked along the south side of
the proposed route of O'Dell Parkway. The objective is to
connect Shelburne Road and Home Avenue with Farrell Street and
the soon -to -be -constructed recreation path paralleling I-189.
2
Preliminary
December 8,
November 17,
Page 2
Comments
1992 agenda items
1992
applicant to show that this development will not have an undue,
adverse effect on and will protect rare and irreplaceable
historic sites. Applicant should address this issue.
--- indicate proposed use of existing barn.
--- all watercourses should be shown on the 1"=40' scale plans
with the corresponding C.O. zones.
--- type of line used to designate existing wetlands should be
consistent throughout the plans, i.e. the legend for "existing
wetlands" on sheet 3 is not the same as is shown on sheet 9
and the line for existing wetlands in the legend on sheet 9 is
not the same as is used in the drawing on sheet 9.
- - - exterior lighting details for the multi -family buildings
should be provided.
--- dumpsters for the multi -family buildings should be shown and
screened.
--- provide size of Ginkgo trees.
--- plan should show buffer plantings along street "C" similar to
the plantings along street "A".
NOWLAND II - 132 PRD - SKETCH PLAN
--- traffic study should be submitted as discussed at the 6/16/92
meeting.
--- note 7 on sheet 3 should be revised to indicate that this
project also includes 40 multi -family units.
--- all proposed streets should be named.
--- a complete survey of the subdivision tract by a licensed land
_/ surveyor must be submitted.
--- plans should show limits of developable area as shown on the
SEQ map.
--- building envelopes for lots 9-11 should be shown.
--- it is staff's reading of the 6/16/92 minutes that the
--- applicant would construct and dedicate to the City the access
road to Spear Street north of lot #11. The applicant should
address the impact of this road on the adjacent single family
homes and redesign the retention basin so that no portion of
this structure lies within the street r.o.w.
--- all lots should be numbered including the retention basin lot,
wetland lots and multi -family lot.
--- it should be noted on the plans that the wetland lots and the
retention basin lot are to be held in common.
Preliminary
December 8,
November 17,
Page 3
Memorandum
1992 agenda items
1992
--- this property is located within the Dorset Park View
Protection Zone. Applicant should provide detailed
information on the allowable height of each house within the
development. All site and street landscaping should be
evaluated and revised to be certain plantings proposed will
not exceed the height limitations.
90 parking spaces are required including 4 handicapped spaces
for the multi -family buildings and only 81 spaces are provided
with no handicapped spaces.
--- dumpsters should be shown and screened.
bike path should not be constructed in wetland.
landscaping schedule should be broken down into three (3)
parts: 1) all multi -family plantings, 2) all street trees and
3) all other landscaping.
-- plan should show a reserved r.o.w. between lots #13 and 14 for
future connection.
provide Champlain Water Disrict with copy of water line plans
and details for their review and comment.
provide total number of bedrooms in multi -family buildings.
list waivers the applicant desires from the zoning and
subdivision regulations i.e., reduction in lot frontage and
area requirements.
- a portion of the development is proposed outside of the
designated development area as shown on the SEQ zoning map.
Section 26.606 of the zoning regulations allows the Planning
Commission to review proposed developments in a restricted
area according to certain criteria contained in this section.
The applicant should submit a report which addresses these
criteria.
applicant should provide approximate dimensions and acreage
for each lot.
a copy of the wetland study should be submitted. This is
-- needed to allow a variation from the SEQ zoning map.
all watercourses should be shown on the 1"=40, scale plans
with the corresponding C.O. zones.
exterior lighting details for the multi -family buildings
should be provided.
dumpsters for the multi -family buildings should be shown and
screened.
eITY ftER 'S 6PPI6b
ReceivP('J1L1C_$,f__._199'b at3� 26"
Reco, h Vol. 3 53 on page-2 �,3
Of
Attest UAington land Recor Vol.
��vaoat,c�.
NOTICE OF DEVELOPMENT CONDITIONS Margaret card, city clerk Pa 8S
THIS NOTICE is made as of the 5th day of November, 1993, by Gerald C. Milot
of Burlington, County of Chittenden, State of Vermont and John P. Larkin, of
Burlington, County of Chittenden, State of Vermont, (the "Owners").
\ WITNESSETH•
i
WHEREAS, the South Burlington City Planning Commission (the "Planning
Commission") has approved a planned residential development known as Nowland Two
(the "Nowland Two PRD") as depicted on a final subdivision plat entitled "Nowland
Two: Plat of Subdivision of Lands of Gerald C. Milot et al.", Sheets 1 of 2 and 2 of 2,
signed October 11, 1993, and prepared by Fitzpatrick -Llewellyn Incorporated, and
recorded in Map Volume &at Pages fL and fl2 respectively; and
WHEREAS, the final approval of the Planning Commission dated August 10, 1993
requires some of the specific conditions which will be of particular interest to purchasers
of lots in the Nowland Two PRD to be included in a Notice of Development Conditions
to be recorded simultaneously with the recording of the aforementioned final plat.
NOW THEREFORE, in consideration of the Planning Commission's final
approval, and for other good and valuable consideration, the Owners hereby give notice
of the following obligations, restrictions, and requirements that will directly affect lots
' within the Nowland Two PRD. Reference should also be made to the complete text of
the South Burlington City Planning Commission approval dated August 10, 1993, and on
file in the planning office of the City of South Burlington.
1. Obligation for Tree Planting. Owners shall plant two (2) trees on each lot
as required in Section 19.104(a) of the South Burlington Zoning Regulations. The
approximate location of said trees is depicted on a survey entitled "Nowland Two:
Landscape & Lighting Plan", Drawing D-4501, dated November 1992, last revised
October 5, 1993 and recorded in Map Volumeaat Page/ of the South Burlington
City Land Map Records. Particular reference should be made to tree height limits and
eligible species referred to in the notes of the survey.
2. Height Limitations. The Nowland Two planned residential development is
in compliance with the Dorset Park View Protection Zone set forth in Article XXV,
Section 25.40. Calculations of elevations and maximum height for each lot for Structures
and landscaping are set forth on a schematic plan and tables attached hereto as Exhibit
"A". Reference is also made to the Landscape & Lighting Plan referred to hereinabove
and to surveys entitled "Nowland Two: Site and Utilities Plan" revised October 5, 1993,
Drawings D-4383 through D-4388 and recorded in Map Volume a8&at Pages
/f�, al d, and Q of the South Burlington City Land Map Records.
3. Building Envelopes on Lots 5-8. To satisfy the requirements imposed by
the 200' view corridor adjacent to the Spear Street right-of-way, the area where
Voi,.
N7
Page
residences can be constructed on Lots 5, 6, 7, and 8 have been limited to building
envelopes located therein. Reference should be made to the survey entitled "Nowland
Two: Site and Utilities Plan", Drawing D-4384, last revised October 5, 1993 and recorded
in Map Volume, at Page A of the South Burlington City Land Map Records, which
depicts the boundaries of the building envelopes.
4. Community Mailbox Areas. The final approval of the Planning
Commission includes a requirement to provide for two community mailbox areas. The
first is adjacent to Pinnacle Drive and shall impose an easement imposed on Lot 49, the
second is adjacent to Vail Drive and shall impose an easement on Lots 52 and 53.
Reference is made to the aforementioned final subdivision plat and to a survey entitled
"Nowland Two: Overall Site Plan" dat d July, 1992, last revised October 1, 1993 and
recorded in Map Volumea�at Pag@lltof the South Burlington City Land Map
Records for depiction of the aforementioned mailbox easements. The homeowners'
association established to govern the Nowland Two PRD shall be obligated to maintain
the community mailbox easement areas as well as all drainage ditches and ponds which
serve the development.
5. Miscellaneous. Reference should be made to the plat of Subdivision of
Lands, Overall Site Plan, Landscape & Lighting Plan, and Site and Utilities Plans for
identification of any further easements, obligations, or restrictions which affect a .
particular lot within the Nowland Two PRD.
Executed as of the date first above -mentioned.
OWNERS
hGeral C. Milot
ohn Larkin
by Stephen R. Crampton, his
attorney -in -fact
STATE OF VERMONT
COUNTY OF CHITTENDEN, SS.
At Burlington, in said County and State, this 5th day of November, 1993,
personally appeared Gerald C. Milot and he acknowledged this instrument, by him
signed, to be his free act and deed.
Before me,
Notary Public
My commission expires 2/10/95
-2-
CITY OF SOUTH BURLINGTON
Subdivision Application - SKETCH PLAN
1) Name, address, and phone number of:
a. Owner of record S�t,� P-
La2K ��
�/
LA2Ki►J 'Re a l4
1110 5he (Zug-d
.-aL"-.L1
V+ ps.gU3
b. Applicant Tok, (D . LAzw- N
c. Contact Nce- LLF P
AO.49 UJ%L --y,,j terc�-A Su.�„��l�.�S-�u�l , V% 0s-qy3
2) Purpose, location, and nature of subdivision or development,
including number of lots, units, or parcels and proposed
use(s).
�.�-� s '� le - +s
TL 4--1 VI_ L0 IAr-+•Y�J
3) Applicant's legal interest in the property (fee simple,
option, etc.
4) Names of owners of record of all contiguous properties
t'AAriC � �s%�ar--, Lco.jurnuy, �iln+ch�wooGY .C, S (�VI�L
5) Type of existing or proposed encumbrances on property such
as easements, covenants, leases, rights of way, etc.
1
6) Proposed extension, relocation, or modification of
municipal facilities such as sanitary sewer, water supply,
streets, storm drainage, etc. A�/i, �..� 1�k«t ., t1�A�; r.' ,o(��
(A N L�S LO L L"12_ 2�+[_'i-[_ N �h!L_Lrvv� T V+�- Lt P
7)
4„ Sc,z.ve U,4s S Z--�3
Describe any previous actions taken by the Zoning Board of
Adjustment or by the South Burlington Planning Commission
which affects the proposed subdivision, and include the
dates of such actions: /
DC •,a t y kc.•c x, uN-+ \ . 1 u t S A- A \ •'L [n N IA % ,2e: c c tP � . '- ,
o-U^o( ,sr LA An
Submit fAvelcopies and one reduced 6opy (81 x 11, 8J x 14 or
11 x 17) of a Sketch plan showing the following information:
a) Name and address of the owner of record and applicant.
b) Name of owners of record of contiguous properties.
c) Date, true north arrow and scale (numerical and
graphic).
d) Boundaries and area of: 1) all contiguous land
belonging to owner of record, and 2) proposed
subdivision.
e) Existing and proposed layout of property lines; type
and location of existing and proposed restrictions on
land, such as easements and covenants.
i f) Type of, location, and size of existing and proposed
streets, structures, utilities, and open space.
g) Existing zoning boundaries.
h) Existing water courses, wetlands, floodplains, wooded
areas, ledge outcrops, and other natural features.
i) Location of existing septic systems and wells.
j) Location map, showing relation of proposed subdivision
to adjacent property and surrounding area.
k) All applicable information required for a site plan, as
provided in the South Burlington Zoning Regulations,
shall be submitted for subdivisions involving a
commercial or industrial complex, multi -family project,
planned unit development, or planned residential
development.
2-2-98
(Signature) appll ant or contact person Date
N/F ECONLWOU FARMS INC.
GRAPHIC SCALE
O
( W 16T )
1 _b - 2w IL
ADO PRORERn OWNER NAW.% RENSE LOT NI.N/B£RS
ADO NOWCANO I - CENTER DRAW NG ON SNEEJ, REASE PRWERT OWNERS
RENSE LOT LAYOUT, ADO SOUTH wro
REASED ROADWAYS AND SOME LOTS
A[kanvs
RECE,--, rD
FEB 0 3 1998
City of So. Burlino-tcYn.
- •,,•
/ROOMW M WT U PnamkART OE90N E M& DC9W
ACT 2W
o,fola wocx wJkCAMS SrAM a' NS pv..wc
IT IS satyr Ai 4.W" W904MVW Ta Oduff rW DRA04 ACIM rK LAUT ArwsOa
NOWLAND TWOOlI
_-
i01IM pMRwGrfw
.[ArO.I
--_
Gz�
II
VICINITY PLAN
_ ;_'t
04�PQ4G°30Q a
LLC �C dd�(ayIm
INCORPONAIED
Y.R
_W^
0 -- 4MI
-----VERMONT
? `o ?7
PRIM; NOV 12 1993
I
I t A - 1171'JO , - 14DSa3• a . y7a'N• i / AREA CONTAINED MIIHIN
1 1 SX74'sl•a R - IR4.00' /
1 rs• r. 7aer / BIKE PA1H/PEDESTR/AN SEE SHEET ? OF $ 0-4745
r. 71.a7' NgpvptYD yp• EASEMENT 39.664 Sf.
10 L . a.u• PRg•a6(0 70• 0.91 ACRES
L . nice• L . Ia14• PLnrsmAR
Ngt3'w'oJY [A9aNrNr p - J3377s• A. s wn. Uh1rV USONCNr
04.8 --- qU e . woo• R . saw, F FOR CON 77NUA770N OF 7H/S PUT
Na'w'OJY >e r 17. DS' r . ra 4T /
1 I^ IW.0 JS01' L - J).sT a1 •% �'
I Na671's7Y r•06• ° 11 D5'aS' a - 1e76•B• V) a h {!�• 0 - on ra•
I� J„S• R . IJo.", A . -- R . Ia00 .j(e •�:../ e R . In7. 44' a . ollt GI• Uyy GRID
la t/. 7- 31i1' N' /. 1AOt' �, 1•�___ ? L Sx7a' /.
p . 107rq•
I .Ils7!'Oe'R L IO[iT L - 37. i1'sOA7.'7rR' l . xw' x17
so7W301W �_ -L - S2171' R. Sto W'
1 N Imo_ _ oabo d074 ITt j} tuia i - i11w7'
M L .*a-ouo c IgeK r
1 fig . tASCcwi/ s O : a a 5v O Y `'�r•R. Nrr r,' oa _---_- R: 9aaal C(AREA D
h 3 53 Q 54 5% 13". ,r. r i 4S. p . ,r.t.s 859,600 Sf.
5�, 8 8 O �18 1 x897 SF. !h8 1336J SF 58 '°a ie_�` L . saw, i : ld2523 79.7J AC.
1 N p •. aamao•Oli .'^i�i 'iR ?!_ 718 O '• ^ --a
1 R Isao 13,'N SF. - 1J,000 IF. 2' Q31 AG iR QJ1 AG 1aT Si v81^ 59 / ; 43t� \
•hIa I r ., Is00. 20, 386 S.F.i z p - OJsi•01•
71si' 0.30 AG QJO AG R . 70Jpar p - o7vr71• QJf AG 4p )x 1.x J7? IF. ! 60 15, 711 Sf. h \ L - :77 u•
Q47 AG r . s7.ao a . 7oJaoo a . lu.i7l��I^ QJ/ AG8 / 1 61 f a - 17'a.s RECE
L . rasar r - wol R . xium N p _ o7a7/• 0 14,12E Si. + Q36 AG i O r - 111.83* �.
�L . IOaaO' r. xior is 74ra 00' ^I� Q32 AG g . m7i'se 01
13,308 IF.
r . n1u
PRa�os[o ,o' __-L.loaoo R:�nr. 73N0.31 AGL-sryFEB 0 3 1998
unrn [scurwr p--_-r" Iwoao• I an - Jar1r .B p - ae.e•as•
_ [ • . 7i. 0o' •' I Ig YAaBOr rAY1KNI VALE DRTVl L " ?0.f0.°,o TO i R . Nnro• / \ �-
r.Ina' TO BE DED/GATED ---- - r.74.Jr r- n11'
L-slau T - / r.Ilsr i a-inrar
1 5067.'sTR J.7.l i' 7B, SITS g F TY (,CI ♦{ L - xi,s' _ i :.i °:• I
a. aa.e•os• {{ ' e r j n
fi.fJ'f - -/_ Ty B44L / T Icli s ;y a _ _ - `. ud. 16.58E SF.; `\ i s n s00• �1 ®� S0. BUM!"�t�
W ■ i - aam'oo• p _ oiva.y. � _ 0/ qC AC QV _ 1 O.3B AG
IOW' R ,ilg ro' a . 07s4'JO' A • Is'J7Ji• y - - ! 1'1•' • a l 13314' 1
C\ (' p • If
I. IS00' I. JI.la' A. nro•`_-IRnm/1 RppR I,J1 JJL 7156' I . xi01' R . waoo' _ 7 • 7n>r' / . xw.
ipn T\ _ A - 7ess'w• L . S7.a0'
' 72 71 L • IpOro' l IxiaO°m' R: o amr L 1,7.17• , r . 753. aa• p - 7373'7r
I r O �I O }gl nl8 p �K'«• _ L . 3a17a• R . nsJ JJ'
8 73 88 ?18 .6 r-.are' jr. 1 noo I r-76a,r
{� LLi 81 810 81 ' �r?i n' ' L - ei.N' I .LOOM /7 �- 7. T7,7T l L sn.77'
1J,000 S.F. `� 1J,000 SF. >: O s9 RI� 619 LRiA' L - °Vas• l p �y�a'o,• �L - sa.o• / \ `\ I
14046 IF. 0.30 AG O 4-
9. A . 7ats7'70• \�
1 3 I QJO AG 12,757 S.F. : 6% 8i^� i r _M0°
1 0.36 AG Q?9 AG 1$60B IF. 176L78 SF. ^ O I w R
Q?9 AG o - rJsr« L \ L - 17t.r / p • LJey ` O e�_'iq.Y6' 'PaLg' ,00po• a3a9• QT�I9AG/ZO.IJ SF. 66 a. uoo. 1 5. u400i' p. oesr'Jr
e 1 soi7.srR Yii.1 i7i 1 Q?B AG I-X 466 Sf. r - as L p . risrsi 1M . L - ir.si `\ a . loxiao' - - - - - -_
Lr. L . ruY r. Inn•
1 . air AG I Q �: J6Y % a. rr7r'm
Q I J Ig 4 - 2ela'43' I ` R : 7ye.o�ati'• \\ a . 347r7T `, L • IO7I!'
R . lsoo TEMPORARY R.O.W. FLIR 15,662 SF, i r - xao' nro ' • �\ ° uwr
1 i .: ni,• GRAVEL CUL.-DE-SAC a36 AG L . sa7r j 7 - 17.ra• p: a7Tsa. L ` o• unurr asr.IrNl
1 COMMON LAND �zq• L - n.xi' , . ww' iN I
(AREA D") 64 11,59? IF. i L - rraJ7 U to-o�a� i / I
p r7awlo )99,232 IF. ` Q50 AC. 63 S1 / R - nv'v
r 4,57 AG lA iU, p . an7s I . Ja 11
r - ra.sf I 1 �� : iuio. r.777u'
1 � r •b�• I 25,745 SF. L i �. L. n7R1•
u18 Q59 AG sp.`/ COMMON LAND
- I�ty- (AREA "C f p - oe'!J'a - -
1 ii00i' Nsautyso,- UU / ?a5B AGF /p_ 0 1� -�- - - -� - - ---
�1 8i -------------- - - ------,°a37af------------ ------ -------------------i i-/-----------'.4M7�-----------r-■-i-- _sa3+_-----
18 Isar
o'-
I SOi74'sre TO BE DEDICATED TO THE L7TY OF SOUTH BURLING TOM (FOR FUTURE USE)
.° w, L 125 97C 5. F 2. 99 Ac.
N a74'Sr [
N/F SCANLON
�- 1421174
SnE4R 9
nI i r r ! . \I " i LV
LKII IIo Gs,
P/NNACLf - DR/L•£ _ _, _ _ J•r Ini
Iti
II i I
WI I _ I..•W�,,,
I PINNACLE D w
III I
I I
- - - - - - - - - - - - - - - - - - - -
-
i I
I q2
[L I i i
0I VADRI LE VE IO
til I ~
v� l IL �__ __ __
L----- SHEET 1-OF 2
----------j
INDEX TO SHEETS N,s
N/r £CONOMOU FARMS, INC.
O TES 97/444
1) OWIR / APPLICANT. GERALD C 1ELOr el. aL
C/0 LARxw ARLOr PAR7mxs711a
410 SIHE.BL.RNE ROAD
BIAwmia . V•1tRwwr
A MARAE
GERALD M"WLLO1 AND W P LAOW DTmIS MADE 70 W WARRANTY DEED � 14AROVU1992 AS
NDiNNOOD TO
RECORDED W WU/ME JY7 BELiYNNING ON PAL! 166 OF THE CITY OF SW I N
BARLANGTOV LAND RECORDS "AWY "TV RM(
AND
HILLAW N�R GAGN� If MA" 110 rW C OENALD MrLOI AND JONN A LANKAN. �0 f
AXY 1"0 AS RECORDED W VOLUME 296 MGM" ON PAGE 5J6 OF THE
arY OF SOUTN BWRLANGTON LAND RECORDS
4) REPD4ENKE /S MADE IO 1NE PLANS PREPARED BY RW-A IMM-UEMELLW
UNCa%-QRAIEL7 Einnm 'AADWA AO PROPERTY R SWIM BNRLMGTOV,
WRMONr 9.1[itY VI90V PLAN , PROECr NUMBER ROM DATED MARCH
I99r, LA LEST REVISION AWE 7.X 1991, DRAWNG NUMBERS D-3679 AND
D-JeeO AS RECORDED IN VOLUME 286 Alf4WW#G OV PALE £? OF INC CITY
OF SOUTH BIRRLAINBTON LAND RECORDS
5) TIE PERIMCIER PROPERTY LUTES -HONN HEREON HAW BEEN CALCIALA TED
FROM AYFOPW PON TAKEN FROM TINE LNSIAUMEN73 a7ED W NOTES 2
THROUGH A CURRENT RECORD OMNERS OF THE' PROPERTY AS DaAVEAIED
BY THESE PERIMETER PROPERTY UNES ARE SE7FORTH AN THE /NS7RUMEN7S
CITED W NOTES I AND J AND ARE sue.ECr To AV/E7dPRETA7KAN BY LEGAL
COUNSEL.
6) THE PROPERTY 94ONW HEREON is 9A&ccr ro THE OFFER OF LRREWCABL£
DEDICA YIN AN AGREEMENT MADE 6 FEBWARY 1992 BY AND BETIAM
GERALD G AMLOT, •OYW A LARK^ MARIE LAN"WOW AND THE CITY OF
SOUTH BLRUNGION AS RECORDED W MXUME 322 BEGTRNNG ON PAGE 102
OF INC CITY OF SOUTH BURUNOWN LAND RECORDS
7) THE PROPERTY snow HE]REOM is S"cr TO A NOTICE OF DEWIO'MENT
COV077OVS AN AwamENT DATED a nmRUARY I992 BY AND BErmmv
GERALD G MOOT, "W P. LAR"4 MARIE UNDERWW AND TIE CITY OF
SOUTH BURUNGIOV AS RECORDED W VOLUME 312 BEONAWNG ON PAGE I97
Or THE Cry OF SOUTH BURUNG?DV LAND RECORDS
6) BCAAbNGS SI OW HEREON HAVE BEEN CALCULATED FROM WFORMAnOV TAKEN
FROM A PLAN PREPARED BY R17PA IMCK-LIEMELLYH WCORPORA 7m
EN7171ED •NOMLAND PROPERTY SOUIN BURUNGIDV, VERMONT FINAL
PLAT REUSED' PRJ%CCT NUMBER 8101. DA7m NOYEMBER 1961. ORA MING
NUMBER D-391
9) JNMR/OR 9WW90N LANES HAVE BEEN CALCULATED AS DiRECIED BY
THE OMN£R(S)/AGLNT(Sl
to) PRGPosED L sEwN15 SHOW HEREON ARE 9/B.Ecr To As-BW.r LocAr"S
LEGEND
PERMNE'TER PROPERTY LINE
- -
PROPOSM IOr LAVE
- -
PROPOSED Mar Of MN Y/EAS[MLNr LINE
- -
OTHER PROPERTY LINE
UARIS OF TION TO BE TRANSFERRED
_ _ _ _ _ _ _ _ _ _
10 THE arY or SCLAIN WRUNG TON
■
PROPOSED CONORcir MLNUMENr
PROPOSED A" PIN
O
CONCREV MMOOIIUM£NT FOUND
°
POOR z1EY ., /E 4)
A
CALCLLAIED ANIERSECIION
N/T
NOW OR FORMERLY
R.a W.
MOLT DF WAY
125 /456
VOLUME / PAGE CITY or
SOUTH BURLIN6TON LAND RECORDS
THIS PLAT /S BASED ON A GROUND SURVEY
AND ON FXAMWA7K.N OF IW LAND RECORDS
RECORDED AS OF OCTCBER 11, 199.1 LOCH TED W
IHE Cry OF SOU7H BURLWGTOV OERKY OFFICE:
BASED UV 1W GROUND SIARIEY AND OUR
INIERPRE7ADON OF NNE LAND RECORDS aIm
W NOTES 2 170OUOY 4. 1 HEREBY CERWY
THE PEIRME71F PROPERTY LINES SNOW HEREON
ARE CORRECT 76 7HE BEST OF MY KNOIM.EDG'E
INTERIOR LOT PAR177X WNG HAS BEEN REVIEMED
twom NY sL/P6wg5V AND Is TRUE AND OYYBR£Cr
70 7HE BEST OF MY KNOW.EDGE I FURTHER
a7R71FY INAr PRIOR 76 Ro-im CnO'O rHis PLAT
SUBSrANI7ALLY CONFORMS MEIN IAE REOWREMEN7S
Or I7LE 27.'VIA. SECILN /44=
WRY )C CG& LI/ RWATRICK-LLEML.YN WCORPORAIm
N/F /SHAM N/F FARRELL et.ol.
69/327 2741440
-- LOCUS - - -
GRAPHIC SCALE
L
. • 60 n
PRINI"- NOV 121993
STITZEL, PAGE & FLETCHER, P.C.
ATTORNEYS AT LAW
171 BATTERY STREET
P.O. BOX 1507
BURLINGTON, VERMONT 05402-1507
STEVEN F. STITZEL
PATTI R. PAGE'
ROBERT E.FLETCHER
JOSEPH S. MCLEAN
TIMOTHY M. EUSTACE
(`ALSO ADMITTED IN N.Y.)
Carl H. Lisman, Esq.
Lisman & Lisman
P.O. Box 728
Burlington, VT 05402-0728
(802) 660-2555 (VOIC=D)
FAX (802) 660-2552
E-MAMJMM2555 AOL.COM)
August 22, 1997
Re: South Burlington - Nowland II
Dear Carl:
OF COUNSEL
ARTHUR W.CERNOSIA
I am writing to inquire about the status of the outstanding
original documents for the above -referenced project. By letter
dated February 13, 1997 I sent you a number of original documents
that required revision and signatures by the respective parties
before they were ready for recording. I enclose a copy of that
letter for your reference.
Please do not hesitate to call if you have any questions.
Thank you for your attention to this matter.
Sincerely,
Timothy M. Eustace
THE/dah
Enclosure
cc: Ray Belair (w/ encl.)t,
SON3376.COR
S ,. .. _ kEL, PAGE & FLETCHER, P.
ATTOKNEYS AT L4W
171 BATTERY STREET
P.O. BOX 1507
BURUNIGTON, VERJ.90NT 05402-1507
(802) 660-2.555 (VOICFJfDD)
STEVEN F. STITZEL FAX (802) 660-25$2
PATTI R. PAGE* E-MAM.IMML455 gAOL.COM)
ROBERT E.FLETCHER
JOSEPH S. MCLEAN
TIMOTHY M. EUSTACE
('ALSO AD.Mn= IN N.Y.)
February-13, 1997
Carl H. Lisman, Esq.
Lisman & Lisman
P.O. Box 728
Burlington, VT 05402-0728
Re: South Burlington - Nowland II
Dear Carl:
OF COUNSEL
ARTHUR W. CERNOSIA
Enclosed please find original documents for the above -
referenced project which need revision before they can be
recorded. In reviewing these documents, I noticed a consistent
error that can be remedied without redrafting. I realize that
your clients are currently out of state and that making the
necessary changes may take some time, but we want to record
accurate documents.
The March 17, 1992 Underwood deed is incorrectly listed as
being recorded in Volume 332 of the South Burlington Land Records
in every document which contains the reference. The correct
Volume is 322. This reference can be found in the following
enclosed documents:
-Exhibit A to the Irrevocable Offer of Dedication of utility
and recreation path easements from Larkin and Milot to the
City of South Burlington.
-Warranty Deeds from Larkin and Milot conveying utility
easements (3) and the recreation path easement to the City
of South Burlington.
-The Second Notice of Development Conditions.
-Exhibit A to the Irrevocable Offer of Dedication of
roadways (and future roadways) from Larkin and Milot to the
City of South Burlington.
Carl H. Lisman, Esq
Lisman & Lisman
February 13, 1997
Page 2
-Warranty Deeds from Larkin and Milot conveying roadways
(and future roadways) to the City of South Burlington.
Schedule A's for each of the Partial Discharges
I received three different versions of Schedule A for the
Partial Discharges. I am enclosing a proposed draft of a revised
Schedule A which uniformly refers to the necessary documents.
Please review and give me your thoughts as to the changes made,
and the likelihood of success of obtaining approval of the
parties.
Finally, we have issues with the Hausner Documents. The
volume and page of the plan referred to ("Nowland Two, South
Burlington, Vermont, Sanitary Sewer Extension") needs to be added
to the Irrevocable Offer of Dedication and Exhibit A (Vol. 365,
Page 120). Moreover, Walter Grenier's signing of the document as
a witness, notary and duly authorized agent of the Merchants Bank
is troublesome. We request that this document be replaced with
one which does not have Walter signing in multiple capacities.
Thank you for your attention to this matter. Please do not
hesitate to call if you have any questions.
Very truly
/r
L�
Timothy �M.
Enclosures
CC: Mr. Raymond Belair (w/out encl.)
scNK99.coR
yours;
t
Eustace
City of South Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT 05403
FAX 658-4748
PLANNER
658-7955
August 21, 1997
John Larkin
410 Shelburne Road
South Burlington, Vermont 05403
Re: Modify Condition #15, Pinnacle at Spear
Dear Mr. Larkin:
ZONING ADMINISTRATOR
658-7958
Enclosed is a copy of the July 8, 1997 Planning Commission
meeting minutes and the Findings of Fact and Decision on the above
referenced project. Please note that the roadways in this
development must be completed by December 21, 1998.
If you have any questions, please give me a call.
S ncere y,
J Weith,
C' y Planner
JW/mcp
2 Encls
MOTION OF APPROVAL 7/8/97
JOHN LARKIN & GERALD MILOT
I move the South Burlington Planning Commission approve the evised
final plat application of John Larkin and Gerald Milot j7 amend a
condition of approval for a planned residential development
consisting of 73 single family lots, Pinnacle @ Spear, Spear
Street. The amendment is to extend, by one year, the date by which
the roadways serving the development must be completed. This will
in turn extend, by one year, the approved reserved sewer allocation
for the development. This approval is based on the following
stipulations:
1. Condition #15 of the 8/10/93 approval shall be revised to read
as follows:
" The Commission approves a total sewer allocation of 46,957
gpd for this development. The length of time that this sewer
allocation approval shall remain in effect shall be tied to
roadway construction. The roadways serving this development
shall be completed by December 21, 1998. The sewer allocation
for any lots served by roadways which are not completed by
12/21/98 shall be lost unless reapproved by the Planning
Commission".
MOTION OF APPROVAL 7/8/97
PORINIOWAZWO•
I move the South Burlington Planning Commission approve the revised
final plat application of John Larkin and Gerald Milot be amend a
condition of approval for a planned residential development
consisting of 73 single family lots, Pinnacle @ Spear, Spear
Street. The amendment is to extend, by one year, the date by which
the roadways serving the development must be completed. This will
in turn extend, by one year, the approved reserved sewer allocation
for the development. This approval is based on the following
stipulations:
1. Condition #15 of the 8/10/93 approval shall be revised to read
as follows:
" The Commission approves a total sewer allocation of 46,957
gpd for this development. The length of time that this sewer
allocation approval shall remain in effect shall be tied to
roadway construction. The roadways serving this development
shall be completed by December 21, 1998. The sewer allocation
for any lots served by roadways which are not completed by
12/21/98 shall be lost unless reapproved by the Planning
Commission".
Memorandum - Planning
July 8, 1997 agenda items
July 3, 1997
Page 2
4)
CENTURY PARTNERS - OUTDOOR PLAZA - REVISED FINAL PLAT
This project consists of amending an approved planned unit
development consisting of 96,800 square feet of general office and
shopping center use in four (4) buildings, 100 Dorset Street and 2
Corporate Way.
The amendment consists of minor site modifications to accommodate
an outdoor plaza area. This PUD was last amended on 12/10/96
(minutes enclosed). The only issues affected by this amendment are
overall coverage, which is not changing, and landscaping.
Coverage at Phase II buildout: Cl District: Building coverage is
24% (maximum allowed is 30%). Overall coverage is 84% (maximum
allowed is 70%). Front yard coverage along Dorset Street is 79.6%
(maximum allowed is 30%). CD1 District: Building coverage is
49.8% (maximum allowed is 90%). Overall coverage is 82.1% (maximum
allowed is 90%).
Landscaping: The shrubs and perennials displaced by the plaza will
be relocated on the site. The Crabapple tree will be relocated
off -site.
5)
JOHN LARKIN - SEWER ALLOCATION EXTENSION - REVISED FINAL PLAT
This project consists of amending a previously approved planned
residential development consisting of 73 single family lots,
Pinnacle @Spear, Spear Street. The amendment is to modify condition
#15 of the 8/10/93 approval to extend the time period by which the
roadways in the development are to be completed by one (1) year.
The sketch plan was reviewed on 6/10/97 (minutes enclosed).
Condition #15 of the 8/10/93 approval reads as follows:
"The Commission approves a total sewer allocation of 46,957 gpd for
this development. The length of time that this sewer allocation
approval shall remain in effect shall be tied to roadway
construction. The roadways serving this development shall be
completed within four (4) years of final plat approval. The sewer
allocation for any lots served by roadways which are not completed
within this four ( 4 ) year time limit shall be shall be lost unless
K
Memorandum - Planning
July 8, 1997 agenda items
July 3, 1997
Page 3
reapproved by the Planning Commission. In addition, if at the end
of three years no more than 50% of the roads have been completed,
25% of the total sewer allocation shall be lost unless reapproved
by the Planning Commission."
The applicant is requesting one (1) additional year in which to
complete construction of the roadways serving the development. The
applicant claims to have been held up from starting the project due
to an appeal taken to the Superior Court. The only road yet to be
developed is Vale Drive which will provide access to 22 lots. This
represents 14,151 gpd of sewer allocation. If this extension is
not approved by the Commission, and the applicant does not
construct the road by December, 1997, the 14,151 gpd of sewer
allocation will go to all the projects on the waiting list and
eliminate the waiting list.
Staff recommends that the condition be revised to read as follows:
"The Commission approves a total sewer allocation of 46,957 gpd for
this development. The length of time that this sewer allocation
approval shall remain in effect shall be tied to roadway
construction. The roadways serving this development shall be
completed by December 21, 1998. The sewer allocation for any lots
served by roadways which are not completed by 12/21/98 shall be
shall be lost unless reapproved by the Planning Commission.
6)
PATRICK & TERESE AYER - EXPAND PARKING AREA - SITE PLAN
This project consists of constructing 62 auto storage spaces on a
lot containing a 9761 square foot building with 3200 square feet of
printing use and 6561 square feet of auto repair and service use.
This property was last reviewed on 9/15/92 (minutes enclosed).
This property located at 4 Berard Drive lies within the IC
District. It is bounded on the north by undeveloped land, on the
east by a restaurant (Pizza Putt), on the west by a multiple use
commercial building, and on the south by Berard Drive.
Access/circulation: Access is provided by a 20 foot curb cut on
Berard Drive. Applicant has been using the adjacent Pizza Putt
property for access to the northeast portion of the building.
Approval for this access has never been approved by the Planning
Commission and an easement across the Pizza Putt property does not
exist. Since the access does not exist, the applicant should
3
PLANNING COMMISSION
10 JUNE 1997
PAGE 4
5. The applicant shall obtain a Certificate of Occupancy/Compliance from the administrative
Officer prior to the use of the new antenna tower.
6. Any change to the site plan shall require approval by the South Burlington Planning
Commission.
7. The site plan shall be revised to show the proposed concrete pad under the tower. Existing
covered area shall be converted to green area so that there is no increase in covered area for the
property. The revised plan shall require approval by the City Planner.
Ms. Barone seconded. Motion passed unanimously.
Mr. Weith said he will send a memo to the Zoning Board indicating that the Planning Commission
did not consider the height issue in its deliberations and that the approval by the Commission does
not represent an endorsement of the height of the proposed structure.
Messrs. Dinklage and O'Rourke rejoined the Commission.
6. Sketch Plan application of John Larkin to amend a previously approved planned residential
development consisting of 73 single family lots, Pinnacle at Spear, Spear Street:
Mr. Larkin said that when the plan was first approved, sewer capacity was not a problem.
Because of delays at Act 250, they are now asking for a year delay on building the rest of the road
(which is tied to the sewer allocation). The project is being built.
Mr. Burgess explained that the time limit was placed so there would be no hoarding of sewer
capacity.
Members had no problems with the request.
Mr. Weith said there would have to be a warned hearing.
Other Business:
Mr. O'Rourke asked for a further breakdown on the list of variances provided by the Zoning
Administrator. Members wanted to know which of the variances on the list had been approved.
As there was no further business to come before the Commission, the meeting adjourned at 9 pm.
yard coverage is 57.7% (maximum allowed is 30%). Overall and front
yard coverages are existing and will not be made worse by this
application.
The Zoning Administrator has determined that the tower meets
setback requirements. Setback requirements are not met by the
existing office building. The office building is a noncomplying
structure subject to the limitations of Section 26.002 of the
zoning regulations.
Parking: A total of five (5) parking spaces are required and eight
(8) spaces including one (1) handicapped space and a bike rack are
provided.
Landscaping: There is no minimum landscaping requirement, based on
building costs, for the project. No additional landscaping
recommended.
Traffic: No additional traffic expected.
Dumpster: The existing dumpster is screened from the adjacent
residences by shrubs and trees.
Lighting: The existing building mounted flood light should be
replaced with a downcasting shielded fixture approved by the City
Planner.
6) JOHN LARKIN - SEWER ALLOCATION EXTENSION - SKETCH PLAN
This project consists of amending a previously approved planned
residential development consisting of 73 single family lots,
Pinnacle @Spear, Spear Street. The amendment is to modify condition
#15 of the 8/10/93 approval (minutes enclosed) to extend the time
period by which the roadways in the development are to be completed
by one (1) year.
Condition #15 of the 8/10/93 approval reads as follows:
"The Commission approves a total sewer allocation of 46,957 gpd for
this development. The length of time that this sewer allocation
approval shall remain in effect shall be tied to roadway
construction. The roadways serving this development shall be
completed within four (4) years of final plat approval. The sewer
allocation for any lots served by roadways which are not completed
within this four (4) year time limit shall be lost unless
reapproved by the Planning Commission. In addition, if at the end
of three years no more than 50% of the roads have been completed,
25% of the total sewer allocation shall be lost unless reapproved
by the Planning Commission."
4
Memorandum - Planning
June 10, 1997 agenda items
June 6, 1997
Page 5
The applicant is requesting one (1) additional year in which to
complete construction of the roadways serving the development. The
applicant claims to have been held up from starting the project due
to an appeal taken to the Superior Court. The only road yet to be
developed is Vale Drive which will provide access to 22 lots. This
represents 14,151 gpd of sewer allocation. If this extension is
not approved by the Commission, and the applicant does not
construct the road by December, 1997, the 14,151 gpd of sewer
allocation will go to all the projects on the waiting list and
eliminate the waiting list.
5
Ybz m u.c
So. Burlington. VT 05403
HEALTHCARE/
TECHNOLOGY
WRITER
Healthcare/Technology
Writer needed for busy
marketing department.
1-3 years experience in
corporate communica-
tions required. Reply to:
IDX Systems Corporation,
Human Resources
Department, 1400 Shel-
burne Road, Burlington,
VT 05401: fax (802) 863-
9288: E-mail Shelley
_moultonr7a idx.com
KENNEL &
MAINTENANCE
Must love animals.
1 person (apt. avail for 1
or 2.) Crossover Ken-
nels, 802-899-3877.
PERSONALS 6
CANADIAN PORK PIE
All the details to make it
authentically. Light & de-
licious. Send for info to:
Fern's Recipies, PO Box
279, Wilton, NH 03086'
CORPORATE BOX
Molson Center hockey,
to include playoffs. Call
to discuss terms of
lease. Eric at 802-527-
7792. -
Merchandise Thrifty
ads: quick, easy, and
they work greatl Call
658-3321.
WANTED yearly garage
rental; near airport. 941-
778-0073 after 6pm.
days 9-5 941-778-2253.
NUDIST Family oriented
cooperative nudist club
seeking Increase in
membership. Facilities
incl. pool, clubhouse,
recreation field, trailer &
tenting sites situated on
exquisite 300 acre Ver-
mont site. Contact Maple
Glen, Box 443B, Enos -
burg Falls, VT 05450.
ORGANIZING SINGLE
MOTHERS who have
lost custody of children
to actual or alleged men-
tal illness through Ver
mont courts. 802-747
3086.
TEXAS DESCENDANT
Very much wants family
info from descendents
Henry Hull and Georgana
Gratton Murphey, and
Thomas O'Halloran and
:TON Daniel O'Flaherty. Please
es 16th an- Iv. msg. or call Radisson
rood Sale, Hotel, Mon. & Tues. for
rg for ev- Mary Jane Murphey Her
-
& 22 9-4 mon.
s will be
'T'ISS ;hiss!
Neighbor- 1,
urniture, j
�s i more.
3 Sun 9-4.
Neighbor -
id Stage Es -
Stage Rd.)
,ekes, toys.
Snowblower,
household
340 Main
ling lawn
Buick, boat
se Johnson,
Fri- Sat, 9
Good g
F, ,...,,..-_
TICKETS
2 for U2 concert on July
1. 7:30. in Foxboro,
Mass. Good seats. $150.
802-253-2298.
WANTED
2 VSO July 4th adult
tickets. Will pay pre-
mium. 658-2003, Bill.
ENTERTAINMENT $
A PLANET ROCK
EXPERIENCE
Dancers 7 days/wk. 127
No Main, Barre 479-0234
HARDBODIES
...-..,.,,.. 14- CO.
s familiar With coporate
executive Insurance ben-
efits. Individual —st
have a strong
ground using life
ance proposal systen s,
understand various types
of insurance products
and have excellent writ-
ten and communication
skills. Primary responsi-
bility will be technical and
marketing support. Can-
didate should possess
experience in word pro-
cessing, spreadsheet,
database software in a
Windows environment.
WordPerfect, QuattroPro
and Paradox skills a
plus. Send resume to
BBC. 200 Twin Oaks
Terrace, Suite 12, So.
Burlington, VT 05403.
MARINE MECHANIC
Rate of pay dependent
on experience. City Dock
Marina, 1 King St.
Cali 862-7200
LEGAL 11
NOTICES
AGENCY OF
TRANSPORTATION,
MONTPELIER,
INVITATION FOR BIDS
Sealed bids, on forms
furnished by the State,
will be received until
11:00 a.m. prevailing
time on Friday, July 11,
1997, at 133 State
Street, Room 319, Mont-
pelier, VT for the con-
struction of the project
hereinafter described.
The time of receiving and
opening bids may be
postponed due to emer-
gencies or unforseen
conditions.
LOCATIONS: Middle-
bury-Ripton STP
9743(1)S: In the town of
Middlebury on VT Route
125 at station 197 + 50
and extendingg east for a
distance of 2.507 miles
to station 33 + 44 in Rip -
ton.
CONSTRUCTION BE-
ING: Guard rail replace-
ment and improvements
and other related items.
Plans and Bid Proposals
may be seen and ob-
tained at the Agency of
Transportation, Montpel-
ier, VT and may be seen
at the office of R.D.
Hoskings, District Trans-
portation Administrator
#5, Colchester, Ver-
mont. Minimum wage
rates predetermined by
the Secretary of Labor
for the project are set
out in the advertised
specifications and bid
proposals, and such
rates are a part of the
Contract covering the
project in accordance
with Section 115 of the
Federal -Aid Highway Act
of 1956. This Contract is
subject to the Work
Hours Act of 1962, PL
87-581, and implement-
ing regulations. Contrac-
tors must perform this
work under the Fair La-
bor Standards Act (Fed-
eral Wage -Hour Law) as
well as all other applic-
able labor laws. Min-
imum labor and truck
rates have been prede-
termined by the State
Transportation Board
and are set out in the Bid
Proposal. Contractors
bidding on this project
must be qualified in
accordance with the
Agency Regulations. The
Vermont Agency of
Transportation hersi
notifies sill bidders that R
will affirmativNY _ ii!e
MS `Nordvrequirea. ]ireat
benefits. Resume &
cover to: Managing
Member, Burak Ander-
son & Melloni, PO Box
787, Burlington, VT
05402-0787.
MAINTENANCE
Hotel handy person
needed. General mainte-
nance and painting/wal-
lpaper skills required. At-
tention to details
important. Appply to:
Econo Lodge, 1076 Will-
iston Rd., S. Burlington.
MYSTERY SHOPPING'
Must have fax/e-mail. !
Visit www.second-to-
none.com or call 313-
668-1836.
PLUMBER JOURNEY-
MAN for residential work
in Chittenden Co. Good
benefits & pay. Must be
neat & experienced.
Please call 899-1966.
LEGAL 11
NOTICES
General Services until
1:30 P.M. Wednesday,
July 16, 19A7. At that
time all bids accompa-
nied by Bid Security will
be open d and publicly
read aloud at Two Gov-
ernor /Aiken Avenue,
Montpelier, Vermont,
State Buildings Confer-
ence Room.
Bonsfide Bidders may
obtain documents at the
Department of Buildings
and General Services,
Two Governor Aiken
Avenue, Montpelier,
Vermont 05602, upon
request.
There will be a site in-
spection on Wednesday,
July 2, 1997, at 9:00 am,
in the maintenance office
at the site.
June 20, 21 & 23 1997
PUBLIC HEARING
SOUTH BURLINGTON
CITY COUNCIL
otter to: riuit a
sources, 1i '50 Main
Nuth Sy stems :urrentiy
seekingCarter Manag-
Street. Montpelier, VT
ors for our South eur-
05602.
lington office. `Ne offer a
Convert clutter to cash
high -base salary, weekly
a Free Press Classified ___
commissions, monthly
call6S8.3J21.
bonus and oenefits. Call
OFFICE ASSISTANT
863-5011.
Ideal candidate to have
TEACHING ASSISTANT
ability to work indepen-
School -year position to
dently, good communica-
work with emotionally/
tion skills, computer
behaviorally disturbed
skills, & customer serv-
high school students. BA
ice helpful. 26-34 hrs./
Degree required. 32.5
Neek. Weekends req..
hours per week at $9.18
More hrs. possible in fu-
per hour with excellent
cure. $6.50/hr Resumes
benefits.
to: PO Box 9279, So.
Applicants should send
Burlington, VT 05407.
letter of application and
RALPH GOODRICH INC.
resume to:
Seeking highly moti-
Chittenden Central
vated. team -oriented
Supervisory Union
people. Operators for:
Human Resources Dept
Excavator, Loaper,
7_Meadow Terrace
Dozer. Also P ayers,
ESs_6xxJct., VT 05452
Foremen, iiiii�borers. TOP
Wages,, for those that
Deadline:7/4/97
nualifdAU84 fAF
EDE
The South Burlington
City Council will hod a
public hearing at the
South Burlington City
Hall, Conference Room,
575 Dorset Street, South
Burlington, Vermont on
Monday, July 7, 1997 to
consider the following:
1) Proposed amendment
to the South Burlington
Zoning Ordinance to es-
tablish two (2) new land
use categories in the city
- Bus Terminals and
Transportation Services.
The purpose of the
amendment is to recog-
nize these land uses and
allow for them in appro-
priate areas of the City.
The amendments affect
lands located within or
near the following zoning
districts: Commercial 1
(Cl), Commercial 2 (C2),
Mixed Industrial and
Commercial (I-C), Airport
(AIR), Airport Industrial
(AIR -I) and Muncipal
(MUN). Specific sections
to be amended include
the following:
1. 28.10, Specific
Definitions
2. 12.20, Conditional
Uses, C1 Dist{ict
3. 13.20._ Conditional
Uses, C2 District "
4. 15.20 ' y
LEGAL 11
NOTICES
PUBLIC HEARING
SOUTH BURLINGTON
PLANNING
COMMISSION
The South Burlington
Planning Commission
will hold a public hearing
at the South Burlington
City Hall, Conference
Room, 575 Dorset
Street, South Burlington,
Vermont on July 8, 1997
at 7:30 P.M. to consider
the following:
1) Revised final plat ap-
plication of John Larkin
and Gerald Milot to
amend a condition of ap-
proval for a planned resi-
dential development con-
sisting of 73 single family
lots, Pinnacle (p Spear,
Spear Street. The
amendment is to extend,
by one year, the date by
which the roadways
serving the development
must be completed. This
will in turn extend, by
one year, the approved
reserved sewer alloca-
tion for the development.
2) Revised final plat ap-
plication of Century Part-
ners to amend an ap-
proved planned unit
development consisting
of 96,800 square feet of
general office and shop -
pin center use in four
(4) buildings, 100 Dorset
Street and 2 Corporate
Way. The amendment
consists of minor site
modifications to accom-
modate an outdoor plaza
area.
3) Final Plat application
of Nile and Julie Dupps-
tadt and John and Debo-
rah Alden for a planned
residential development
consisting of 62 single
family lots on 62.4 acres
of land, 1550 Hinesburg
Road and Van Sicklen
Road.
Copies of the applica-
tions are available for
public inspection at the
South Burlington City
Hall.
William Burgess
Chairman
-Roquest for
hampiain .alley
LEGAL 11
NOTICES as
sistant at the VEPP Inc.
offices. 802-362-0748.
June 21, 1997
STATE OF VERMONT
DISTRICT OF
CHI'fTENDEN, SS.
PROBATE COURT
DOCKET NO.
27867
In Re the Estate of
Evangeline S.
DesLauriers
Late of Bolton, Vermont
NOTICE TO
CREDITORS
To the creditors of the
estate of Evangeline S.
DesLauriers late of Bol-
ton, Vermont.
I have been appointed a
personal representative
of the above named es,
tate. All creditors having
claims against the estate
must present their claims
in writing within 4 months
of the date of the first
publication of this notice.
The claim must be pres-
ented to me at the ad-
dress listed below with a
copy filed with the regis-
ter of the Probate Court.
The claim will be forever
barred if it is not pres-
ented as described
above within the four
month deadline.
Dated: June 17, 1997
Alison J. Bell, Esq.
Address: PO Box 271
Burlington, VT 05402
Telephone:
(802) 864-0217
Name of Publication:
Burlington Free Press
First Publication Date:
June 21, 1997
Second Publication Date:
June 28, 1997
Address of Probate
Court:
Chittenden District
Probate Court
PO Box 511
Main Street
Burlington, VT 05402
June 21, 28, 1997
marketing experience a
plus. --sourly plus Bonus.
Call 378-0614 and ask for
Abdooi.
"Sold the First Dar",
We hear this every 1I
from successful ad-
vertisers. Free Press
Classifieds work, Cab
us at 658-3321. We
can help you make
your ad work.
TELEPHONE SALES
Publisher seeks experi-
enced telephone sales
persons, business to
business. salary plus
commission. Pleasant
work atmosphere.
Vergennes. 877-2510.
TRUCK DRIVER
For local petrolium car-
rier. Tractor trailer class
A CDL haz mat. Clean
record & appearance.
Benefits. Call De Vos &
Sons,425-3020.
EMPLOYMENT 12
ALL CYCLE
WASTE, INC.
A focal waste and recy-
cling company seeks the
following positions:
DRIVERS
CDL truck drivers w/
clean driving record, exp.
pref. but not req.
LABORERS
for our transfer station,
must be hard working.
Excel. benefit package
and competitive wages.
Apply in person at: 28
Avenue B, Williston, VT.
864-3615.
ARC NITECT/DRAFT-
SMAN needed. 5 yrs
.
min. experience. Must be
computer literate. Auto -
CAD 12 pref. Fax resume
to: 802-878-0080.
ASSEMBLY LINE
POSITIONS
30 immediate positions.
1 st, 2nd and weekend
shifts available. Excellent
opportunity for advance-
ment. No experience
necessary. Will train. Call
Jess for immediate inter-
view.
TAD
Employment
Services
658-5007 EOE
NO FEES
ASSISTANT MANAGER
TRAINEE Large national
home care company
seeks 3 individuals. We
train. Car helpful. oppor-
tunity to earn $300-$500
per week to start. Bonu-
ses/salary/commission.
Call 658-2082 . EDE
.ASSISTANT MANAGER
/TRAINEE If you are in-
terested in an exciting
fast paced business
management position
we have career opportu-
nities at our rental cen-
ters. You have to be hon-
est, hardworking, anc
able to lead, manage anc
promote a profitable ca-
reer oriented operation.
Apply in person, nc
phone calls please.
U-Haul Center, 460 Riv-
erside Ave, Burlington
VT 05401.
AUTO BODY
TECH
Est • e r°
WWM here a e
5 years ai bofly e1111W
prate and an, able to for 1
ae am
plate al phases of c
i.... ..n.r Frwrt
CITY OF SOUTH BURLINGTON
Subdivision Application - SKETCH PLAN
1) Name, address, and phone number of:
a. Owner of record
b. Applicant 4e h z-1pt11—
c . Contact
2) Purpose, location, and nature of subdivision or development,
including number of lots, units, or parcels and proposed
usen(s).
w 0 -,,-IQ ire U -�- % /0;?r 0
3) Applicant's legal interest in the property (fee simple,
option, etc.
4)
5)
Names of owners of record of all contiguous properties
Type of existing or proposed encumbrances on property such
as easements, covenants, leases, rights of way, etc.
-WA 'AllillilillgiillllllIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
i
w
1
6) Proposed extension, relocation, or modification of
municipal facilities such as sanitary sewer, water supply,
streets, storm drainage, etc.
7) Describe any previous actions taken by the Zoning Board of
Adjustment or by the South Burlington Planning Commission
which affects the proposed subdivision, and include the
dates of such actions:
8) Submit five copies and one reduced copy (8J x 11, 8J x 14 or
11 x 17) of a Sketch plan showing the following information:
a) Name and address of the owner of record and applicant.
b) Name of owners of record of contiguous properties.
c) Date, true north arrow and scale (numerical and
graphic).
d) Boundaries and area of: 1) all contiguous land
belonging to owner of record, and 2) proposed
subdivision.
e) Existing and proposed layout of property lines; type
and location of existing and proposed restrictions on
land, such as easements and covenants.
f) Type of, location, and size of existing and proposed
streets, structures, utilities, and open space.
g) Existing zoning boundaries.
h) Existing water courses, wetlands, floodplains, wooded
areas, ledge outcrops, and other natural features.
i) Location of existing septic systems and wells.
j) Location map, showing relation of proposed subdivision
to adjacent property and surrounding area.
k) All applicable information required for a site plan, as
provided in the South Burlington Zoning Regulations,
shall be submitted for subdivisions involving a
commercial or industrial complex, multi -family project,
planned unit development, or planned residential
development.
(Signature) applicant or contact person Date
CITY OF SOUTH BURLINGTON
Subdivision Application - FINAL PLAT _ /
1) Name of Applicant �f/ f �`C� 4'�f,
2 ) Name'of Subdivision/ /U,q, zr-e —� ,e/ 0(x
3) Indicate any change to name, address, or phone number of
owner of record, applicant, contact person, engineer,
surveyor, attorney or plat designer since preliminary plat
application
4) Indicate any changes to the subdivision, such as number of
lots or units, property lines, applicant's legal interest
in the property, or developmental timetable, since
preliminary plat applic"a-�t--ion:
�"' o,/Y►'4Q�e�.-�-� C'�fr✓1.Yti D� c� .dL•Q ,cx.c� ��1Q.�1�� �-�
5) Submit five copies and one reduced copy (11 x 17) of a
final plat plus engineering drawings and aQntaining all
information required under Section 202.1 of the subdivision
regulations for a minor subdivision and under Section
204.1(a) for a major subdivision.
6) Submit two draft copies of all legal documents required
under Section 202.1 (11) and (12) of the subdivision
ulations for a minor sudivision and under Section 204.1(b)
for major subdivision.
(
applicant or contact person
1-3 � 7
Date
City of South Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT 05403
FAX 658-4748
PLANNER
658-7955
June 6, 1997
John Larkin
410 Shelburne Road
South Burlington, Vermont 05403
Re: Modify Condition #15, Pinnacle at Spear
Dear Mr. Larkin:
ZONING ADMINISTRATOR
658-7958
Enclosed is the agenda for next Tuesday's Planning Commission
meeting and my comments to the Planning Commission. Please be sure
someone is present on Tuesday, June 10, 1997 at 7:30 P.M. to
represent your request.
If you have any questions,
JW/mcp
Encls
please gi a me a call.
Sin a el ,
Jo Weith,
City Planner
STITZEL, PAGE & FLETCHER, P.C.
ATTORNEYS AT LAW
171 BATTERY STREET
P.O. BOX 1507
BURLINGTON, VERMONT 05402-1507
(802) 660-2555 (VOIC=D)
STEVEN F. STITZEL FAX (802) 660-2552
PATTI R. PAGE' E-MAII.(FIRM2555@AOL.COM)
ROBERT E.FLETCHER
JOSEPH S. MCLEAN
TIMOTHY M. EUSTACE
(*ALSO ADMITTED IN N.Y.)
February 13, 1997
Carl H. Lisman, Esq.
Lisman & Lisman
P.O. Box 728
Burlington, VT 05402-0728
Re: South Burlington - Nowland II
Dear Carl:
OF COUNSEL
ARTHUR W. CERNOSIA
Enclosed please find original documents for the above -
referenced project which need revision before they can be
recorded. In reviewing these documents, I noticed a consistent
error that can be remedied without redrafting. I realize that
your clients are currently out of state and that making the
necessary changes may take some time, but we want to record
accurate documents.
The March 17, 1992 Underwood deed is incorrectly listed as
being recorded in Volume 332 of the South Burlington Land Records
in every document which contains the reference. The correct
Volume is 322. This reference can be found in the following
enclosed documents:
-Exhibit A to the Irrevocable Offer of Dedication of utility
and recreation path easements from Larkin and Milot to the
City of South Burlington.
-Warranty Deeds from Larkin and Milot conveying utility
easements (3) and the recreation path easement to the City
of South Burlington.
-The Second Notice of Development Conditions.
-Exhibit A to the Irrevocable Offer of Dedication of
roadways (and future roadways) from Larkin and Milot to the
City of South Burlington.
i
Carl H. Lisman, Esq.
Lisman & Lisman
February 13, 1997
Page 2
-Warranty Deeds from Larkin and Milot conveying roadways
(and future roadways) to the City of South Burlington.
-Schedule A's for each of the Partial Discharges
I received three different versions of Schedule A for the
Partial Discharges. I am enclosing a proposed draft of a revised
Schedule A which uniformly refers to the necessary documents.
Please review and give me your thoughts as to the changes made,
and the likelihood of success of obtaining approval of the
parties.
Finally, we have issues with the Hausner Documents. The
volume and page of the plan referred to ("Nowland Two, South
Burlington, Vermont, Sanitary Sewer Extension") needs to be added
to the Irrevocable Offer of Dedication and Exhibit A (Vol. 365,
Page 120). Moreover, Walter Grenier's signing of the document as
a witness, notary and duly authorized agent of the Merchants Bank
is troublesome. We request that this document be replaced with
one which does not have Walter signing in multiple capacities.
Thank you for your attention to this matter. Please do not
hesitate to call if you have any questions.
Very truly yours;
Timothy M. Eustace
Enclosures
cc: Mr. Raymond Belair (w/out encl.)
SON3199.COR
STEVEN F. STITZEL
PATTI R. PAGE*
JOSEPH S. MCLEAN
TIMOTHY M. EUSTACE
(-ALSO ADMITTED IN N.Y.)
Carl H. Lisman,
Lisman & Lisman
P.O. Box 728
Burlington, VT
STITZEL & PAGE, P.C.
ATTORNEYS AT LAW
171 BATTERY STREET
P.O. BOX 1507
BURLINGTON, VERMONT 05402-1507
Esq.
05402-0728
(802) 660-2555 (VOICE/TDD)
FAX (802) 660-2552
E-MAIL(FIRM2555@AOL. COM)
January 27, 1997
Re: South Burlington - Nowland II
Dear Carl:
OF COUNSEL
ARTHUR W.CERNOSIA
ROBERT E.FLETCHER
Once again I am writing to request the legal documents that
are still needed to finalize the above -referenced project.
Please forward to this office a Partial Discharge of Mr. and Mrs.
Gagnan's mortgage as well as the Property Transfer Tax Returns
for all interests conveyed by your clients and Mr. and Mrs.
Hausner to the City of South Burlington.
Thank you for your attention to this matter. Please do not
hesitate to call if you have any questions.
Very truly yours,
Timot y M. Eustace
CC: Joseph Weith
son3186.cor
1'
F74? -
/4)7
41-�
J
F1.._ANTING L15T
TREE SELECTIONS FOR STREET TREES AND C MMON AREAS REC.OMME'NL
FOR REC�UIR
1QY QTY m M�"� �'� �'� " bm 1�10 I �D (5ect lon 19.104 of a
�T W Acer tatarloum Tatarlan Maple 25-3" StB 15-20, @ �- IOOZT
C. � r- O�� i�� tr -. dy .�" �'S•�y 111 - i
AR 41 Acer rubrum Northwood Northwood R- Maple 25-3" 54B 3b-4c,@/35°' =6, 0V-25' CLOT a 1,
q do _ Acw g I" la
AG 3 Asaculus glabra Ohlo Bvci a 2-25" 1548 30-40' �O ��1 - Acer tatarlcum
Crataegus cruegalll In,
E=0- 34 G61:10 oecldentalls "ackberry �.p3' B45 40-5i Malue floribunda
cP 43 Grataegus phaenopTum Washlnoton "ak,thorn 2' 134B 18-20' l Y!--53325-35, CLOT 03,
FP 38 Fraxwous p. Emerald Emerald Groom Ash 2!+-3" BtB 40-461: pcsr Gdropestre
Gr a to sgw pha er�opyr�
KP 3 Koelreuterla paniculata Golcisn Raln Tres 2-25` BAB 25-3fd',�/y�a;ya� 1�alsele earollna
(oil s Koelreuterla paniculat
MF 5 Malus rloribunda Flowering Grab 15-21 1545 Ia-15'Cd Sb7
Ov 56 Ostrya vlr!@miana A. 1.lophornbsam 25-3" Big 30-40'@ l79 o -4W 3b-45' CLOT • 5
P5 12 Pfnw d etrobiformis M. Borer Pins 5 6' BtB 30-40' ? qp: =robo Aesculue glabraGarpinus carolWana
PT 42 Pinus thinbsrgil J. Black Pins 5-6' ede 25-30' $0= '33irb Cxr dsndrum arbor Qum
2 _ Phellodendron am,rsrw
SG 14 Salix. caprQa Goat Willow 542' B.R 15-20, � g9s`�S�Pynis calleryana cv ci
SN 20 Sallx nlobe Nlobe Willow 1.5-2" BtB 40-45'd! %a!t"p
TC 6S NA VA me /ll;(,.. I- K. ,ifiYh h�1Mn� 3 ('4v a� aS @air = 13 i
f Approxhnate mature hteightt of tress under Ideal cOndltlons. Heavy clay sobs on this site F 7 lff 5D
will Ihnit growth and reduce the mature height.
a
sw.Sa X0,97.
i
i
i
_�
Eff 7WAINWr X �*Aft
ow(kcl
-4v
-------------
7-
qv-,e,f --
/rf
ac>l
7
STEVENF. STITZEL
PATTI R PAGE*
JOSEPH S. MCLEAN
TIMOTHY M. EUSTACE
(-ALSO ADM=D IN N.Y.)
Carl H. Lisman,
Lisman & Lisman
P.O. Box 728
Burlington, VT
STITZEL & PAGE, P.C.
ATTORNEYS AT LAW
171 BATTERY STREET
P.O. BOX 1507
BURLINGTON, VERMONT 05402-1507
Esq.
05402-0728
(802) 660-2555 (VOICErIDD)
FAX (802) 660-2552
E-MAIL(FBtNU 555QAOL. COM)
December 16, 1996
Re: South Burlington - Nowland II
Dear Carl:
OF COUNSEL
ARTHUR W. CERNOSIA
ROBERT E.FLETCHER
On November 6, 1996 I wrote you a letter regarding documents
that we needed to finalize the above -referenced project. I am
writing to follow up that letter and remind you that we still
need to obtain a Partial Discharge of Mr. and Mrs. Gagnan's
mortgage as well as the Property Transfer Tax Returns for all
interests conveyed by your clients and Mr. and Mrs. Hausner to
the City of South Burlington.
Please forward these documents to our office at your
earliest convenience. Thank you for your assistance. Do not
hesitate to call if you have any questions or wish to discuss
this matter.
Very truly yours,
Timothy M. Eustace
cc: Joseph Wieth
son3166.cor
STEVENF. STITZEL
PAM R- PAGE'
JOSEPH S. MCLEAN
TIMOTHY M. EUSTACE
('ALSO ADMITTED IN N.Y.)
Carl H. Lisman,
Lisman & Lisman
P.O. Box 728
Burlington, VT
STITZEL & PAGE, P.C.
ATTORNEYS AT LAW
171 BATTERY STREET
P.O. BOX 1507
BURLINGTON, VERMONT 05402-1507
Esq.
05402-0728
(802) 660-2555 (V OICE/TDD)
FAX (802) 660-2552
E-MAIL(FIRM2555@AOL. COM)
November 6, 1996
Re: South Burlington - Nowland II
Dear Carl:
OF COUNSEL
ARTHUR W. CERNOSIA
ROBERT E.FLETCHER
I have been working with Bob Fletcher on the above -
referenced project. About a month ago, Bob spoke to you
regarding some documents that we needed to finalize this matter.
I am writing to follow up that discussion. In order to finish
this project we need to obtain a Partial Discharge of Mr. and
Mrs. Gagnan's mortgage as well as the Property Transfer Tax
Returns for all interests conveyed by your clients and Mr. and
Mrs. Hausner to the City of South Burlington.
The City is anxious to receive these documents and finalize
this project. Please forward them to our office at your earliest
convenience. Thank you for your assistance. Please do not
hesitate to call if you have any questions or wish to discuss
this matter.
Very truly
Timothy M.
cc: Joseph Wieth
son3141.cor
yours,
Eustace
WARRANTY EASEMENT DEED
KNOW ALL MEN BY THESE PRESENTS, That LARKIN MILOT PARTNERSHIP, a
Vermont general partnership with a place of business in Burlington, Chittenden County, State of Vermont,
("Grantor"), in consideration of Ten and More Dollars, paid to its full satisfaction by THE CITY OF
SOUTH BURLINGTON, a municipal corporation located in Chittenden County, State of Vermont,
("Grantee") by these presents, does freely GIVE, GRANT, SELL, CONVEY and CONFIRM unto the
said Grantee, THE CITY OF SOUTH BURLINGTON, its successors and assigns forever, an easement
in perpetuity for the purpose of installing, repairing, maintaining, restoring, and/or replacing a stormwater
drainage pipe, together with all appurtenances thereto, under and through land in South Burlington, County
of Chittenden, State of Vermont, (hereinafter the "Easement") described as follow, viz:
Being that Easement, subject to certain terms and conditions, conveyed to the within Grantor by
Warranty Easement Deed of Victor L. and Ann 0. Ratkus of or about even date herewith and
to be recorded in the South Burlington City Land Records. Reference is made to the plan
described in said aforementioned Warranty Easement Deed for a more complete description of the
Easement conveyed herein.
TO HAVE AND TO HOLD the granted Easement with all the privileges and appurtenances
thereof, to Grantee, its successors and assigns, to its own use and behoof forever, and Grantor for itself
and its heirs, successors, and assigns, does covenant with Grantee, its successors and assigns, that until
the ensealing of these presents it is the sole owner of the lands through which the Easement is granted and
has good right and title to convey and encumber the same in the manner aforesaid, that the lands are
FREE FROM EVERY ENCUMBRANCE, except as aforementioned, and it hereby engages to
WARRANT AND DEFEND the same against all lawful claims whatever, except as aforementioned.
IN WITNESS WHEREOF, Grantor sets its hand this2� day of August, 1995.
IN PRESENCE IDF:
Witnes
LARKIN LOT ARTNERS
By:
Gerald C. Milot
STATE OF VERMONT
COUNTY OF CHITTENDEN, SS.
At ', D , in said County and State, this L 5 day of August, 1995 personally
appeared GVV.ALD C.
JULOT, duly authorized agent of LARKIN MILOT PARTNERSHIP, and he
acknowledged this instrument, by him signed, to be his free act and deed and the free act and deed of
LARKIN MILOT PARTNERSHIP.
Before me U U Qom_
Notary Public
My commission expires: 2/10/99
«Iarkinwd.b08>>
WARRANTY EASEMENT DEED
KNOW ALL MEN BY THESE PRESENTS, That VICTOR L. RATKUS and ANNE
O. RATKUS of South Burlington, County of Chittenden, State of
Vermont ("Grantors"), in consideration of Ten and More Dollars,
paid to their full satisfaction by LARKIN MILOT PARTNERSHIP, a
Vermont general partnership with a place of business in
Burlington, Chittenden County, State of Vermont, its successors
and assigns ("Grantee") by these presents, do freely GIVE,
GRANT, SELL, CONVEY and CONFIRM unto the said Grantee, LARKIN
MILOT PARTNERSHIP, its successors and assigns forever, an
easement in perpetuity for the purpose of installing, repairing,
maintaining, restoring, and/or replacing a stormwater drainage
pipe, together with all appurtenances thereto, under and through
land in South Burlington, County of Chittenden, State of
Vermont, (hereinafter the "Easement") described as follow, viz:
An Easement with an initial width of ten (10) feet centered
on the existing drainage pipe located in the southeasterly
corner of Grantors' property as it lies adjacent to the
Spear Street right-of-way. Said Easement proceeds westerly
from the westerly edge of the Spear Street right-of-way,
diminishing in width until it terminates at the
southwesterly boundary of Grantors' property, and is more
particularly described as follows: Beginning at a point in
the southwesterly sideline of the Spear Street right-of-way
which marks the southeasterly corner of the 838 square foot
easement area, said point being 4.74 feet northeasterly of
the southeasterly corner of the property of the within
Grantors; thence N 27047157" E in and along said Spear
Street sideline 10.01 feet to a point; thence N 65008/300
W 70.14 feet to a point; thence N 67056100" W 25.32 feet to
* point; thence N 85007105" W 11.66 feet to a point in the
southwesterly sideline of Grantors' property; thence S
59058133" E 53.08 feet in and along the southerly sideline
of Grantors, property; thence S 65008130" E 52.63 feet to
the point of beginning. Included is the right to allow
water exiting from the stormwater drainage pipe to drain
within an existing ditch as said ditch proceeds from the
southwesterly end of the drainage pipe to its intersection
with the southwesterly boundary line of Grantors' property.
Said "Easement Area" is depicted on a survey entitled
"Drainage Easement Plan V & A Ratkus Parcel" dated May 9,
1995 with a latest revision date of July 17, 1995, and
recorded simultaneously in Map Volume at Page of
the South Burlington City Land Records.
In exercising any right granted hereunder the Grantee shall
comply with the following conditions:
f-ANGRUCKSYFREIN 1. Construction disturbance shall be kept to a
���>�,�. minimum by utilizing the smallest available
equipment to complete the installation. Prior
d
L..1 \(:R(x: K SPERRY
NVYxx.
to initiating construction, the proposed
alignment shall be reviewed in the field by the
Grantors and Grantee so that the limits of
construction disturbance can be kept to a
minimum.
2. The new storm drainage line shall be aligned so
that the maximum number of existing trees to be
removed and replaced shall be two (2). The
Grantee will replace each damaged tree with a
new tree the size (DBH) of the tree(s) that was
damaged in a location to be determined by
Grantors.
3. Grantee shall warrant the continued health of
the replanted or new planted trees for two (2)
years following the completion of the
construction improvements. Any diseased or
dying plants identified during this period shall
be also replaced by the Grantee and the two year
warranty period shall be extended from the time
of the replacement tree.
4. The existing stormwater drainage pipe, and any
replacement thereto, is and shall be made of a
long lasting material such as Polyvinyl Chloride
(PVC) or High Density Polyethylene (HDP) and
shall be installed in accordance with the
manufacturer's recommendations.
5. Once the stormwater drainage pipe improvements
have been installed, the Easement Area shall be
graded, seeded and mulched.
6. The Grantee shall comply with all laws,
regulations, rules, permits, conditions or other
governmental requirements applicable to the
Grantee's exercise of any rights under this
Warranty Easement Deed.
Grantors and their successors and assigns shall have the
right to make use of the surface of the Easement Area such
as shall not be inconsistent with the rights granted under
this Warranty Easement Deed by the within Grantee for the
purposes set forth herein, and shall place no structures,
landscaping or other improvements within said Easement Area
which would prevent or interfere with Grantee's ability to
exercise its rights granted herein.
Grantee shall protect, indemnify, defend and hold harmless
Grantors, their agents and employees, from and against any
and all liabilities, claims, damages, penalties, causes of
action, costs and expenses (including attorneys' fees and
expenses) imposed upon or incurred by or asserted against
"r;11o(K spFrim
t %N cxn.
Grantors or Grantors' property of which the Easement Area
is a part by reason of the occurrence or existence of any
of the following: (a) Grantee's use or possession of the
Easement Area; (b) the exercise of Grantee's rights under
this Warranty Easement Deed or anything else done or
permitted by Grantee to be done in or about the Easement
Area; (c) any failure by Grantee to perform or comply with
Grantee's obligations under this Warranty Easement Deed, or
arising from failure by Grantee, or Grantee's agents,
contractors or employees; or (d) the performance of any
labor or service or the furnishing of any materials or
other property in respect of the Easement Area. Grantee
shall defend Grantors against all costs, attorney's fees,
expenses and liabilities incurred in the defense of any
such claim, action or proceeding. In case any action or
proceeding is brought against Grantors by reason of a
claim, Grantee, upon notice from Grantors, shall defend the
same at Grantee's expense by counsel satisfactory to
Grantors.
TO HAVE AND TO HOLD the granted Easement with all the
privileges and appurtenances thereof, to Grantee, its successors
and assigns, to its own use and behoof forever, and Grantors for
themselves and their heirs, successors, and assigns, do covenant
with Grantee, its successors and assigns, that until the
ensealing of these presents they are the sole owners of the
lands through which the Easement is granted and have good right
and title to convey and encumber the same in the manner
aforesaid, that the lands are FREE FROM EVERY ENCUMBRANCE,
except as of record, and they hereby engage to WARRANT AND
DEFEND the same against all lawful claims whatever, except as of
record.
IN WITNESS WHEREOF Grant s hereunto set their hands and
seals this 23 day of W6 (i S`T , 1995.
I RESENCE F
Wit ess as to
Witness as to Beth c;,Z�,�
STATE OF VERMONT
CHITTENDEN COUNTY, SS.
Victor L. atkusf G l
Anne O. Ratkus
At �) � c �� ��c: �1 , this '����c'' day of
�7T /�TlIT] r rr T�73 [� ,.7
1995, ,E ANNE O. RATKUS persopa� appeared,
and #tr-�kL acknowledged this instrument, by thci ` sealed and
subscribed, to be-t- -free act
Before me�rC� �c
Notary Public
STATE OF VERMONT
CHITTENDEN COUNTY, SS.
At this 6?3 day of 4116&57-
,
1995, VICTOR L. RATKUS personally appeare , and he acknowledged
this instrument, by him sealed and su s ibed, to a his free
act and deed.
Before me:
N tary Public
f-VNGROCK ` PERRY
& % O()L
s oFFicst l��t
►� 19� I age_ �;M
orded in Vol.
ngton Land Recor
:.clest: r`p,, .�►ua. SUPPLEMENTAL
µµ�rgaret A Picard, City Clerk NOTICE OF DEVELOPMENT CONDITIONS
I
THIS NOTICE is made this ay of AUGUST, 1996, by Gerald C. Milot and John P.
Larkin, doing business as Larkin Milot Partnership, a Vermont general partnership (the "Declarant").
RECITALS
A. This Supplemental Notice of Conditions applies to 66.7 acres of land located on the east
side of Spear Street in the City of South Burlington originally conveyed to Gerald C. Milot and John
P. Larkin pursuant to a warranty deed, dated July 8, 1990, from Rheal C. Gagnon and Helen N.
Gagnon, recorded in Volume 296, Page 538 of the Land Records of the City of South Burlington,
and a portion of the lands and premises conveyed to Gerald C. Milot and John P. Larkin pursuant
to a warranty deed, dated March 17, 1992, from Marie Underwood, recorded in Volume 332, Page
188 of the Land Records of the City of South Burlington (the "Property").
B. The Property is shown and depicted on a plan entitled
Nowland Two
South Burlington Vermont
Plat of Subdivision of Lands
of
Gerald C. Milot, et. al.
dated July 1992, prepared by Fitzpatrick -Llewellyn Incorporated, recorded in Map Volume 286,
Pages I I I and 112 of the Land Records of the City of South Burlington (the "Plan").
C. The Declarant applied for, and received (on August 10, 1993) final plat approval from,
the South Burlington Planning Commission to subdivide the Property into 73 single-family lots,
common areas and roads, as depicted on the Plan.
D. The approval by the South Burlington Planning Commission for the subdivision required
that the Declarant make certain undertaking and promises. One of those conditions was the
requirement that a bond be posted to ensure the planting of two (2) trees per residential lot.
E. On July 30, 1996, the South Burlington Planning Commission amended its approval to
delete the requirement for the bond (Condition #7) and to amend the requirements for the planting
of tree, as follows:.
6. In accordance with Section 412.4 of the South Burlington Subdivision
Regulations, there shall be two (2) trees planted on each residential lot. Said trees shall be
planted on a lot within one year of issuance of a zoning permit for that lot. Only tree species
which comply with the height limits of the Scenic View Protection Overlay District shall be
planted. A "Notice of Condition" addressing this requirement shall be recorded in the South
Burlington land records within 30 days of this approval.
F. This document supplements Notices of Development Conditions, dated February 6, 1992,
November 5, 1993 and November_, 1995, recorded in Voluem 322, Page 197-, Volume 353, Page
585 and Volume ___, Page __, respectively, of the Land Records of the City of South Burlington
andA.
AGREEMENT
In consideration of Ten Dollars and for other good and valuable consideration, the receipt
and sufficiency of which is acknowledged, the Declarant hereby declares that the and confirms that
the Property shall be held, sold and conveyed subject to the following coveants, agreements,
easements and restrictions, all of which are for the purpose of protecting the value and desirability
of, and which shall run with, the Property and be binding on all parties having any right, title or
interest therein or any part thereof, and their heirs, successors and assigns:
1. There shall be two (2) trees planted on each residential lot. Said trees shall be planted on
a lot within one year of issuance of a zoning permit for that lot. Only tree species which comply
with the height limits of the Scenic View Protection Overlay District shall be planted.
2. Except as amended and modifed by this Supplement, the Notice of Development Rights
and the Second Notice of Development Rights shall remain in full force and effect.
IN WITNESS WHEREOF, the Declarant has executed this Supplement.
WITNESS: LARKIN MILOT PARTNERSHIP
n dQQ�- BY
_ I'Le
Gerald C. Milot, general partner and duly authorized
agent
BY
John P. km, general partner and duly authorized
STATE OF VERMONT agent
CHITTENDEN COUNTY, SS.
At Burlington in said County and State on this�rdday of August, 1996, personally
appeared Gerald C. Milot, general partner and duly authorize agent of Larkin Milot Partnership, and
he acknowledged this instrument by him signed and sealed to be his free act and deed and the free
act and deed of Larkin Milot Partnership.
Before meOL4,,( K1 V a r' ,-0 /
Notary Public
a
STATE OF VERMONT
CHITTENDEN COUNTY, SS.
re
At Burlington in said County and State on thisQ8 day of August, 1996, personally
appeared John P. Larkin, general partner and duly authorize agent of Larkin Milot Partnership, and
he acknowledged this instrument by him signed and sealed to be his free act and deed and the free
act and deed of Larkin Milot Partnership.
03\20014\010\Iegsllsuppcon.chl
Before me .0 n d a 9, W a n ,o n
Notary Public
— i I KAEKV
City of South Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT 05403
FAX 658-4748
PLANNER
658-7955
September 12, 1996
Gerald C. Milot
P.O. Box 4193
Burlington, Vermont 05402
Re: Nowland II, Landscape Waiver
Dear Mr. Milot:
ZONING ADMINISTRATOR
658-7958
Enclosed is a copy of the Findings of Fact and Decision on the
above referenced project approved by the Planning Commission on
July 30, 1996. If you have any questions, please give me a call.
S'n er 1
d
Joe eith,
Cit Planner
JW/mcp
1 Encl
t?nccrded in Vol. _ on page��
Of So. Burlington land Recor S9
I Attest.
NOTICE OF DEVELOPMENT CONDITIONS Margaret A. Picard, City Clerk
THIS NOTICE is made as of the 5th day of November, 1993, by Gerald C. Milot
of Burlington, County of Chittenden, State of Vermont and John P. Larkin, of
Burlington, County of Chittenden, State of Vermont, (the "Owners").
WITNESSETH:
WHEREAS, the South Burlington City Planning Commission (the "Planning
Commission") has approved a planned residential development known as Nowland Two
(the "Nowland Two PRD") as depicted on a final subdivision plat entitled "Nowland
Two: Plat of Subdivision of Lands of Gerald C. Milot et al.", Sheets 1 of 2 and 2 of 2,
signed October 11, 1993, and prepared by Fitzpatrick -Llewellyn Incorporated, and
recorded in Map Volume at Pages I
�IL and 1a respectively; and
WHEREAS, the final approval of the Planning Commission dated August 10, 1993
requires some of the specific conditions which will be of particular interest to purchasers
of lots in the Nowland Two PRD to be included in a Notice of Development Conditions
to be recorded simultaneously with the recording of the aforementioned final plat.
NOW THEREFORE, in consideration of the Planning Commission's final
approval, and for other good and valuable consideration, the Owners hereby give notice
of the following obligations, restrictions, and requirements that will directly affect lots
within the Nowland Two PRD. Reference should also be made to the complete text of
the South Burlington City Planning Commission approval dated August 10, 1993, and on
file in the planning office of the City of South Burlington.
1. Obligation for Tree Planting. Owners shall plant two (2) trees on each lat
as required in Section 19.104(a) of the South Burlington Zoning Regulations. The
approximate location of said trees is depicted on a survey entitled "Nowland Two:
Landscape & Lighting Plan", Drawing D-4501, dated November 1992, last revised
October 5, 1993 and recorded in Map Volume ,9 t & at Page /. O of the South Burlington
City Land Map Records. Particular reference should be made to tree height limits and
eligible species referred to in the notes of the survey.
2. Height Limitations. The Nowland Two planned residential development is
in compliance with the Dorset Park View Protection Zone set forth in Article XXV,
Section 25.40. Calculations of elevations and maximum height for each lot for structures
and landscaping are set forth on a schematic plan and tables attached hereto as Exhibit
"A". Reference is also made to the Landscape & Lighting Plan referred to hereinabove
and to surveys entitled "Nowland Two: Site and Utilities Plan" revised October 5, 1993,
Drawings D-4383 through D-4388 and recorded in Map Volume ,2&7at Pages
/11 , 115, A, and L,'L[> of the South Burlington City Land Map Records.
Post -it® Fax Note 7671
Date C' _
4 9�/
/
pag°es�
To `0 1 Z_e�
From
'
Co./Dept.
Co.
Phone #
Phone #
Fax #
Fax #
itisfy the requirements imposed by
ight-of-way, the area where
r
1 7/30/96
MOTION OF APPROVAL
LARKIN MILOT PARTNERSHIP
I move the South Burlington Planning Commission approve the revised
final plat application of Larkin Milot Partnership to amend a
condition of approval for a planned residential development
consisting of 73 single family lots, Pinnacle @ Spear, Spear
Street. The amendment is to waive the requirement for posting a
bond to insure the planting of two (2) trees per residential lot,
with the following stipulations:
1. All previous approvals and stipulations which are not
superseded by this approval shall remain in effect.
2. The Planning Commission amends condition #6 of the August 10,
1993 final plat approval to read as follows: "In accordance with
Section 412.4 of the South Burlington Subdivision Regulations,
there shall be two (2) trees planted on each residential lot. Said
trees shall be planted on a lot within one year of issuance of a
zoning permit for that lot. Only tree species which comply with
the height limits of the Scenic View Protection Overlay District
shall be planted. A "Notice of Condition" addressing this
requirement shall be recorded in the South Burlington land records
within 30 days of this approval."
3. The Planning Commission amends condition #7 of the August 10,
1993 final plat approval to no longer require the applicant to post
a $65,335 bond for proposed "lot trees."
1
City of South Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT 05403
FAX 658-4748
PLANNER
658-7955
August 27, 1996
Gerald C. Milot
P.O. Box 4193
Burlington, Vermont 05401
Re: Nowland II, Landscape Waiver
Dear Mr. Milot:
ZONING ADMINISTRATOR
658-7958
Enclosed is a copy of the July 30, 1996 Planning Commission meeting
minutes. Please note the conditions of approval.
If you have any questions, please give me a call.
i4cere,*y,
be Weith;
ity Planner
JW/mcp
1 Encl
CARL H. LISMAN
ALLEN D. WEBSTER C.PA.
MARY G. KIRKPATRICK
E. WILLIAM LECKERLING
DOUGLAS K. RILEY
RICHARD W. KOZLOWSKI
JUDITH L. DILLON
CHRISTINA A. JENSEN
Mr. Joseph Weith
City Planner
City of South Burlington
575 Dorset Street
South Burlington, VT 05403
Dear Joe:
LISMAN & LISMAN
A PROFESSIONAL CORPORATION
ATTORNEYS AT LAW
P 0. BOX 728
BURLINGTON. VERMONT 05402
602-864 5756
August 26, 1996
Pinnacle at Spear
TELECOPIER
602 - 664-3629
OFFICES IN FINANCIAL PLAZA
AT 64 PINE STREET
BURLINGTON. VERMONT
LOUIS LISMAN
BERNARD LISMAN
MARK D. OETTINGER
COUNSEL
In connection with this matter, I am enclosing the original of the Supplemental Notice of
Development Conditions, now ready to be recorded. ,
Carl H. Lisman
CHL/ddp
Enclosure
20014\010
PLANNING COMMISSION
30 JULY 1996
PAGE -s
pursuant to Section 27.302 of the zoning regulations or this
approval is null and void.
3. The applicant shall obtain a Certificate of--Occupancy/Compli-
ance from the Administrative Officer prior to occupancy of the
new building.
4. Any change to the site plan shall require approval by the
South Burlington Planning Commission.
Mr. Teeson seconded. Motion vassed unanimously.
4. Public Hearing: Revised final plat application of Larkin
Milot Partnership to amend a condition of approval for a planned
residential development consisting of 73 single family lots,
Pinnacle @ Spear, Spear Street. The amendment is to waive the
requirement for posting a bond to insure the planting of two
trees per lot:
Mr. Burgess explained that the difficulty is that if the lots are
sold, they may not be built on for a number of years, till after
the bond has expired.
Mr. Weith said his recommendation is to waive the requirement for
a bond for 2 trees per lot but to add a condition that two trees
be planted on a lot and require that a Notice of Condition be
recorded in the land records so a buyer can see this requirement.
He suggested that all residential subdivisions be treated this
way from now on.
Mr. Teeson asked if that can be tied into the building permit.
Mr. Weith said Mr. Ward didn't want to accept a bond from each
person buying a lot.
Mr. Burgess felt that most people buying a lot will plant trees
as it increases the value of the property. Mr. Teeson said the
reason for the bond is to assure that the trees last 3 years.
That assurance will now no longer exist. He also doubted whether
the proposed condition would be found in the land records.
Members questioned whether notices of violation get into the land
records.
Mr. Teeson suggested that a plan submitted for a building permit
show two trees.
Mr. Weith felt Mr. Ward should address this.
Mr. Crow moved the Planning Commission approve the revised final
PLANNING COMMISSION
30 JULY 1996
PAGE 4
plat application of Larkin Milot Partnership to amend a condition
of approval for a planned residential development consisting of
73 single family lots, Pinnacle @ Spear, Spear Street. The
amendment is to waive the requirement for posting a bond to in-
sure the planting of two trees per residential lot, with the fol-
lowing stipulations:
1. All previous approvals and stipulations which are not super-
seded by this approval shall remain in effect.
2. The Planning Commission amends condition #6 of the August 10,
1993 final plat approval to read as follows: "In accordance with
Section 412.4 of the South Burlington Subdivision regulations,
there shall be two trees planted on each residential lot. Said
trees shall be planted on a lot within one year of issuance of a
zoning permit for that lot. Only tree species which comply with
the height limits of the Scenic View Protection Overlay District
shall be planted. A "Notice of Condition" addressing this re-
quirement shall be recorded in the South Burlington Land records
within 30 days of this approval."
3. The Planning Commission amends condition #7 of the August 10,
1993 final plat approval to no longer require the applicant to
post a $65,335 bond for proposed "lot trees."
Mr. Dinklage seconded. Motion passed unanimously.
5. Public Hearing: Revised Final Plat application of Christopher
Bishop, Chittenden Bank, to amend an approved 10 building planned
unit development on a 38.5 acre lot consisting of 202,546 sq. ft.
of shopping center use, a 55,000, sq. ft. supermarket, a 95 room
hotel, and a 2500 sq. ft. bank with drive -through service, 981
Shelburne Road. The amendment consists of increasing the size of
the drive -through bank to 3585 sq. ft., decreasing the size of
the shopping center use to 201,461 sq. ft., and other minor
modifications including landscaping, building footprints and
circulation:
Mr. White showed the location for the Chittenden Bank. The size
of Building B will be decreased. The size of Building H will be
increased slightly with a similar decrease in Building B.
Mr. White said they were also called by a neighbor regarding
additional screening for the retention pond. He said they will
add landscaping there.
Other minor changes include "cart corrals" in the Hannaford
parking lot and other detail changes in landscaping and grading.
Mr. White showed a layout of the bank and drive -up lanes and
City of South Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT 05403
FAX 658-4748
PLANNER
658-7955
August 5, 1996
Gerald C. Milot
P.O. Box 4193
Burlington, Vermont 05406
Re: Nowland II, Landscape Waiver
Dear Mr. Milot:
ZONING ADMINISTRATOR
658-7958
Enclosed is a copy of the June 18, 1996 Planning Commission meeting
minutes. If you have any questions, please give me a call.
in erel ,
Jo Weith,
City Planner
JW/mcp
1 Encl
26. Subdivision plat:
--- survey data for the recreation path/pedestrian trail easement
and the utility easement between lots 41-42 and 57-58 should
be provided.
27. Other:
--- lot numbers not correctly shown on sheet 2.
--- the plans should show a 20 foot drainage easement across the
Ratkus property for the drainage pipe. This easement should
be included in the legal documents.
DECISION & CONDITIONS
Based on the above Findings of Fact, the South Burlington Planning
Commission approves the Final Plat application of Larkin-Milot
Partnership for a planned residential development consisting of 73
single-family lots on 66.7 acres of land located on the east side
of Spear Street opposite Deerfield Drive as depicted on a plat
entitled, "Nowland Two, Subdivision Plat, and last revised 7/28/93,
and a 28 page set of plans, page one entitled "Nowland Two, South
Burlington, Vermont", dated October, 1992 (stamped "received"
7/30/93), prepared by Fitzpatrick -Llewellyn, Inc. with the
following stipulations:
1. Any previous approvals and stipulations affecting the subject
property which are not superseded by this approval shall remain Ln
effect.
2. In accordance with section 26.602 of the South Burlington
Zoning Regulations, the Planning Commission approves the creation
of lots for development upon land designated as "restricted area"
on the Southeast Quadrant Official Zoning Map. It is the
commission's opinion that based on the information submitted by the
applicant the proposed development will not adversely affect
wetlands on the property. Also, it is the Commission's opinion
that the goals for maintaining an open space corridor along the
north -south arterial roadways in the Southeast Quadrant will be
promoted through the establishment of building envelopes on lots 5
through 8. The allowance of buildings in this manner is compatible
with adjacent development along Spear Street. Finally, the
Planning Commission supports moving the r.o.w. for a future north -
south collector road to the east as proposed so as not to impact
the wetland area.
3. The Commission approves the 1100 foot long cul-de-sac street
serving lots 52 - 73. It is the Commission's opinion that the 1100
foot length will not result in unsafe or inefficient traffic
conditions particularly since r.o.w.'s are being reserved for
roadway connections to future developments on adjoining parcels.
IN
4. In order for the Commission to find that the proposed
development will not cause unreasonable highway congestion or
unsafe conditions with respect of use of the highways, the
applicant shall be responsible for the following:
a) The applicant shall construct the southbound left turn
lanes at each project access on Spear Street (sheets 5 and 7)
prior to issuance of a zoning/building permit for the 38th
lot.
b) The applicant shall construct the improvements to the
Spear Street/Swift Street intersection as shown on the plan
entitled "Spear Street/Swift Street Intersection Improvements"
dated 5/93, prior to the issuance of a zoning/building permit
for the construction of any residential structures.
c) Prior to issuance of any zoning/building permits for this
development, the applicant shall post a bond to cover the
costs of constructing the improvements referenced in a) and c)
above. This bond or bonds shall remain in effect until such
time as the improvements are constructed.
d) Prior to issuance of any zoning/building permits for this
development, the applicant shall be responsible for retiming
the signal phasing at the Spear Street/Swift Street
intersection as recommended in the traffic analysis submitted
by the applicant.
5. The Planning Commission grants a credit of $300 per lot for
construction of the portion of the proposed recreation path located
outside of any public street right-of-way. This credit may be
applied toward required recreation fees. At time of application
for a zoning/building permit, the applicant shall pay the
difference between the recreation impact fee and the $300 per lot
credit.
6. The developer shall be required to install two (2) trees on
each lot as required in Section 19.104(a) of the South Burlington
Zoning Regulations. A "Notice of Condition" addressing this
requirement shall be recorded in the South Burlington land records
prior to recording the final plat plans.
7. Prior to issuance of any zoning/building permits, the applicant
shall post a $130,366 landscape bond for proposed street and common
area trees, and a $65,335 bond for proposed lot trees. The bonds
shall remain in effect for three (3) years to assure that the
planted landscaping has taken root and has a good chance of
surviving.
8. Legal documents for all public streets (i.e., irrevocable offer
of dedication) and easements (e.g., utility easements and
recreation path easements) shall be submitted to the City Attorney
A
for approval and shall be recorded in the South Burlington Land
Records prior to issuance of any zoning/building permits.
9. A "Notice of Condition" addressing the height limitations for
structures and landscaping on each lot shall be submitted to the
City Attorney for approval and shall be recorded in the South
Burlington land records prior to recording the final plat plans.
10. In accordance with Section 301.5 of the subdivision
regulations, within 14 days of completion of required improvements
(e.g., streets, water mains, sanitary sewers, storm drains, etc.),
the developer shall submit to the City Engineer "as -built"
construction drawings certified by a registered engineer.
11. A "Notice of Condition" addressing the building envelopes on
lots #5 - 8 and purpose and restrictions thereof shall be submitted
to the City Attorney for approval and shall be recorded in the
South Burlington land records prior to recording the final plat
plans.
12. Prior to final plat submittal, the plans shall be revised to
show the following:
a) The survey plat shall show survey data for the recreation
path easement and the utility easement between lots 41-42 and
57-58.
b) Lot numbers shall be correctly shown on sheet 2.
c) The plans shall show a 20 foot drainage easement for the
proposed drainage pipe on the Ratkus property west of Spear
Street. This easement shall be included in the required legal
documents.
13. A bond for streets, sidewalks, recreation paths, sewer and
water shall be posted prior to issuance of a zoning/building
permit. The amount of the bond shall be approved by the City
Engineer.
14. No zoning/building permit will be issued for a lot until the
street serving that lot has a gravel sub -base installed in
conformance with City specifications.
15. The Commission approves a total sewer allocation of 46,957 gpd
for this development. The length of time that this sewer
allocation approval shall remain in effect shall be tied to roadway
construction. The roadways serving this development shall be
completed within four (4) years of final plat approval. The sewer
allocation for any lots served by roadways which are not completed
within this four (4) year time limit shall be lost unless
reapproved by the Planning Commission. In addition, if at the end
of three years no more than 50% of the roads have been completed,
25% of the total sewer allocation shall be lost unless reapproved
by the Planning Commission.
7
16. No zoning/building permit will be issued for construction of
any dwelling unit within this development until after the City
adopts an education impact fee ordinance or September 1, 1993,
whichever first occurs. This condition is being imposed to provide
the school district a reasonable period of time to complete
development of an impact fee ordinance and present the ordinance to
the South Burlington City Council for adoption. No zoning/building
permits shall be issued after the adoption of such an impact fee
until that impact fee has been paid.
17. A "Notice of Condition" shall be recorded in the land records
prior to recording the final plat plans which addresses the
requirement of the homeowner's association to maintain the
community mailbox area and all drainage ditches.
18. The final plat plans, including survey plat, shall be recorded
in the South Burlington land records within 90 days or this
approval is null and void. The plans shall be signed by the
Planning Commission Chair or Clerk prior to recording.
19. As provided in Section 605 of the South Burlington Subdivision
Regulations, if no action is taken to construct substantially the
proposed subdivision within three years, said approval shall become
null and void.
20. The retention ponds shall be maintained by the homeowners'
association. The legal documents for the Association shall state
this responsibility. The legal documents shall be approved by the
City Attorney prior to permit issuance.
21. The recreation path shall be constructed by the completion of
Pinnacle Drive or during the construction of the cul-de-sac,
whichever first occurs.
Chairman 6r Crerk,
South Burlington Planning Commission
Date
1
PLANNING COMMISSION
18 JUNE 1996
page 11
approved revised plat shall be submitted to the City Planner
prior to recording.
a. the parking information on the plat shall be revised
to reflect correct parking requirements.
3. The applicant shall post a $750 landscape bond prior to
issuance of a zoning permit. The bond shall remain in effect for
three years to assure the landscaping takes root and has a good
chance of surviving.
4. The planning Commission approves an additional sewer
allocation of 1410 gpd. The applicant shall pay the per gallon
fee prior to permit issuance.
5. For the purpose of calculating road impact fees under the
South Burlington Impact Fee Ordinance, the Planning Commission
estimates that the change in use will generate 20 additional
vehicle trip ends during the P.M. peak hour.
6. The proposed pedestrian walkway between the two parking areas
shall be plowed in the winter.
7. The restaurant shall have a grease grit trap on the kitchen
sanitary line.
8. Any change to the plat shall require approval by the South
Burlington Planning Commission.
9. The final plat plan shall be recorded in the land records
within 90 days or this approval is null and void. The plan shall
be signed by the Planning Commission Chair or Clerk prior to
recording.
Mr. Jacob seconded. Motion passed unanimously.
7. Public Hearing: Revised final plat applicatiodof Larkin Milot
Partnership to amend a condition of approval fora planned
residential development consisting of 73 single family lots,
Pinnacle at Spear, Spear Street. The amendment is to waive the
requirement for posting a bond to insure the planting of two
trees per lot:
Mr. Milot said he felt the tree issue should be handled the same
way it is for multi -family units. He felt posting of the bond
should be by the person getting the building permit. He said he
is only selling lots. His preference would be for a landscaping
and cleanup bond. At present, they have 3-year bonds they can't
control and there is nothing they can do if the person buys a lot
and doesn't build for a number of years.
PLANNING COMMISSION
18 June 1996
page 12
Mr. Weith said his concern is that the city wants to stay away
from enforcing private covenants.
After a brief discussion, members agreed to look into the matter
and continue discussion at a later date.
Mr. Flaherty moved to continue the application until 30 July
1996. Ms. Barone seconded. Motion passed unanimously.
8. Sketch plan application of Wayne and Beverly Darling to
subdivide a 1.66 acre parcel into three lots of 0.32 acres, 0.65
acres and 0.69 acres, 385 White Street:
Mr. Darling said the lots will be 100' x 290', 104' x 290' and
100' x 140'.
Ms. Darling asked that the sewer be put in so the street won't
have to be dug up again.
No issues were raised.
As there was no further business to come before the Commission,
the meeting was adjourned at 10:00 p.m.
Clerk
City of South Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT 05403
FAX 658-4748
PLANNER
658-7955
July 26, 1996
Gerald C. Milot
P.O. Box 4193
Burlington, Vermont 05406
Re: Nowland II, Landscape Waiver
Dear Mr. Milot:
ZONING ADMINISTRATOR
658-7958
Enclosed is the agenda for next Tuesday's Planning Commission
meeting and my comments to the Planning Commission. Please be
sure someone is present on Tuesday, July 30, 1996 at 7:30 P.M. to
represent your request.
If you have any questions, please give�me a call.
0
J
C
JW/mcp
Encls
Memorandum - Planning
July 30, 1996 agenda items
July 26, 1996
Page 2
4) LARKIN-MILOT PARTNERSHIP - LANDSCAPING BOND
This application was continued from the 6/18/96 meeting (see
enclosed minutes). This request is to amend a condition of
approval for a planned residential development consisting of 73
single family lots, Pinnacle at Spear. The amendment is to waive
the requirement for posting a bond to insure the planting of two
(2) trees per lot. See enclosed letter from Gerald Milot.
As was discussed at the last meeting, there is a logistical problem
with requiring the developer to post a bond to cover the cost of
planting 2 trees per residential lot. The problem is that the bond
remains in effect for 3 years, however once the lot is sold it may
not be developed for many years beyond the 3 year life of the bond.
The 2 trees per lot typically are not planted until after the lot
is developed.
At the meeting, Gerry proposed requiring each individual lot owner
to post a bond when they applied for a building permit. We met
with the Zoning Administrator, Dick Ward, to get his input on this
proposal. Dick does not support it because it would add a
tremendous administrative burden which he feels in not necessary.
Basically, he feels the requirement for two trees per lot is
unnecessary because lot owners are willing to landscape their lots
regardless of the requirement. I tend to agree with Dick.
Therefore, staff recommends that the Planning Commission waive the
requirement for a bond to cover the cost of planting 2 trees per
lot. In addition, the Commission should include a condition which
requires future lot owners to plant 2 trees per lot within one year
of issuance of a building permit for the lot. Furthermore, this
condition should appear in a "Notice of Condition" which the
developer must record in the land records. This notice will alert
future buyers of this particular condition. In the rare event a
lot owner does not comply, the Zoning Administrator would then
issue a notice of violation and pursue enforcement of the
requirement.
5) CHITTENDEN BANK - PCD MODIFICATIONS - REVISED FINAL PLAT
This project consists of amending an approved ten (10) building
planned unit development on a 38.5 acre lot consisting of 202,546
square feet of shopping center use, a 55,000 square foot
supermarket, a 95 room hotel, and a 2,500 square foot bank with
drive -through service. The amendment consists of increasing the
size of the drive -through bank to 3,585 square feet, decreasing the
2
PN W_ ■
® 1� m ® U
P P 4 P F R T t F. i t h e
Joe Weith
City of So. Burlington
Dorset Street
So Burlington, Vt
Dear Joe,
Please schedule me for an amendment to the conditions of our pen7nit at Pinnacle on Spear
Street concerning the requirement for the developer to port a bond to insure the planting
of two lot trees on each lot. My presentation will request that this requirement be waived
on this project for the following reasons;
1..After we sell a lot we have no control over the landscaping on the lot other than the
covenants of the development which require substantially more landscaping than two
trees.
2 The zoning officer has a bond from us and the responsibility to plant trees lies with the
homeowner or builder. The zoning officer has no way of enforcing this requirement. If he
collects from our bond, he has no way to force the planting.
I will also request that the Planning Commission consider a change to the regulations that
would require;
1. The developer ,as a condition of final plat, be required to demonstrate through
protective covenants that the minimum landscaping requirements will be met.
Please schedule me sometime after May S.
Sincerely,
Gerald C. Milot
PO. Box '1 (93
Buriin ton, Vermunc
0 5 4 U 6
Tcl (MU2) 658- OO
iax (862) 86-i-81'2
- /� 171 ---- � �
NO ,-j ( j r1
�,i dkncf.,, -� �y� -� � Gil �•-v .�k �! v r
Memorandum - Planning
June 18, 1996 agenda items
June 14, 1996
Page 9
7)
LARKIN MILOT PARTNERSHIP - LANDSCAPING BOND - REVISED FINAL
PLAT
This request is to amend a condition of approval for a planned
residential development consisting of 73 single family lots,
Pinnacle at Spear, Spear Street. The amendment is to waive the
requirement for posting a bond to insure the planting of two (2)
trees per lot. The last amendment to this project was on 8/8/95
(minutes enclosed).
Landscaping: The total landscaping requirement for this project is
$199,114 ($65,335 for lot trees and $133,779 for street trees and
common areas). The applicant is requesting that the requirement
for a bond be posted for three (3) years for the two (2) trees per
lot be waived. The applicant will be requesting the Planning
Commission to consider a zoning amendment that the developer, as a
condition of final plat, be required to demonstrate through
protective covenants that the minimum landscaping requirements will
be met (see enclosed letter from applicant). Staff is
uncomfortable with the applicant's request for the following
reasons:
1. To our knowledge the Planning Commission has never waived
the bonding requirement for lot trees, thus a precedent would
be set.
2. The bond is not only to assure that the trees are planted
but that they survive for a three (3) year period. If the
zoning regulations are amended as suggested by the applicant
and the lot trees are not planted or die within three (3)
years, the enforcement remedy would be to take legal action
which would be costly and lengthy. The City might not
consider it cost effective to take legal action for a few
trees. Whereas obtaining the money from a bond is relatively
easy and quick and doesn't cost the City anything.
3. If there is a problem with the trees, it would be better
to deal with one (1) person than with 73 different property
owners.
4. Protective covenants are typically not enforceable by the
City.
City of South Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT 05403
FAX 658-4748
PLANNER
658-7955
June 14, 1996
Gerald C. Milot
P.O. Box 4193
Burlington, Vermont 05406
Re: Nowland II, Landscaping Waiver
Dear Mr. Milot:
ZONING ADMINISTRATOR
658.7958
Enclosed is the agenda for next Tuesday's Planning Commission
meeting and my comments to the Planning Commission. Please be
sure someone is present on Tuesday, June 18, 1996 at 7:30 P.M. to
represent your request.
If you have any questions, please give me a call.
n erely
Joe Weith,
Cit Planner
JW/mcp
Encls
LEGALLEGALOTICESO
ADVERTISEMENT
FOR BIDS
Grand Isle Fire
District #4
72 Moccasin Avenue
Grand Isle, VT 05458
Separate sealed BIDS f)
the construction of Zebi
Mussel Control In
provements, including 45
foot extension of existin
intake, installation (
1,000 feet of C HDP
containment piping wit
chemical feed lines an
sample lines, chemict
feeders and other appur
tenances will be receive,
by Grand Isle Fire
District N4, Howart,
Parizo, Chairman a
the office of Lamou
roux, Stone d O'Lea
Consulting Engineers
14 Morse Drive, Esse
Junction, VT 0543
until 4:00 P.M., (Dayligh
Savings Time) June 27
1996, and then at sai
office publicly opened an
read aloud.
Each BID must be accom-
panied by a certified
check payable to the
OWNER for five per-
cent (5%) of the total
]mount of the BID. A BID
3ond may be used In
ieu of a certified
:heck.
adders are reminded that
Minority Business Enter.
)rise", "Women's Busi-
ess Enterprise" and
Federal Wage Rates -Da-
is Bacon Act" do not
pply to the WORK.
he CONTRACT DOCU-
tENTS may be examined
t the following locations:
lorksin Progress,
)49 Williston Road,
o. Burlington, VT 05403
odge Plan Room,
) Farrel Street,
). Burlington, VT 05403
imureux, Stone &
Leary, 14 Morse Drive,
;sex Jct., VT 05452
)pies of the CONTRACT
)CUMENTS may be
tained at the office of
moureux, Stone &
_eary Consulting Engi-
�rs, Inc. located at 14
)rse Drive, Essex Junc-
1, VT 05452 upon pay-
nt of $35.00 for each
. Any BIDDER, upon
irning the CONTRACT
CUMENTS within 30
is after the actual date
BID opening and in
A condition, will be
)nded his payment.
Performance BOND
a Payment BOND ea-
h in an amount equal
one hundred percent
)%) of the contract
e, will be required.
mum wage rates and
is work employment
are applicable.
28, 1996
'ard Parizo
ict Chairman
30 & 31, 1996
1, 1996
I _
AGENCY OF
TRANSPORTATION
Mr"ITPELIER
INVIT W FOR BIDS
Sealed bids, on forms fur-
nished by the State, will
be received until 1100
a.m. prevailing time on
Friday, June 14, 1996,
at 133 State Street, Room
319, Montpelier, VT for
the construction of the
project hereinafter de-
scribed. The time of re-
ceiving and opening bids
may be postponed due to
emergencies or unfore-
seen conditions.
LOCATION: JERICHO
AG MC 0005(1). In the
Town of Jericho begin-
ning a a point on TH 2,
0.25 mile east of its inter-
section with TH 1 and
extending easterly 0.0159
mile.
CONSTRUCTION BEING:
Replace existing bridge
and other related items.
d
t Plans and Bid Proposals
may be seen and ob-
tained at the Agency of
Transportation, Montpe-
lier, VT and may be seen
x at the office of J.E.
2 Wood, District Transpor-
t tation Administrator N5,
Colchester, Vermont.
d Minimum wage rates pre-
determined by the Secre-
tary of Labor for the
project are set out in the
advertised specifications
and bid proposals, and
such rates are a part of
the Contract covering the
project in acordance with
Section 115 of the Feder-
al -Aid Highway Act of
1956. This Contract is
subject to the Work Hours
Act of 1962, PL 87-581,
and implementing regula-
tions. Contractors must
perform this work under
the Fair Labor Standards
Act (Federal Wage -Hour
Law) as well as all other
applicable labor laws -
Minimum labor and truck
rates have been predeter-
mined by the State Trans-
portation Board and are
set out in the Bid Propo-
sal. Contractors bidding
on this project must be
qualified in accordance
with the Agency Regula-
tions, The Vermont Agen-
cy of Transportation
hereby notifies all bidders
that it will affirmatively in-
sure that in any contract
entered into pursuant to
this advertisement;, mi-
nority business enter-
prises will be afforded full
opportunity to submit bids
in response to this invita-
tion and will not be dis-
criminated against on the
grounds of race, color,
religion, sex, or national
origin in consideration for
an award. The right is
reserved to reject any or
all bids, to waive any for-
mality and any and all _
technicalities in bids and
to accept such bid as may
be deemed in the best
interest of the awarding
agency.
May 29, 1996
June 1, 1996
BURLINGTON PUBLIC
SCHOOL DISTRICT
BID REQUEST FOR
ROOF REPLACEMENT
The Burlington Public
School District invites in-
terested roofers to submit
Letter of Interest and
Qualification Statement,
Continued Next Column
AIA Docurnent A305 for
Pre -qualification for bid-
ding on the contract for
the roof replacement of
the Barnes, Champlain,
Smith Elementary
Schools, Edmunds School
Complex and Burlington
High School. The Burling-
ton Board of School Com-
missioners has
established pre -qualifica-
tions which a contractor
must meet. Sixty (60)
days prior to opening
bids, the Burlington Public
School District requests
contractors to complete
the pre -qualification
statement. At least thirty
(30) days prior to the pro-
posed bid opening, the
Board will give written no-
tice to each eligible bid-
der. The pre-
q u a I i f i c a t i o n
statement must be
completed and filed
with the architectural
office of Colin Lind-
berg no later than
June 21, 1996,
Bid specifications may be
obtained at the architectu-
ral office of Colin Lind-
berg, A.I.A, 444 South
Union Street, Burlington,
VT 05401 starting June
28, 1996. The contractor
must comply with the City
of Burlington Women In
Trades Ordinance.
The bid shall be submitted
in a sealed envelope
clearly marked SCHOOL
DISTRICT ROOF PRO-
JECT -SEALED BID and
mailed to the Burling-
ton School District,
150 Colchester Ave-
nue, Burlington, Vt
05401, Attn: Scott
Lisle.
A11 proposals are due
no later than 2:00
P.m. August 2, 1996 at
the Burlington School Dis-
trict Office, 150 Colches-
ter Avenue, Burlington, Vt.
The Burlington Board of
School Commissioners
reserves the right to reject
any and all bids and to
accept or reject any part
of any bid and to re -ad-
vertise, to waive any or all
informalities in the bid and
to accept the bid which in
the sole judgment of the
Burlington Board of
School Commissioners is
most advantageous to the
Burlington School Depart-
ment, even though it may
not be the lowest priced
bid. Any exceptions to the
specifications in the bid
should be clearly ex-
plained in writing. No bid
shall be withdrawn for a
period of ninety (90) days
after the opening of the
bids.
June 1, 2 & 3, 1996
ADVERTISING
WITH
STARS
IS LIKE
PUTTING
YOUR
NAME
IN LIGHTS
Lt"AL NV I IILJ
LEGAL NOTICE
The Es- Junction
School )t invites
bids for the tallation of
approximately 600 ft. of
dram pipe behind the Al-
bert D. Lawton Jr. High
School. Prot1ect may begin
June 17, 1996. Specifica-
tions can be obtained by
contacting the Property
Services Office at the Es-
sex Community Educatio-
nal Center, 2 Educational
Drive, Essex Junction,
Vermont 05452, 879-5554
(lam-3pm).
Sealed bids clearly
marked Drainage" will be
opened publicly at the
above address @ 2:15
pm, June 13, 1996.
May 31, 1996
June 1, 2 & 3, 1996
LEGAL NOTICE
The Essex Junction
School District invites
bids for a project at the
Albert D. Lawton Jr. High
School for the removal of
the present gym floor,
shot blasting and water-
proofing the existing con-
crete slab.
Specifications can be ob-
tained by contacting the
Property Services Office
at the Essex Community
Educational Center, 2 Ed-
ucational Drive, Essex
Junction, Vermont 05452,
879-5554 (7am-3pm).
Sealed bids clearly
marked "Gym Floor" will
be opened publicl at the
above address 2:15
Pm, June 13, 1996.
May 31, 1996
June 1, 2 & 3, 1996
NOTICE OF
PUBLIC SALE OF
PERSONAL
PROPERTY
Notice is hereby given
that the undersign will sell
to satisfy lien of owner, at
public sale by closed bid-
ding on June 22, 1996 at
10:00 A.M. at Extra Space
Storage Facility located at
15 Williston Rd., Williston,
VT. The personal goods
stored therein by the
following:
George Blakley
Jeff Folb
Bonnie Westdyke
Louis LaRose
Gregory Enterprises
Purchases must be made
with cash only and paid
for at the time of sale. All
items to be removed from
the unit at time of pur-
chase. A $50.00 deposit
will be made and re-
funded after unit has been
broom cleaned. We re-
serve the right to accept
or reject bids.
June 1 & 8, 1996
PUBLIC HEARING
SOUTH BURLINGTON
PLANNING
COMMISSION
The South Burlington
Planning Commission will
hold a public hearing at
the South Burlington City
Hall, Conference Room,
575 Dorset Street, South
Burlington, Vermont on
Tuesday, June 18, 1996
at 7:30 P.M. to consider
the following:
1) Final plat application of
Continued Next Column
LEGAL NOTICES 1
EZP Golfco inc. for con-
struction of Phase I of a
planned residential devel-
opment consisting of 191
single family lots and 40
multi -family units, and an
18 hole golf course on
approximately 452 acres
of land, Dorset Street,
Phase 1 B consists of the
creation of 75 single fami-
ly lots for development
and construction of re-
lated roadways and utili-
ties.
2) Final plat application of
Dr. Herbert & Joan Martin
for subdivision of 10.10
acres of land into two (2)
lots of 2.75 acres and
7.35 acres, 1201 Spear
Street.
3) Revised final plat appli-
cation of Larkin Milot
Partnership to amend a
condition of approval for a
Planned residential devel-
opment consisting of 73
single family lots, Pinnacle
RSpear, Spear Street.
e amendment is to
waive the requirement for
posting a bond to insure
the planting of two (2)
trees per lot.
4) Revised final plat appli-
cation of Dik Kwan to
amend a planned unit de-
velopment consisting of
two (2) multi -use commer-
cial buildings and 16 mul-
ti -family units. The
amendment is to convert
1,836 square feet of office
space to a 50 seat restau-
rant, Patchen road.
Copies of the applications
are available for public
inspection at the south
Burlington City Hall.
William Burgess
Chairman,
South Burlington
Planning Commission
June 1, 1996
STATE OF VERMONT
DISTRICT OF
FRANKLIN, SS
PROBATE COURT
DOCKET NO. 96-95E
IN RE THE ESTATE OF
SUZAN NICHOLS
LATE OF
CHARLOTTE, VT
NOTICE TO
CREDITORS
To the creditors of
the estate of Suzan Nich-
ols late of Charlotte, VT.
I have been appoint-
ed a personal representa-
tive of the above named
estate. All creditors hav-
ing claims against the es-
tate must present their
claims in writing within 4
months of the date of the
first publication of this no-
tice. The claim must be
presented to me at the
address listed below with
a copy filed with the regis-
ter of the Probate Court.
The claim will be forever
barred if it is not pre-
sented as described
above within the four
month deadline.
Dated May 23, 1996
Renee C. Kleinman
c/o David H. Greenberg,
Esq.
P.O. Box 201
Burlington, VT 05402
Telephone: (802) 655-
6621
Continued Next Column
Name of Publicati�
The Burlington Fr,
First Publication C
June 1, 1996
Second Publicatioi
June 8, 1996
Address of Probat(
County Courthousc
P.O. Box 511, Mair
Burlington, VT 054,
June 1 & 8, 1996
ABSOLUTELY FRE
auto, able 7 days
Free Junk car re
Cash for good c
Dan K Sons 89,
autc
A FREE
JUNK CAR REM,
Some cars worth
Greater Burlington
Rathe's Salvage
Fri 8-5. Sat 8-12 65,
Bol
The Burl
80
PUBLIC HEARING
SOUTH BURLINGTON PLANNING COMMISSION
The South Burlington Planning Commission will hold a public hearing
at the South Burlington City Hall, Conference Room, 575 Dorset
Street, South Burlington, Vermont on Tuesday, June 18, 1996 at 7:30
P.M. to consider the following:
1) Final plat application of EZP Golfco Inc. for construction of
Phase 1B of a planned residential development consisting of 191
single family lots and 40 multi -family units, and an 18 hole golf
course on approximately 452 acres of land, Dorset Street. Phase 1B
consists of the creation of 75 single family lots for development
and construction of related roadways and utilities.
2) Final plat application of Dr. Herbert & Joan Martin for
subdivision of 10.10 acres of land into two (2) lots of 2.75 acres
and 7.35 acres, 1201 Spear Street.
3) Revised final plat application of Larkin Milot Partnership to
amend a condition of approval for a planned residential development
consisting of 73 single family lots, Pinnacle @ Spear, Spear
Street. The amendment is to waive the requirement for posting a
bond to insure the planting of two (2) trees per lot. -
4) Revised final plat application of Dick Kwan to amend a planned
unit development consisting of two (2) multi -use commercial
buildings and 16 multi -family units. The amendment is to convert
1,836 square feet of office space to a 50 seat restaurant, Patchen
Road.
Copies of the applications are available for publiC- inspection at
the South Burlington City Hall.
William Burgess
Chairman,
South Burlington Planning Commission
June 1, 1996
CITY OF SOUTH BURLINGTON
Subdivision Application - FINAL PLAT
1) Name of Applicant
2) Name of Subdivision ,QP
3)
Indicate any change to name, address, or phone number
owner of record, applicant, contact person, engineer,
surveyor, attorney or plgt designer since preliminary
application
of
plat
4) Indicate any changes to the subdivision, such as number of
lots or units, property lines, applicant's legal interest
in the property, or developmental timetable, since
preliminary plat application:
5) Submit five copies and one reduced copy (11 x 17) of a
final plat plus engineering drawings and containing all
information required under Section 202.1 of the subdivision
regulations for a minor subdivision and under Section
204.1(a) for a major subdivision.
6) Submit two draft copies of all legal documents required
under Section 202.1 (11) and (12) of the subdivision
regulations for a minor sudivision and under Section 204.1(b)
for major subdivision.
(Signature) applicant or contact person