Loading...
HomeMy WebLinkAboutSD-93-0000 - Decision - 1600 Spear StreetFINDINGS OF FACT & DECISION STATE OF VERMONT COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of Larkin-Milot Partnership for a planned residential development consisting of 73 single family lots on 66.7 acres of land located on the east side of Spear Street opposite Deerfield Drive. On the loth of August, 1993, the South Burlington Planning Commission approved the request of Larkin-Milot Partnership for final plat approval under Section 204 of the South Burlington Subdivision Regulations based on the following findings: 1. This project consists of a planned residential development consisting of 73 single family lots. Preliminary plat approval was granted on 3/30/93. 2. This property is located on the easterly side of Spear Street in the vicinity of Deerfield Drive. It is bounded on the west by Spear Street and several single family residences, on the north, south and east by undeveloped property. It is located within the Southeast Quadrant District. 3. The applicant, since preliminary plat, has reduced the number of lots located to the east of the Meredith, Gagnon, Chiu and IBIS properties in order to increase the size of the lots in this area. The number of lots were reduced from six (6) to four (4). The two (2) lots were relocated to the end of the cul-de-sac and its length increased by 100 feet to 1100 feet. 4. Access: The development is proposed to be served by two (2) accesses, one at either end of the property along Spear Street. The southerly access will be an extension of Deerfield Drive and is part of the east -west arterial shown on the Official Map. 5. The northerly access was relocated approximately 150 feet to the south to minimize the impact on the houses located on the west side of Spear Street with headlight glare. This was a requirement of the preliminary plat approval. 6. A cul-de-sac street is proposed on the easterly side of the property running in a north -south direction. This street would serve 20 lots and would provide future access to the Farrell property to the north and the Economou property to the east via reserved r.o.w.'s. This cul-de-sac is 1,100 feet in length and would exceed the allowable limit of 850 feet (Section 401.1(7) of the subdivision regulations). The Planning Commission approved the length of the cul-de-sac as part of its preliminary plat approval. 1 7. Density: The PRD provision in the Southeast Quadrant zoning may allow this property to generate 73 units (maximum base density) plus 25% or 92 units maximum for development. The applicant is proposing the maximum base density of 73 units. 8. Nonbuildable are lots are within the zoning. Included in (lots 5-8) for which to keep the houses envelopes are shown i El: Either all or a portion of 45 individual restricted area under the Southeast Quadrant. this number are the lots along Spear Street: the applicant is proposing building envelopes away from Spear Street. These building )n the plan. 9. Wetlands: The site contains approximately five (5) acres of class 2 wetlands which are shown on the plans. 10. View protection: This property is located within the Dorset Park View Protection Zone. The applicant has submitted detailed information on the allowable height of each house within development. Allowable heights for structures and landscaping will range from 17.6 feet to 41 feet. 11. Recreation Path/Pedestrian Trail: The path/trail has been relocated outside of the wetland area as recommended by the Natural Resources Committee. A 20 foot easement is being provided for that portion of the path/trail which is not located within a future street r.o.w. The path/trail has been widened to eight (8) feet for the entire length of Deerfield Drive as required under preliminary plat approval. 12. The survey plat should be revised to provide survey data on the location of the path/trail easement. This should include the same type of information provided for a City street. 13. Traffic: A traffic impact analysis was conducted. The study projects that at full build -out the project will generate 81 P.M. peak our trip ends. The following scenarios were evaluated: o North and south project access with Spear Street: --- 1993 A.M. and P.M. DHV with Phase I build (i.e., 37 units) --- 1988 A.M. and P.M. DHV with full -build (i.e., 73 units) o For Spear Street/Swift Street Intersection: --- Existing 1993 and 1998 A.M. and P.M. DHV (no -build) --- 1993 A.M. and P.M. DHV with Phase I --- 1998 A.M. and P.M. DHV with full -build 14. The results of the analysis indicate the following: 1) both project access intersections and the Spear Street/Swift Street E intersection will operate at acceptable levels of service during both the 1993 and 1998 build scenarios, 2) traffic safety (e.g., sight distances) will not be a problem, and 3) upon the completion of Phase I,southbound left turn lanes on Spear Street for traffic entering both project accesses will be needed. 15. An addendum to the traffic impact analysis was prepared in response to concerns expressed by staff. The applicant took new traffic counts at the Spear/Swift Street intersection. The counts were adjusted to the design hour and turned out to be slightly higher than the counts used in the original analysis. The model was rerun with the new numbers and the results were presented in Table 3 in the addendum indicates that the Spear Street/Swift Street intersection will operate at an acceptable LOS with the project fully built. 16. The consultant also reran the analysis for existing conditions using existing signal timings. The previous report had assumed optimal signal timings for existing conditions. Table 2 in the addendum presents the results of the model assuming existing signal timings. The estimated LOS for the north bound approach during the A.M. peak hour is "E". This better reflects existing conditions. It is the consultant's opinion that the intersection LOS can be greatly improved by simply adjusting the signal timings so that less green time is given to Swift Street during the A.M. peak. Signal timings have been adjusted and the intersection is working much better than before. 17. The applicant has submitted a plan for proposed improvements to the corner radius for northbound right -turns at the Spear Street/Swift street intersection. This was a requirement for preliminary plat approval. 18. Sewer: The Planning Commission at preliminary plat approval granted a sewer allocation of 46,957 g.p.d. based on the following conditions: "The length of time that this sewer allocation approval shall remain in effect shall be tied to roadway construction. The roadways serving this development shall be completed within four years of final plat approval. The sewer allocation for any lots served by roadways which are not completed within this four year time limit shall be lost unless reapproved by the Planning Commission. In addition, if at the end of three years no more than 50% of the roads have been completed, 25% of the total sewer allocation shall be lost unless reapproved by the Planning Commission". 19. Historic sites: The applicant has received a letter from State Division for Historic Preservation indicating that the project will not have an adverse effect on any historic or archeological properties. 20. Recreation_ A credit of $22,000 should be given the applicant 3 for construction of the portion of the proposed recreation path located outside of any public street r.o.w. This value is based on $11 per linear foot for a distance of 2,000 feet. This translates to $300 per lot. Based on the current recreation impact fee of $200, the applicant would not pay a recreation fee since the credit is more than the actual fee. If in the future the City adopts a recreation fee of more than $300 per lot, then the applicant would be required to pay the difference. 21. Landscaping/Street Trees: The landscaping plan has been revised since preliminary plat to propose trees appropriate to the tree height limits. The landscaping plan has also been revised to add a note addressing the requirement for two ( 2 ) trees on each lot. The total value of street trees and common areas is $130, 366 and the value for the two (2) trees per lot is $65,335. 22. School Impact: The Planning Commission as part of the preliminary plat approval imposed a condition (#16) which prevents a zoning/building permit from being issued until after the City adopts an education impact fee ordinance or September 1, 1993, whichever first occurs. This condition should also be made a part of the final plat approval. 23. Lighting: The applicant is proposing street lighting similar to what is in Butler Farms and Oak Creek. The lamps would be 70 watt high pressure sodium mounted on 20 foot poles with cut-off luminaries. It appears the top of the fixtures will meet the height limitation. 24. Water: Municipal water system will serve this development. The applicant has received a letter from CWD indicating that the demand of 43,800 g.p.d. can be met. 25. Leaal Documents: o applicant should submit a "Notice of Condition" addressing the requirement of two (2) trees on each lot, addressing the height limitations for structures and landscaping on each lot, and addressing the requirement of the homeowner's association to maintain the community mailbox area and all drainage ditches for review by the City Attorney. o the applicant should submit the legal documents for all public streets and easements for review by the City Attorney. o applicant should submit a "Notice of Condition" addressing the building envelopes on lots #5-8 and purpose and restrictions thereof for review by the City Attorney. 4 26. Subdivision plat: --- survey data for the recreation path/pedestrian trail easement and the utility easement between lots 41-42 and 57-58 should be provided. 27. Other: --- lot numbers not correctly shown on sheet 2. --- the plans should show a 20 foot drainage easement across the Ratkus property for the drainage pipe. This easement should be included in the legal documents. DECISION & CONDITIONS Based on the above Findings of Fact, the South Burlington Planning Commission approves the Final Plat application of Larkin-Milot Partnership for a planned residential development consisting of 73 single-family lots on 66.7 acres of land located on the east side of Spear Street opposite Deerfield Drive as depicted on a plat entitled, "Nowland Two, Subdivision Plat, and last revised 7/28/93, and a 28 page set of plans, page one entitled "Nowland Two, South Burlington, Vermont", dated October, 1992 (stamped "received" 7/30/93), prepared by Fitzpatrick -Llewellyn, Inc. with the following stipulations: 1. Any previous approvals and stipulations affecting the subject property which are not superseded by this approval shall remain Ln effect. 2. In accordance with section 26.602 of the South Burlington Zoning Regulations, the Planning Commission approves the creation of lots for development upon land designated as "restricted area" on the Southeast Quadrant Official Zoning Map. It is the commission's opinion that based on the information submitted by the applicant the proposed development will not adversely affect wetlands on the property. Also, it is the Commission's opinion that the goals for maintaining an open space corridor along the north -south arterial roadways in the Southeast Quadrant will be promoted through the establishment of building envelopes on lots 5 through 8. The allowance of buildings in this manner is compatible with adjacent development along Spear Street. Finally, the Planning Commission supports moving the r.o.w. for a future north - south collector road to the east as proposed so as not to impact the wetland area. 3. The Commission approves the 1100 foot long cul-de-sac street serving lots 52 - 73. It is the Commission's opinion that the 1100 foot length will not result in unsafe or inefficient traffic conditions particularly since r.o.w.'s are being reserved for roadway connections to future developments on adjoining parcels. L7 4. In order for the Commission to find that the proposed development will not cause unreasonable highway congestion or unsafe conditions with respect of use of the highways, the applicant shall be responsible for the following: a) The applicant shall construct the southbound left turn lanes at each project access on Spear Street (sheets 5 and 7) prior to issuance of a zoning/building permit for the 38th lot. b) The applicant shall construct the improvements to the Spear Street/Swift Street intersection as shown on the plan entitled "Spear Street/Swift Street Intersection Improvements" dated 5/93, prior to the issuance of a zoning/building permit for the construction of any residential structures. c) Prior to issuance of any zoning/building permits for this development, the applicant shall post a bond to cover the costs of constructing the improvements referenced in a) and c) above. This bond or bonds shall remain in effect until such time as the improvements are constructed. d) Prior to issuance of any zoning/building permits for this development, the applicant shall be responsible for retiming the signal phasing at the Spear Street/Swift Street intersection as recommended in the traffic analysis submitted by the applicant. 5. The Planning Commission grants a credit of $300 per lot for construction of the portion of the proposed recreation path located outside of any public street right-of-way. This credit may be applied toward required recreation fees. At time of application for a zoning/building permit, the applicant shall pay the difference between the recreation impact fee and the $300 per lot credit. 6. The developer shall be required to install two ( 2 ) trees on each lot as required in Section 19.104(a) of the South Burlington Zoning Regulations. A "Notice of Condition" addressing this requirement shall be recorded in the South Burlington land records prior to recording the final plat plans. 7. Prior to issuance of any zoning/building permits, the applicant shall post a $130,366 landscape bond for proposed street and common area trees, and a $65,335 bond for proposed lot trees. The bonds shall remain in effect for three (3) years to assure that the planted landscaping has taken root and has a good chance of surviving. 8. Legal documents for all public streets (i.e., irrevocable offer of dedication) and easements (e.g., utility easements and recreation path easements) shall be submitted to the City Attorney 2 for approval and shall be recorded in the South Burlington Land Records prior to issuance of any zoning/building permits. 9. A "Notice of Condition" addressing the height limitations for structures and landscaping on each lot shall be submitted to the City Attorney for approval and shall be recorded in the South Burlington land records prior to recording the final plat plans. 10. In accordance with Section 301.5 of the subdivision regulations, within 14 days of completion of required improvements (e.g., streets, water mains, sanitary sewers, storm drains, etc.), the developer shall submit to the City Engineer "as -built" construction drawings certified by a registered engineer. 11. A "Notice of Condition" addressing the building envelopes on lots #5 - 8 and purpose and restrictions thereof shall be submitted to the City Attorney for approval and shall be recorded in the South Burlington land records prior to recording the final plat plans. 12. Prior to final plat submittal, the plans shall be revised to show the following: a) The survey plat shall show survey data for the recreation path easement and the utility easement between lots 41-42 and 57-58. b) Lot numbers shall be correctly shown on sheet 2. c) The plans shall show a 20 foot drainage easement for the proposed drainage pipe on the Ratkus property west of Spear Street. This easement shall be included in the required legal documents. 13. A bond for streets, sidewalks, recreation paths, sewer and water shall be posted prior to issuance of a zoning/building permit. The amount of the bond shall be approved by the City Engineer. 14. No zoning/building permit will be issued for a lot until the street serving that lot has a gravel sub -base installed in conformance with City specifications. 15. The Commission approves a total sewer allocation of 46,957 gpd for this development. The length of time that this sewer allocation approval shall remain in effect shall be tied to roadway construction. The roadways serving this development shall be completed within four (4) years of final plat approval. The sewer allocation for any lots served by roadways which are not completed within this four (4) year time limit shall be lost unless reapproved by the Planning Commission. In addition, if at the end of three years no more than 50% of the roads have been completed, 25% of the total sewer allocation shall be lost unless reapproved by the Planning Commission. 7 16. No zoning/building permit will be issued for construction of any dwelling unit within this development until after the City adopts an education impact fee ordinance or September 1, 1993, whichever first occurs. This condition is being imposed to provide the school district a reasonable period of time to complete development of an impact fee ordinance and present the ordinance to the South Burlington City Council for adoption. No zoning/building permits shall be issued after the adoption of such an impact fee until that impact fee has been paid. 17. A "Notice of Condition" shall be recorded in the land records prior to recording the final plat plans which addresses the requirement of the homeowner's association to maintain the community mailbox area and all drainage ditches. 18. The final plat plans, including survey plat, shall be recorded in the South Burlington land records within 90 days or this approval is null and void. The plans shall be signed by the Planning Commission Chair or Clerk prior to recording. 19. As provided in Section 605 of the South Burlington Subdivision Regulations, if no action is taken to construct substantially they proposed subdivision within three years, said approval shall become null and void. 20. The retention ponds shall be maintained by the homeowners' association. The legal documents for the Association shall state this responsibility. The legal documents shall be approved by the City Attorney prior to permit issuance. 21. The recreation path shall be constructed by the completion of Pinnacle Drive or during the construction of the cul-de-sac, whichever first occurs. Chairman 6r Clerk; South Burlington Planning Commission Date 0