HomeMy WebLinkAboutSP-03-32 - Decision - 0000 Hinesburg RoadCITY of SOUTH BURLINGTON
DEPARTMENT of PLANNING & ZONING
CHITTENDEN COUNTY TRANSPORTATION AUTHORITY — BUS SHELTER
SITE PLAN APPLICATION #SP-03-32
FINDINGS of FACT AND DECISION
The Chittenden County Transportation Authority, herein referred to as the applicant, is
requesting Site Plan approval for one (1) bus shelter in South Burlington. Application #SP-03-
32 is for a bus shelter adjacent to the Grand Union Shopping Plaza on Hinesburg Road. Tom
Peterson represented the applicant.
Based on testimony provided at the above mentioned public hearing and the plans and supporting
materials contained in the document file for this application, the DRB finds, concludes, and
decides the following:
FINDINGS OF FACT
1. The applicant is requesting Site Plan approval for a bus shelter adjacent to the Grand Union
Shopping Plaza on Hinesburg Road.
2. The owner of record is the State of Vermont, Technical Services Division.
3. The proposed bus shelter location is currently a designated CCTA bus stop.
A. Shelters may be constructed adjacent to or within street rights -of -way in any zoning
district after approval of a site plan by the Development Review Board.
The proposed bus shelter is located in a right-of-way along Hinesburg Road.
B. The shelter shall be located to permit ample room for a bus to conveniently leave the
traveled roadway to pick up or discharge passengers.
As the proposed shelter is along Hinesburg Road, there should be ample room for busses to safe
pick-up and discharge passengers.
C. The design shall be harmonious with adjacent properties.
The proposed design is a standard CCTA bus shelter. This structure is harmonious with adjacent
properties.
l
D. The structure shall not have more than one (1) sign. This sign shall not exceed two (2)
square feet in area.
The proposed structure does not include a sign.
E. Other
The applicant has received a letter from the Vermont Agency of Transportation, Utilities and
Permits Unit, stating that proposed bus shelter meets all requirements for work within the
highway rights -of -way.
DECISION
Motion by leLI
i-useconded by to
approve Final Plat Application #-03-32, subject to the following conditions:
1. All previous approvals and stipulations shall remain in full effect, except as amended herein.
2. This project shall be completed as shown on the plans submitted by the applicant, as amended
by this decision, and on file in the South Burlington Department of Planning & Zoning.
3. The applicant shall obtain a zoning permit within six (6) months.
4. The applicant shall obtain a certificate of occupancy prior to use or occupancy of the structure.
5. Any changes to the site plan shall require approval of the South Burlington Development
Review Board.
Chuck Bolton - e nay/abstain/not present
Mark Boucher - vlenay/abstain/not present
John Dinklage
nay/abstain/not present
eenay/abstain/not
Roger Farley -
present
Michele Kupersmith
- e nay/abstain/not present
Larry Kupferman
- e nay/abstain/not present
Gayle Quimby yy
nay/abstain/not present
Motion Carried by a vote of 7 - c., - (-�
Signed this 19th day of August, 2003, by
hn Dinklage, Chair