Loading...
HomeMy WebLinkAboutSP-03-30 - Decision - 0000 Williston RoadCITY of SOUTH BURLINGTON DEPARTMENT of PLANNING & ZONING CHITTENDEN COUNTY TRANSPORTATION AUTHORITY — BUS SHELTER SITE PLAN APPLICATION 4SP-03-30 FINDINGS of FACT AND DECISION The Chittenden County Transportation Authority, herein referred to as the applicant, is requesting Site Plan approval for one (1) bus shelter in South Burlington. Application #SP-03- 30 is for a bus shelter in the right-of-way in front of the Texaco Station at the intersection of Hinesburg Road and Williston Road. Tom Peterson represented the applicant. Based on testimony provided at the above mentioned public hearing and the plans and supporting materials contained in the document file for this application, the DRB finds, concludes, and decides the following: FINDINGS OF FACT 1. The applicant is requesting Site Plan approval for a bus shelter in the right-of-way in front of the Texaco Station at the intersection of Hinesburg Road and Williston Road. 2. The owner of record is the State of Vermont, Technical Services Division. 3. The proposed bus shelter location is currently a designated CCTA bus stop. A. Shelters may be constructed adjacent to or within street rights -of -way in any zoning district after approval of a site plan by the Development Review Board. The proposed bus shelter is located in a right-of-way along Hinesburg Road. B. The shelter shall be located to permit ample room for a bus to conveniently leave the traveled roadway to pick up or discharge passengers. As the proposed shelter is along Hinesburg Road, there should be ample room for busses to safe pick-up and discharge passengers. C. The design shall be harmonious with adjacent properties. The proposed design is a standard CCTA bus shelter. This structure is harmonious with adjacent properties. C I D. The structure shall not have more than one (1) sign. This sign shall not exceed two (2) square feet in area. The proposed structure does not include a sign. E. Other The applicant has received a letter from the Vermont Agency of Transportation, Utilities and Permits Unit, stating that proposed bus shelter meets all requirements for work within the highway rights -of -way. DECISION Motion by C�i le, QL, 1, , seconded by P�Ictrl �� �� �- , to approve Final Plat Application #S-03-30, subject to the following conditions: 1. All previous approvals and stipulations shall remain in full effect, except as amended herein. 2. This project shall be completed as shown on the plans submitted by the applicant, as amended by this decision, and on file in the South Burlington Department of Planning & Zoning. 3. The applicant shall obtain a zoning permit within six (6) months. 4. The applicant shall obtain a certificate of occupancy prior to use or occupancy of the structure, 5. Any changes to the site plan shall require approval of the South Burlington Development Review Board. Chuck Bolton - anay/abstain/not present Mark Boucher - enay/abstain/not nay/abstain/not present John Dinklage - present Roger Farley - onay/abstain/not present Michele Kupersmith - �e /nay/abstain/not present Larry Kupferman - &nay/abstain/not present Gayle Quimby - y�ay/abstain/not present Motion Carried by a vote of % - U - C3 Signed this 19th day of August, 2003, by hn Dinklage, Chair