Loading...
HomeMy WebLinkAboutMS-00-05 - Decision - 1397 Spear Street#MS-00-05 FINDINGS OF FACT AND DECISION STATE OF VERMONT COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of Faucet Builders, Inc. under Section 25.117 of the South Burlington Zoning Regulations to add 96 cubic yards of fill material on an existing residential lot for the construction of a single family dwelling, 1397 Spear Street. On the 5th of September, 2000, the South Burlington Development Review Board approved the application of Faucet Builders, Inc. for approval under Section 25.117 of the South Burlington Zoning Regulations based on the following findings: This project consists of adding 96 cubic yards of fill material on an existing residential lot for the construction of a single-family dwelling, 1397 Spear Street. The applicant has submitted a site plan depicting the existing and proposed grades. 2. The property is located in both the Residential One and Residential Four Districts. The project area lies completely within the Residential One District. It is bounded on the east by Spear Street, on the south and west by the lands of the Stonehedge Homeowners Association, and on the north by a single-family residence. 3. Section 25.117 Requirements: The proposed filling will exceed twenty (20) cubic yards and therefore must comply with the standards of Section 25.113(b) referenced in Section 25.117(a) of the Zoning Ordinance: (a) The project must utilize topography and must relate to other existing and proposed structure must be aesthetically compatible with the neighborhood. The filling must not extend to the property lines and must blend with the existing contours. The property owner to the north has submitted a letter to the City with drainage concerns (see enclosed). The applicant should not make existing stormwater runoff conditions worse. (b) The project must not detract from scenic views of adjacent properties or public walkways. The proposed grading must not exceed the elevations presently found on the site. The proposed structure must comply with the height requirements of Section 25.113(a) of the Zoning Ordinance. (c) The project should allow for retention of additional green space that will enhance the appearance of the developed property. Staff recommends that the access drive be revised to include only one point of access in order to retain additional green space. Two points of access are currently proposed. 4. Lot size/Frontage: The proposed filling will not affect the lot size or frontage. 5. Setbacks: The building has been delineated on the plans and meets all setback requirements. DECISION AND CONDITIONS Based on the above Findings of Fact, the South Burlington Development Review Board approves the application #MS-00-05 of Faucet Builders, Inc. under Section 25.117 of the South Burlington Zoning Regulations to add 96 cubic yards of fill material on an existing residential lot for the construction of a single family dwelling, 1397 Spear Street, as depicted on a plan entitled "Faucet Property Site Plan South Burlington, Vermont", by Llewellyn — Howley, Inc., dated 7/25/00, with the following stipulations: All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. The site plan shall be revised to show the changes listed below and shall require approval of the Director of Planning & Zoning (hereinafter Director). Three (3) copies of the approved revised site plan shall be submitted to the Director prior to permit issuance. a) The site plan shall be revised to eliminate one of the curb cuts/driveways. 3. The applicant shall obtain a zoning permit within six (6) months pursuant to Section 27.302 of the Zoning Regulations or this approval is null and void. 4. Any change to the site plan shall require approval by the South Burlington Development Review Board. 5. The existing storm water drainage will not be altered by the fill. Chair or Clerk South Burlington Development Review Board Date