Loading...
HomeMy WebLinkAboutZP-18-452 - 0090 Ledge Way 12/31/2018CITY OF SOUTH BURLINGTON ZONING PERMIT APPLICATION Applicant: O'Brien Farm Road, LLC Applicant Mailing Address: 1855 Williston Road Applicant Email: nicole@obrienbrothersagency.com Property Street Address: 90 Ledge Way South Burlington Property Owner: O'Brien Farm Road, LLC Property Owner Mailing Address: Same As Above Application No: (� — 452 [office use only] Daytime phone: 802 658 5000 VT 05403 Parcel size: Total 39.16 acres Tax Parcel ID No. 1. PROPOSED project including building dimensions (describe): Construction of a 2,806 square foot single family home on Lot 05-021 of the O'Brien Farm Road subdivision, approved by Final Plat SD-17-17, including construction of a 6'x20' front porch, as well as a 10' x 12' rear deck. See attached floor plan and elevation. 2. Present USE(S) of the property: 0 Single family home on its own parcel ❑ Other (please state the USE per Land Development Regulations- retail, general office, multifamily residential, etc.): 3. List all present structure(s) on property (describe including dimensions or square footage of each): None 4. Does the project include a proposed change of USE? ❑No (the property will still be used for the same purpose) ❑✓ Yes (please state proposed changed or added USES per Land Development Regulations- retail, general office, multifamily residential, etc.): Residential Development Per Final Plat Approval SD-17-17 5. ESTIMATED total cost of improvements (materials and labor): $ Approx. $250,000 Direct Cos 6. Building footprint — i.e. size in sq.ft of main floor of house and all attached and detached structures including enclosed breezeways, garages, and sheds (describe): Existing: Proposed: 7. Total square feet of other impervious surfaces on site (i.e. driveways, patios, decks) Existing: Proposed: 8. ATTACH SKETCH PLAN OR SITE PLAN (not required if project consists ONLY of interior renovations or replacement of existing roof, siding, etc. in the exact same size) 9. APPLICANT/OWNER CERTIFICATION The undersigned property owner hereby consents to submit this application and understands that if the application is approved, the i Zoning NrmA-" atpchRd conditions will be binding on the property. Evan Langfeldt CEO Leo/1 Property Owne gna PRINT NAME Date 7The n ers gned a pl' an ere aff ms that the information presented in this application is true, accurate and complete. Evan Langfeldt CEO fo A p p ' ant Signatu , PRINT NAME Date OFFICE USE ONLY — ADMINISTRATIVE OFFICER ACTION — OFFICE USE ONLY DATE Received: (2 I O FEE Received: $ 11�Ja Identification of zoning district: _ Identification of proposed use: Sl k4G" lj�- Fp, i"^ I L q 4-0 M (� PROPOSED USE TYPE: F3q Permitted Conditional Date of SITE PLAN approval/denial Approval Date Denial Date Date of SUBDIVISION approval/ denial gll:�tl] Approval Date Denial Date Date of CONDITIONAL USE approval/ denial Approval Date Denial Date I Date of appeal VARIANCE approval/ denial Approval Date Denial Date Date of MISCELLANEOUS approval/ denial Approval Date Denial Date IN Provided applicant copy of URBEC or VCBE Standards Handbook or []Not Applicable FINAL ADMINISTRATIVE OFFICER ACTION Z O N II� � NG P E R M I T F1APPROVED fZI3I e -Q` —Approva Date Administrative Officer's Signature Permit EFFECTIVE date JAA 2o1 q Permit EXPIRATION date 12/30 J 20�9 DENIED REASON for DENIAL Denial Date Administrative Officer's Signature Notice of Appeal Rights: Any interested person may appeal this decision by filing a written Notice of Appeal with the clerk of the Development Review Board within fifteen [15] days of the date of this decision. The notice of appeal must be accompanied by a filing fee of $223,00. This permit does NOT authorize commencement of any development activity approved by the permit until the permit takes -ffect as set forth above. Site modifications and improvements made prior to this permit becoming effective may be subject to removal lid site restoration if a timely appeal is commenced. NOTE: The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state permits for this project. Call (802) 879-5676 to speak with the regional Permit Specialist. Planning & Zoning Invoice Residential Impact & Permit Fees AMW sotxthburlington P LAN NINE 6 26NNN Property Owners Name: O'Brien Farm Road LLC Property Location: 90 Ledge Way Amount: 7,486.35 Payment Type: Check #001064 Date: 12/31/2018 Code Amount Due Zoning Permit (New Residential) ZP-18-452 zp Recording fee $ 13.00 plus 2806 sq. ft building at $ 0.45 per sq. ft. $ 1,262.70 plus 578 sq. ft unfinished basement at $ 0.20 per sq. ft. $ 115.60 plus 2 garage bay(s) at $ 50.00 per bay $ 100.00 plus After -the fad of 50% [no NOV] or 100% [NOV] $ - Zoning Permit Total $ 1,491.30 Sewer Allocation Fee WWA- #204 242.95 g.p.d x $ 11.92 $ 2,895.96 Bartlett Bay F'x"]Airport Parkway Re )n Impact Fee #220 $ 1,665.08 South Village Recreation Impact Fee #243 $ - Road Impact Fee #221 $ 9C2.12 Fire Impact Fee #203 $ - Police Impact Fee #222 $ 468.89 Dorset Street Waterline Fee #230 $ - Sewer Connection Inspection WW-18-4604 ww $ 63.00 $ 63.00 Total (Impact Fees + Permit) $ 7,486.35 South Burlington Planning Zoning Single -Family Impact Fees Project Anticipated to be Completed by April 1, 2018 Project Name & Address Property Owner Effective Date W; O'Brien Farm Road LLC C,l CJNJ 121 -31118 TOTAL, IMPACT FEE $3,036.09 Number of Units: 1 Dorset Street Water Line? (enter 1 if yes) Fee: Values: RECREATION FEE $1,665.08 . ROAD IMPACT FEE $902.12 DORSET STREET WATER LINE $394.51 POLICE IMPACT FEE $468.89 jZ / 1 1.0 1,. \ It 1:2 9 S 0 2 1� BRA i€ Fi'�! '� //iR Rti HIIT�1��"'-1 •� \+` .4 \I.+�e / r � 1 _\� €p,; ,.^ j� ,1 _ `�l s €€i i i ��RR 111 1'! I '-`. �1 \ ,f -�. _-1 � =_ �1 ' , \ • � \ g, u � t €�` L p ,' / ��� ' jjgg•yR'�Iya ; ;; 1 ,, >w:eo ,, ; ` 1 � , � ` �, 1 \ ,, ..--«�; �yyglll � 3 /. €€i I1jj1 1 / ♦ ,, \ \ 1 I 1 1 I I 1 \ i / �I /y � � _ / I TII\ 11'lll -- I i % % -- , . `\♦ , i k IFI 1 1 �Ft ® €j' n ,•'// 1I III \ ewggg r I \f � � � I 1 9 1!<""I •// 11 111 / n \ - I I �I � � �- ea�rggA- IF.AA'g' \ � I � � 2E�S �,,✓ I/, � I 1 \t'�".. � fit, I, t, 1111� / `t-- 11 I as I,ao 1yy ,` ` ` ` \``\\ �• I / /� / / / / / _ dl ,1 It 11 It 1 7 )) d 1111111111'tl ; I i`i \\� \I ;\ _ _ \per� 1 \` It it `, ae; ``.aie ; ��`C,`�`t, 11�\I 1`111 t, F ='fl f '-/`----' ✓ 1 4 1 - �' 1'~"p 11 \'`, tt, `111\I `I�11 `\'\ \I` ^ I t !i rat ♦ II` *-- "-- :-•• ' ` 1� 1 O €F1! r111. ♦h , �1 \ '` "`\\ \1 i 1\ 1' \ ,1 1 fig v,�� ��� 1• t� lit \�I 1 1 i 1 i l_ '; � '�♦ \ ,a1 € ®�SYi - \I` 1\ 1 Z � I it UP. ♦ \ \A � dI � \ �i '<{ cK\ \t `\ II 1 I✓1 $ l / �� — Yy�J•Fd'r•+r e,,• R\\ t�`` , _�,. O �+,��, � \ \ ♦ , � 1\ .�..� `yam:---_��`` ♦ \1 1, ` ,,, 1'�-i `,` \ 11, , � tom; � \\�,n , ♦ I F f \ 1 0 ' it /__ \ ,1 \\ \\ • i 1.G'S J.€R�' ,s`,\\ 11I AV '1 \ A\\\\\� / L'J.. , 1 FLOOR FINISH SCHEDULE L_ FOOTING SCHEDULE men rnE P611IXiE1011 IM PL Op111.01RfOO1W fK.fAwe11101A .oPCmwnpnemon e +.ovE: uuv caurs mw. �wvE � wiowrwE rrw ua.o cwwry wr ueo x �awtnKxo�ESPan FOUNDATION WALL SCHEDULE arra �yg wa r " ^O1• �i !I�■�':�1 lam. �A ®����_,��� ]I -------------------------- ------------------- Unexcavated I� I Foundation/ Walkout Basement Plan we] GENERAL BASEMENT CONSTRUCTION PLAN NOTES: ASSEMBLIES: T. w� woE.w .. i& EAF E� �wDS a. �oo� @ s TO �.ss.areo �.�'xr�sPs�w�PE"n ` .���Iz 0 o = .E.r.,r h.o s FLOOR PLAN KEYNOTES• C Elevation - B wuuno�rmw� &SEww PL L A0.1 B FLOOR FINISH SCHEDULE II e mm Oil W.rl IMM EFOR ME ■2 Car Garage MFE —-—-----—————- .. .. �a. - 001.' ' -. FIB R111111110111111MIAW m. Main Floor Plan Elevation - B CONSTRUCTION ASSEMBLIES: ZFERMONME �E — S=Sa R%FFR.—G I.— F ,T =1 *A s— seec' FLOOR PLAN KEYNOTES: ERBUILI—El E cz LIL. =—S---c cn ca =UE E=Cl2EFME=I­­ E 0 0 11 ==.IIIIEP En_ "I =--F 3 D. 0 R Ir—I .owEi�YMhF.F. VJZ DAISY A1.1 B CONSTRUCTION ASSEMBLIES: A cr asp "uwi0wc vIA Ra ias "RW"Aa�� �-'AR.R a o 0 J t C 3 0 0 T cc LL O cm C N E i cc L- a) E O = ca C � d d m 1� rn co 0 0 H 0 m m 0 N rawMaa. uum: STAIR SECTIpMS DAISY A5.1 I—T ----- --------— _. _._._.—._.—.—.. — -- — --- — ----- _emErFn! WPIL._. _. -Left Elevation Roof Plan Right El scue.�.-sac � CONSTRUCTION ASSEMBLIES: — — — — - "°E".ATM u . /ation GENERAL EXTERIOR ELEVATION NOTES: 0 EXTERIOR ELEVATION KE�L YNOTES'LpFRS� d >� E Y M vs. e,ucrt'r Eww m,risxiw°.E L O O E O c = o ,a a> 0 � c CD d m m r _ J � O �n suepaE,eev.Tnxq W i `nooE"i ri °vir�i'00 uas � TMs"E"*E°.r+e..swueE o"ow,aE°".°. mE°�o. mrE. rnEE��is �,�soor,� �i -/�CIWL,Ei FREEVEp °SCfiR"REAs �E C�KEGMVFD BV LWOMi ,ETRFEVEME°E#Frt �.vT,E �� v ,w •v uo sP .. m'1�Y.Y.,.E 11E �To�inNENNBER�U bFirt � a E RORELMTM. 00� ",8 Elevation - Craftsman DAISY A3.1 B 1-ftw N.01 CONSTRUCTION ASSEMBLIES: El E o wwn« oc.w.+wu.�ww o -EA s IE—. 1¢cvaww J _ 0 0 ar ca U- m in E Ki chm Famk Ow s Bath L L o y o E > ---- ------ o _ � c d m Unfinished Basement W L � J j O cn _ w Building Section Q DAISY AU B