HomeMy WebLinkAboutZP-18-452 - 0090 Ledge Way 12/31/2018CITY OF SOUTH BURLINGTON
ZONING PERMIT APPLICATION
Applicant: O'Brien Farm Road, LLC
Applicant Mailing Address: 1855 Williston Road
Applicant Email: nicole@obrienbrothersagency.com
Property Street Address: 90 Ledge Way South Burlington
Property Owner: O'Brien Farm Road, LLC
Property Owner Mailing Address: Same As Above
Application No: (� — 452
[office use only]
Daytime phone: 802 658 5000
VT 05403
Parcel size: Total 39.16 acres
Tax Parcel ID No.
1. PROPOSED project including building dimensions (describe):
Construction of a 2,806 square foot single
family home on Lot 05-021 of the O'Brien Farm Road subdivision, approved by Final Plat
SD-17-17, including construction of a 6'x20' front porch, as well as a 10' x 12' rear deck.
See attached floor plan and elevation.
2. Present USE(S) of the property:
0 Single family home on its own parcel
❑ Other (please state the USE per Land Development Regulations- retail, general office, multifamily residential, etc.):
3. List all present structure(s) on property (describe including dimensions or square footage of each):
None
4. Does the project include a proposed change of USE?
❑No (the property will still be used for the same purpose)
❑✓ Yes (please state proposed changed or added USES per Land Development Regulations- retail, general
office, multifamily residential, etc.): Residential Development Per Final Plat Approval SD-17-17
5. ESTIMATED total cost of improvements (materials and labor): $ Approx. $250,000 Direct Cos
6. Building footprint — i.e. size in sq.ft of main floor of house and all attached and detached structures including enclosed
breezeways, garages, and sheds (describe): Existing: Proposed:
7. Total square feet of other impervious surfaces on site (i.e. driveways, patios, decks)
Existing:
Proposed:
8. ATTACH SKETCH PLAN OR SITE PLAN (not required if project consists ONLY of interior renovations or replacement of
existing roof, siding, etc. in the exact same size)
9. APPLICANT/OWNER CERTIFICATION
The undersigned property owner hereby consents to submit this application and understands that if the application is approved, the
i Zoning NrmA-" atpchRd conditions will be binding on the property.
Evan Langfeldt CEO Leo/1
Property Owne gna PRINT NAME Date
7The n ers gned a pl' an ere aff
ms that the information presented in this application is true, accurate and complete.
Evan Langfeldt CEO fo
A p p ' ant Signatu , PRINT NAME Date
OFFICE USE ONLY — ADMINISTRATIVE OFFICER ACTION — OFFICE USE ONLY
DATE Received: (2 I O FEE Received: $ 11�Ja Identification of zoning district: _
Identification of proposed use: Sl k4G" lj�- Fp, i"^ I L q 4-0 M (�
PROPOSED USE TYPE: F3q Permitted Conditional
Date of SITE PLAN approval/denial
Approval Date Denial Date
Date of SUBDIVISION approval/ denial gll:�tl]
Approval Date Denial Date
Date of CONDITIONAL USE approval/ denial
Approval Date Denial Date
I
Date of appeal VARIANCE approval/ denial
Approval Date Denial Date
Date of MISCELLANEOUS approval/ denial
Approval Date Denial Date
IN Provided applicant copy of URBEC or VCBE Standards Handbook or []Not Applicable
FINAL ADMINISTRATIVE OFFICER ACTION
Z O N II� � NG P E R M I T
F1APPROVED fZI3I e -Q` —Approva Date Administrative Officer's Signature
Permit EFFECTIVE date JAA 2o1 q Permit EXPIRATION date 12/30 J 20�9
DENIED REASON for DENIAL
Denial Date
Administrative Officer's Signature
Notice of Appeal Rights: Any interested person may appeal this decision by filing a written Notice of Appeal with the clerk of the
Development Review Board within fifteen [15] days of the date of this decision. The notice of appeal must be accompanied by a filing
fee of $223,00.
This permit does NOT authorize commencement of any development activity approved by the permit until the permit takes
-ffect as set forth above. Site modifications and improvements made prior to this permit becoming effective may be subject to removal
lid site restoration if a timely appeal is commenced.
NOTE: The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state permits for this project. Call (802)
879-5676 to speak with the regional Permit Specialist.
Planning & Zoning Invoice
Residential Impact & Permit Fees
AMW
sotxthburlington
P LAN NINE 6 26NNN Property Owners Name: O'Brien Farm Road LLC
Property Location: 90 Ledge Way
Amount:
7,486.35 Payment Type: Check #001064
Date: 12/31/2018
Code
Amount Due
Zoning Permit (New Residential) ZP-18-452
zp
Recording fee
$
13.00
plus
2806 sq. ft building at $ 0.45
per sq. ft.
$
1,262.70
plus
578 sq. ft unfinished basement at
$ 0.20 per sq. ft.
$
115.60
plus
2 garage bay(s) at $ 50.00
per bay
$
100.00
plus
After -the fad of 50% [no NOV]
or
100% [NOV]
$
-
Zoning Permit Total
$
1,491.30
Sewer Allocation Fee
WWA-
#204
242.95 g.p.d x $
11.92 $
2,895.96
Bartlett Bay
F'x"]Airport
Parkway
Re )n Impact Fee
#220
$
1,665.08
South Village Recreation Impact Fee
#243
$
-
Road Impact Fee
#221
$
9C2.12
Fire Impact Fee
#203
$
-
Police Impact Fee
#222
$
468.89
Dorset Street Waterline Fee
#230
$
-
Sewer Connection Inspection
WW-18-4604
ww
$ 63.00
$
63.00
Total (Impact Fees + Permit)
$
7,486.35
South Burlington Planning Zoning
Single -Family Impact Fees
Project Anticipated to be Completed by April 1, 2018
Project Name & Address
Property Owner
Effective Date
W;
O'Brien Farm Road LLC
C,l CJNJ 121 -31118
TOTAL, IMPACT FEE $3,036.09
Number of Units: 1
Dorset Street Water Line? (enter 1 if yes)
Fee: Values:
RECREATION FEE $1,665.08
. ROAD IMPACT FEE $902.12
DORSET STREET WATER LINE $394.51
POLICE IMPACT FEE $468.89
jZ
/ 1 1.0 1,. \
It 1:2
9 S 0 2
1� BRA i€
Fi'�! '� //iR Rti HIIT�1��"'-1 •� \+` .4 \I.+�e / r � 1 _\� €p,; ,.^ j� ,1 _ `�l s €€i
i i ��RR 111 1'! I '-`. �1 \ ,f -�. _-1 � =_ �1 ' , \ • � \ g, u � t €�` L p
,' / ��� ' jjgg•yR'�Iya ; ;; 1 ,, >w:eo ,, ; ` 1 � , � ` �, 1 \ ,, ..--«�; �yyglll � 3
/. €€i I1jj1 1 / ♦ ,, \ \ 1 I 1 1 I I 1 \ i / �I /y �
�
_ / I TII\
11'lll -- I i % % -- , . `\♦ , i k IFI 1 1 �Ft ® €j' n
,•'// 1I III \ ewggg r I \f � � � I 1 9 1!<""I
•// 11 111 / n \ - I I �I � � �-
ea�rggA-
IF.AA'g'
\ � I � � 2E�S �,,✓ I/, � I 1 \t'�".. � fit, I, t, 1111� / `t--
11 I as
I,ao
1yy
,` ` ` ` \``\\ �• I / /� / / / / / _ dl ,1 It 11 It
1 7 )) d
1111111111'tl ; I
i`i
\\�
\I ;\ _ _
\per� 1 \` It it
`, ae;
``.aie ; ��`C,`�`t, 11�\I 1`111 t, F ='fl f '-/`----' ✓ 1 4 1 - �' 1'~"p 11 \'`, tt, `111\I `I�11 `\'\ \I` ^ I
t !i rat ♦
II`
*-- "-- :-•• ' ` 1� 1 O €F1! r111. ♦h , �1 \ '` "`\\ \1 i 1\ 1' \ ,1 1
fig
v,�� ��� 1• t� lit \�I 1 1 i 1 i l_ '; � '�♦ \ ,a1 € ®�SYi - \I` 1\ 1 Z �
I it
UP. ♦ \ \A � dI � \ �i '<{ cK\ \t `\ II 1 I✓1 $
l / �� — Yy�J•Fd'r•+r e,,• R\\ t�`` , _�,. O �+,��, � \ \ ♦ , � 1\ .�..� `yam:---_��`` ♦
\1 1, ` ,,, 1'�-i `,` \ 11, , � tom; � \\�,n , ♦ I F f \ 1 0
' it
/__ \ ,1 \\ \\ • i 1.G'S J.€R�' ,s`,\\ 11I
AV
'1
\ A\\\\\� / L'J.. , 1
FLOOR FINISH SCHEDULE
L_
FOOTING SCHEDULE
men rnE
P611IXiE1011 IM
PL Op111.01RfOO1W fK.fAwe11101A
.oPCmwnpnemon e
+.ovE: uuv caurs mw. �wvE � wiowrwE rrw ua.o cwwry wr ueo x
�awtnKxo�ESPan
FOUNDATION WALL
SCHEDULE
arra �yg
wa r " ^O1•
�i
!I�■�':�1
lam.
�A
®����_,���
]I
-------------------------- -------------------
Unexcavated
I�
I
Foundation/ Walkout Basement Plan
we]
GENERAL BASEMENT
CONSTRUCTION
PLAN NOTES:
ASSEMBLIES:
T.
w�
woE.w
.. i& EAF
E�
�wDS
a.
�oo�
@
s
TO
�.ss.areo
�.�'xr�sPs�w�PE"n
`
.���Iz 0
o
=
.E.r.,r h.o s
FLOOR PLAN
KEYNOTES•
C
Elevation - B
wuuno�rmw�
&SEww PL L
A0.1 B
FLOOR FINISH SCHEDULE
II
e
mm
Oil
W.rl
IMM
EFOR
ME
■2
Car Garage
MFE
—-—-----—————-
.. ..
�a.
-
001.' '
-.
FIB
R111111110111111MIAW m.
Main Floor Plan
Elevation - B
CONSTRUCTION
ASSEMBLIES:
ZFERMONME �E
— S=Sa
R%FFR.—G I.—
F
,T
=1 *A
s—
seec'
FLOOR PLAN
KEYNOTES:
ERBUILI—El E
cz
LIL.
=—S---c
cn
ca
=UE
E=Cl2EFME=I E
0
0
11 ==.IIIIEP En_
"I =--F 3
D. 0 R
Ir—I .owEi�YMhF.F.
VJZ
DAISY
A1.1 B
CONSTRUCTION
ASSEMBLIES:
A cr asp
"uwi0wc vIA
Ra ias
"RW"Aa��
�-'AR.R a
o
0
J
t
C
3
0
0
T
cc
LL
O
cm
C
N
E
i
cc
L-
a)
E
O
= ca
C �
d d
m 1�
rn
co
0
0
H
0
m
m
0
N
rawMaa.
uum:
STAIR SECTIpMS
DAISY
A5.1
I—T
----- --------—
_. _._._.—._.—.—.. — -- — --- — ----- _emErFn! WPIL._. _.
-Left Elevation
Roof Plan
Right El
scue.�.-sac �
CONSTRUCTION
ASSEMBLIES:
— — — — - "°E".ATM
u .
/ation
GENERAL EXTERIOR
ELEVATION NOTES: 0
EXTERIOR ELEVATION KE�L
YNOTES'LpFRS� d
>�
E
Y M
vs. e,ucrt'r Eww m,risxiw°.E L O
O
E
O c
= o
,a a>
0 � c
CD d
m m r
_ J �
O �n
suepaE,eev.Tnxq W
i `nooE"i ri °vir�i'00
uas � TMs"E"*E°.r+e..swueE o"ow,aE°".°. mE°�o. mrE. rnEE��is �,�soor,� �i
-/�CIWL,Ei FREEVEp °SCfiR"REAs �E C�KEGMVFD BV LWOMi ,ETRFEVEME°E#Frt �.vT,E ��
v ,w •v uo sP .. m'1�Y.Y.,.E 11E �To�inNENNBER�U bFirt � a
E RORELMTM.
00� ",8
Elevation - Craftsman
DAISY
A3.1 B
1-ftw N.01
CONSTRUCTION
ASSEMBLIES:
El
E
o wwn«
oc.w.+wu.�ww o
-EA s
IE—. 1¢cvaww J
_
0
0
ar
ca
U-
m
in
E
Ki chm Famk Ow s Bath L L o
y o
E >
---- ------ o
_ � c
d m
Unfinished Basement
W L
� J j
O cn
_ w
Building Section Q
DAISY
AU B