Loading...
HomeMy WebLinkAboutAgenda 04_SD-21-12_311 Market St_Snyder Braverman_SK 575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburl.com TO: South Burlington Development Review Board FROM: Marla Keene, Development Review Planner SUBJECT: SD-21-12 311 Market Street Sketch Plan Application DATE: May 4, 2021 Development Review Board meeting Snyder-Braverman Development Company, LLC has submitted sketch plan application #SD-21-12 to subdivide an existing 11.9 acre lot into four lots of 9.4 acres (Lot L), 1.0 acres (Lot M4), 1.2 acres (Lot M5), and 0.4 acres (Lot M6) for the purpose of constructing projects on each of Lots M4, M5 and M6, which will be reviewed under separate site plan application, 311 Market Street. The Board began review of the application on April 20, 2020 and continued the meeting to review additional submitted information pertaining to connections to adjoining properties. Subdivision standard #8 reads as follows. (8) Roads, recreation paths, stormwater facilities, sidewalks, landscaping, utility lines and lighting have been designed in a manner that is compatible with the extension of such services and infrastructure to adjacent properties. For Transect Zone subdivisions, this standard shall only apply to the location and type of roads, recreation paths, and sidewalks. The City plan includes a pedestrian connection across the wetland on proposed Lot L to the existing City Center Park on Barrett Street. 15.12D(4) Connections to adjacent parcels. (a) If the DRB finds that a roadway or recreation path extension or connection to an adjacent property may or could occur in the future, whether through City action or development of an adjacent parcel, the DRB shall require the applicant to construct the roadway to the property line or contribute the cost of completing the roadway connection. (b) In determining whether a connection to an adjacent property may or could occur, and the location and configuration of such connection, the DRB may consider: (i) The existence of planned roadways or recreation paths in the City’s Comprehensive Plan, Official Map, or these Regulations; (ii) The requirements of the Zoning District in which the adjacent property is located and whether these Regulations allow additional development or development density on the adjacent parcel; (iii) The context of the proposed development’s setting in relation to the adjacent property; (iv) The presence of physical obstacles to such a connection, such as wetlands, water bodies, or steep slopes; #SP-20-035 2 (v) The presence of legal restrictions to development or use on the adjacent property; and/or; (vi) Any other information it deems necessary to make its determination. On April 20, the applicant argued that the City should be responsible for constructing the connection to City Center park because the “City Center – Dumont Park Phase A Alternatives Summary & Recommendations” report prepared by LandWorks refers to the connection as an element of the City Center Park. City Council resolution R-2015-5, entitled “A Resolution Approving a Preferred City Center-Dumont Park Project Preferred Concept, Circulation Plan and Land Acquisition,” included in the April 20 packet for the Board, approves ONLY the following. 1. A preferred park concept for Dumont Park as shown in Exhibit B1. 2. A preferred circulation plan as shown in Exhibit A1. 3. Exploration of land acquisition of the parcel directly to the west of and adjacent to Dumont Park. No element of the City Council resolution approves the full recommendations of the LandWorks study, consistent with typical practice of the City Council, DRB and Planning Commission regarding consultant reports, nor does it indicate who is responsible for construction of the park. Therefore, Staff considers the Board’s direction to the applicant should be based only on the Land Development Regulations and not by the contents of the LandWorks report other than those elements adopted by City Council. Staff notes the City is not the owner of the lands on Lot “L” depicted in Exhibit B, nor does the City intend to acquire those lands. As described in the notes for the April 20 meeting, Staff considers that since City Center Park exists today, 15.12D(4) requires the applicant to construct the connection to City Center Park to the limit of the applicant’s property. Since there is no development proposed on Proposed Lot “L,” Staff recommends the Board consider whether instead of actual construction as required under 15.12D(4), they will allow the applicant to instead provide a conceptual connection design sufficient to demonstrate feasibility in horizontal and vertical space, and to provide a 30-ft wide easement to the City centered on the connection, at the next stage of review. As previously noted, the provided design should demonstrate compliance with the approved wetland impact permits, including DRB conditional use approval #CU-18-01, State wetland permit #2013-293, State stormwater permit 7736-INDS.A, Act 250 permit #4C0503-11, and all other applicable approvals. Respectfully submitted, Marla Keene, Development Review Planner 1 The Exhibits included in the resolution were originally developed in conjunction with the LandWorks study. Consulting Engineers, Inc.LAMOUREUX & DICKINSON14 Morse DriveEssex Junction, VT 05452Tel: 802-878-4450THESE PLANS WITH LATEST REVISIONS SHOULD ONLY BE USED FORTHE PURPOSE SHOWN BELOW:REVISIONSFINAL LOCAL REVIEWPRELIMINARYSKETCH/CONCEPTSOUTH BURLINGTONCITY CENTER, LLCLANDS OFMARKET STREET SOUTH BURLINGTON, VT15143KMRABRABRDLH/DJGsht. no.scaledatecheckeddrawndesignsurveyproject no.RECORD DRAWINGCONSTRUCTIONACT 250 REVIEWdescriptiondatebyPL-1AS NOTEDPROJECTSITERICK MARCOTTECENTRAL SCHOOLLOCATION PLANNTS N/F LEGENDTO THE BEST OF MY KNOWLEDGE, THIS PLAT IS BASEDON INFORMATION ABSTRACTED FROM PERTINENTDEEDS AND/OR OTHER OFFICIAL RECORDS, ANDMARKERS EVIDENT ON THE PROPERTY, ANDCONFORMS WITH THE REQUIREMENTS OF 27 VSA§1403. DATED THIS _____ DAY OF ____________, 2021_________________________________________PROPERTY LINE TO BE DISSOLVEDABUTTING PROPERTY LINEIRON PIPE FOUNDIRON PIPE SETCONCRETE MONUMENT FOUNDNOW OR FORMERLYABOVE GRADEBELOW GRADELANDOWNERSOUTH BURLINGTON CITY CENTER, LLCC/O SOUTH BURLINGTON REALTY CO.P.O. BOX 2204SOUTH BURLINGTON, VT 05407DEED REFERENCE:VOL. 853, PAGE 222PARCEL AREA: 21.74 ACRESTAX MAP PARCEL:0450-00002IPFIPSNOTES:1. THE PURPOSE OF THIS PLAN IS TO SUBDIVIDE LOT L, CREATING LOTS M4-M6 AND A MODIFIED LOT L.2. THIS PLAT WAS COMPILED FROM FIELD SURVEYS AND RECORD RESEARCH INCLUDING THE USE OF THEFOLLOWING PLATS:A."CORPORATE CIRCLE, SOUTH BURLINGTON, VERMONT, SOUTH BURLINGTON REALTY CORP., PROPERTYPLAT." BY WEBSTER-MARTIN, INC., DATED SEPT. 1981, LAST REVISED 5-27-92, AS RECORDED IN SLIDE 248OF THE CITY OF SOUTH BURLINGTON LAND RECORDS.B. "ALTA/ACSM LAND TITLE SURVEY, CENTURY PARTNERS, 100 DORSET STREET, SOUTH BURLINGTON,VERMONT." BY TRUDELL CONSULTING ENGINEERS, DATED DECEMBER 9, 1997, LAST REVISED 11/26/07, ASRECORDED IN SLIDE 509 OF THE CITY OF SOUTH BURLINGTON LAND RECORDS.C. "SOUTH BURLINGTON SCHOOL DISTRICT, SOUTH BURLINGTON CENTRAL SCHOOL, 10 MARKET STREET,SOUTH BURLINGTON, VERMONT. " BY CIVIL ENGINEERING ASSOCIATES, INC., DATED MAY 19, 2004, LASTREVISED 12-17-04 AS RECORDED IN SLIDE 447 OF THE CITY OF SOUTH BURLINGTON LAND RECORDS.D. "SUBDIVISION ASND BOUNDARY LINE ADJUSTMENT PLAT, LANDS OF SOUTH BURLINGTON CITY CENTER,LLC", SHEET PL-1, BY LAMOUREUX & DICKINSON CONSULTING ENGINEERS, INC. DATED 10-14-16, LASTREVISED 04-04-18 AS RECORDED IN SLIDE 625.1 OF THE CITY OF SOUTH BURLINGTON LAND RECORDS.E. "SUBDIVISION ASND BOUNDARY LINE ADJUSTMENT PLAT, LANDS OF SOUTH BURLINGTON CITY CENTER,LLC", SHEET PL-2, BY LAMOUREUX & DICKINSON CONSULTING ENGINEERS, INC. DATED 01-25-18, LASTREVISED 06-11-18 AS RECORDED IN SLIDE 625.2 OF THE CITY OF SOUTH BURLINGTON LAND RECORDS.F. "5 LOT SUBDIVISION SOUTH BURLINGTON CITY CENTER, INC., MARKET STREET SOUTH BURLINGTON, VT"SHEETS P1 & P2, BY CIVIL ENGINEERING ASSOCIATES, INC. DATED 06-01-18 AS RECORDED IN SLIDE 626.1 &626.2 OF THE CITY OF SOUTH BURLINGTON LAND RECORDS.G. "SUBDIVISION PLAT", SHEET PL-1 BY LAMOUREUX & DICKINSON CONSULTING ENGINEERS, INC. DATED07-15-19, LAST REVISED 12-05-19, AS RECORDED IN SLIDE ____ OF THE CITY OF SOUTH BURLINGTON LANDRECORDS.2. BEARINGS SHOWN ON THIS SURVEY ARE BASED ON GPS OBSERVATIONS RECORDED IN OCTOBER, 2016.3. THIS PROPERTY MAY BE SUBJECT TO OTHER EASEMENTS AND/OR RIGHTS-OF-WAY.4. A CLOSED TRAVERSE SURVEY WAS COMPLETED IN OCTOBER, 2016. THE METHODS AND THE RESULTINGERROR OF CLOSURE MEET OR EXCEED THE MINIMUM PRECISION REQUIREMENTS FOR URBAN SURVEYS.5. MONUMENTATION FOUND IS AS NOTED ON PLAN. IRON PIPES SET ARE 1" DIAMETER WITH A PLASTIC CAP.6. THE RIGHT-OF-WAY WIDTH FOR MARKET STREET OF 80 FEET IS BASED ON A DEED RECORDED IN VOL. 687,PAGE 143.AGBGSUBDIVISION PLATCMFCITY OF SOUTH BURLINGTON, VT. __________________ , 20___ATTEST: ______________________________ CITY CLERK__ M., AND RECORDED IN SLIDE# ________RECEIVED FOR RECORD AT________ O'CLOCKCITY CLERK'S OFFICECONCRETE MONUMENT TO BE SETCMSCALCULATED POINT NO MARKER FOUND OR SETWHITE STWILLISTON ROADHINESBURG ROADDORSET STREETIBY STREETBARRETT STSAN REMO DRMARKET ST10001002004001" = 100 FEET INSETSCALE 1" = 20'LINE TABLELINE NUMBER BEARING DISTANCEL1N43°34'48"E50.13'L2S46°25'12"E49.97'L3 S43°35'10"W 50.13'SIDELINE OF EASEMENTL6 S52°38'42"W 28.71'L7N52°38'42"E18.36'L8N52°38'42"E10.36'L4N46°25'12"W14.02'L5N08°36'59"E5.00'07-15-19PROPOSED PROPERTY LINESCHEDULE OF EASEMENTSA15' WIDE PEDESTRIAN EASEMENT TO THE CITYOF SOUTH BURLINGTON (VOL. 212, PG. 152)BCULVERT, HEADWALL, RIP-RAP AND UTILITY EASEMENTTO CITY OF SOUTH BURLINGTON (VOL. 1217, PG. 137-139)CSTORMWATER EASEMENT TO BLACKBAY VENTURES XI, LLCDEASEMENT TO CITY OF SOUTH BURLINGTON FOR STORM WATER DETENTION BASIN, ARECREATION AREA AROUND THE STORMWATER DETENTION BASIN, AND APEDESTRIAN AND BICYCLE RECREATION PATH FOR PUBLIC USE (VOL. 1408, PG. 79)EEASEMENT TO CITY OF SOUTH BURLINGTON FOR STORMWATER DETENTION BASIN (VOL. 1408, PG. 79)FPROPOSED 55' WIDE ACCESS & UTILITY EASEMENT FOR THEBENEFIT OF LOTS M1, M3 & M411-22-19 MINOR LOT LINE ADJUSTMENT - LOTS L, M1, M2, M3ABRGPROPOSED 15' WIDE PEDESTRIAN PATH EASEMENT TO THECITY OF SOUTH BURLINGTON12-05-19 ADD PROPOSED 15' PED PATH EASE ON LOTS M2 & M3 ABRAPPROVED BY RESOLUTION OF THE DEVELOPMENT REVIEWBOARD OF THE CITY OF SOUTH BURLINGTON,VERMONT, ON THE____ DAY OF _______________, 2021SUBJECT TO THE REQUIREMENTS AND CONDITIONS OF SAIDRESOLUTION. SIGNED THIS ____ DAY OF ___________ 2021 BY(CLERK OR CHAIRMAN)04-02-21 SUBDVIDE LOT L - CREATE LOTS M4-M6ABRPROJECT BOUNDARY Consulting Engineers, Inc.LAMOUREUX & DICKINSON14 Morse DriveEssex Junction, VT 05452Tel: 802-878-4450THESE PLANS WITH LATEST REVISIONS SHOULD ONLY BE USED FORTHE PURPOSE SHOWN BELOW:REVISIONSFINAL LOCAL REVIEWPRELIMINARYSKETCH/CONCEPTSOUTH BURLINGTONCITY CENTER, LLCLANDS OFMARKET STREET SOUTH BURLINGTON, VT15143KMRABRABRDLH/DJGsht. no.scaledatecheckeddrawndesignsurveyproject no.RECORD DRAWINGCONSTRUCTIONACT 250 REVIEWdescriptiondatebyPL-1AS NOTEDPROJECTSITERICK MARCOTTECENTRAL SCHOOLLOCATION PLANNTS N/F LEGENDTO THE BEST OF MY KNOWLEDGE, THIS PLAT IS BASEDON INFORMATION ABSTRACTED FROM PERTINENTDEEDS AND/OR OTHER OFFICIAL RECORDS, ANDMARKERS EVIDENT ON THE PROPERTY, ANDCONFORMS WITH THE REQUIREMENTS OF 27 VSA§1403. DATED THIS _____ DAY OF ____________, 2021_________________________________________PROPERTY LINE TO BE DISSOLVEDABUTTING PROPERTY LINEIRON PIPE FOUNDIRON PIPE SETCONCRETE MONUMENT FOUNDNOW OR FORMERLYABOVE GRADEBELOW GRADELANDOWNERSOUTH BURLINGTON CITY CENTER, LLCC/O SOUTH BURLINGTON REALTY CO.P.O. BOX 2204SOUTH BURLINGTON, VT 05407DEED REFERENCE:VOL. 853, PAGE 222PARCEL AREA: 21.74 ACRESTAX MAP PARCEL:0450-00002IPFIPSNOTES:1. THE PURPOSE OF THIS PLAN IS TO SUBDIVIDE LOT L, CREATING LOTS M4-M6 AND A MODIFIED LOT L.2. THIS PLAT WAS COMPILED FROM FIELD SURVEYS AND RECORD RESEARCH INCLUDING THE USE OF THEFOLLOWING PLATS:A."CORPORATE CIRCLE, SOUTH BURLINGTON, VERMONT, SOUTH BURLINGTON REALTY CORP., PROPERTYPLAT." BY WEBSTER-MARTIN, INC., DATED SEPT. 1981, LAST REVISED 5-27-92, AS RECORDED IN SLIDE 248OF THE CITY OF SOUTH BURLINGTON LAND RECORDS.B. "ALTA/ACSM LAND TITLE SURVEY, CENTURY PARTNERS, 100 DORSET STREET, SOUTH BURLINGTON,VERMONT." BY TRUDELL CONSULTING ENGINEERS, DATED DECEMBER 9, 1997, LAST REVISED 11/26/07, ASRECORDED IN SLIDE 509 OF THE CITY OF SOUTH BURLINGTON LAND RECORDS.C. "SOUTH BURLINGTON SCHOOL DISTRICT, SOUTH BURLINGTON CENTRAL SCHOOL, 10 MARKET STREET,SOUTH BURLINGTON, VERMONT. " BY CIVIL ENGINEERING ASSOCIATES, INC., DATED MAY 19, 2004, LASTREVISED 12-17-04 AS RECORDED IN SLIDE 447 OF THE CITY OF SOUTH BURLINGTON LAND RECORDS.D. "SUBDIVISION ASND BOUNDARY LINE ADJUSTMENT PLAT, LANDS OF SOUTH BURLINGTON CITY CENTER,LLC", SHEET PL-1, BY LAMOUREUX & DICKINSON CONSULTING ENGINEERS, INC. DATED 10-14-16, LASTREVISED 04-04-18 AS RECORDED IN SLIDE 625.1 OF THE CITY OF SOUTH BURLINGTON LAND RECORDS.E. "SUBDIVISION ASND BOUNDARY LINE ADJUSTMENT PLAT, LANDS OF SOUTH BURLINGTON CITY CENTER,LLC", SHEET PL-2, BY LAMOUREUX & DICKINSON CONSULTING ENGINEERS, INC. DATED 01-25-18, LASTREVISED 06-11-18 AS RECORDED IN SLIDE 625.2 OF THE CITY OF SOUTH BURLINGTON LAND RECORDS.F. "5 LOT SUBDIVISION SOUTH BURLINGTON CITY CENTER, INC., MARKET STREET SOUTH BURLINGTON, VT"SHEETS P1 & P2, BY CIVIL ENGINEERING ASSOCIATES, INC. DATED 06-01-18 AS RECORDED IN SLIDE 626.1 &626.2 OF THE CITY OF SOUTH BURLINGTON LAND RECORDS.G. "SUBDIVISION PLAT", SHEET PL-1 BY LAMOUREUX & DICKINSON CONSULTING ENGINEERS, INC. DATED07-15-19, LAST REVISED 12-05-19, AS RECORDED IN SLIDE ____ OF THE CITY OF SOUTH BURLINGTON LANDRECORDS.2. BEARINGS SHOWN ON THIS SURVEY ARE BASED ON GPS OBSERVATIONS RECORDED IN OCTOBER, 2016.3. THIS PROPERTY MAY BE SUBJECT TO OTHER EASEMENTS AND/OR RIGHTS-OF-WAY.4. A CLOSED TRAVERSE SURVEY WAS COMPLETED IN OCTOBER, 2016. THE METHODS AND THE RESULTINGERROR OF CLOSURE MEET OR EXCEED THE MINIMUM PRECISION REQUIREMENTS FOR URBAN SURVEYS.5. MONUMENTATION FOUND IS AS NOTED ON PLAN. IRON PIPES SET ARE 1" DIAMETER WITH A PLASTIC CAP.6. THE RIGHT-OF-WAY WIDTH FOR MARKET STREET OF 80 FEET IS BASED ON A DEED RECORDED IN VOL. 687,PAGE 143.AGBGSUBDIVISION PLATCMFCITY OF SOUTH BURLINGTON, VT. __________________ , 20___ATTEST: ______________________________ CITY CLERK__ M., AND RECORDED IN SLIDE# ________RECEIVED FOR RECORD AT________ O'CLOCKCITY CLERK'S OFFICECONCRETE MONUMENT TO BE SETCMSCALCULATED POINT NO MARKER FOUND OR SETWHITE STWILLISTON ROADHINESBURG ROADDORSET STREETIBY STREETBARRETT STSAN REMO DRMARKET ST10001002004001" = 100 FEET INSETSCALE 1" = 20'LINE TABLELINE NUMBER BEARING DISTANCEL1N43°34'48"E50.13'L2S46°25'12"E49.97'L3 S43°35'10"W 50.13'SIDELINE OF EASEMENTL6 S52°38'42"W 28.71'L7N52°38'42"E18.36'L8N52°38'42"E10.36'L4N46°25'12"W14.02'L5N08°36'59"E5.00'07-15-19PROPOSED PROPERTY LINESCHEDULE OF EASEMENTSA15' WIDE PEDESTRIAN EASEMENT TO THE CITYOF SOUTH BURLINGTON (VOL. 212, PG. 152)BCULVERT, HEADWALL, RIP-RAP AND UTILITY EASEMENTTO CITY OF SOUTH BURLINGTON (VOL. 1217, PG. 137-139)CSTORMWATER EASEMENT TO BLACKBAY VENTURES XI, LLCDEASEMENT TO CITY OF SOUTH BURLINGTON FOR STORM WATER DETENTION BASIN, ARECREATION AREA AROUND THE STORMWATER DETENTION BASIN, AND APEDESTRIAN AND BICYCLE RECREATION PATH FOR PUBLIC USE (VOL. 1408, PG. 79)EEASEMENT TO CITY OF SOUTH BURLINGTON FOR STORMWATER DETENTION BASIN (VOL. 1408, PG. 79)FPROPOSED 55' WIDE ACCESS & UTILITY EASEMENT FOR THEBENEFIT OF LOTS M1, M3 & M411-22-19 MINOR LOT LINE ADJUSTMENT - LOTS L, M1, M2, M3ABRGPROPOSED 15' WIDE PEDESTRIAN PATH EASEMENT TO THECITY OF SOUTH BURLINGTON12-05-19 ADD PROPOSED 15' PED PATH EASE ON LOTS M2 & M3 ABRAPPROVED BY RESOLUTION OF THE DEVELOPMENT REVIEWBOARD OF THE CITY OF SOUTH BURLINGTON,VERMONT, ON THE____ DAY OF _______________, 2021SUBJECT TO THE REQUIREMENTS AND CONDITIONS OF SAIDRESOLUTION. SIGNED THIS ____ DAY OF ___________ 2021 BY(CLERK OR CHAIRMAN)04-02-21 SUBDVIDE LOT L - CREATE LOTS M4-M6ABRPROJECT BOUNDARYSITE DEVELOPMENT 04-02-21 DRAFT FOR REVIEW: 4.2.15 CITY CENTER | PHASE A ALTERNATIVES SUMMARY CITY CENTER | PHASE A ALTERNATIVES SUMMARY DRAFT FOR REVIEW: 4.2.15 33 City Center - Dumont Park DATE: March 17, 2015 LandWorks · Jackie Brookner - Ecological Artist · Engineering Ventures · North Woods Ecological Consulting · Hartgen Archeological Associates, Inc. DRAFT FOR REVIEW Overall Circulation-Preferred Plan Option 0 150’300’600’ Source: Esri, DigitalGlobe, GeoEye, i-cubed, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community See Conceptual Site Plan-Preferred Option Bike/ped access to Market Street (paths associated with Market Street stormwater feature) Boardwalk See inset Bike/ped access to future Garden Street (assumes Garden Street will include cycle track) 10’ paved multi-use path to Garden St. 10’ paved multi-use path to San Remo Dr. Pre-engineered bridge, approx. 30’ span with headwalls Pre-engineered bridge, approx. 75’ span with headwalls 10’ paved multi-use path with retaining wall INSET: Pedestrian multi-use path & connections 0’50’ DRAFT FOR REVIEW: 4.2.15 CITY CENTER | PHASE A ALTERNATIVES SUMMARY CITY CENTER | PHASE A ALTERNATIVES SUMMARY DRAFT FOR REVIEW: 4.2.15 City Center - Dumont Park DATE: March 18, 2015 LandWorks · Jackie Brookner - Ecological Artist · Engineering Ventures · North Woods Ecological Consulting · Hartgen Archeological Associates, Inc. DRAFT FOR REVIEW Conceptual Site Plan - Preferred Option 0 50’100’200’ Source: Esri, DigitalGlobe, GeoEye, i-cubed, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community Kiosk / gateway element Pedestrian bridge (6’ wide, with railings) Wetland restoration area Outer loop path (4’ wide, gravel/stonedust) Boardwalk (5’ wide, no railings- except on multi-use path- 10’ wide w/ railings) Multi-use path (10’ wide, paved, with lighting) Outdoor classroom w/ seating (stone slabs or seat walls) Natural play area (logs, boulders, etc. w/ bark mulch ground surface) Inner loop path (5’ wide, gravel/stonedust) - “wildflower walk” “Pause place” or destination with natural design/art element(s) Accessible tree house Multi-use boardwalk/bridge (10’ wide, railings, approx. 5’ above wetland water level) Access to Garden Street (to be determined by future City Center development plan) Access path for Market Street stormwater feature Note: benches, wayfinding signs, and interpetive elements to be located throughout the park as appropriate Class II wetland Class III wetland 50’ wetland buffer Existing path 1 1 1 1 1 9 9 5 5 555 5 13 14 13 14 3 3 3 3 11 11 7 7 2 2 10 10 10 6 6 4 4 12 12 8 8 34