HomeMy WebLinkAboutSD-05-83 SD-05-84 - Decision - 0147 Spear StreetCITY OF SOUTH BURLINGTON
DEPARTMENT OF PLANNING AND ZONING
UNIVERSITY OF VERMONT - PLANNED UNIT DEVELOPMENT
147 SPEAR STREET
PRELMINARY PLAT APPLICATION #SD-05-83
FINAL PLAT APPLICATION #SD-05-84
FINDINGS OF FACT AND DECISION
The University of Vermont, hereafter referred to as the applicant, is seeking preliminary
and final plat plan approval for a proposal to construct a 600' x 275' athletic track, 14930
sq. ft. located in South Burlington, 147 Spear Street. The Development Review Board
held a public hearing on November 1, 2005. Lani Ravin represented the applicant.
Based on testimony provided at the above mentioned public hearing and supporting
materials contained in the document file for this application, the Development Review
Board finds, concludes, and decides the following:
INDINGS OF FACT
1. The applicant is seeking preliminary and final plat plan approval for a proposal to
construct a 600' x 275' athletic track, 14930 sq. ft. located in South Burlington,
147 Spear Street.
2. The Development Review Board reviewed the sketch plan for this project on July
19, 2005.
3. The owner of record of the subject property is the University of Vermont.
4. The subject property is located in the Institutional & Agricultural -North (IA-N)
Zoning District.
5. The plans submitted consist of a ten (10) page set of plans, page one (1) entitled,
"UVM Track 147 Spear Street Burlington, Vermont", prepared by Gossens
Bachman Architects, dated May 2005.
ZONING DISTRICT & DIMENSIONAL REQUIREMENTS
Table 1. Dimensional Requirements
WN Zoning District
Required
Proposed
�l Min. Lot Size
10 acres
±14.43 acres
�l Max. Building Coverage
20%
<20%
Max. Overall Coverage
40%
37.5%
�l Min. Front Setback
75 ft.
>75 ft.
Min. Side Setback
50 ft.
>50 ft.
Min. Rear Setback
50 ft.
>50 ft.
zoning compliance
Section 3.06(H) of the South Burlington Land Development Regulations prohibits more than
30% of the front setback from being used for driveways and parking, and the balance shall
be landscaped and maintained in good appearance. Furthermore, a continuous landscaped
strip of 15 ft. in width traversed only by driveways and sidewalks shall be maintained
between the street right-of-way and the balance of the lot. The proposed athletic track
project will not affect front yard coverage.
Institutional & Agricultural District
Section 7.01(F)(1) of the South Burlington Land Development Regulations requires
properties in the IA District west of Spear Street and north of Quarry Hill Road to maintain
an undeveloped area for a minimum of 65 ft. between the boundary of an adjacent
residential district and any new non-residential structure. The plans show that the proposed
athletic track will be further than 65 ft. from the zoning district boundary, which occurs at the
center of the Spear Street right-of-way. The proposed track is 100 ft. from the Spear Street
center line. An existing line of trees along the easterly property boundary provides suitable
screening in accordance with Section 3.06 of the South Burlington Land Development
Regulations, offering a buffer from residential uses.
PLANNED UNIT DEVELOPMENT STANDARDS
Pursuant to Section 15.18 of the South Burlington Land Development Regulations, PUDs
shall comply with the following standards and conditions:
Sufficient water supply and wastewater disposal capacity is available to meet the
needs of the project.
No water or wastewater services will be required for the new athletic field.
Section 15.13(F) of the South Burlington Land Development Regulations requires that the
PUD meet the standards of the Vermont Stormwater Management Manual. The applicant
has indicated that they will build a new stormwater treatment pond east of the new track
-2-
that will be designed to have capacity for all future development on the athletic complex.
This pond will meet the Vermont stormwater management standards.
Sufficient grading and erosion controls will be utilized during and after construction
to prevent soil erosion and runoff from creating unhealthy or dangerous conditions
on the subject property and adjacent properties.
The applicant has submitted acceptable details of erosion control measures to be used
during and after construction. The proposed project adheres to standards for erosion
control as set forth in Section 16.03 of the South Burlington Land Development
Regulations. In addition, the grading plan meets the standards set forth in Section 16.04 of
the South Burlington Land Development Regulations.
The project incorporates access, circulation, and traffic management strategies
sufficient to prevent unreasonable congestion of adjacent roads.
According to the applicant, the track will be used daily for practice in the fall and spring,
with general recreational use available at other times. The track will host 3-5
intercollegiate meets per year. The applicant also estimates that approximately 250
spectators may attend each meet. The applicant has indicated that additional parking will
not be necessary for the increased use of the athletic complex. The current parking
facility is adequate to support spectators at ice hockey games and basketball games
simultaneously in the winter, which is the peak season for the complex. It is not
anticipated that the demand for the proposed athletic track will surpass the current
capacity of the parking facility.
The project's design respects and will provide suitable protection to wetlands,
streams, wildlife habitat as identified in the Open Space Strategy, and any unique
natural features on the site.
No wetlands, streams, wildlife habitat, or unique natural features are known to be present
on the site.
The project is designed to be visually compatible with the planned development
patterns in the area, as specified in the Comprehensive Plan and the purpose of the
zoning district(s) in which it is located.
Section 7.01(A) of the South Burlington Land Development Regulations indicates that
University -related uses should be integrated "into the City's overall land use pattern through
the use of appropriate site planning techniques that promote a beneficial pattern of access,
circulation, landscaping, and pedestrian connections between University properties and
adjacent neighborhoods." The subject site has long contained a track and athletic fields. A
slight increased use of the area is anticipated. However, an established tree line along the
easterly property boundary provides appropriate screening from adjacent residential uses.
The project is compatible with existing development in the area.
Open space areas on the site have been located in such a way as to maximize
opportunities for creating contiguous open spaces between adjoining parcels and/or
stream buffer areas.
-3-
The proposed track will replace a previously existing track. The effects on the open space
character of the athletic fields will be minimal.
The layout of a subdivision or PUD has been reviewed by the Fire Chief or (designee)
to ensure that adequate fire protection can be provided.
The proposed changes to the athletic fields on the site do not require review by the South
Burlington Fire Department. Fire Chief Doug Brent has previously noted that the City of
Burlington has jurisdiction for emergency response to the subject property.
Roads, recreation paths, stormwater facilities, sidewalks, landscaping, utility lines
and lighting have been designed in a manner that is compatible with the extension of
such services and infrastructure to adjacent landowners.
An existing recreation path runs along the easterly property line. No new landscaping is
proposed. The stormwater and utility plans, as depicted on the plans, appear compatible
with stormwater management and utilities on adjacent properties. The applicant has
indicated that no new lighting is proposed.
Roads, utilities, sidewalks, recreation paths, and lighting are designed in a manner
that is consistent with City utility and roadway plans and maintenance standards.
Any newly installed utility lines, services, and service modifications shall be underground.
The project is consistent with the goals and objectives of the Comprehensive Plan
for the affected district(s).
The project is consistent with the goals and objectives of the Comprehensive Plan.
Sidewalks & Recreation Paths
Section 15.13(M)(1) of the South Burlington Land Development Regulations requires
sidewalks and/or recreation paths on both sides of arterial streets at locations to be
determined by the Development Review Board. There is an existing recreation path along
the easterly property boundary.
SITE PLAN REVIEW STANDARDS
Pursuant to Section 14.03(A)(6) of the South Burlington Land Development Regulations
any PUD shall require site plan approval. Section 14.06 establishes the following general
review standards for all site plan applications:
The site shall be planned to accomplish a desirable transition from structure to site,
from structure to structure, and to provide for adequate planting, safe pedestrian
movement, and adequate parking areas.
The proposal does not directly involve structures or parking facilities. Adequate pedestrian
facilities and landscaping exist on the site.
-4-
Parking shall be located to the rear or sides of buildings to the greatest extent
practicable.
The proposal does not directly involve parking facilities.
Without restricting the permissible limits of the applicable zoning district, the height
and scale of each building shall be compatible with its site and existing or adjoining
buildings.
No buildings are proposed.
Newly installed utility services and service modifications necessitated by exterior
alterations or building expansions shall, to the extent feasible, be underground.
It has already been noted that utilities lines, services, and service modifications shall be
underground.
The DRB shall encourage the use of a combination of common materials and
architectural characteristics, landscaping, buffers, screens and visual interruptions
to create attractive transitions between buildings of different architectural styles.
The proposal does not involve any buildings.
Proposed structures shall be related harmoniously to themselves, the terrain and to
existing buildings and roads in the vicinity that have a visual relationship to the
proposed structures.
The proposed project meets this criterion.
In addition to the above general review standards, site plan applications shall meet the
following specific standards as set forth in Section 14.07 of the South Burlington Land
Development Regulations:
The reservation of land may be required on any lot for provision of access to
abutting properties whenever such access is deemed necessary to reduce curb cuts
onto an arterial of collector street, to provide additional access for emergency or
other purposes, or to improve general access and circulation in the area.
The subject site is part of a larger site containing multiple university offices and facilities.
The applicant is currently completing construction of an expanded parking facility on the
subject parcel.
Electric, telephone and other wire -served utility lines and service connections shall
be underground. Any utility installations remaining above ground shall be located so
as to have a harmonious relation to neighboring properties and to the site.
It has already been noted that utilities lines, services and service modifications shall be
underground.
All dumpsters and other facilities to handle solid waste, including compliance with
any recycling or other requirements, shall be accessible, secure and properly
- 5 -
screened with opaque fencing to ensure that trash and debris do not escape the
enclosure(s).
No solid waste facilities are shown. Dumpster-sized solid waste containers are not
necessary for the proposed athletic track.
Parking
The proposal does not directly involve parking facilities. It has already been indicated that
the current parking lots and garages will be adequate to support the proposed track.
While the South Burlington Land Development Regulations do not require bicycle racks for
such uses, the Board respectfully suggests that the plans include a bicycle rack. The
proposed track is adjacent to an existing bike path and the nature of the use of the track
would warrant such an item.
Landscaping
Pursuant to Section 13.06(A) of the South Burlington Land Development Regulations,
landscaping and screening shall be required for all uses subject to site plan and PUD
review, and street tree plantings shall be required for all public streets in a PUD. Section
13.06(C) of the South Burlington Land Development Regulations requires landscaping
and/or screening whenever two adjacent uses are dissimilar. Furthermore, Section
13.06(C)(3) of the South Burlington Land Development Regulations require landscaping to
be designed to minimize erosion and stormwater runoff. While no minimum landscaping is
required, the applicant is proposing $40,000 in landscaping surrounding the stormwater
retention basin, entirely within the City of South Burlington. The plans also show an
established line of street trees along the easterly property line.
DECISION
Motion by seconded b
to approve Preli inary Plat Applicati n #SD-05-83 and Final Plat Application #SD-05-84
of the University of Vermont, subject to the following conditions:
1. All previous approvals and stipulations shall remain in full effect, except as
amended herein.
2. This project shall be completed as shown on the plat submitted by the applicant,
and on file in the South Burlington Department of Planning and Zoning.
3. The plat plans shall be revised to show the changes below and shall require
approval of the Administrative Officer. Three (3) copies of the approved revised
plans must be submitted to the Administrative Officer prior to recording.
a. The final plat plan shall be revised to incorporate the changes
requested by the Director of Public Works.
4. Pursuant to Section 15.13(E) of the Land Development Regulations, any new
utility lines, services, and service modifications shall be underground.
-6-
5. The applicant shall post a $40,000 landscape bond, prior to issuance of a zoning
permit. The bond shall remain in effect for three (3) years to assure that the
landscaping has taken root and has a good chance of surviving.
6. Any changes to the final plat plan shall require approval of the South Burlington
Development Review Board.
7. The final plat plan (Sheet C1.2) shall be recorded in the land records within 180
days or this approval is null and void. The plan shall be signed by the Board
Chair or Clerk prior to recording.
Mark Behr — re nay/abstain/not present
MatthewBirmingham — yea/nay/abstain not present
Chuck Bolton — ye ay/abstain/not presen
John Dinklage — e nay/abstain/not present
Roger Farley — 5eay/abstain/not
/abstain/not present
Larry Kupferman nay/abstain/not present
Gayle Quimby — present
Motion carried by a vote of & - 0-0
Signed this -?
day of�✓�`
4
John Dinklage, Chair
LO
2005, by
Please note: You have the right to appeal this decision to the Vermont Environmental
Court, pursuant to 24 VSA 4471 and VRCP 76 in writing, within 30 days of the date this
decision is issued. The fee is $225.00. If you fail to appeal this decision, your right to
challenge this decision at some future time may be lost because you waited too long.
You will be bound by the decision, pursuant to 24 VSA 4472 (d) (exclusivity of remedy;
finality).
7-