Loading...
HomeMy WebLinkAboutSD-03-81 - Decision - 0097 Spear StreetCITY of SOUTH BURLINGTON DEPARTMENT of PLANNING & ZONING UVM PARKING GARAGE — PLANNED UNIT DEVELOPMENT FINAL PLAT APPLICATION #SD-03-81 FINDINGS of FACT AND DECISION The University of Vermont, hereafter referred to as the applicant, is requesting fmal plat plan approval for a Planned Unit Development (PUD) consisting of a proposed 254,100 sq. ft. parking garage, 176,400 sq. ft. of which falls within the City of South Burlington. The subject property contains approximately 14.43 acres located in South Burlington. The South Burlington portions of the property are located in the Institutional and Agricultural -North (IA-N) District. The South Burlington Development Review Board (DRB) held a public hearing on January 20, 2004. Bob Penniman represented the applicant. Based on testimony provided at the above mentioned public hearing and the plans and supporting materials contained in the document file for this application, the DRB finds, concludes, and decides the following: FINDINGS OF FACT 1. The applicant is requesting fmal plat plan approval for a Planned Unit Development (PUD) consisting of a proposed 254,100 sq. ft. parking garage, 176,400 sq. ft. of which falls within the City of South Burlington. The subject property contains approximately 14.43 acres located in South Burlington. 2. The owner of the record is the University of Vermont. 3. The subject property contains 14.43 acres and is located in the Institutional and Agricultural - North (IA-N) District. 4. The plans consist of one (1) sheet entitled "South Campus Master Plan", prepared by Krebs and Lansing Consulting Engineers, Inc., dated December 10, 2003; one (1) sheet entitled "Overall Watersheds with Snow Storage", prepared by Krebs and Lansing Consulting Engineers, Inc., dated December 11, 2003; sixteen (16) sheets entitled "UVM Gutterson Parking Facility - Burlington, Vermont", prepared by Civil Engineering Associates, Inc.; Smith, Alverez, and Sienkiewycz Architects; Desman Associates; and Barr & Barr, Inc., dated October 30, 2003, last revised on December 12, 2003; and one (1) survey plat entitled `Burlington/South Burlington City Line from Main Street South to 233 Spear Street", prepared by Harris G. Abbott, dated June 25, 2003. 5. The Development Review Board granted preliminary plat plan approval of the project on December 2, 2003. ZONING DISTRICT & DIMENSIONAL REQUIREMENTS Table 1. Dimensional Requirements IA-N Zoning District Required Pro osed 4 Mn. Lot Size 10 acres ±14.43 acres Max. Building Coverage 20% 10.31% Max. Overall Coverage 40% 38.57% 4 Max. Front Yard Coverage 30% 38.07% ♦ Min. Front Setback 75 ft. 60 ft. Min. Side Setback 50 ft. >50 ft. Min. Rear Setback 50 ft. > 50 ft. Max. Buildin Hei ht 35 ft. 34 ft. zoning compliance ♦ waiver required pursuant to Section 15.02(A)(3) of the Land Development Regulations 40 preexisting noncompliance Setbacks Pursuant to Table C-2 of the South Burlington Land Development Regulations, all structures in the IA-N District require a 75 ft. front yard setback. The front yard setback of the proposed project is approximately 60 ft., which is not in compliance with the South Burlington Land Development Regulations. However, pursuant to Section 15.02(A)(3) of the South Burlington Land Development Regulations, in conjunction with PUD review, the Development Review Board may allow a new structure up to 5 ft. from any property line. Thus, the Development Review Board may approve this setback encroachment for the proposed project. Front Yard Coverage Section 3.06(H) of the South Burlington Land Development Regulations prohibits more than 30% of the front setback from being used for driveways and parking, and the balance shall be landscaped. Furthermore, a continuous landscaped strip of 15 ft. in width traversed only by driveways and sidewalks shall be maintained between the street right-of-way and the balance of the lot. The applicant has stated that the front yard coverage, which is currently 38.07%, will not change as a result of the proposed project. The applicant has received permission from the City Council to use the City's right-of-way along Spear Street for landscaping, but it shall not count towards coverage requirements. Pa Height Pursuant to Section 3.07 of the South Burlington Land Development Regulations, no point of the parking structure shall rise more than 35 ft. above the average pre -construction grade. This standard applies to the portions of the parking structure falling within the City of South Burlington. The applicant submitted a building elevation plan which indicates that the height of the proposed parking structure will be 34 ft., measured from the average pre -construction grade of the site (393') to the top of the lighting fixtures (427). Traffic For a PUD application, Section 15.12(E)(1) of the South Burlington Land Development Regulations establishes level of service measures rather than traffic generation measures as limiters to the proposed development. According to Section 15.12(E)(1) of the South Burlington Land Development Regulations, the nearest signalized intersection, or those intersections specified by the DRB , must maintain a level of service of "D" or better at the peak hour, including the anticipated impact of the proposed development. It is unclear what the current level of service is or what level of service would result from the development of the proposed parking facility. The applicant submitted a traffic impact study prepared by Resource Systems Group, Inc. The original traffic study is dated December 2001, but the study was updated in May 2003. On April 1, 2003, during the sketch plan review stage of this project, the DRB passed a motion to invoke technical review of the applicant's traffic study. The City contracted Lamoureux and Dickinson to perform the technical review. Roger Dickinson, of Lamoureux and Dickinson, worked with Resource Systems Group, Inc. throughout the process of developing the traffic study. Roger Dickinson reviewed the traffic study for UVM and provided his comments to Resource Systems Group, Inc. in a memorandum dated November 26, 2003. Resource Systems Group, Inc. responded to Roger Dickinson's concerns in a memorandum dated January 12, 2004. Roger then provided his final comments on the traffic study in a memorandum dated January 16, 2004. The traffic study for this project and associated memorandums are incorporated by reference. Institutional & Agricultural District Section 7.01(F)(1) of the South Burlington Land Development Regulations requires properties in the IA-N District west of Spear Street and north of Quarry Hill Road to maintain an undeveloped area for a minimum of 65 ft. between the boundary of an adjacent residential district and any new non-residential structure. The plans show that the proposed parking structure will be approximately 95 ft. from the zoning district boundary, which occurs at the center of the Spear Street right-of-way. However, the DRB may require landscaping or other suitable screening in accordance with Section 3.06 of the South Burlington Land Development Regulations to ensure adequate buffering of non- residential uses from residential uses. 3 PLANNED UNIT DEVELOPMENT STANDARDS Sidewalks & Recreation Paths Section 15.13(M)(1) of the South Burlington Land Development Regulations requires sidewalks and/or recreation paths on both sides of arterial streets at locations to be determined by the DRB. The plans indicate no sidewalk or recreation path exists on either side of Spear Street in the vicinity of the Gutterson parking facility. The applicant has not proposed any sidewalk or recreation path. The DRB does not require a sidewalk to be constructed along Spear Street as part of the proposed project. Section 15.13(F) of the South Burlington Land Development Regulations requires that the PUD meet the standards of the Vermont Stormwater Management Manual. The City Engineer reviewed and approved the final stormwater plans for the proposed project. Pursuant to Section 15.18 of the South Burlington Land Development Regulations, PUDs shall comply with the following standards and conditions: Sufficient water supply and wastewater disposal capacity is available to meet the needs of the project As already indicated water and wastewater services are not proposed. The applicant has submitted a letter from the City of Burlington's Public Works Department stating that the City of Burlington has sufficient water and wastewater capacity to serve the proposed project. Sufficient grading and erosion controls will be utilized during and after construction to prevent soil erosion and runoff from creating unhealthy or dangerous conditions on the subject property and adjacent properties. Sheets C 10 and C 11 of the plans contain the applicant's erosion control plan and associated details. The City Engineer reviewed the plans and did not raise any issues with the erosion control plans or details. The project incorporates access, circulation and traffic management strategies sufficient to prevent unreasonable congestion of adjacent roads. The applicant submitted a traffic impact study prepared by Resource Systems Group, Inc. The original traffic study is dated December 2001, but the study was updated in May 2003. On April 1, 2003, during the sketch plan review stage of this project, the DRB passed a motion to invoke technical review of the applicant's traffic study. The City contracted Lamoureux and Dickinson to perform the technical review. Roger Dickinson, of Lamoureux and Dickinson, worked with Resource Systems Group, Inc. throughout the process of developing the traffic study. Roger Dickinson reviewed the traffic study for UVM and provided his comments to Resource Systems Group, Inc. in a memorandum dated November 26, 2003. Resource Systems Group, Inc. responded 4 to Roger Dickinson's concerns in a memorandum dated January 12, 2004. Roger then provided his final comments on the traffic study in a memorandum dated January 16, 2004. The project's design respects and will provide suitable protection to wetlands, streams, wildlife habitat as identified in the Open Space Strategy, and any unique natural features on the site. No wetlands, streams, wildlife habitat, or unique natural features are present on the site. The project is designed to be visually compatible with the planned development patterns in the area, as specified in the Comprehensive Plan and the purpose of the zoning districts) in which it is located Section 7.01(A) of the South Burlington Land Development Regulations indicates that university - related uses should be integrated "into the City's overall land use pattern through the use of appropriate site planning techniques that promote a beneficial pattern of access, circulation, landscaping, and pedestrian connections between University properties and adjacent neighborhoods." The proposed project meets this standard. Open space areas on the site have been located in such a way as to maximize opportunities for creating contiguous open spaces between adjoining parcels and/or stream buffer areas. The portions of the site currently covered by the parking lot will be covered by the new parking lot and the proposed parking structure. Some green space within the existing parking lot will be eliminated for the construction of the parking structure. However, open space areas on other portions of the subject property will not be affected. Therefore, this requirement is being met. The layout of a subdivision or PUD has been reviewed by the Fire Chief or (designee) to ensure that adequate fire protection can be provided Fire Chief Doug Brent has indicated that the City of Burlington Fire Department has jurisdiction for emergency response to the subject property. The applicant has submitted a letter from the City of Burlington's Fire Department indicating they have jurisdiction over the proposed structure. Roads, recreation paths, storm waterfacilities, sidewalks, landscaping, utility lines and lighting have been designed in a manner that is compatible with the extension of such services and infrastructure to adjacent landowners. Stormwater details have been approved by the City Engineer. Landscaping is proposed within the Spear Street right-of-way to screen the parking structure. The applicant has submitted a letter from the Burlington Electric Department stating that the City of Burlington will provide the necessary electrical services to the proposed project. The applicant submitted a lighting point by point plan, which is contained on Sheet SL-1 of the plans. 5 Pursuant to Appendix A.9 of the South Burlington Land Development Regulations, luminaries shall not be placed more than 30' above ground level and the maximum illumination at ground level shall not exceed an average of three (3) foot candles. The lighting plan does not indicate the average illumination at ground level on the site. Staff notes that the area that the proposed lighting plan covers is sufficient for the proposed project. However, the average illumination at ground level must be calculated to ensure it is in compliance with the Appendix A.9 of the South Burlington Land Development Regulations. Pursuant to Appendix A.10(b) of the South Burlington Land Development Regulations, indirect glare produced by illumination at ground level shall not exceed 0.3 foot candles maximum, and an average of 0.1 foot candles average. The lighting plan describes the indirect illumination levels in relation to the "Spear Street corridor, edge of pavement." However, the lighting plans must be revised to indicate the indirect illumination levels in relation to the property line. The illumination levels at ground level on the exterior of the property line shall not exceed 0.3 foot candles maximum, and an average of 0.1 foot candles. Roads, utilities, sidewalks, recreation paths, and lighting are designed in a manner that is consistent with City utility and roadway plans and maintenance standards. The parking area lighting plan must comply with Section 13.07 of the South Burlington Land Development Regulations. The applicant has submitted a lighting plan and exterior lighting details for the proposed project, which are in compliance with Appendix D of the South Burlington Land Development Regulations. The height of poles for the proposed lighting for the parking area is 19' 9" and the height of the poles for the proposed lighting for the pedestrian areas is 12' 0". Both of the proposed heights are in compliance with Section 13.07(B) of the South Burlington Land Development Regulations. The project is consistent with the goals and objectives of the Comprehensive Plan for the affected district(s). In general, the project is consistent with the goals and objectives of the Comprehensive Plan. The Comprehensive Plan recommends that the City pursue partnerships to explore the implementation of transportation management techniques as mitigation to potential negative traffic impacts resulting from proposed development. The potential traffic management techniques that arise as a result of the applicant's traffic study's recommendations and the recommendations of the technical review of that traffic study will work towards accomplishing this goal. 0 SITE PLAN REVIEW STANDARDS Pursuant to Section 14.03(A)(6) of the South Burlington Land Development Regulations, and shall require site plan approval. Section 14.06 establishes the following general review standards for all site plan applications: The site shall be planned to accomplish a desirable transition from structure to site, from structure to structure, and to provide for adequate planting, safe pedestrian movement, and adequate parking area& The proposed parking facility is part of a much larger site, which includes the University of Vermont athletic complex, student housing, and administrative offices, with existing pedestrian pathways, roadways, landscaping, and parking facilities. Most of the site falls within the City of Burlington. The proposed parking garage would be the only structure within the City of South Burlington on the subject parcel of land. The applicant has indicated that the parking facility would add an additional 550 parking spaces for the site. The proposed structure accomplishes a reasonable transition from structure to site and from structure to structure, as the existing buildings on the site are all large. The applicant received permission from the City Council to utilize the Spear Street right-of-way, so adequate planting area is being provided. The plans depict a network of sidewalks extending from the proposed structure to facilitate pedestrian movement. Parking shall be located to the rear or sides of buildings to the greatest extent practicable. The site is already extensively developed and the new parking facility is proposed to be built over existing parking lot along the Spear Street frontage. Therefore, the location of both the existing and proposed parking spaces is acceptable. Without restricting the permissible limits of the applicable zoning district, the height and scale of each building shall be compatible with its site and existing or adjoining buildings The height of the proposed parking structure will be 34 ft., measured from the average pre - construction grade of the site (393') to the top of the lighting fixtures (427'). The proposed parking structure is compatible with the scale and height of the existing buildings on the site, which are all UVM buildings. The proposed structure is not compatible with the existing single-family dwellings on the opposite side of Spear Street, but sufficient landscaping is proposed to mitigate the visual impacts from the proposed structure. Newly installed utility services and service modifications necessitated by exterior alterations or building expansions shall, to the extentfeasible, be underground Pursuant to Section 15.13(E) of the South Burlington Land Development Regulations, any new utility lines, services, and service modifications shall be underground. 7 The DRB shall encourage the use of a combination of common materials and architectural characteristics, landscaping, buffers, screens and visual interruptions to create attractive transitions between buildings of different architectural styles. It appears that the proposed project will incorporate a diversity of design elements that will offer attractive transitions between the massive brick facade of the adjoining PFG Complex and the parking garage, including brick columns on the parking structure and a mix of deciduous and conifer tree species surrounding the parking facility. Proposed structures shall be related harmoniously to themselves, the terrain and to existing buildings and roads in the vicinity that have a visual relationship to the proposed structures The proposed parking structure takes advantage of the sloped grade of the site to minimize the size of the structure and integrate it with the terrain. In addition, the applicant proposes regrading the easterly tier of exterior parking below existing grade to prevent vehicle headlights from shining onto adjacent residential properties. Again, landscaping and the columnar structure of the parking garage offer an attractive visual alternative to the massive brick fagade of the athletic complex. In addition to the above general review standards, site plan applications shall meet the following specific standards as set forth in Section 14.07 of the South Burlington Land Development Regulations: The reservation of land may be required on any lot for provision of access to abutting properties whenever such access is deemed necessary to reduce curb cuts onto an arterial or collector street, to provide additional access for emergency or other purposes, or to improve general access and circulation in the area. The subject site is part of a much larger site containing multiple university offices and facilities. The existing Spear Street curb cuts will be retained. In addition, the applicant will be upgrading University Heights to provide access onto Main Street in Burlington. Interior connections to Prospect Street in Burlington will also be provided. Electric, telephone and other wire -served utility lines and service connections shall be underground Any utility installations remaining above ground shall be located so as to have a harmonious relation to neighboring properties and to the site. Pursuant to Section 15.13(E) of the South Burlington Land Development Regulations, any new utility lines, services, and service modifications shall be underground. All dumpsters and otherfacilities to handle solid waste, including compliance with any recycling or other requirements, shall be accessible, secure and properly screened with opaque fencing to ensure that trash and debris do not escape the enclosure(s). E:? No solid waste facilities are shown. Dumpster-size solid waste containers are not necessary for the proposed parking facilities. Parking Section 13.01(G)(1) of the South Burlington Land Development Regulations establishes design requirements for parking spaces. Design guidelines for parking structures are further detailed in Dego Guidelines for Parking Structures, dated March 1997. Internal aisles appear to be between 18 and 24 ft. wide. Some parking spaces appear to be at a 70 degree angle to internal aisles. Other spaces appear to be at a 90 degree angle to internal aisles. Stall dimensions are 8.5 ft. wide by 18 ft. deep. This does not comply with the dimensional requirements outlined in Table 13-8 of the South Burlington Land Development Regulations. However, during the sketch plan review of this project the DRB stated that 8.5' wide parking spaces were acceptable within the proposed parking structure, but that the spaces surrounding the proposed structure need to be 9' wide. However, during the preliminary plat approval of the project, the DRB approved the existing spaces on the exterior of the proposed structure at 8.5' wide. Thus, the DRB has approved all of the spaces relating to the subject project at 8.5' wide. One of the conditions of preliminary approval was that the applicant shall submit a document with the final plat application that describes how the proposed parking facility complies with the standards set forth in the South Burlington Design Guidelines for Parking Structures dated March 1997. Any discrepancies shall be identified and defended in this document, so that the DRB can make an informed decision. The applicant has responded to this condition stating that "the proposed project complies with all applicable guidelines per the South Burlington Design Guidelines for Parking Structures dated March 1997. This is sufficient for approval. Section 13.01(G)(5) of the South Burlington Land Development Regulations requires that bicycle parking or storage facilities are provided for employees, residents, and visitors to the site. The plans depict four (4) bicycle parking facilities on each level of the proposed structure. Pursuant to Section 13.01(I) of the South Burlington Land Development Regulations, 2% of the spaces within the proposed parking facility must be handicapped -accessible and comply with ADA Accessibility Guidelines. The proposed project contains a total of 1,312 parking spaces (765 existing and 550 new), so a total of 27 handicapped -accessible parking spaces shall be provided. Furthermore, one in every eight handicapped -accessible spaces must be van -accessible and signed "van -accessible". The applicant has referred to the University of Vermont "South Campus Master Plan" to fulfill this requirement. On this plan, forty-seven (47) handicapped -accessible parking spaces are depicted, eight (8) of which are van -accessible. Section 13.01(M) of the South Burlington Land Development Regulations gives the DRB authority to require design elements for parking structures that specifically address safety, security, lighting, landscaping, and visual aesthetics as conditions for approval. 9 Landscaping Pursuant to Section 13.06(A) of the South Burlington Land Development Regulations, landscaping, and screening shall be required for all uses subject to site plan and PUD review, and street tree plantings shall be required for all public streets in a PUD. Landscaping plans are provided on Sheet L-1 of the plans. Section 13.06(B) requires parking facilities to be curbed and landscaped with appropriate trees, shrubs, and other plants including ground covers. This Section does not apply to the project because the parking area surrounding the proposed structure is currently in existence. Pursuant to Section 13.06(B)(4), snow storage areas must be shown on the plans. The plans contain a note that states "snow to be removed and stored at the UVM stormwater treatment facility." Section 13.06(C) of the South Burlington Land Development Regulations requires landscaping and/or screening whenever two adjacent uses are dissimilar. Furthermore, Section 13.06(C)(3) requires landscaping to be designed to minimize erosion and stormwater runoff, and to protect neighboring residential properties from parking areas. The adjacent residential uses necessitate such screening along the Spear Street right-of-way. Staff notes that the proposed landscape screening is entirely within the Spear Street right-of-way. At its meeting on September 15, 2003 the City Council granted the applicant permission to utilize the City's Spear Street right-of-way for landscaping to meet the requirements of Section 13.06(C) of the South Burlington Land Development Regulations. This approval is solely for the purposes of landscaping and is not to count towards the applicant's coverage requirements for the property. Landscaping budget requirements are to be determined pursuant to Section 13.06(G)(3) of the South Burlington Land Development Regulations, and shall be prepared by a landscape architect or professional landscape designer. Required costs are based on construction costs. Pursuant to Table 13-9 of the South Burlington Land Development Regulations, the proposed project will require a minimum of $67,500 of landscaping. A landscape budget has been incorporated into the planting schedule on sheet L-1 of the plans. The applicant is proposing to provide approximately $106,400 of landscaping. The City Arborist has approved the most recent landscaping plans and provided comments in a letter dated November 24, 2003. Other The City Engineer reviewed the plans and provided comments in a letter dated January 8, 2004. 10 DECISION Motion by Mark Boucher, seconded by Chuck Bolton, to approve Final Plat Application 4SD- 03-81, subject to the following conditions: 1. All previous approvals and stipulations shall remain in full effect, except as amended herein. 2. This project shall be completed as shown on the plans submitted by the applicant, as amended by this decision, and on file in the South Burlington Department of Planning & Zoning. 3. The plans shall be revised to show the following changes and shall require approval from the Administrative Officer. Four (4) copies of the revised plat plans shall be submitted to the Administrative Officer prior to recording: a. The lighting plan shall be revised to indicate the average illumination on the site and shall be in compliance with Appendix A.9 of the South Burlington Land Development Regulations. b. The lighting plan shall be revised to indicate the indirect illumination levels on the exterior of the property line, which shall not exceed 0.3 foot candles maximum, and an average of 0.1 foot. c. The plans shall be revised to clearly depict all property lines. 4. The plans shall be revised, prior to permit issuance, to depict three (3) crosswalks across Spear Street. The design and location of these crosswalks shall be approved by the Director of Public Works. 5. The exterior parking spaces that exist on the site today are grandfathered and are approved at 8.5' wide. 6. Pursuant to Section 15.02(A)(3) of the South Burlington Land Development Regulations, the Development Review Board approves a front yard setback of 60' for this project. 7. Stormwater drainage plans must demonstrate compliance with the Vermont Stormwater Management Manual, pursuant to Section 15.13(F) of the South Burlington Land Development Regulations. 8. The proposed project shall adhere to standards for erosion control as set forth in Section 16.03 of the South Burlington South Burlington Land Development Regulations. In addition, the grading plan shall meet the standards set forth in Section 16.04 of the South Burlington South Burlington Land Development Regulations. 9. Pursuant to Section 15.13(E) of the South Burlington Land Development Regulations, any new utility lines, services, and service modifications shall be underground. 10. For the purpose of calculating road impact fees under the South Burlington Impact Fee Ordinance, the Development Review Board estimates that the proposed project will generate zero 11 (0) additional vehicle trip ends during the P.M. peak -hour. 11. The applicant shall post a landscape bond for $67,500, prior to the issuance of the zoning permit. This bond shall remain in effect for three (3) years to assure that the landscaping has taken root and has a good chance of surviving. 12. Any changes to the final plat plans shall require approval of the South Burlington Development Review Board. 13. The final plat plans (sheets C4 and survey plat) shall be recorded in the land records within 90 days or this approval is null and void. The plans shall be signed by the Board Chair or Clerk prior to recording. Prior to recording the final plat plans, the applicant shall submit a copy of the survey plat in digital format. The format of the digital information shall require approval of the Director of Planning and Zoning. Chuck Boltonley/abstain/not ay/abstain/not present Mark Boucheray/abstain/not present John Dinklageay/abstain/not present Roger Farley - present Michele KupersmitWenay/abstain/not nay/abstain/not present Larry Kupferman - esent Gayle Quimby - yea/nay/abstain/ of presen Motion Carried by a vote of 6-0-0. Signed the a � day of January, 2004, by John Dinklage, Chair 12