HomeMy WebLinkAboutBATCH - Supplemental - 1835 Shelburne RoadAugust 9, 1973 Automaster 'Motor Co,,-npany 1835 Shelburne Road South Burlington, V'117 051+01 Attention: 'Mr. Jack rural Dear -'Ir. DuBrul: Be advised that the South Burlington Zoning Board of Adjust- ment will hold a public hearing at the South Burlington City hall, Conference Room, 1175 Williston Road on Wednesday, August 15, 1973 at 7:_)0 P,m. to consider your request for a zoning variance. Please plan to attend. 'Very truly, Richard Ward Zoning Administrative Officer F,,W/j July e- 269 1973 .,'�utomaster Notor. Co., Inc. 1835 Shelbitrne, Poad L,outh Burling ton, VT 0 �401 Dear -,ir Be advised that due to a lack o" a quorum of the '(.'Joning., 1,)oarCj of ..'Adjustment the regular meeting scheduled for August Ugust 1, 1973 has been cancelled and this j meeting 2-1i be moved to Wednesday, August 15, 1973 at 7:30 P.m. to be held in the City Hall Conferencr Room. Very truly, Richard ',yard Zoning Administrative Officer RW/j CITY OF SOUTH BURLINGTON DEPARTMENT ' F PLANNE4G & ZONING 575 DORSET STREET SOUTH BURLINGTON, VERMONT 05403 (802) 846-4106 FAX (802) 846-4101 December 4, 2002 Mr. David Birmingham Burlington Mitsubishi 1835 Shelburne Road South Burlington, VT 05403 RE: Change of Lighting Fixtures Dear Mr. Birmingham, Thank you for submitting the revised lighting information for the change in light fixtures at Burlington Mitsubishi. The proposed changes to standard GMP cobra head lights and the locations of the fixtures are acceptable for the City. If at any time you submit a revised site plan for the property, please make sure that it correctly indicates the location and types of all light fixtures on the property. Please call if you have any questions. Sincerely, Juli Beth Hoover, AICP Director of Planning & Zoning cc: File _ �URLINGTON MITSUBISHI wSUSIM Burlington Mitsubishi 1835 Shelburne Road South Burlington, Vermont 05403 South Burlington Planning and 'Zoning Attention: Raymond Belair 575 Dorsett Street South Burlington, Vermont 05403 Mr. Raymond Belair- This letter is in follow up to our conversation last week- in regards to Iighting options for our sales lot. In consultation with '� - Glen Ghostlaw and Mr. Michael Burke of Green >iourtain Power, we have reached are agreement for our lighting needs and arc writing you as you requested to obtain approval from the South Burlington Zoning board. 1 have included a sketch of the whereabouts of the lighting positions for your review. There will be no additional poles installed at this time as we will use the newly installed poles from the road construction of Route 7 , and the current pole at the edge of our lot already- The lights will be the "cobra" style light as per South Burlington Zoning and installed by Green Mountain Power. There will be two lights installed on the pole in front of the dealership p.r zoning regulations of thirty feet in height or below, and one light on our current pole at the edge of the interior lot, again per zoning regulations. Thank you in advance for your efforts and timeliness in this matter and we appreciate the ease it has always been to work with. the Zoning Board. Sincerely, Michael P. Brennan 1835 Shelburne (Road (Rt. 7) • Burlington o Vermont 05403 • (802) 855-4400 �0 39hd SI3i 151IW NONi9NI1dnS aE'c1.Lr98z@3 89 -'9L r EK/t? /Z1 r►za L(->-r rp 44� Per CD State ®f Vermont ..az WASTEWATER SYSTEM AND POTABLE WATER SUPPLY PERMIT LAWS/REGULATIONS INVOLVED Environmental Protection Rules Effective August 16, 2002 Case Number: WW-4-2267 PIN: EJ97-0496 Landowner: Pecor Auto Sales P.O. Box 132 Essex Jet. VT 05453 This project, consisting of eliminating a failed on -site wastewater disposal system and connecting to the municipal sewer an existing auto dealer with 11 employees served by an existing municipal water service located off Shelburne Road in the City of South Burlington, Vermont, is hereby approved under the requirements of the regulations named above subject to the following conditions. GENERAL 1. This permit does not relieve the permittee from obtaining all other approvals and permits as may be required from the Department of Labor & Industry — telephone (802) 828-2106 or (802) 879-2300 and local officials prior to proceeding with this project. 2. The project shall be completed as shown on the following plans which have been stamped "approved" by the Wastewater Management Division: Project: 2004066, Sheet 1 of 2 "Proposed Sewer Location" dated 11/3/04 and Sheet 2 of 2 "Proposed Sewer Location" dated 11/3/04 prepared by Llewellyn -Howley, Inc. 3. The project shall not deviate from the approved plans in a manner that would change or affect the exterior water supply or wastewater disposal systems, building location or the approved use of the building, without prior review and written approval from the Wastewater Management Division. 4. The conditions of this permit shall run with the land and will be binding upon and enforceable against the permittee and all assigns and successors in interest. The permittee shall be responsible for the recording of this permit and the "Notice of Permit Recording" in the South Burlington Land Records within thirty, (30) days of issuance of this permit and prior to the conveyance of any lot subject to the jurisdiction of this permit. 5. The Wastewater Management Division now reviews the water and wastewater disposal systems under 10 V.S.A., Chapter 64 — Potable Water Supply and Wastewater System Permit. 6. By acceptance of this permit, the permittee agrees to allow representatives of the State of Vermont access to the property covered by the permit, at reasonable times, for the purpose of ascertaining compliance with the Vermont environmental and health statutes and regulations. 7. A copy of the approved plans and this permit shall remain on the project during all phases of construction, and upon request, shall be made available for inspection by State or local personnel. Wastewater System and Potable Water Supply Permit WW-4-2267 Pecor Auto Sales Page 2 WATER SUPPLY & WASTEWATER DISPOSAL 8. No penult issued by the Secretary shall be valid for a substantially completed wastewater system until the Secretary receives a certification from a designer or the installer, signed and dated, that states: "I hereby certify that, in the exercise of my reasonable professional judgment, the installation -related information submitted is true and correct and the wastewater system was installed in accordance with the permitted design and all penmit conditions, was inspected, was properly tested, and has successfully met those performance tests." 9. The project is approved for wastewater disposal by the construction of a connection to the municipal wastewater treatment facility as depicted on the approved plans. The project is approved for a maximum of 149 gallons of wastewater per day. The Wastewater Management Division shall allow no other method, or location of wastewater disposal without prior review and approval. Dated at Essex Junction, Vermont on November 16, 2004. Jeffrey Wennberg, Commissioner Department of Environmental Conservation C\ By Ernest Christianson Regional Engineer C For the Record South Burlington Planning Coummission & Select Board Llewellyn -Howley, Inc. Department of Labor & Industry State of Vermont X AGENCY OF NATURAL RESOURCES Department of Environmental Conservation Department of Fish and Wildlife Department of Forests, Parks and Recreation Department of Environmental Conervation State Geologist RELAY SERVICES FOR HEARING IMPAIRED 1-800-253-0191 TDD>VoicE 1-800-253-0195 VoicE>TDD November 5, 2004 Pecor Auto Sales P.O. Box 132 Essex Jct. VT 05453 Wastewater Management Division Essex Regional Office 111 West Street Essex Junction, VT 05452-4695 Telephone: (802) 879-5656 RE: W W-4-2267, Burlington Mitsubishi existing auto dealer connecting to municipal sewer with 11 employees located on the Shelburne Road in the City of South Burlington, Vermont. Dear Applicant: We received your completed application for the above referenced project on November 4, 2004, including a fee of $210.00 paid by check #53112. Under the performance standards for this program, we have a maximum of 30 days of "in-house" time to review your application. If we require further information from you to make a decision, the time until we receive it is not included in the in-house performance standards. If you have any questions about the review process, or if you have not received a decision on your application within the 30 in-house days, please contact this office. We have forwarded the information contained in your application to the Information Specialist for this region. A Project Review Sheet will be sent to you indicating other state agencies and departments you should contact regarding additional permits or approvals you may need under their programs. If you have not already done so, you should also check with town officials about any necessary town permits. For the Division of Wastewater Management C.f -wcat� c�- Ernestine Chevrier Regional Office Coordinator cc: South Burlington Planning Commission Trafton Crandall Regional Offices - Barre/Essex Jct./Rutland/Springfield/St. Johnsbury State of Vermont Department of Fish and Wildlife Department of Forests, Parks and Recreation Department of Environmental Conservation State Geologist RELAY SERVICE FOR THE HEARING IMPAIRED 1-800-253-0191 TDD>Voice 1-800-253-0195 Voioe>TDD Mr. Norman Pecor Pecor Auto Sales P.O. Box 132 Essex Junction, Vermont 05453 RE: Petroleum Contamination at Mountain View Mitsubishi South Burlington, Vermont SMS Site # 99-2633 (former site 88-0285) Dear Mr. Pecor: AGENCY OF NATURAL RESOURCES Department of Environmental Conservation Waste Management Division 103 South Main Street/West office Waterbury, Vermont 05671-0404 (802) 241-3888 FAX (802) 241-3296 August 2, 1999 The Sites Management Section (SMS) has received the Underground Storage Tank (UST) closure report which outlines the subsurface conditions for the above referenced site. The fieldwork was conducted by Griffin International, Inc. on June 2, 1999. The report is dated June 8, 1999 and summarizes the degree and extent of contamination encountered. The USTs removed include: UST #1 - 1,000 gallon motor oil (closed in -place) UST #2 - 1,000 gallon waste oil During the site activities, screened soils had concentrations up to 68 parts per million (ppm) as measured by a photoionization detector (PID). The peak PID readings were measured at depths of 4 feet below ground surface (fbgs) in the excavation. Approximately 2 cubic yards of excavated soil were stockpiled on -site due to the presence of PID elevated headspace readings. The limits of soil contamination were not defined. Contaminated soil was used for backfill at the conclusion of the UST removal program. Two soil samples from the limits of excavation were submitted for laboratory analysis. No VOC's were detected above laboratory limits using EPA 8260. The results for TPH via EPA 8015 were not submitted. Site soils consisted of gravel. Groundwater was not encountered at a (maximum) depth of approximately 5 fbgs. The Mountain View Mitsubishi was inspected for sensitive receptors. The possible receptors potentially affected include groundwater, basements of adjacent buildings, and soil. Based on the report information, the SMS has determined additional work is necessary to determine the severity of contamination. Due to possible contamination to nearby receptors, the SMS requests that Pecor Auto Sales retain the services of a qualified environmental consultant to perform the following: ❑ Further define the degree and extent of contamination to the soil. ❑ If appropriate, determine if the airspace beneath the site and site adjacent building(s) (e.g. basements) has been impacted by the release using a PID. Wall and floor construction and susceptibility to vapor migration should be noted. PID measurements should be made in cracks and/or joints likely impacted. If the airspace has been impacted, SMS requests confirmatory sampling and laboratory analyses be performed using EPA Method TO-2. ❑ Determine the degree and extent of contamination, if any, to groundwater. A sufficient number of monitoring sites should be installed to adequately define the severity of site contamination. Analyze groundwater samples for TPH and BTEX. At sites proximal to water supply sources, determine the hydrologic relationship of the contaminated area to the water supply source. Pumping influences should be considered in the evaluation. Assess the potential for contaminant impact on sensitive receptors. Base this update on all available Regional Offices - Barre/Essex Jct./Pittsford/Rutland/Springfield/St Johnsbury information and include basements of adjacent buildings, nearby surface water, any proximal drinking water sources, wetlands, sensitive ecologic areas, outdoor or indoor air, sewers, or utility corridors. Sample and analyze any at -risk water supplies for BTEX, TPH and MTBE compounds. ❑ Determine the need for long-term treatment and/or monitoring that addresses groundwater contamination. ❑ Develop a plan to treat and/or monitor the stockpiled soils. The soils must remain located in an area such that they have a low potential to impact nearby receptors. The soils must also remain properly encapsulated in plastic. The plan should demonstrate that child and public access to the soils is sufficiently restricted. If the soil pile is located in an area subject to public activity and where public access is unrestricted, the soil pile should be surrounded by fence. The fence should be no less than 3 feet in height and of durable construction; ❑ Submit a summary report that outlines the work performed, as well as provides conclusions and recommendations. As appropriate include analytical data; a site map showing the location of any potential sensitive receptors, stockpiled soils and monitoring or sample locations; an area map; detailed well logs; and a groundwater contour map. ❑ With the Workplan or Expressway form, please submit a site location map at an approximate scale of 1:24000 showing the location of the site. Please include a scale, a north arrow, the SMS site number, and a citation of the source map. The purpose of this map is to enable the SMS to enter the site location into a Geographical Information Systems database. ❑ Submit remaining soil sample analyses. Please have your consultant submit a preliminary work plan and cost estimate or a site investigation expressway notification form within fifteen days of your receipt of this letter, so it may be approved prior to the initiation of onsite work. Enclosed please find a list of consultants who perform this type of work as well as the brochure "Selecting Your UST Cleanup Contractor," which will help you in choosing an environmental consultant. Based on current information, the underground storage tanks at Mountain View Mitsubishi are eligible for participation in the Petroleum Cleanup Fund (PCF). You must provide written proof to the SMS that you hold no other applicable insurance in order to receive reimbursement from the PCF. The owner or permittee must pay for the removal and/or repair of the failed tank(s), and for the initial $10,000.00 of the cleanup. The fund will reimburse the tank owner or permittee for additional eligible cleanup costs of up to $1 million. All expenditures must be pre -approved by the Agency or performed in accordance with the "Site Investigation Guidance" expressway program. Please refer to the enclosed guidance document titled, "Procedures for Reimbursement from the Petroleum Cleanup Fund' for additional information concerning the PCF. The Secretary of the Agency of Natural Resources reserves the right to seek cost recovery of fund monies spent at the Mountain View Mitsubishi site if the Secretary concludes that Pecor Auto Sales is in significant violation of the Vermont Underground Storage Tank Regulations or the Underground Storage Tank statute (10 V.S.A, Chapter 59). We realize this may be a lot to absorb and respond to. We are here to help make this process as effective and uncomplicated as possible. Please review the enclosed documents and call me with any questions you may have. I can be reached at (802) 241-3876. Sincerely, 'Chuck Schroer, Supervisor Sites Management Section Enclosures (3) cc: South Burlington Selectboard w/o enclosure South Burlington Health Officer w/o enclosure DEC Regional Office w/o enclosure (transmitted electronically) Willis Doe, Griffin International, Inc. w/o enclosure (transmitted electronically) CS 112633.wpd MERCEDES � x1Uf=WtW PORSCHE BENZ auoI May 16, 1974 Mr. Richard Ward Zoning Administrative Officer City of South Burlington So. Burlington, Vermont 054.01 Dear Mr. Ward: I would like to withdraw my variance request until such time as we find out what the Vermont Highway Department is planning to do with Route 7 in front of the property. Sincerely, ack D)rul, President E AUTOMASTER sh Rt. 7 South of Burlington, Vermont 05401 802/864-05" April 18, 1974 Richard Ward Zoning Administrator City of South Burlington South Burlington, Vermont 05401 Dear Richard: Enclosed is a site plan of the proposed addition for Automaster Motors on Shelburne Road. The proposed addi- tion does not meet the 75' set -back requirement from the road right-of-way. The lot size is in excess of 80,000 square feet, which is the minimum size allowed in a Bus- iness Planned Developement. (BPD) zoned district. Auto - master presently parks approximately 90 cars on the site. This number appears to be more than adequate in meeting the minimum off-street parking requirements. Therefore, it appears that the only variance required is for the 75' front yard set -back. Very truly yours, Paul E. Marcotte PEM:K Enclosure 9a/• i0&f 000, so* NOTICE OF APPEAL SOUTH BURLINGTON ZONING BOARD OF ADJUSTMENT I hereby appeal to the Zoning Board of Adjustment for the following: conditional use. variance. decision of administrative officer. Property location & description Variance of Section /�•�0 , s. %/ SAJ �t • //�� A � number)— title of section Basis of appeal • Ff b. N '�O LN��+ r�'� �� O.g I understand the regular meetings are held twice a month on Monday at 5:CO p.m. at the City Hall, Conference Rood. The legal advertise- ment must appear in the Burlington Free Press a minimum of fifteen (15) days before the hearing, I agree to pay a fee of $30.00 which fee is to off -set the costs of advertising and the hearing. Hearing Date Signature of Appellant SOUTH BURLINGTON ZONING NOTICE In accordance with the South Burlington Zoning Regulations and Chapter 91, Title 21+ V.S.A. the South Burlington Zoning Board of Adjustment will hold a public hearing at the South Burlington City Offices, CoPM.-ence Room, 1175 Williston Road, South Burlington, Vermont on C , at 'iC} (day of we" month nd ate (time) to considethe following: Appeal of / L' kseeking a name r variance from, Section , of bed title of section the South Burlin ton Zoning Regulations. Request is for permission to 4� NOTICE OF APPAL SOUTH BURLINGTON ZONING BOARD OF ADJUSTMENT I hereby appeal to the Zoning Board of Adjustment for the following: conditional use, variance, decision of administrative officer. Property Owner Property location & description Variance of Section , ��umber title of section Basis of appeal I understand the regular meetings are held twice a month on Monday at 5:00 p.m. at the City Hall, Conference Room. The legal advertise- ment must appear in the Burlington Free Press a minimum of fifteen (15) days before the hearing, I agree to pay a fee of $30.00 which fee is to off -set the costs of advertising and the hearing. Hearing Date Signature of Appellant SOUTH BURLINGTON ZONING NOTICE In accordance with the South Burlington Zoning Regulations and Chapter 91, Title 21- V.S.A. the South Burlington Zoning Board of Adjustment will hold a public hearing at the South Burlington City Offices, Conference Room, 1175 Williston Road South urlirgton, Vermont on zaar.,,, _ M e . at 40 day of week month and date time to consider the following: n Appeal of e ,, eeking a �adczuic � variance from Section 1. 0 0 Yam. Aac =-3 ^°�tlt of number (title of section) I the South Burlington Zoning Regulations. .Request is for permission t9 Hearing DateAdvt. Date,/ Advertise 6 days prior to meeting. South Burlington Zoning Board of Adjustment South Burlington, Vermont Gentlemen: I hereby appeal to the Zoning Board of Adjustment for the following variance. Iunderstand that regular meeting dates are the first and third Wednesdays of the month at 7:30 p.m. at the South Burlington City Hall, Conference Room. The legal advertisement shall appear as below, and I agree to pay, either now or before the ad appears, a fee of $30..00 which fee is to off -set costs of holding said hearing. 4171-xe-/ e and Ad re s Date z SOUTH BUR LINGTON ZONING NOTICE The South Burlington Zoning Board of Adjustment will hold a public hearing at the South Burlington City Offices, Conference Room, 1175 Williston Road, South Burlington, Vermont on , day of week at _ to consider the following: month and date time Appeal of Z, ;�6 �'' seeking a name variance from Section ,/,-V- v number title of sect n the South Burlington Zoning Ordinance. Request is for permission to ZONING BOARD OF ADJUSTMENT July 311 1c)6() Autom- ster :Motor Co. Inc. 1835 :1helhi.irne rio c South Bi.zrlim,ton, Vermont 0 401 Dear '4r . DuBrul : This is to notify you th ,t the South Bia.rlin€ ton Zoning Board of +d;jl:stment will hold a. public meeting on 1,11g'ist 61 196� at 7: 30 P.M., South Biirl ington IiiFh :)chool, Cafeteria Two, Dorset ',treet, to consider yoia.r request f )r a variance froYn the South Burlington Zoning 0rdirmnce. Very truly, Rich-rd `,,lard Code Officer E AUTOMASTER MOTOR COMPANY, INC. SHELBURNE ROAD / SOUTH BURLINGTON, VERMONT 05401 / 802-864-0544 1969 Richard Ward Zoning Administration South Burlington, Vermont Dear Mr. Ward: I would like you to present to the zoning board an application 3H for me to extend my service building by S@ feet. The present building is a Stausteel 30 x 70. I will make the building /0 30 x *@8. It still makes me way within the limits of the lot. Sincerely; k DuBrul President pez l 7 Enclosure `ham k Hearing Date �. Advt. Date ,,e� , , Advertise 6 days prior to meeting South Burlington Zoning E-oard of Adjustment South Burlington' Vermont Gentlemen: I hereby appeal to the Zoning Board of Adjustment for the following variance. I understand that regular meeting dates are the first and third Wednesdays of the month at 7:30 p.m. at the Town Office Building. The legal advertisement shall appear as below, and I agree to pay, either now or before the ad appears,, a fee of $30.00, which fee is to offset costs of holding said hearing. Signature and address Date r SOUTH BURLINGTON ZONING NOTICE . s�o��, ��,�E r�,�iA %7C, 1_4,ese r 5 The South Burlington Zoning Board of Adjustment will hold a public hearing at the ` Mtn Office eer D.Orset S*'„^^+ i South Burlington v Vermont on. 1 [ .I 1.;t e- 194' at �•" o ��. day of week)F —7motith and date time to consider the following: Appeal o 7 �.� 6�n a variance from (name Section IcV , 10111 f �, L � �., f the number title of section) South Burlington Zoning Ordinance. Request is for permission to ZONING BO UiD OF ADJUST:1""ITT October 14, 1971 Autorriaster Motor Attention: 'MIT. Jack DuBrul IP35 Shelburne Road South Burlington, VT 05401 Dear Mr. DuPrul.- Notification given that the South Purlington Zoning Poard of Adjustment will hold a public hearing at the City 11',ull$ Conference F,00m, 1175 'illiston Tload on '.ednesday, nctober 20, 1971 at 7:30 Perri* to consider the request for a zoning variance. Prior to "onday October 1P, 1971. a plot plan should be submitted to this office. Please plan to attend. Very truly, V Richard ',.lard. Zoning Administrator RW/j NORTHFIELD ROAD P. O. BOX 541 PHONE 223-2306 MONTPELIER• VERMONT 05602 e PETROLEUM DISPENSING EQUIPMENT N SALES & SERVICE November 2, 11071 City of South Burlington 1175 Williston Road South Burlington, Vermont 05401 ATT: Mr. Ward Gentlemen: With further reference of our conversation of Tuesday November 2nd. at which time we informed you that due to conditions beyond our control, we would like to post pone any further action by your planning board with relation to the proposed Automatic Car Wash at 18.40 Shelburne Rd. just south of Automaster Motor Co. We appreciate the courtesys extended to us by you & your planning board and hope to be back with your group in this connection early in the Spring of 1972. Yours Truly WYMAN'S, INC. S NEY HEdT tr EI SERVING THE PETROLEUM INDUSTRY SINCE 1927 Hearing Date Advt. Date _,_dvertI.sv 6 days prior to meeting. South Burlington Zoning Board of Adjustment South Burlington, Vermont Gentlemen: I hereby appeal to the Zoning Board of Adjustment for the following variance. I understand that regular meeting dates are the first and third Wednesdays of the month at 7:30 p.m. at the South Burlington City Offices, Conference Room. The legal advertisement shall appear as below, and I agree to pay, either now or before the ad appears, a fee of $30.00, which fee is to off -set costs of holding said hearing. Signature and Address Date SOUTH BIMLINGTON ZONING NOTICE The South Burlington Zoning Poard of Adjustment will hold a public hearing at the South Burlington City Offices, Con erence,Room, 1175 Williston Road, South Burlington, Vermont on "�-44 day of wr � '2 L o / at %'��'' to consider the following: month and date) ;time Appeal of seeking a (name ) variance from Section 7 /a of the numbers (title of ection),. South Burlington Zoning Ordinance. Request is for permission to d , c /� 3� � r��o��-u y!�-, ..cam �. a -a. �i G��vl k/4'0 't." ti•rt. � � rr, [.r._.-�:.. ���-C e..�..�. �. ..,,e.,� a�'""� ;�.,t.�.e -�u �7" .-?%�' &J-y L�<� , � �d b '" ZONING BOARD OF ADJUSTMENT Hearing Date �6; L, 6 , J _ tdv r� nef pa / )971 )ate ._ Advert -_se 6 days .A. prior to meeting South Burlington Zoning Board of Adjustment South Furlington, Vermont Gentlemen: I hereby appeal to the Zoning Board of Adjustment for the following variance. I understand that regular Meeting dates are the first and third Wednesdays of the month at 7:30 p.m. at the South Burlington City Offices, Conference Room. The legal advertisement shall appear as below, and I agree to pay, either now or before the ad appears, a fee of 00.00, which fee is to off -set costs of holding said hearing. ig ature and Address Da e SOUTH BT71LINGTON ZONING NOTICE The South Burlington Zoning Board of Adjustment will hold a public hearing at the South Burlington City Offices, Co fe ence oomy 1175 Williston Road, South Burlington, Vermont on day of wee a� 7/ at ,361 '1W, to consider the follows g: month and datedtima M A peal of variance a of the South Burlington Zoning Ordinance. Request is for permission o Zf /�, d. & eA C.OA 64, Dim ZONING BOARD OF ADJUSTMENT October 30, 1968 Mr. Jack DuBrul c/o Autom;---isters Motor Company, I 2020 Shelburne Road South 3urlington, Vermont 05)44 Dear Mr. DuDrul: This is to notist Board of Idjust en 4 mf Dorset Uffice 3uilding, 0orset on idednesday I No tuber 6. 19 request for .0 vi,rlance, GF at'%"q<South Burlington Zoning B\�a -u 'A c hearing at the Town et th Hurlington, Vermont t 70'.:-3 M. to consider your truly yours, George F. -'"'ilvp.r Assistant Zoning :Idministrator AUTOMASTER MOTOR COM ANY, INC. 7.3• Aul4orized American Mtor_, sues 4�7 servit e Pam► October 29, 1968 if 5' o 5-ee- 3 . Zoning Board of Adjustments So. Burlington, Vermont Dear Sirs; I would like an extension of my non conforming use variance for the following purpose. - Additional service building to be located in the rear of my property. Building size 30 x 70. Strand steel building. Sincerely; *JackIrui Pres. Automaster Motor Co., Inc. jt Diagnostic Tune -Up Clinic 2020 SHELBURNE ROAD High Performance Equipment SO. BURLINGTON, VERMONT Race Car Preparation PHONE 1-802-864-0544 Machine Shop Service