HomeMy WebLinkAboutSP-86-0000 - Supplemental - 1785 Shelburne RoadPARTNER TIRE AND SERVICE
ANALYSIS OF HYDROLOGIC IMPACT
H
WAGNER, HEINDEL, AND NOYES, INC.
COi•iSU..7'1I'G GEOLOGISTS
BURLIAI GTOr i� VERII!ONT
H
VNWagner, Helndel, and Noyes, Inc. consulting geologists
P.O. Box 1629 Burlington, Vermont 05402-1629 802-658-0820
ANALYSIS OF HYDROLOGIC IMPACT
PARTNER TIRE AND SERVICE
BARTLETT BROOK WATERSHED
Prepared by:
4ffrey A. Nelson
6 ,
Geologist
Revi wed and Approved by:
- /3,
IJef ey Noyes
ri cip 1
Date: October 16, 1986
Summary, Conclusions} and Recommendations
1. Hydrologic analyses of the proposed Partner Tire and
Service site on Shelburne Road indicate that the peak
discharge for the 25-year, 24-hour storm would increase
from 6.52 cfs to 7.43 cfs as a result of the proposed
development.
2. A stormwater retention basin is recommended along the
western limit of the lot, near the south fork of
Bartlett Brook. The volume of this basin should be at
least 24,600 gallons at a depth of 3 feet. This size
basin will result in no significant increase in peak
discharge downstream in Bartlett Brook.
3. On the proposed site plan, a culvert of unspecified
dimension for an access road crossing the south fork of
Bartlett Brook is shown. We recommend that these
modifications not be approved at this time, pending
receipt of more detailed information. We are concerned
that this modification could restrict or alter the
stream flow characteristics along this reach of the
Brook.
i
Analysis of Hydrologic Impact
Partner Tire and Service
Bartlett Brook Watershed
Introduction
This report presents the results of hydrologic analysis
performed by Wagner, Heindel, and Noyes, Inc. to examine the
impact of the proposed Partner Tire and Service facility on
storm flow conditions in Bartlett Brook. The site is located
along the south fork of Bartlett Brook as shown on the watershed
map on page 1 of the Appendix. Currently, the site is an open
field. Runoff in
flow to the channel
Appendix 1, pg. 3).
Hydrologic Analysis
the existing condition occurs via overland
of the south fork of Bartlett Brook (see
To determine the hydrologic impact of the proposed development,
conditions of predevelopment and post development have been
examined using the TR-20 computer model with the pre -established
data file for the Bartlett Brook watershed. The site is located
within subwatershed 9 of the modeled area, and this subwatershed
was broken down further in order to enable more accurate
prediction of peak discharge from the site. The design storm
2
for the analysis was a 25-year, 24-hour storm or 4.0 inches of
rainfall in 24 hours. As a result of the change in land use
condition which will involve the coverage of approximately 48%
of the lot with impervious or gravel areas, the volume of runoff
and peak discharge from the site will be increased over
predevelopment values. Therefore, it will be necessary to
provide stormwater retention to mitigate any increase to peak
discharge in the brook. Additionally, a retention structure
will allow for sedimentation of certain particulate matter
contained in the stormwater runoff.
Site Characterization
The Partner Tire site is underlined by Vergennes Clay Soils
which are classified as hydrologic group D. These soils are
characterized by the Soil Conservation Service as having very
low infiltration rates and thus high rates of runoff during
storm events.
In the existing condition, runoff from the site occurs via
overland flow to the channel of the south fork of Bartlett
Brook. Under the proposed development condition, it is proposed
that sheet flow off the paved area will occur through the
3
western limit of the site. The runoff conditions on the site
for both the predevelopment and postdevelopment conditions have
been computed (see Appendix , pgs. 4-7). The total site area
consists of 1.81 acres, with a predevelopment curve number or 84
and time of concentration of 0.074 hours. Under the proposed
development conditions the curve number is increased to 87.6 and
the time of concentration reduced to 0.053 hours.
Runoff reaches the south fork of Bartlett Brook at the location
of cross-section 15, a new cross-section just below the site.
Results
The updated TR-20 data used for analysis is included on pages 9
through 15 of the Appendix. For the predevelopment condition,
the results are summarized on pages 16 and 17 of the Appendix.
The peak predevelopment rate of runoff from the site is 6.52
cfs, occurring at time 11.96 hours into the 24-hour storm.
Under the postdevelopment condition, the peak is increased to
7.43 cfs, occurring at the same time.
Trial and error solutions were performed to arrive at a basin
volume/elevation/outflow relationship which would result in the
reduction of peak discharge from the site to predevelopment
4
levels and also cause no increase to peak discharge in the south
fork of Bartlett Brook. The resulting basin characteristics are
identified as structure 10 on page 14 of the Appendix, and shown
in the schematic retention cross-section on page 22. The basin
should consist of an excavated area with the volume/elevation
relationship indicated on page 14 of the Appendix. The maximum
volume required at a depth of 3 feet is 0.0755 acre feet or
24,600 gallons. Outflow from the basin would be via a vertical
riser pipe of 6 inch diameter. The height of the riser would be
0.5 feet above the basin floor, and at the very bottom of the
riser a small 2 inch diameter hole would be cut to dewater the
basin during dry periods. With this basin in place, the
postdevelopment peak discharge from the site is reduced to 6.33
cfs. At the confluence of the south fork at cross-section 15,
the peak discharge is 199.45. This is increased slightly above
the predevelopment value of 199.36, but we do not view this as
being a significant change since it is within the limits of
accuracy of the model.
I
� k
Y
tolo
f
d C109
C44 8"
,s
�4
:. j
O '" E
�V O C23 24" x 40' C25 16"
cc
IX
119 I C 25 4
N 16x 85� '+
��N r -N T- N
Iftftwm
� .� F3 R 00 K
�IR
9
E�
CIO 65x 515�
WEIR
C 4 8, 5 M— B
I
WEIR�
C7 15
S Tf. C6 77.5" x 25�
fi �r t � t C-Y111—H
I �► `i ____4_C29 16" x 105� C30
aj1
24 x 40
SIMs aw CMI xm" C=Mo mamas �
VERMONT — SHEET NUMBER 38
c V •D Vet AdA
E
CV MYB FaC Cv. _MuCB
Fu
Ile
189
D H1ATE.131
14 FaE ♦` �P�7' FtwA' . ia� a �r ��.. f a• {
AdA p
• � r y 11 ,2 J1 IA .d w " r -- -- - 0 :' Q1J{4 �p� �,.
1:• 1 ♦t: \ ' 11 • �x '� 'mat} `:� '� de AdA
r1 „G°eC`
.Hn « II •' /'�.- •�..r, 4 �t a- i __ ° � a't' e+• . ,:i � w.:
81Bi x 1 .}.{. ( a•'r `
I •.. +{� IIp•,�y}A iI�• ,�_• • � `rr.,+ p, - _ •i �' -�'• � ' • - " iga• L
t ti 't ;�. II / 9a �;✓ t \ AdB f+
o n f7 a
Yn AT}A �. .+• , % i 'lam•".
AdA
} rw+'t •i.3,._ .t:Y.lr ,, •y,.R- A .«,' ... :; i�: ^L y t AdB
� � -.',� � "I7 �,•,�.a o BIB+ •F% i};••l'� ',ir r• �.1 ((• , -.'�• ` Cv
` ''a �q ��,},, `B)A„ e ; r �'<'• t �; 1 • i AdB �"
chars _ x
'4f"tr BIB �81 +} +i
' cc`t ♦ r•(�r �' ; + �r sy; r ,- i AdA
Ir. B 16d IN
ieT
f,Z F*
o
BIB r ' r + , r GeB
• �%' 1 ; • r � �v1a,/ "Y�•'4' � 1�. 1 EW Jew ':'�. � � �A$B' � �! � �� � � $d �t '��+ '� ,�
c� r 7
w t ' 7!at. •� �d�'. 1B VeB Ew6 �
CV
L9 n •'il �AdA •T utkFJ<:'< ,t;, _ 'r
�{ r• r >� 1 �, r t -'f sr ,�•Br) •' GWB_' a �., .tom, / ,.��{{,,, ,.
_ r � �� +may •w.� • ei,9 , . --y_ `�eL_ t� a iv. :du �{.
`� �y �r�*r .°N •, � IA t {•Al ;�. .� :t x"'+ti?i�hlt7 �.: •� �� � r;
r.:, �t it �;�,a�r ' t �. EwA Ew8
B / e A�Aa'r
t. / - 34.�.".+�.x�' 4i4 y� -•0 ' �� . FlJ � : i1�;T �• ` 1
p ,11 _ �_- e t • AdA .t' A;1Y� e
AR WER TIRE Yt1: _ =v— -9P �� r t•� .1� Ge6
1. 1 v n
c'•s ,�l � + .�•. AdB • �ti t.r '+. •���~ � '�'
1
�"'`�` �¢`� ;'c�„ � y�'� •fg:• :u -- Ve6 •v p Hn� �'9• hAi1 .�j,{ s'''.(t a :� w• ...- T-•i� �?
.'� ��'r' s � ty, � } M �I f BIB'• 'L' � `EwA , M�K � 1 k. �xR, �7:
<;.r t?i•%=r c'1`� �'„ � �. r4;. '� `• ��.. ,g. � GeB 1 i � .VpB 1�
a A BIA
t�•���pR � ,: . �r s .� 'y T .BIB � \ }i�: +�;,vyf,`�. 1;•,��� .GeC �., :�, � �'- '.,�n
Tisaa �M4+yka _y- HDB .il, • a r . y Mj - r�`
�`• r yy s4 �' 4 1 Cv fie^ r :, "' T 4 J' �aB •' (•
�,'�•�,�.Fiut
�i �' ':. t•.n�h�glic . '�. K ,. 0 .aF�Ayrtg•+ �, �i& r;k. •i r •; +�` ,
i -��Y F'stc ?°,�,j,' o• '`'"9�"+•` S- x � �''� 2 '+ j _� � L`j+i .y '• °� ' l t H1tC '�"'�•try," R
A.
. ter N'i.r 4 'ir t.• •Xl•
•� itf'B 7 1 '. 1.
Cv s. EwA 'BIA BIB • ,��, .. t..- Ve�►
.SUB
a _ ,
p 698 OW FEET
,1 ..d
yAS Rt)InP� S ��. l tiG A'f IvN M OW /
�\IV
/ I
�0 8 I . o9' _
N
3 \\ i \2vn �8, 3,
H
WN
Wagner, Heindel, and Noyes, Inc.
Consulting Geologists Burlington, Vermont
0
Page No.
PAGE OF
P fZT F-,k Tee
PROJECT -r
PPK-
DATE:
HI� DK-O L O G 1 c'T�- E 17
51-fIE�- 42Ez1 = ! . S t ACRES = .00283 MIZ
FR'C - DENU I.OPME NT = COULM 10"
C-N - G+.o
T i M E- of c0rjcc-:NTRA-n O1, = .0 7-h rs
FOST - UEA/M CF M Irk N T
CN=87.(c
i i C IE OF CONICEINITRATICH = , O53 hrs
H
W�N
Wagner, Heindel, and Noyes, Inc.
Consulting Geologists Burlington, Vermont
0
Page No.
PAGE OF
PAR-MER _nRE
PROJECT,IRACTU-710S2 K
DATE:
PRC - .DE ✓E-LOPMENT
or Scs c-uRvE' No,
SotL COVES 1,APZA OFP9RTN CN cN X A'
L
WATER S14 E)(A;
VeD - HYDkbL 110 SDILL G ROUP '` D `r .GO } ` 50. t
Ve B - RYOROI.660c AIL_ c: ROUP " D" .40 �4 133. Co
= s+, D
6uR11 NO. /S if-fg 50/ 7&4-270/u ol= 4 ,
nv �� • so FOR PP Z—::- — PE I/��OMOVF
CN = 840
tJoTE W rA►R" PASTURE �oNDiT10"S Fog
FC-DCVEI.bPMpfjT AND H'f[)g0L0GlC SOIL_
H
WN
Wagner, Heindel, and Noyes, Inc.
Consulting Geologists Burlington, Vermont
Pew pf--vF.aPrva7J-r-
Ti M E o f co►-)c i T 10 v, l
(D
Page No.
PAGE OF
PgRiN�K T�
PROJECTooK
DATE:
0 VXW-�b FLDW L = 319 S
319 -�=i-
V — ';IS COmRLAIJD FLOW)
j =( 319 1- l hr _ ,0-�4-hr5
� s
POST DGVaOffA T
TiMt�- OF C000E7,-Y,(RATI0ti..i
5 N "rR ow �Pr�Q�h ) LZ= 3 7S Sz = Z,'9 °/- Vim= ?,17P /s
0 0-�A� U F20 L j lr� t 7S SL = i Z % V3 = 2..� �Pi�s
C= 3 Z+ 80 f 7 5 11�Z )� �� � , O S3 k rS
o
H
W�N
s
00
Wagner, Heindel, and Noyes, Inc.
Consulting Geologists Burlington, Vermont
G
Page No.
PAGE OF
p fui7 �
PROJECT��aRILr' r Cz 00K
DATE:
foST DE Viz oPM�NT
p�TceiYliNr3T oA/
5 a, L- coUEr2
oAio of Pfl
C N
C N 1( A c.
ksHE1j CA 1
Paved Pam. K 1-61-51 Res/ Si va /K s
. 3 2 6
99
31, 95
Crtl✓el Rath/ Pa+'K:�
, l58
91
t4W✓] — �74GYi �onQ�T7tr✓1 r 7s % elove,-
vV
41 , ICJ
7 = 57.(o1
G/ /6yT GrJ�Pv vt/O. /S !f!� Sv/j'1/rif%- i /oN OF .
Ci x A ) o �"o� P05T - iD�VCi-oPMENT :
1Jo i E; PYD2 LDGIG 661L- CR0uP ' D VAS A S?5v('IC:Z FO(Q
sE� rrroN OF C ,W s
H
WN
Wagner, Heindel, and Noyes, Inc.
Consulting Geologists Burlington, Vermont
l 3f
135
13�
133
13z
sTR E-A M. X -_- 7! o�
0 5' 10' 1520
�-I)
W4�j'
AREA (�)'
I `NJP (S� !
R"
Q cf s
132
0
0
0
0
0
0
13Z, 5
.5
6.5
?.)
6.9
, 500
17.0
133
1.0
11.0
G.8
12.1
.6GI
43,G
133.5
1.5
1-7,0
14A
It-7
- b`to
114. 6
i3t
7.0
t?,.D
23.2.
- ,,)•3
1, O93
239.0
134.5
2.1�
19.25
32,5
22.3
I , Z85
393.7
(35
3.0
19.75
-42.1
3.5
1 177
11,177
5U-5
13".3
3,�
20.75
48.2
Z5,1
7
0
Page No.
PAGE OF
64kn& 774-00<-
PROJECT7v,C iTp�
DATE: LIO9
t
4 !. 4 9A R� ; /L
11 , 0 2S5c�t?IE't1 ►' /Yj,c +t�i, i4S �. V)
%w F
61
LIST OF INPUT DATA FOR TR-20 HYDROLOGY*****************
JOB TR-20
SUMMARY NOPLOTS
TITLE 001
BARTLETT BROOK MODEL(1984+COND.)
LATEST REV 10i8i86 FASSETS LOTS
TITLE
CALIBRATED
BASED ON MAY
27-28, 1985
RAINSTORM
3
STRUCT
01
8
220.
0.0
0.0
8
220.5
9.86
0.597
8
221.0
19.31
1.194
8
221.25
22.28
1.492
8
221.5
24.53
1.791
8
222.0
28.21
2.388
8
222.25
30.0
2.686
8
222.5
30.1
2.984
8
223.0
30.2
3.581
9
ENDTBL
2
XSECTN
002
1.0
217.
8
215.
0.0
0.0
8
215.5
2.51
1.13
8
216.
15.37
4.45
8
216.5
45.49
9.83
8
217.
95.90
17.50
9
ENDTBL
2
XSECTN
001
1.0
212.0
8
210.
0.0
0.0
8
210.25
0.81
0.38
8
210.5
5.12
1.38
8
210.75
15.10
3.00
8
211.
33.10
5.75
8
211.25
59.80
8.75
8
211.5
99.34
13.13
8
212.
208.31
22.60
9
ENDTBL
2
XSECTN
003
1.0
208.0
8
205.
0.0
0.0
8
205.5
13.97
3.48
8
206.
44.09
7.65
8
206.5
88.94
12.75
8
207.
147.75
18.50
8
207.5
220.75
24.88
8
208.
312.81
32.40
9
ENDTBL
3
STRUCT
02
8
220.0
0.0
0.0
8
221.0
0.053
0.030
8
222.0
0.108
0.060
8
223.0
0.159
0.090
8
224.0
0.212
0.120
LIST OF INPUT DATA (CONTINUED)*********************
8
224.17
0.68
0.12001
8
224.50
3.43
0.12002
8
224.83
8.48
0.12003
8
225.17
12.93
0.12004
8
225.33
14.59
0.12005
8
225.50
15.00
0.12006
8
225.67
15.01
0.12007
9 ENDTBL
2 XSECTN 004
1.0
192.0
8
190.
0. 0
0. 0
8
190.5
1.90
1.59
8
191.
11.24
2.50
8
191.5
33.44
3.28
8
192.
67.28
3.93
9 ENDTBL
2 XSECTN 005
1.0
198.0
8
195.
0.0
0.0
8
195.1
0.073
0.15
8
195.2
0.33
0.43
8
195.3
0.82
0.81
8
195.4
1.62
1.32
8
195.6
4.19
2.61
8
195.8
8.54
4.40
8
196.
14.90
6.6
8
197.
82.97
23.20
8
198.
268.39
60.00
9 ENDTBL
3 STRUCT 03
9 ENDTBL
2 XSECTN 006
1.0
193.0
8
190.0
0.0
0.0
8
190.1
0.37
0.48
8
190.2
1.20
1.03
8
190.3
2.42
1.64
8
190.4
4.04
2.32
8
190.5
6.01
3.03
8
191.0
22.43
7.75
8
191.5
50.46
13.95
8
192.
93.63
22.1
8
192.5
151.42
31.5
8
193.
192.03
41.25
9 ENDTBL
3 STRUCT 04
8
145.
0.0
0.0
8
145.4
2.69
0.000215
8
146.2
25.18
0.00187
LIST OF INPUT DATA (CONTINUED)*********************
8
147.
49.8
0.00735
I 8
147.8
111.27
0.01955
8
148.2
130.47
0.03293
8
148.6
130.94
0.07313
I 8
149.
132.79
0.09449
9
ENDTBL
2
XSECTN
007
1.0
151.0
8
145.
0.0
0.0
8
I
145.2
0.186
0.24
8
145.4
0.83
0.68
8
145.6
2.29
1.44
8
I
145.8
4.37
2.28
8
146.
8.11
3.65
8
147.
44.81
12.80
8
148.
123.36
27.00
I 8
149.
321.75
68.40
8
150.
702.80
114.50
8
151.
1225.87
167.10
9
ENDTBL
2
XSECTN
008
1.0
134.0
8
130.
0. 0
0. 0
8
130.1
0.027
0.10
8
130.2
0.15
0.35
8
130.3
0.37
0.65
8
130.4
1.64
1.66
8
130.5
2.51
2.23
8
131.
8.06
4.90
8
131.5
16.23
8.03
8
132.
26.28
11.30
8
132.5
39.51
15.25
8
133.
55.6
19.65
8
133.5
248.90
57.15
8
134.
922.10
169.65
9
ENDTBL
2
XSECTN
009
1.0
208.0
8
205.
0.0
0.0
8
205.5
8.75
2.48
8
206.
31.33
6.10
8
206.5
69.73
10.95
8
207.
124.99
16.6
8
207.5
200.68
23.88
8
208.
299.91
32.25
9
ENDTBL
2
XSECTN
010
1.0
212.5
8
210.
0.0
0.0
8
210.5
9.97
2.90
3
'1 �7/
I
LIST OF INPUT DATA (CONTINUED)*********************`
8
211.
33.41
6.60
8
211.5
69.80
11.10
8
212.
120.00
16.40
8
212.5
183.17
22.65
9
ENDTBL
2
XSECTN 011
1.0
206.0
8
200.
0.0
0.0
8
201.
31.60
5.85
8
202.
105.36
13.70
8
203.
217.78
23.10
8
204.
378.39
34.80
8
205.
579.05
47.75
8
206.
828.03
62.40
9
ENDTBL
2
XSECTN 012
1.0
147.0
8
145.
0.0
0.0
8
145.2
0.26
0.16
8
145.4
2.26
0.86
8
145.6
7.76
2.25
8
145.8
16.87
4.04
8
146.
29.00
6.00
8
147.
208.60
27.10
9 ENDTBL
3 STRUCT 05
8
145.
0.0
0.0
8
145.6
9.80
0.00018
8
146.8
91.60
0.00370
8
148.0
241.57
0.0161
8
149.2
404.85
0.0807
8
149.8
474.72
0.11457
8
150.4
512.81
0.1537
8
151.0
513.00
0.2005
9 ENDTBL
2 XSECTN 013
1.0
134.0
8
130.
0.0
0.0
8
130.1
0.05
0.05
8
130.2
0.26
0.13
8
130.3
0.71
0.38
8
130.4
1.47
0.64
8
130.5
2.52
0.95
8
131.
14.73
3.50
8
131.5
42.12
7.65
8
132.
87.91
13.20
8
132.2
107.11
16.06
8
133.
272.20
64.06
8
134.
954.93
160.06
LIST OF INPUT DATA (CONTINUED)*********************
9 ENDTBL
3
STRUCT 06
8
120.
0. 0
0. 0
8
120.9
20.87
0.065
8
121.8
78.63
0.40
8
122.7
158.40
1.36
8
123.6
264.67
2.79
8
124.5
388.43
4.94
8
125.4
533.68
8.37
8
126.2
705.17
11.39
8
127.1
914.85
14.89
8
128.0
1216.89
18.84
8
128.8
2273.95
22.79
9
ENDTBL
2
XSECTN 014
1.0
104.
8
100.
0.0
0.0
8
100.1
0.53
0.62
8
100.2
1.65
1.24
8
100.3
3.32
1.86
8
100.4
5.36
2.52
8
100.5
7.80
3.20
8
101.
24.33
6.75
8
101.5
47.33
10.58
8
102.
75.96
14.70
8
102.5
110.20
19.13
8
103.
150.57
24.00
8
103.5
231.30
34.00
8
104.
393.99
54.00
9
ENDTBL
2
XSECTN 015
1.0
135.3
8
132.
0.0
0.0
8
132.5
12.0
2.5
8
133.0
43.6
6.8
8
133.5
114.0
14.4
8
134.0
239.0
23.2
8
134.5
393.7
32.5
8
135.0
587.5
42.2
8
135.3
701.7
48.2
9
ENDTBL
2
XSECTN 016
1.0
149.5
8
148.
0.0
0.0
8
148.2
0.32
0.31
8
148.5
2.03
1.19
6
149.0
9.59
3.75
8
149.5
25.0
7.68
9
ENDTBL
1,
LIST OF INPUT DATA (CONTINUED)********************
3 STRUCT
07
8
180.
0.0
0.0
8
181.0
4.80
0.001
8
181.5
9.10
0.002
8
182.0
12.0
0.003
8
183.0
25.0
0.006
9 ENDTBL
3 STRUCT
08
9 ENDTBL
3 STRUCT
09
9 ENDTBL
3 STRUCT
10
i. •,- . ,
r ->
c etc_
. t. ti
8
140.00
o.0
0.0
8
140.50
0.087
0.0079
^r
Poo-
8
141.00
3.52
0.0174
P(�. �_,��4
Z-L
8
141.50
4.35
0.0288
8
142.00
6.57
0.0421
8
142.50
7.21
0.0579
8
143.00
8.01
0.0755
9 ENDTBL
6 RUNOFF
1
01
6
0.257
77.
0.57
1
1
1
6 RESVOR
2
01
6
7
220.0
1
1
1
6 REACH
3
001
7
5
500.
3.27
1.23
1
1
1
6 RUNOFF
1
002
6
0.083
64.
0.52
1
1
1
6 ADDHYD
4
003
5
6
7
1
1
1
6 REACH
3
005
7
5
1000.
1
1
1
6 RUNOFF
1
02
6
0.175
61.
0.61
1
1
1
6 RESVOR
2
02
6
4
220.0
1
1
1
6 REACH
3
004
4
6
600.
1.5
1.20
1
1
1
6 ADDHYD
4
03
5
6
7
1
1
1
6 RESVOR
2
03
7
5
190.0
1
1
1
6 REACH
3
006
5
6
50.
1
1
1
6 REACH
3
007
6
7
1250.
1
1
1
6 RUNOFF
1
007
5
0.110
71.
0.40
1
1
1
6 ADDHYD
4
007
5
7
6
1
1
1
6 RESVOR
2
04
6
7
145.
1
1
1
6 REACH
3
008
7
5
650.
1
1
1
6 RUNOFF
1
008
6
0.006
78.
0.063
1
1
1
6 ADDHYD
4
008
5
6
7
1
1
1
6 RUNOFF
1
009
1
0.263
76.
0.87
1
1
1
6 RUNOFF
1
010
2
0.050
69.
0.54
1
1
1
6 ADDHYD
4
011
1
2
3
1
1
1
6 REACH
3
012
3
1
1200.
1
1
1
6 RUNOFF
1
012
2
0.0179
75.
0.17
1
1
1
6 ADDHYD
4
012
1
2
3
1
1
1
6 RUNOFF
1
07
6
0.0116
77.
0.0945
1
1
1
LIST OF INPUT DATA (CONTINUED)**********************
6
RUNOFF
1
08
5
0.00257
86.
0.043
1
1
1
6
ADDHYD
4
012
5
6
4
1
1
1
6
RUNOFF
1
09
2
0.0134
87.
0.048
1
1
1
6
ADDHYD
4
012
3
2
1
1
1
1
1
6
ADDHYD
4
012
1
4
2
1
1
1
1
6
RESVOR
2
05
2
4
145.
1
1
1
6
REACH
3
015
4
2
270.
A-ttN��
1
1
1
6
RUNOFF
1
10
3
0.00283
88.
0.093
6
RESVOR
2
10
3
4
140. vrt��rJ
1
1
1
6
ADDHYD
4
015
2
4
1
1
1
1
6
RUNOFF
1
016
3
0.00248
82.
0.0633
1
1
1
1
6
REACH
3
016
3
2
380.
1
1
1
6
ADDHYD
4
015
1
2
3
1
1
1
6
REACH
3
013
3
2
630.
1
1
1
6
RUNOFF
1
013
3
0.00969
69.0
0.14
1
1
1
1
6
ADDHYD
4
013
2
3
1
1
1
1
6
ADDHYD
4
06
1
7
4
1
1
1
6
RESVOR
2
06
4
3
120.
1
1
1
6
REACH
3
014
3
4
700.
1
1
1
1
ENDATA
7
INCREM
6
0.10
7
BASFLO
5
0.0041
1.0
24.0
7
COMPUT
7
01
008
4.0
1.0
2
2
01
01 !
7
BASFLO
5
0.0041
1.0
24.0
7
COMPUT
7
009
014
4.0
1.0
2
2
01
01 !
ENDCMP
1
ENDJOB
2
*******************************END OF 80-80
t�JV l Pin EN 7
- ?Pv&T N �,& T CZ
TR20 XEQ
BARTLETT BROOK
MODEL(1984•COND.)
LATEST
REV 10/8/86 FASSETS
LOTS
JOB 1
SUMMARY
REV
05/02/83
CALIBRATED BASED
ON
MAY 27-28,
1985 RAINSTORM
PAGE 18
SUMMARY TABLE
1 - SELECTED RESULTS OF STANDARD
AND EXECUTIVE
CONTROL INSTRUCTIONS
IN THE ORDER
PERFORMED
(A STAR(-) AFTER THE
PEAK DISCHARGE
TIME AND
RATE (CFS)
VALUES INDICATES
A FLAT TOP
HYDROGRAPH
A QUESTION MARK(?)
INDICATES
A HYDROGRAPH
WITH PEAK
AS LAST
POINT.)
SECTION/
STANDARD
RAIN
ANTEC
MAIN
PRECIPITATION
PEAK DISCHARGE
STRUCTURE
CONTROL
DRAINAGE
TABLE
MOIST
TIME
-------------------------
RUNOFF
--------------------------------------
ID
OPERATION
AREA
#
COND
INCREM
BEGIN
AMOUNT
DURATION
AMOUNT
ELEVATION
TIME
RATE
RATE
(SQ MI)
(HR)
(HR)
(IN)
(HR)
(IN)
(FT)
(HR)
(CFS)
(CSM) {
ALTERNATE
1 STORM
1
STRUCTURE
1
RUNOFF
.257
2
2
.10
.0
4.00
24.00
1.81
.88-
12.24
223.97
871.5
STRUCTURE
1
RESVOR
.257
2
2
.10
.0
4.00
24.00
1.81
229.34
13.52
31.47
122.4
XSECTION
1
REACH
.257
2
2
.10
.0
4.00
24.00
1.81
210.98
13.60
31.47
122.4
XSECTION
2
RUNOFF
.083
2
2
.10
.0
4.00
24.00
.98
.88-
12.24
36.52
440.0
XSECTION
3
ADDHYD
.340
2
2
.10
.0
4.00
24.00
1.61
206.26
12.29
67.39
198.2
XSECTION
5
REACH
.340
2
2
.10
.0
4.00
24.00
1.61
196.74
12.37
65.48
192.6
STRUCTURE
2
RUNOFF
.175
2
2
.10
.0
4.00
24.00
.82
.88-
12.32
53.11
303.5
STRUCTURE
2
RESVOR
.175
2
2
.10
.0
4.00
24.00
.82
925.84
12.32
56.20
321.1
XSECTION
4
REACH
.175
2
2
.10
.0
4.00
24.00
.80
191.83
12.42
56.10
320.6
STRUCTURE
3
ADDHYD
.515
2
2
.10
.0
4.00
24.00
1.33
.88-
12.41
120.93
234.E
STRUCTURE
3
RESVOR
.515
2
2
.10
.0
4.00
24.00
1.33
.88-
12.41
120.93
234.8
XSECTION
6
REACH
.515
2
2
.10
.0
4.00
24.00
1.34
192.24
12.51
120.93
234.8
XSECTION
7
REACH
.515
2
2
.10
.0
4.00
24.00
1.33
147.96
12.61
120.04
233.1
XSECTION
7
RUNOFF
.110
2
2
.10
.0
4.00
24.00
1.40
.98-
12.15
68.95
808.6
XSECTION
7
ADDHYD
.625
2
2
.10
.0
4.00
24.00
1.35
148.12
12.59
147.19
235.5
STRUCTURE
4
RESVOR
.625
2
2
.10
.0
4.00
24.00
1.35
150.38
12.67
139.19
222.7
XSECTION
8
REACH
.625
2
2
.10
.0
4.00
24.00
1.34
133.22
12.77
139.19
222.7
XSECTION
8
RUNOFF
.006
2
2
.10
.0
4.00
24.00
1.86
.88-
11.96
11.49
1915.5
XSECTION
8
ADDHYD
.631
2
2
.10
.0
4.00
24.00
1.35
133.22
12.77
140.11
222.1
XSECTION
9
RUNOFF
.263
2
2
.10
.0
4.00
24.00
1.74
.88-
12.44
164.75
626.4
XSECTION
10
RUNOFF
.050
2
2
.10
.0
4.00
24.00
1.27
.88-
12.25
29.72
594.4
XSECTION
11
ADDHYD
.313
2
2
.10
.0
4.00
24.00
1.67
202.24
12.41
188.19
601.3
XSECTION
12
REACH
.313
2
2
.10
.0
4.00
24.00
1.66
146.89
12.51
188.19
601.3
XSECTION
12
RUNOFF
.018
2
2
.10
.0
4.00
24.00
1.67
.98-
12.01
24.51
1369.4
XSECTION
12
ADDHYD
.331
2
2
.10
.0
4.00
24.00
1.67
146.91
12.50
191.64
579.1
STRUCTURE
7
RUNOFF
.012
2
2
.10
.0
4.00
24.00
1.79
.80-
11.97
20.25
1745.8
STRUCTURE
6
RUNOFF
.003
2
2
.10
.0
4.00
24.00
2.53
.88-
11.96
6.46
2514.8
XSECTION
12
ADDHYD
.014
2
2
.10
.0
4.00
24.00
1.92
145.96
11.97
26.68
1882.6
STRUCTURE
9
RUNOFF
.013
2
2
.10
.0
4.00
24.00
2.62
.88-
11.96
34.48
2573.2
XSECTION
12
ADDHYD
.344
2
2
.10
.0
4.00
24.00
1.70
146.92
12.50
194.99
566.3
XSECTION
12
ADDHYD
.358
2
2
.10
.0
4.00
24.00
1.71
146.94
12.50
197.91
552.1
STRUCTURE
5
RESVOR
.358
2
2
.10
.0
4.00
24.00
1.72
147.66
12.50
198.79
554.6
TR20 XEQ
BARTLETT BROOK
MODEL(1984-COND.) LATEST REV 1018i86 FASSETS LOTS
JOB 1
SUMMARY
REV 05/02/83
CALIBRATED
BASED ON
MAY 27-28,
1985
RAINSTORM
PAGE 19
SUMMARY TABLE
1 - SELECTED RESULTS OF
STANDARD
AND EXECUTIVE CONTROL
INSTRUCTIONS
IN THE
ORDER PERFORMED
(A
STAR(-) AFTER THE
PEAK DISCHARGE
TIME AND
RATE (CFS)
VALUES
INDICATES A FLAT TOP
HYDROGRAPH
A
QUESTION MARK(?)
INDICATES A HYDROGRAPH WITH
PEAK
AS LAST POINT.)
SECTIONi
STANDARD
RAIN
ANTEC
MAIN
PRECIPITATION
PEAK DISCHARGE
STRUCTURE
CONTROL
DRAINAGE
TABLE
MOIST
TIME
-------------------------
RUNOFF
--------------------------------------
ID
OPERATION
AREA
*
COND
INCREM
BEGIN
AMOUNT
DURATION
AMOUNT
ELEVATION
TIME
RATE
RATE
(SQ MI)
(HR)
(HR)
(IN)
(HR)
(IN)
(FT)
(HR)
(CFS)
(CSM)
ALTERNATE
1 STORM
1
XSECTION
15
REACH
.358
2
2
.10
.0
4.00
24.00
1.71
133.84
12.60
198.79
554.6
XSECTION
15
RUNOFF
.003
2
2
.10
.0
4.00
24.00
2.34
.88-
11.96
6.52SCr
E-2303.1
XSECTION
15
A
61
2
2
.10
_
.0
4.00
24.00
1.72
133.64
12.60
199.36
551.8
XSECTION
16
RUNOFF
.002
2
2
.10
.0
4.00
24.00
2.17
.89-
11.96
5.45
2195.8
XSECTION
16
REACH
.002
2
2
.10
.0
4.00
24.00
2.27
148.73
12.06
5.45
2195.7
XSECTION
15
ADDHYD
.364
2
2
.10
.0
4.00
24.00
1.72
133.84
12.60
199.91
549.5
XSECTION
13
REACH
.364
2
2
.10
.0
4.00
24.00
1.73
132.65
12.70
199.91
549.5
XSECTION
13
RUNOFF
.010
2
2
.10
.0
4.00
24.00
1.27
.88-
12.00
10.55
1089.0
XSECTION
13
ADDHYD
.373
2
2
.10
.0
4.00
24.00
1.71
132.66
12.70
201.16
538.6
STRUCTURE
6
ADDHYD
1.004
2
2
.10
.0
4.00
24.00
1.49
124.15
12.72
339.91
338.4
STRUCTURE
6
RESVOR
1.004
2
2
.10
.0
4.00
24.00
1.49
123.96
12.88
314.73
313.3
XSECTION
14
REACH
1.004
2
2
.10
.0
4.00
24.00
1.49
103.76
12.98
314.73
313.3
TR20 XEQ
BARTLETT
BROOK
MODEL(1984+COND)
LATEST
REV 10/8/86 FASSETS LOTS
JOB 1
SUMMARY
REV 05/02/83
CALIBRATED
BASED ON
MAY 27-28; 1985 RAINSTORM
PAGE 18
SUMMARY TABLE
1 - SELECTED RESULTS OF
STANDARD
AND EXECUTIVE
CONTROL INSTRUCTIONS IN THE
ORDER PERFORMED
(A
STAR(-) AFTER THE
PEAK DISCHARGE
TIME AND
RATE (CFS)
VALUES INDICATES A FLAT TOP
HYDROGRAPH
A
QUESTION MARK(?)
INDICATES A HYDROGRAPH
WITH PEAK
AS LAST
POINT.)
SECTION/
STANDARD
RAIN
ANTEC
MAIN
PRECIPITATION
PEAK DISCHARGE
STRUCTURE
CONTROL
DRAINAGE
TABLE
MOIST
TIME
-------------------------
RUNOFF
--------------------------------------
ID
OPERATION AREA
#
COND
INCREM
BEGIN
AMOUNT
DURATION
AMOUNT
ELEVATION
TIME
RATE
RATE
(SQ MI)
(HR)
(HR)
(IN)
(HR)
(IN)
(FT)
(HR)
(CFS)
(CSM)
ALTERNATE
1 STORM 1
STRUCTURE
1
RUNOFF
.257
2
2
.10
.0
4.00
24.00
1.81
.08-
12.24
223.97
871.5
STRUCTURE
1
RESVOR
.257
2
2
.10
.0
4.00
24.00
1.81
229.34
13.52
31.47
122.4
XSECTION
1
REACH
.257
2
2
.10
.0
4.00
24.00
1.81
210.98
13.60 •
31.47
• 122.4
XSECTION
2
RUNOFF
.083
2
2
.10
.0
4.00
24.00
.98
.08-
12.24
36.52
440.0
XSECTION
3
ADDHYD
.340
2
2
.10
.0
4.00
24.00
1.61
206.26
12.25
67.39
198.2
XSECTION
5
REACH
.340
2
2
.10
.0
4.00
24.00
1.61
196.74
12.37
65.48
192.6
STRUCTURE
2
RUNOFF
.175
2
2
.10
.0
4.00
24.00
.82
.00-
12.32
53.11
303.5
STRUCTURE
2
RESVOR
.175
2
2
.10
.0
4.00
24.00
.82
925.84
12.32
56.20
321.1
XSECTION
4
REACH
.175
2
2
.10
.0
4.00
24.00
.80
191.83
12.42
56.10
320.6
STRUCTURE
3
ADDHYD
.515
2
2
.10
.0
4.00
24.00
1.33
.08-
12.41
120.93
234.8
STRUCTURE
3
RESVOR
.515
2
2
.10
.0
4.00
24.00
1.33
.00-
12.41
120.93
234.8
XSECTION
6
REACH
.515
2
2
.10
.0
4.00
24.00
1.34
192.24
12.51
120.93
234.8
XSECTION
7
REACH
.515
2
2
.10
.0
4.00
24.00
1.33
147.96
12.61
120.04
233.1
XSECTION
7
RUNOFF
.110
2
2
.10
.0
4.00
24.00
1.40
.08-
12.15
88.95
808.6
XSECTION
7
ADDHYD
.625
2
2
.10
.0
4.00
24.00
1.35
148.12
12.59
147.19
235.5
STRUCTURE
4
RESVOR
.625
2
2
.10
.0
4.00
24.00
1.35
150.38
12.67
139.19
222.7
XSECTION
8
REACH
.625
2
2
.10
.0
4.00
24.00
1.34
133.22
12.77
139.19
222.7
XSECTION
8
RUNOFF
.006
2
2
.10
.0
4.00
24.00
1.86
.00-
11.96
11.49
1915.5
XSECTION
8
ADDHYD
.631
2
2
.10
.0
4.00
24.00
1.35
133.22
12.77
140.11
222.1
XSECTION
9
RUNOFF
.263
2
2
.10
.0
4.00
24.00
1.74
.08-
12.44
164.75
626.4
XSECTION
10
RUNOFF
.050
2
2
.10
.0
4.00
24.00
1.27
.80-
12.25
29.72
594.4
XSECTION
11
ADDHYD
.313
2
2
.10
.0
4.00
24.00
1.67
202.74
12.41
1B8.19
601.3
XSECTION
12
REACH
.313
2
2
.10
.0
4.00
24.00
1.66
146.89
12.51
188.19
601.3
XSECTION
12
RUNOFF
.018
2
2
.10
.0
4.00
24.00
1.67
.88-
12.01
24.51
1369.4
XSECTION
12
ADDHYD
.331
2
2
.10
.0
4.00
24.00
1.67
146.91
12.50
191.64
579.1
STRUCTURE
7
RUNOFF
.012
2
2
.10
.0
4.00
24.00
1.79
.00-
11.97
20.25
1745.8
STRUCTURE
8
RUNOFF
.003
2
2
.10
.0
4.00
24.00
2.53
.88-
11.96
6.46
2514.8
XSECTION
12
ADDHYD
.014
2
2
.10
.0
4.00
24.00
1.92
145.96
11.97
26.68
1882.6
STRUCTURE
9
RUNOFF
.013
2
2
.10
.0
4.00
24.00
2.62
.00-
11.96
34.48
2573.2
XSECTION
12
ADDHYD
.344
2
2
.10
.0
4.00
24.00
1.70
146.92
12.50
194.99
566.3
XSECTION
12
ADDHYD
.358
2
2
.10
.0
4.00
24.00
1.71
146.94
12.50
197.91
552.1
STRUCTURE
5
RESVOR
.358
2
2
.10
.0
4.00
24.00
1.72
147.66
12.50
198.79
554.6
TR20 XEQ
BARTLETT BROOK
MODEL(1984+COND.) LATEST REV 10/8/86 FASSETS LOTS
JOB 1
SUMMARY
REV
05/02/83
CALIBRATED
BASED ON
MAY 27-28,
1985
RAINSTORM
PAGE 19
SUMMARY TABLE
1 - SELECTED RESULTS OF
STANDARD
AND EXECUTIVE
CONTROL
INSTRUCTIONS IN THE
ORDER PERFORMED
(A
STAR(•) AFTER THE
PEAK DISCHARGE
TIME AND
RATE (CFS)
VALUES
INDICATES A FLAT TOP
HYDROGRAPH
A
QUESTION MARK(?)
INDICATES A HYDROGRAPH
WITH
PEAK AS LAST POINT.)
SECTION/
STANDARD
RAIN
ANTEC
MAIN
PRECIPITATION
PEAK DISCHARGE
STRUCTURE
CONTROL
DRAINAGE
TABLE
MOIST
TIME
-------------------------
RUNOFF
--------------------------------------
ID
OPERATION
AREA
#
COND
INCREM
BEGIN
AMOUNT
DURATION
AMOUNT
ELEVATION
TIME
RATE
RATE
(SO MI)
(HR)
(HR)
(IN)
(HR)
(IN)
(FT)
(HR)
(CFS)
(CSM)
ALTERNATE
i STORM
1
XSECTION
15
REACH
.358
2
2
.10
.0
4.00
24.00
1.71
133.84
12.60
198.79
554.6
XSECTION
15
RUNOFF
.003
2
2
.10
.0
4.00
24.00
2.70
.88-
11.96
7.43
2626.9 SST E
XSECTION
15
ADDHYD
.361
2
2
.10
.0
4.00
24.00
1.72
133.84
12.60
199.39
551.9
XSECTION
16
RUNOFF
.002
2
2
.10
.0
4.00
24.00
2.17
.88-
11.96
5.45
2195.8
XSECTION
16
REACH
.002
2
2
.10
.0
4.00
24.00
2.27
148.73
12.06
5.45
2195.7
XSECTION
15
ADDHYD
.364
2
2
.10
.0
4.00
24.00
1.72
133.84
12.60
199.95
549.6
XSECTION
13
REACH
.364
2
2
.10
.0
4.00
24.00
1.73
132.65
12.70
199.95
549.6
XSECTION
13
RUNOFF
.010
2
2
.10
.0
4.00
24.00
1.27
.98-
12.00
10.55
1089.0
XSECTION
13
ADDHYD
.373
2
2
.10
.0
4.00
24.00
1.72
132.66
12.70
201.20
538.7
STRUCTURE
6
ADDHYD
1.004
2
2
.10
.0
4.00
24.00
1.49
124.15
12.72
339.94
338.4
STRUCTURE
6
RESVOR
1.004
2
2
.10
.0
4.00
24.00
1.49
123.96
12.88
314.77
313.4
XSECTION
14
REACH
1.004
2
2
.10
.0
4.00
24.00
1.49
103.76
12.98
314.77
313.4
PoSi OE.V£WPME,\JT
w� BPc�\N
TR20 XEQ
BARTLETT BROOK
MODEL(1984*COND.) LATEST REV 10/8/86 FASSETS LOTS
JOB 1
SUMMARY
REV 05/02/83
CALIBRATED BASED
ON
MAY 27-28,
1985
RAINSTORM
PAGE 18
SUMMARY TABLE
1 - SELECTED
RESULTS OF
STANDARD
AND EXECUTIVE CONTROL
INSTRUCTIONS
IN THE
ORDER PERFORMED
(A
STAR(-) AFTER THE
PEAK DISCHARGE
TIME AND
RATE (CFS)
VALUES
INDICATES A FLAT TOP
HYDROGRAPH
A
QUESTION MARK(?)
INDICATES
A HYDROGRAPH WITH
PEAK
AS LAST POINT.)
SECTION/
STANDARD
RAIN
ANTEC
MAIN
PRECIPITATION
PEAK DISCHARGE
STRUCTURE
CONTROL
DRAINAGE
TABLE
MOIST
TIME
-------------------------
RUNOFF
--------------------------------------
ID
OPERATION
AREA
#
COND
INCREM
BEGIN
AMOUNT
DURATION
AMOUNT
ELEVATION
TIME
RATE
RATE
(SQ MI)
(HR)
(HR)
(IN)
(HR)
(IN)
(FT)
(HR)
(CFS)
(CSM)
ALTERNATE
1 STORM 1
STRUCTURE
1
RUNOFF
.257
2
2
.10
.0
4.00
24.00
1.81
.80-
12.24
223.97
871.5
STRUCTURE
1
RESVOR
.257
2
2
.10
.0
4.00
24.00
1.81
229.34
13.52
31.47
122.4
XSECTION
1
REACH
.257
2
2
.10
.0
4.00
24.00
1.81
210.98
13.60 ■
31.47 •
122.4
XSECTION
2
RUNOFF
.083
2
2
.10
.0
4.00
24.00
.98
.88-
12.24
36.52
440.0
XSECTION
3
ADDHYD
.340
2
2
.10
.0
4.00
24.00
1.61
206.26
12.25
67.39
198.2
XSECTION
5
REACH
.340
2
2
.10
.0
4.00
24.00
1.61
196.74
12.37
65.48
192.6
STRUCTURE
2
RUNOFF
.175
2
2
.10
.0
4.00
24.00
.82
.89-
12.32
53.11
303.5
STRUCTURE
2
RESVOR
.175
2
2
.10
.0
4.00
24.00
.82
925.64
12.32
56.20
321.1
XSECTION
4
REACH
.175
2
2
.10
.0
4.00
24.00
.80
191.83
12.42
56.10
320.6
STRUCTURE
3
ADDHYD
.515
2
2
.10
.0
4.00
24.00
1.33
.80-
12.41
120.93
234.8
STRUCTURE
3
RESVOR
.515
2
2
.10
.0
4.00
24.00
1.33
.80-
12.41
120.93
234.8
XSECTION
6
REACH
.515
2
2
.10
.0
4.00
24.00
1.34
192.24
12.51
120.93
234.8
XSECTION
7
REACH
.515
2
2
.10
.0
4.00
24.00
1.33
147.96
12.61
120.04
233.1
XSECTION
7
RUNOFF
.110
2
2
.10
.0
4.00
24.00
1.40
.88-
12.15
88.95
808.6
XSECTION
7
ADDHYD
.625
2
2
.10
.0
4.00
24.00
1.35
148.12
12.59
147.19
235.5
STRUCTURE
4
RESVOR
.625
2
2
.10
.0
4.00
24.00
1.35
150.38
12.67
139.19
222.7
XSECTION
8
REACH
.625
2
2
.10
.0
4.00
24.00
1.34
133.22
12.77
139.19
222.7
XSECTION
8
RUNOFF
.006
2
2
.10
.0
4.00
24.00
1.86
.89-
11.96
11.49
1915.5
XSECTION
8
ADDHYD
.631
2
2
.10
.0
4.00
24.00
1.35
133.22
12.77
140.11
222.1
XSECTION
9
RUNOFF
.263
2
2
.10
.0
4.00
24.00
1.74
.88-
12.44
164.75
626.4
XSECTION
10
RUNOFF
.050
2
2
.10
.0
4.00
24.00
1.27
.98-
12.25
29.72
594.4
XSECTION
11
ADDHYD
.313
2
2
.10
.0
4.00
24.00
1.67
202.74
12.41
188.19
601.3
XSECTION
12
REACH
.313
2
2
.10
.0
4.00
24.00
1.66
146.89
12.51
188.19
601.3
XSECTION
12
RUNOFF
.018
2
2
.10
.0
4.00
24.00
1.67
.98-
12.01
24.51
1369.4
XSECTION
12
ADDHYD
.331
2
2
.10
.0
4.00
24.00
1.67
146.91
12.50
191.64
579.1
STRUCTURE
7
RUNOFF
.012
2
2
.10
.0
4.00
24.00
1.79
.88-
11.97
20.25
1745.8
STRUCTURE
8
RUNOFF
.003
2
2
.10
.0
4.00
24.00
2.53
.&8-
11.96
6.46
2514.8
XSECTION
12
ADDHYD
.014
2
2
.10
.0
4.00
24.00
1.92
145.96
11.97
26.68
1882.6
STRUCTURE
9
RUNOFF
.013
2
2
.10
.0
4.00
24.00
2.62
.08-
11.96
34.48
2573.2
XSECTION
12
ADDHYD
.344
2
2
.10
.0
4.00
24.00
1.70
146.92
12.50
194.99
566.3
XSECTION
12
ADDHYD
.358
2
2
.10
.0
4.00
24.00
1.71
146.94
12.50
197.91
552.1
STRUCTURE
5
RESVOR
.358
2
2
.10
.0
4.00
24.00
1.72
147.66
12.50
198.79
554.6
m
TR20 XEQ
BARTLETT BROOK
MODEL(1984+COND.) LATEST
REV 10i8186 FASSETS LOTS
JOB 1
SUMMARY
REV 05i02/83
CALIBRATED
BASED ON
MAY 27-28,
1985 RAINSTORM
PAGE 19
SUMMARY TABLE
1 - SELECTED RESULTS OF
STANDARD
AND EXECUTIVE
CONTROL INSTRUCTIONS
IN THE
ORDER PERFORMED
(A
STAR(-) AFTER THE
PEAK DISCHARGE
TIME AND
RATE (CFS)
VALUES
INDICATES A FLAT TOP
HYDROGRAPH
A
QUESTION MARK(?)
INDICATES A HYDROGRAPH
WITH PEAK
AS LAST POINT.)
SECTION/
STANDARD
RAIN
ANTEC
MAIN
PRECIPITATION
PEAK DISCHARGE
STRUCTURE
CONTROL
DRAINAGE
TABLE
MOIST
TIME
-------------------------
RUNOFF
--------------------------------------
ID
OPERATION
AREA
#
COND
INCREM
BEGIN
AMOUNT
DURATION
AMOUNT
ELEVATION
TIME
RATE
RATE
(SQ MI)
(HR)
(HR)
(IN)
(HR)
(IN)
(FT)
(HR)
(CFS)
(CSM)
ALTERNATE
1 STORM
1
XSECTION
15
REACH
.358
2
2
.10
.0
4.00
24.00
1.71
133.84
12.60
198.79
554.6
STRUCTURE
10
RUNOFF
.003
2
2
.10
.0
4.00
24.00
2.70
.88-
11.96
7.43'%tf- 2626.9
STRUCTURE
10
RESVOR
.003
2
2
.10
.0
4.00
24.00
2.75
141.95
12.00
6.33
2238.4
XSECTION
15
ADDHYD
361
2
.10
.0
4.00
24.00
1.72
_
133.84
12.60
199.45
552.0
XSECTION
16
RUNOFF
.002
2
2
.10
.0
4.00
24.00
2.17
.86-
11.96
5.45
2195.8
XSECTION
16
REACH
.002
2
2
.10
.0
4.00
24.00
2.27
148.73
12.06
5.45
2195.7
XSECTION
15
ADOHYD
.364
2
2
.10
.0
4.00
24.00
1.72
133.84
12.60
200.00
549.8
XSECTION
13
REACH
.364
2
2
.10
.0
4.00
24.00
1.73
132.65
12.70
200.00
549.8
XSECTION
13
RUNOFF
.010
2
2
.10
.0
4.00
24.00
1.27
.88-
12.00
10.55
1089.0
XSECTION
13
ADDHYD
.373
2
2
.10
.0
4.00
24.00
1.72
132.66
12.70
201.25
538.9
STRUCTURE
6
ADDHYD
1.004
2
2
.10
.0
4.00
24.00
1.49
124.15
12.72
339.99
338.5
STRUCTURE
6
RESVOR
1.004
2
2
.10
.0
4.00
24.00
1.49
123.96
12.88
314.83
313.4
XSECTION
14
REACH
1.004
2
2
.10
.0
4.00
24.00
1.49
103.76
12.98
314.83
313.4
H
W�N
Wagner, Heindel, and Noyes, Inc,
Consulting Geologists Burlington, Vermoni
ME
P
PAGE OF age No.
PROJECT: PL-' 'LL � `
DATE= l o 2
cJ C-" v- M ArT l C, %� C. �_ Al 1. nJ ✓ ft - \ /v C CLo S'� S F.CX" 1 u /\/
C- Dka.,;
I Sw.yu v!J �'LRrilti'
hLo 02 r�CL.
6�f' N 6". "LIV ,-L- PEA. Gt.MV,V'T°EO P.4%r.-Z
OIV (ChK INFww (1-15F0-/CrTc
PROVIDE `'c01MENT x—, 1oN vF
FINS P': cj
IoZ�� GOuDV�i PIPE 5%
STATE OF VERMONT
AGENCY OF NATURAL RESOURCES
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
Re: Revocation of Permit 4CO339-4
Dale Franklin and Howard Sherman
c/o Partner Tire and Service
Creek Farm Plaza
Colchester, Vermont 05446
Sewage Utility Connection Denial
STATEMENT OF FACTS
1. The Department of Environmental Conservation ("Department") issued a
Certificate of Compliance 4CO339-4 to Dale Franklin and Howard Sherman for
construction of a tire and auto service store on September 9, 1986. The
permit was conditioned on connection to a municipal sewer collection
system.
2. On May 21, 1991, the Department received an Affirmation of
Inadequate Sewage Treatment, from the Bartlett's Bay Wastewater Treatment
Facility notifying the Department that the project authorized by
Certificate of Compliance 4CO3399-4 will not utilize the village of Benson
wastewater treatment facility for sewage treatment because approval
for connection of this project was terminated on November 13, 1986.
3. On August 13, 1991, the Department petitioned the Commissioner to revoke
Certificate of Compliance 4CO339-4 because sewage service was no longer
available to the project.
4. By letter dated May 1, 1992 the Department notified Dale Franklin and
Howard Sherman of the petition to revoke Certificate of Compliance
4CO339-4. The letter informed Mr. Franklin and Mr. Sherman that they had
the right to a revocation hearing or, if they did not contest the
revocation, they could waive the hearing.
5. The Department received a waiver of the revocation hearing, signed by
Mr. Sherman on May 7, 1992. The waiver also needed to be signed by Mr.
Franklin as co -applicant. Mr. Franklin signed the waiver and returned it
in May, 1993.
6. A revocation hearing in this matter is not necessary because both Mr.
Sherman and Mr. Franklin have waived their right to a hearing.
-1-
ORDER
Based on the facts above, IT IS ORDERED, that Certificate of Compliance
4CO339-4 is hereby REVOKED.
Waterbury, Vermont.
Department of Env#
June Z0 , 1993.
nmental Conservation
ack Long, Coonissioner
N State of . trmont
i r MM
f' far
Department of Fish and Wildlife
Department of Forests, Parks and Recreation
Department of Environmental Conservation
State Geologist
Natural Resources Conservation Council
May 1, 1992
Dale Franklin and Howard Sherman
c/o Partner Tire & Service
Creek Farm Plaza
Colchester, Vermont 05446
SUBJECT: Tire and service store
4CO339-4
Dear Mr. Franklin and Mr. Sherman:
AGENCY OF NATURAL RESOURCES
Department of Environmental Conservation
Office of the Commissioner
Building One South, 103 South Main Street
Waterbury, Vermont 05671-0401
Telephone: (802) 244-8755
The Environmental Protection Division of the Department of Environmental
Conservation issued a Certificate of Compliance for the above referenced
project on September 6, 1986. This Certificate of Compliance was issued on the
basis of the project being connected to the Bartlett's Bay Wastewater Treatment
Facility. On May 20, 1991, the Division received an affirmation (copy
attached) from the Bartlett's Bay Wastewater Treatment Facility that it is no
longer committed to providing sewage treatment and disposal service to the
project and that it would like the Division to remove the project from its
reserve capacity commitment list.
After reviewing the pertinent file information, the Environmental
Protection Division concluded that sewage service is no longer available to
your project and, therefore one of the key bases for issuance of Certificate of
Compliance 4CO339-4 is no longer true. On August 13, 1991 the Division
petitioned the Commissioner to revoke your permit based on the fact that
without authorization from the Bartlett's Bay Wastewater Treatment Facility for
a sewage connection, construction of your project constitutes a violation of
your permit and of the Environmental Protection Rules. A copy of the petition
is attached.
As specified in Section 2.02F of the Environmental Protection Rules, the
Commissioner of the Department of Environmental Conservation is required to
hold a hearing to determine whether your permit should be revoked. You may,
however, waive your right to a hearing if you do not contest the revocation
action described above. Therefore, please complete the attached form and
return it no later than May 22, 1992, so I can schedule a hearing date if so
indicated.
/St. Johnsbur y
Mr. Franklin and Mr. Sherman
May 1, 1992
Page 2
If you have any questions on the petition proceedings, please contact me at
244-8755. If you have questions about the evidence in support of the petition,
please contact Donald Robisky, Environmental Protection Division at 244-5674.
Sincerely,
a&��
Charles A. Bristow, General Counsel
CAB/bl-h
Enclosures
cc: Joe Weith, South Burlington Planner
Bonnie Loomer-Hostetler, Dept. of Environmental Conservation
REQUEST FOR OR WAIVER OF REVOCATION HEARING
Applicant: Dale Franklin and Howard Sherman
Address: c/o Partner Tire and Service
Creek Farm Plaza
Colchester, Vermont 05446
Project: Tire and service store
Permit No.: 4CO339-4
Town/Village: South Burlington
I, the undersigned permittee, have read the Petition for Revocation of the
referenced permit. I certify that I am the present permittee of Permit No.
4C0339-4. I wish to inform the Commissioner of the Department of Environmental
Conservation that:
Please initial one:
I waive my right to a hearing on this matter. (I understand this means
the permit will be revoked without a hearing.)
I request that a hearing be held.
Permittee: signature
o-Permittee: signature
Date Date
Please return this form by May 22, 1992 to:
Charles A. Bristow, General Counsel
State of Vermont, Agency of Natural Resources
Department of Environmental Conservation
103 South Main Street, Building One South
Waterbury, Vermont 05676-0401
NOTE: Permits run with the land so the present permittee is the owner of the
land. In some cases, the project developer might differ from the land
owner and may be a co-permittee. If the property was sold since the
permit was issued, the permittee is the new owner not the original owner
named on the permit.
State of ti Irmont
Department of Fish and Wildlife
Department of Forests, Parks and Recreation
Department of Environmental Conservation
State Geologist
Natural Resburces Conservation Council
August 13, 1991
Reginald A. LaRosa, Acting Commissioner
Department of Environmental Conservation
103 South Main Street
Waterbury, Vermont 05676
Dear Mr. LaRosa:
AGENCY OF NATURAL RESOURCES
Department of Environmental Conservation
Permits, Compliance and Protection
The Annex, 103 South Main Street
Waterbury, Vermont 05671-0405
Telephone: (802) 244-5674
RE: Permit Revocations
This Division has received formal notification from a number of
municipalities of withdrawal of their commitment to provide sewage treatment
and disposal to specific projects. The Division is, therefore, requested to
remove the projects from the list of sewage service commitments charged against
reserve capacity. The following permits and/or certificates of compliance were
issued this Division were based on sewage treatment allocation by
municipalities:
PERMIT NUMBER/NAME
WW-4-0255 BDP Realty Assoc.
PB-4-1375 Davis Dev. Corp.
WW-2-0050 SMC Dev. Corp. of Vt.
EC-2-1589 HB Van Guilder
EC-2-1795 Daniel & Susan Hallock
WW-2-0137 Environmental Consultants
WW-2-0177 Mount Snow LTD
PB-5-0044-2 B.E., INC.
EC-5-1420 E. Leonard
PB-5-1031 Genge, Holtan, Lepeltier
EC-5-1594 James Bond
UTILITY
Bartletts Bay Wastewater
Treatment Facility
Bartletts Bay Wastewater
Treatment Facility
Ludlow Wastewater Treatment
Facility
Ludlow Wastewater Treatment
Facility
Jacksonville Wastewater
Treatment Facility
North Branch Fire District #1
Wastewater Treatment Facility
North Branch Fire District #1
Wastewater Treatment Facility
Waterbury Wastewater Treatment
Facility
Waterbury Wastewater Treatment
Facility
Waterbury Wastewater Treatment
Facility
Waterbury Wastewater Treatment
Facility
Regional Offices - Barre/Essex Jct./Pittsford/N. Springfield/St. Johnsbury
Mr. LaRosa
August 13, 1991
Page Two
CERTIFICATE OF COMPLIANCE
4C0339-4 Dale Franklin &
Howard Sherman
5W0861 Pilgrim Partnership
5W0090-4 Peter Sears
5L0822 Stowe Club Associates
Bartletts Bay Wastewater
Treatment Facility
Waterbury Wastewater Treatment
Facility
Waterbury Wastewater Treatment
Facility
Stowe Wastewater Treatment
Facility
In accord with the provisions of Section 2-02.F of the 1982 Environmental
Protection Rules, the Division petitions the Commissioner to revoke the
above -mentioned permits and certifications of compliance on the basis that
without authorization from the municipal wastewater treatment facilities for
sewage connection, construction of these projects constitutes violations. The
Division requests that the petitions be heard at the Commissioner's earliest
convenience. The Division does not require a stenographer's transcript of the
hearings.
Sincerely,
Gary V. Schultz, Director
GVS/bl -h
CC: Permittees
Utilities
Town Planning Commissions
Act 250
Regional Offices.
AFFIRMATION OF
INADEQUATE SEWAGE TREATMENT
P6rmittee: DALE FRANKLIN & HOWARD SHERMAN
Permit: 4C0339-4
Issued: September 6, 1986
We, the undersigned, do affirm that the Partner Tire & Service Bldq
authorized through the above -noted permit will not be allowed to utilize
the Bartletts Bay Wastewater Treatment Facility for sewage treatment.
Municipal approval for connection of this project terminated on
We understand that this statement will be used as evidence of
inadequate sewage treatment in the proceedings for revocation of the
above -noted permit.
For the BARTLETTS BAY ';J1.17
l
By Dated a o
Tit l C" 17-
By _
Title
By —
Title
By
Title
Dated
Dated
Dated
CITY OF SOUTH BURLING`I'ON
SITE PLAN APPLICATION
1) NAME, ADDRESS, AND PHONE NUMBER OF:
a) Owner of Record Peter Bouvea et al 862-2222
1805 Shelburne Road, South Burlinqton
b) Applicant Partner Tire and Service, Inc. 878-6731
Creek Farm Plaza, Colchester
c) Contact Person David A. Desautel s 864-0900
135 College Street, Burlington
2) PROJECT STREET ADDRESS: 1785 Shelburne Road
3) PROPOSED USE (s) Automotive Service, Tire Sales, Retail Parts 1 -1��
4) SIZE OF PROJECT: (i.e. Building Square Footage, #units, maximum
height and #floors 10,200 S.F., 3 units, 18' Height, Single Story, (plus shower &
office in eaves
5) NUMBER OF EMPLOYEES (full and part time): 12
6) LOT COVERAGE: Building 13 %; Building, Parking, Outside
Storage: 49 %
8) COST
ESTIMATES: Buildings: $ 240
K
; Landscaping
$ 9 K
Other
Site Improvements: (Please
list
with cost) $ 35 K (site
work
9) ESTIMATED PROJECT COMPLETION DATE: October 1, 1986
10) ESTIMATED AVERAGE DAILY TRAFFIC (in and out) 160
11) PEAK HOUR(s) OF OPERATION: Mon. - Friday 7-8 a.m. and 5-6 p.m.
12) PEAK DAY (s) OF OPERATION: Steady Monday - Saturday
L\0 c
SIGNATURES OF APP IC NT
May 23, 1986
Dave De s au t e 1 s
135 College Street
Burlington, Vermont 05401
Res Partner Tire, 1785 Shelburne Road
Dear Dave-.
Enclosed are the minutes of your site plan approval for Partner
Tire. Please be sure to meet all of the stipulations before
filing for a building permit.
Sincerely,
Jane B. Lafleur,
City Planner
JBL/mcp
Encl
VIC-
June 27, 1986
Katherine Vase
AEC
111 West Street
Essex Junction, Vermont 05452
Re: Partner Tire, Shelburne Road
Dear Katherine:
This serves to confirm that the South Burlington Planning
Commission approved the site plan application for Partner
Tire. This project is in conformance with the Comprehensive
Plan of South Burlington.
Sincerely,
Jane B. Lafleur,
City Planner
JBL/mcp
cc: Gordon Woods
5/13/86
JBL
MOTION OF APPROVAL
That the South Burlington Planning Commission approve the site
plan application of Partner Tire and Service, Inc., David
Desautels, agent for construction of a 10,200 square foot
building for Partner Tire Sales, an automotive service business
and a retail parts business as depicted on a plan entitled:
"Partner Tire and Service, Inc., for Howard Sherman and Dale
Franklin, Shelburne Road, South Burlington, Vermont" prepared by
Gordon G. Woods Associates, Architects, Burlington, Vermont,
dated April 10, 1986, and last revised 5/7/86 with the following
stipulations:
1. An $8 000 landsca,ppin bond shall be posted prior to permit.
(Z�� se.e1� S o `l ' f, � [ ��: c �.e� t^ �..t � 4-44 Ao,,%t tfi � , ?v ,l , ,, r .
2. The parking on the northside of the ravine shall not be
constructed unless it is determined by the applicant and/or the
Planning Commission after one year that it is required.
3. The developer shall, contribute 1% of the cost of the
Shelburne Road intersection improvement package due to the 34
trip ends produced by this development.
4. The applicant shall comply with the recommendation of Wagner,
Heindel and Noyse for storm water detention. The recommendation
shall be approved by the City Engineer prior to permit.
5. There shall be a separation between the westerly property
line and the gravel drive to serve as a snow storage area.
6. A fire hydrant shall be installed prior to permit in a
location determined by the South Burlington Fire Chief to serve
these 3 lots.
7. The building permit shall be obtained within 6 months or this
approval shall be null and void.
1
t',-�,n
— Y I \ uii I '(-t,
1
..4f
5) FISSETTE, 10 SHUNPIKE ROAD
This sketch plan is for the two lot subdivision of a 1.02 acre
property with an existing house. The Zoning Board approved a
variance for the 56 foot frontage on the larger lot.
The two lots will be 11,245 square feet with the existing house
and a new lot of 33,344 square foot for a multiple -family
dwelling. It is Zoned R4; three units may be permitted on this
lot. They will require a separate subdivision approval. Muni-
cipal sewer and water will. be provided.
6) PARTNER TIRE, Fassetts lot #3, 1785 SHELBURNE ROAD
Partner Tire proposes to construct a 10,200 square foot structure on
lot #3 of the Fassetts subdivision. The structure will have
three uses: Partner Tire sales, automotive service and retail
parts. These multiple uses were approved by the Zoning Board of
Adjustment.
Access and Circulation: This lot and #2 will share a curb cut.
The curb cut is located just south of Harbor View Road.
Circulation is adequate.
Parking: Forty five parking spaces are provided. The plan shows
a second parking lot north of the ravine to meet the parking
requirements. I suggest this lot be constructed after a one ,year
review only if the parking is needed.
Landscaping and Screening: The project requires a landscaping
plan and bond valued at $ 8000. Although the plan meets this
requirement, the plan should include larger 4 inch caliper trees
along Shelburne Road. I do not particularly like paving right up
to the building and prefer a landscaped buffer around the
building except, of course, where there are overhead doors. I am
expecting to receive revised plans prior to the meeting.
Traffic: The overlay zone permits 89 trip ends during the peak
hour on this property. The applicant has provided data on the
Partner Tire business in Colchester that 72 trip ends will be
produced by 36 customers per day. The two other businesses
project 44 customers per day or 88 trip ends for a total of 160
trip ends per day. During the peak hour of Shelburne Road, the
maximum projection is 17 trips or 34 trip ends. There is no data
from ITE for this type of use.
The applicant must contribute 1% toward the improvement fund
based on this share of total trips over a two year period.
Other: An evaluation by Wagner, Heindel and Noyse is required.
and the applicant must comply with that recommendation for on
site detention and erosion control. Sidewalks must be built
along the frontage. See Bill Szymanski's and Chief Goddette's
comments.
4
OAJL ?41 n-A
->Av \ C--,L'- -'S,6&LJ\N
4,1 'r k7 , q W-4.
• 135 COLLEGE ST.
BURLINGTON,
VERMONT 05401
802-864-0900
• 201 WOODSTOCK AVE.
RUTLAND
VERMONT 05701
802-775-1980
desa7utels
REAL ESTATE, INC.
May 5, 1986
Ms. Jane LaFleur, City Planner
City of South Burlington
575 Dorset Street
So. Burlington, Vt. 05401
Dear Jane,
After reviewing data from Partner Tires present location in
Colchester and securing estimates from our two prospective
tenants, the following summarizes the traffic situation:
Customers/Day Peak Hours
Partner Tire 36 7-8 AM M-F
5-6 PM M-F
Tenant #2 35 Steady
Tenant #3 9 8-9 AM M-F
80 3-4 PM M-F
(in=1, out=1) X 2
Total Trips/Day 160
If you have any questions, please contact me.
DAD/jgc
Si nc ely,
David A. Desautels
CCIM
M E M O R A N D U M
To: South Burlington Planning Commission
From: William J. Szymanski, City Manager
Re: May 13, 1986 agenda items
Date: May 9, 1986
2) LOTHROP PROPERTY, KIRBY ROAD
1. Same comments regarding drainage, tree removal as in
preliminary plan review.
2. A neighbor along Duval Street is interested in a small
corner (south-east) to square off their lot. I have no
objection to this being done.
3) ETHAN ALLEN FARMS, ETHAN ALLEN DRIVE
1. Same comments as previously submitted.
4) HARBOR INN, SHELBURNE ROAD
1. Same comments as previously submitted.
6) PARTNERSHIP TIRE AND SERVICE, INC., SHELBURNE ROAD
1. Site shall include runoff control.
2. There should be a separation between the westerly property
line and the gravel drive to serve as a snow storage areaa.
City of South Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT 05401
PLANNER
658-7955
May 9, 1986
Dave Desautels
135 College Street
Burlington, Vermont 05401
Re: Partner Tire, 1785 Shelburne Road
Dear Dave:
ZONING ADMINISTRATOR
658-7958
Enclosed are the agenda and my memo to the Planning Commission.
Also enclosed are Bill Szymanski's and Chief Goddette's comments.
Please be sure someone is present on Tuesday, May 13, 1986
to represent your request.
Sincerely,
Jane B. Lafleur,
City Planner
JBL/mcp
Encls
cc: Peter Bouyea
Partner Tire & Service, Inc.
1 v
BMW
Al ,.► D 5 C µ A P tP-4 G E- D U L W-
PL. A N T t IN G LA T f N N A AA E Ei.A s�z� �4oT Cw401 lsaW KvMgeR. Sy A/t. c pt_1 �E Q
NT_ MAC -__
FL",QP-.c4CA CV-Af3 tAMAALUS COR.OWI R,IA 2yxDtA, -i -9 2C -VT TALL WD I ISUa-LAP (p A Ta�%'
mokwAV MAPLt"e- Ac rOL PLA'�TAS�tOtOes
Ig-2�BALLEDvQ.LA P f7
s G l0.0
5 P ti ACC I tit C. L 4w M T A 1C U S u w w s t F ` 1 S -t 8_ _ - -- .
tvcUs GLvr01YSiA(54ADow MAsTti�.) 14=t6 600 15ACLL`04 6Ua:LAFF
►qd x3
I h 3 4 : t.
r
-
--
ti
'• � rz A v t= L / h
w �
1 SoNE W
,
G CULART
c
uittl� -Burlington Nire i3cpa tlnent ,
575 Bor,oet street
*M4 Ahirlington, Uermant 1154111
OFFICE OF
JAMES W. GODDETTE, SR.
CHIEF
663-6455
MEMORANDUM
TO: SOUTH BURLINGTON PLANNING COMMISSION
FROM: CHIEF JIM GODDETTE, FIRE CHIEF
RE: MAy 13,1986 AGENDA ITEMS
DATE: MAy 6,1986
Pan-tnenTine 9 Service Inc . ;
1) At this time I do not bee a pnobtem Aok .the
6in.e deparetmen•t on this prcoject. Some one
6houLd make sure the hydn-ant 1,5 .Lns•tatted
which wa6 applcoved 6o)L the 3 .dot 6ubdivi6ion.
2) Gnegoney 9 Ca&ot Lo•thno p; Ki. Lb y Rd
I do not 6 ee a pro bt em with ,thi6 3 .dot
subdivision.
3) Handy, 42 Hine6bung Road;
The onty pnobtem I see at this time is the
dn.ive way 6houtd be at feast 15 Ft. wide
bon ouk 6matten equipment which ,L6 .the Game
a6 teque6.ted {ion. on ,the p1i.2 i6ton road o66ice,
� cite,, Lit* i
October 10, 1986
Jane B. LaFleur
Planner, City of So. Burlington
575 Dorset St.
So. Burlington, VT 05401
Re: Car Wash
1805 Shelburne Rd.
Dear Jane:
The seller of Lot #1 and I did not agree on compensation for
the extra land necessary for my project's approval until September
15th. This time delay will not allow enough time for me to satisfy
all conditions to secure all the permits necessary for me to build
this season.
As a result, I am requesting a six (6). months' extension on
applying for a building permit. My current approval expires on or
about November 2.6, 1986. Please advise as soon as possible.
Sincerely,
--4 -Q�Xk-'- Har Curth
HFC/sm
H
VN
Wagner, Heindel, and Noyes. Inc, consulting geologists
P.O. Box 1629 Burlington, Vermont 05402-1629 802-658-0820
October 16, 1986
Mrs. Jane Lefleur
Planning Office
Municipal Building
Dorset St.
South Burlington, VT 05403
Dear Jane:
We have completed our analysis of the site plan for the proposed
Partner Tire and Service facility on Shelburne Road, within the
Bartlett Brook watershed. In order to prevent any increase in
peak discharge in the brook, we recommend that a retention basin
of volume 243600 gallons, as specified schematically in the
report, be constructed along the western limit of the site.
Additionally, we can not agree at this time with the
construction of an access road and emplacement of a culvert
across the south fork of the Brook. Additional data should be
requested by the city on this proposed crossing. Please contact
me if you have any questions.
Sincerely,
4'"XV
J frey . Nelson, Geologist
Wagner, Heindel, and Noyes, Inc.
JAN:tac
enclosures
cc: David Desautels
• 135 COLLEGE ST.
BURLINGTON,
VERMONT 05401
802-864-0900
• 201 WOODSTOCK AVE.
RUTLAND
VERMONT 05701
802-775-1980
1
v
desa7utels
REAL ESTATE, INC.
May 6, 1986
Ms. Jane LaFleur, City Planner
575 Dorset Street
So. Burlington, Vt. 05401
RE: Update to letter dated 5/5/86
Dear Jane,
After consulting with Partner Tire & Service, and the two
prospective tenants, we estimate traffic to our site during
the following times will be:
Trips/Hour
4-6 P.M. Monday -Thursday 16
3-7 P.M. Friday 17
10-11 A.M. Saturday 11
If you have any comments or questions, please don't
hesitate to call.
DAD/jgc
Sincerely,
David A. Desautels
CCIM
H 6--)Li` -
VNWagner, Heindel, and Noyes, Inc. consulting geologists
W N P.O. Box 1629 Burlington, Vermont 05402-1629 802-658-0820
November 4, 1986
Mr. Doug Fitzpatrick
Fitzpatrick & Llewellyn
15 Brickyard Road
Essex Jct., VT 05452
RE: Shelburne Road Carwash
Dear Doug:
As per our telephone conversation of November 3, 1986, I am
enclosing the tabular hydrograph data you requested. All
section and structure numbers are as designated in our original
report.
Please contact me with any questions.
Sincerely(,
Je freY A. ANelson, Geologist
Wagner, Heindel, and Noyes, Inc.
JAN:tac
enclosures
cc: Jane Lefleur
Harry Curth
�V
0. 1L-cII mmuun I'IUUt.LlLyb4'$_UNU.) LAILhI REV 10/8/86 FASSETS
LOTS
JOB 1 PASS 1
PAGE 13
REV
W102/83
CALIBRATED
BASED ON
MAY 27-28,
1985 RAINSTORM
OPERATION
ADDHYD CROSS SECTION
15 \(ke'. V L
PEAK TIME(HRS)
PEAK
DISCHARGE(CFS)
PEAK
ELEVATION(FEET)
12.12
124.78
133.54
12.60
200.12
133.84
19.76
11.07
132.46
23.76
8.45
132.35
TIME(HRS)
FIRST HYDROGRAPH POINT
.00 HOURS
TIME INCREMENT - .10
HOURS
DRAINAGE
AREA -
.36 SO.MI.
.00
DISCHG
.00
.00
.00
.00
.01
.02
.02
.03
.04
.05
1.00
DISCHG
.06
.06
.07
.07
.07
.07
.07
.07
.07
.07
2.00
DISCHG
.07
.07
.07
.07
.07
.06
.07
.06
.06
.06
3.00
DISCHG
.06
.06
.06
.06
.06
.06
.06
.06
.06
.06
4.00
DISCHG
.06
.06
.06
.06
.06
.06
.06
.06
.06
.06
5.00
DISCHG
.06
.06
.06
.06
.06
.06
.06
.06
.06
.06
6.00
DISCHG
.06
.07
.08
.09
.09
.10
.11
.12
.12
.13
7.00
DISCHG
.14
.15
.15
.17
.17
.18
.19
.20
.20
.21
8.00
DISCHG
.22
.23
.26
.28
.31
.35
.36
.37
.38
.39
9,00
DISCHG
.40
.42
.47
.51
.53
.55
.58
.65
.71
.76
^4.00
DISCHG
.85
.97
1.17
1.37
1.66
1.98
2.28
2.82
3.32
3.90
..00
DISCHG
4.61
5.22
6.26
7.20
8.55
10.06
12.47
24.87
34.42
60.89
12.00
DISCHG
100.36
124.16
113.45
129.80
169.77
188.49
200.10
189.91
176.42
154.19
13.00
DISCHG
133.15
113.26
98.40
85.67
76.06
67.20
60.68
54.24
49.47
45.12
14.00
DISCHG
41.71
38.59
35.96
33.51
31.63
29.65
28.27
26.55
25.30
24.01
15.00
DISCHG
23.07
22.05
21.37
20.60
20.04
19.32
19.02
18.55
18.27
17.79
16.00
DISCHG
17.51
17.10
16.92
16.62
16.55
16.36
16.35
15.98
15.86
15.67
17.00
DISCHG
15.53
15.19
14.97
14.62
14.43
14.15
14.06
13.88
13.85
13.59
18.00
DISCHG
13.40
13.22
13.10
12.80
12.57
12.21
11.99
11.70
11.56
11.36
19.00
DISCHG
11.31
11.19
11.18
11.09
11.11
11.05
11.08
11.03
11.06
10.97
20.00
DISCHG
10.70
10.56
10.45
10.18
9.93
9.59
9.35
9.07
8.91
8.73
21.00
DISCHG
8.67
8.55
8.53
8.46
8.46
8.40
8.42
8.38
8.41
8.37
22.00
DISCHG
8.40
8.36
8.40
8.36
8.40
8.37
8.40
8.37
8.41
8.38
23.00
DISCHG
8.42
8.39
8.42
8.40
8.43
8.41
8.44
8.41
8.43
8.26
24.00
DISCHG
8.07
7.90
7.28
6.70
6.19
5.45
4.64
3.75
2.98
2.26
25.00
DISCHG
1.72
1.26
.97
.70
.55
.39
.31
.21
.18
.11
26.00
DISCHG
.10
.05
.06
.02
.04
.00
.02
.00
.01
.00
27.00
DISCHG
.01
.00
.01
.00
.01
.00
.01
.00
.01
.00
28.00
DISCHG
.01
.00
.01
.00
.01
.00
.01
.00
.01
.00
29.00
DISCHG
.01
.00
.01
.00
RUNOFF
VOLUME ABOVE
BASEFLOW -
1.72 WATERSHED
INCHES,
400.86 CFS-HRS,
33.13
ACRE-FEET;
BASEFLOW -
.00 CFS
OPERATION
RUNOFF STRUCTURE 11
PEAK TIME(HRS)
PEAK
DISCHARGE(CFS)
PEAK
ELEVATION(FEET)
11.96
2.58
(RUNOFF)
TIME(HRS)
FIRST HYDROGRAPH
POINT -
.00 HOURS
TIME INCREMENT
- .10
HOURS
DRAINAGE
AREA -
.00 SO.MI.
6.00
DISCHG
.00
.00
.00
.00
.01
.01
.01
.01
.01
.01
7.00
DISCHG
.01
.01
.01
.01
.01
.01
.01
.01
.01
.01
8.00
DISCHG
.01
.02
.02
.02
.02
.02
.02
.02
.02
.02
9.00
DISCHG
.02
.03
.03
.03
.03
.03
.04
.04
.04
.04
10.00
DISCHG
.04
.04
.05
.05
.06
.06
.07
.08
.09
.10
11.00
DISCHG
.10
.12
.12
.14
.16
.17
.64
.74
1.42
2.25
12.00
DISCHG
2.40
.59
.40
.33
.26
.25
.21
.21
.19
.17
13.00
DISCHG
.17
.14
.14
.13
.12
.12
.10
.10
.10
.09
14.00
DISCHG
.09
.08
.08
.08
.07
.07
.07
.07
.07
.07
15.00
DISCHG
.07
.07
.07
.06
.06
.06
.06
.06
.06
.06
16.00
DISCHG
.06
.06
.06
.06
.06
.06
.05
.05
.05
.05
17.00
DISCHG
.05
.05
.05
.05
.05
.05
.05
.05
.04
.04
18.00
DISCHG
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
19.00
DISCHG
.04
.04
.04
.04
.04
.04
.04
.04
.03
.03
20.00
DISCHG
.03
.03
.03
.03
.03
.03
.03
.03
.03
.03
21.00
DISCHG
.03
.03
.03
.03
.03
.03
.03
.03
.03
.03
22.00
DISCHG
.03
.03
.03
.03
.03
.03
.03
.03
.03
.03
23.00
DISCHG
.03
.03
.03
.03
.03
.03
.03
.03
.02
.02
.24.00
DISCHG
.02
.00
TR20 XEO BARTLETT BROOK MODEL(1984-COND.) LATEST REV 10/8/86 FASSETS LOTS JOB 1 PASS 1
REV 05/02/83 CALIBRATED BASED ON MAY 27-28, 1985 RAINSTORM PAGE 14
OPERATION
RESVOR
STRUCTURE 11
PEAK TIME(HRS)
PEAK
DISCHARGE(CFS)
PEAK ELEVATION(FEET)
11.96
2.48
151.43
TIME(HRS)
FIRST HYDROGRAPH
POINT
.00 HOURS
TIME INCREMENT -
.10
HOURS
DRAINAGE
AREA -
.00 SO.MI.
6.00
DISCHG
.00
.00
.00
.00
.01
.01
.01
.01
.01
.01
7.00
DISCHG
.01
.01
.01
.01
.01
.01
.01
.01
.01
.01
8.00
DISCHG
.01
.02
.02
.02
.02
.02
.02
.02
.02
.02
9.*00
DISCHG
.02
.03
.03
.03
.03
.03
.04
.04
.04
.04
10.00
DISCHG
.04
.04
.05
.05
.06
.06
.07
.08
.09
.10
11.00
DISCHG
.10
.12
.12
.14
.16
.16
.63
.75
1.39
2.16
12.00
DISCHG
2.36
.91
.11
.60
.00
.49
.00
.41
.00
.34
13.00
DISCHG
.00
.30
-.01
.26
-.01
.24
.00
.20
.00
.18
14.00
DISCHG
.01
.16
.01
.15
.01
.13
.01
.12
.02
.11
15.00
DISCHG
.02
.10
.03
.09
.03
.08
.03
.08
.03
.08
16.00
DISCHG
.04
.08
.04
.07
.04
.07
.04
.06
.04
.06
17.00
DISCHG
.04
.06
.04
.06
.04
.05
.04
.05
.04
.04
18.00
DISCHG
.03
.04
.03
.04
.03
.04
.03
.04
.04
.04
19.00
DISCHG
.04
.04
.04
.04
.04
.04
.04
.04
.03
.03
20.00
DISCHG
.03
.03
.03
.03
.03
.03
.03
.03
.03
.03
21.00
DISCHG
.03
.03
.03
.03
.03
.03
.03
.03
.03
.03
22.00
DISCHG
.03
.03
.03
.03
.03
.03
.03
.03
.03
.03
23.00
DISCHG
.03
.03
.03
.03
.03
.03
.03
.03
.02
.02
24.00
DISCHG
.02
.00
RUNOFF
VOLUME ABOVE BASEFLOW
2.93 WATERSHED INCHES,
1.88 CFS-HRS,
.16 ACRE-FEET;
BASEFLOW -
.00 CFS
OPERATION
RUNOFF
STRUCTURE 12
PEAK TIME(HRS)
PEAK
DISCHARGE(CFS)
PEAK ELEVATION(FEET)
11.96
3.95
(RUNOFF)
TIME(HRS)
FIRST HYDROGRAPH
POINT -
.00 HOURS
TIME INCREMENT -
.10
HOURS
DRAINAGE
AREA -
.00 SO.MI.
6.00
DISCHG
.00
.01
.01
.01
.01
.01
.01
.01
.01
.01
7.00
DISCHG
.01
.01
.01
.01
.02
.02
.02
.02
.02
.02
8.00
DISCHG
.02
.02
.02
.03
.03
.03
.03
.03
.03
.04
9.00
DISCHG
.04
.04
.04
.05
.05
.05
.05
.06
.06
.06
10.00
DISCHG
.06
.07
.07
.08
.09
.09
.11
.12
.14
.15
11.00
DISCHG
.15
.18
.19
.23
.24
.25
1.06
1.13
3.06
3.46
12.00
DISCHG
3.63
.59
.59
.39
.38
.38
.31
.31
.25
.25
13.00
DISCHG
.25
.21
.21
.18
.16
.18
.15
.15
.14
.14
14.00
DISCHG
.14
.13
.13
.11
.11
.11
.10
.10
.10
.10
15.00
DISCHG
.10
.10
.10
.09
.08
.08
.08
.08
.08
.08
16.00
DISCHG
.08
.08
.08
.08
.08
.08
.07
.07
.07
.07
17.00
DISCHG
.07
.07
.07
.07
.07
.07
.07
.07
.06
.06
18.00
DISCHG
.06
.06
.06
.06
.06
.06
.06
.06
.06
.06
19.00
DISCHG
.06
.06
.06
.06
.06
.06
.06
.06
.04
.04
20.00
DISCHG
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
21.00
DISCHG
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
22.00
DISCHG
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
23.00
DISCHG
.04
.04
.04
.04
.04
.04
.04
.04
.03
.03
24.00
DISCHG
.03
.00
J
RUNOFF
VOLUME ABOVE BASEFLOW -
2.73 WATERSHED INCHES,
2.62 CFS-HRS,
.22 ACRE-FEET;
BASEFLOW -
.00 CFS
J
1 TR20 XEO BARTLETT BROOK MODEL(1984•COND.) LATEST REV 10i8i86 FASSETS LOTS
REV 05x02i83 CALIBRATED BASED ON MAY 27-28, 1985 RAINSTORM
OPERATION RESVOR STRUCTURE 12
PEAK TIME(HRS) PEAK DISCHARGE(CFS)
11.94 3.71
PEAK ELEVATION(FEET)
147.87
- . _.. .. o,e..
7`
JOB 1 PASS 1
PAGE 15 l
0
TIME(HRS)
FIRST HYDROGRAPH POINT -
.00 HOURS
TIME INCREMENT
- .10
HOURS DRAINAGE
AREA -
.00 SO.MI.
6.00
DISCHG
.00
.01
.01
.01
.01
.01
7.00
DISCHG
.00
.01
.00
.01
.00
.01
.00
.01
.01
.01
.01
.01
.02
.02
8.:00
DISCHG
.02
.02
.02
.02
.02
.02
.03
.03
.03
.03
-)
9.00
DISCHG
.04
.04
.04
.04
.05
.05
.05
0.00
DISCHG
.03
.05
.03
.05
.04
.06
.06
.07
.07
.08
.09
.16
.14
11.00
DISCHG
.16
.17
.19
.22
.25
.24
.94
1.20
2.72
3.64
12.00
DISCHG
3.48
1.15
.20
.70
.17
.53
.22
.38
.21
.27
13.00
DISCHG
.23
.23
.19
.19
.17
.19
.15
.15
.14
.14
14.00
DISCHG
.14
.13
.12
.12
.11
.11
.10
.10
.10
.10
-�
15.00
DISCHG
.09
.09
.09
.04
.08
16.00
DISCHG
.10
.08
.10
.08
.10
.08
.09
.08
.09
.08
.08
.08
.08
.08
.08
17.00
DISCHG
.08
.07
.07
.07
.07
.07
.07
.07
.07
.07
18.00
DISCHG
.06
.06
.06
.06
.06
19.00
DISCHG
.06
.06
.06
.06
.06
.06
.06
.06
.06
.06
.06
.06
.06
.06
.05
20.00
DISCHG
.05
.05
.05
.05
.05
.05
.04
.04
.04
.04
21.00
DISCHG
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
22.00
DISCHG
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
23.00
DISCHG
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
24.00
DISCHG
.04
.03
.02
.02
.02
.01
.01
.01
RUNOFF
VOLUME ABOVE
BASEFLOW -
2.81 WATERSHED INCHES,
2.71 CFS-HRS,
.22 ACRE-FEET;
BASEFLOW -
.00 CFS
OPERATION
ADOHYD STRUCTURE 12
CS ITV-.
TO'T A: v-�
PEAK TIME(HRS)
PEAK DISCHARGE(CFS)
PEAK ELEVATION(FEET)
11.95
6.30
148.27
12.30
1.30
147.63
=(HRS)
FIRST HYDROGRAPH POINT -
.00 HOURS
TIME INCREMENT
- .10
HOURS DRAINAGE
AREA -
.00 SO.Mi.
6.00
DISCHG
.00
.00
.00
.00
.01
.01
.01
J
7.00
DISCHG
.02
.02
.02
.02
.02
.02
.02
.01
.03
.01
.03
.02
.03
8.00
DISCHG
.03
.03
.03
.04
.04
.05
.05
.05
.05
.05
9.00
DISCHG
.06
.06
.06
.07
.07
.07
.08
.08
.09
7
10.00
DISCHG
.09
.10
.10
.11
.13
.13
.15
.16
.09
.24
.24
11.00
DISCHG
.26
.29
.32
.36
.41
.41
1.57
1.95
4.11
5.80
12.00
DISCHG
5.84
2.06
.31
1.30
.17
1.02
.22
.80
.21
.62
13.00
DISCHG
.23
.52
.19
.46
.17
.42
.15
.36
.14
.32
14.00
DISCHG
.15
.29
.14
.26
.12
.25
.11
.21
.12
.21
15.00
DISCHG
.12
.20
.13
.18
.11
.17
.12
.17
.12
.16
J
16.00
DISCHG
.12
.16
.12
.16
.13
.16
.12
.14
.11
.13
17.00
DISCHG
.11
.13
.11
.13
.11
.13
.11
.12
.11
.11 "
18.00
DISCHG
.10
.11
.10
.10
.09
.10
.09
.10
.09
.10
J
19.00
DISCHG
.09
.10
.09
.10
.09
.10
.09
.10
.09
.08
20.00
DISCHG
.08
.08
.08
.08
.07
.07
.07
.07
.07
.07
21.00
DISCHG
.07
.07
.07
.07
.07
.07
.07
.07
.07
.07
`
22.00
DISCHG
.07
.07
.07
.07
.07
.07
.07
.07
.07
.07
23.00
DISCHG
.07
.07
.07
.07
.07
.07
.07
.07
.07
.06
24.00
DISCHG
.06
.03
.02
.02
.02
.01
.01
.01
`
RUNOFF
VOLUME ABOVE
BASEFLOW -
2.96 WATERSHED INCHES,
4.59 CFS-HRS,
.38 ACRE-FEET;
BASEFLOW -
.00 CFS
OPERATION REACH CROSS SECTION 16
PEAK TIME(HRS)
PEAK
DISCHARGE(CFS)
PEAK
ELEVATION(FEET)
12.05
6.30
148.78
12.40
1.30
148.37
TIME(HRS)
FIRST HYDROGRAPH POINT -
.00 HOURS
TIME INCREMENT - .10
HOURS
DRAINAGE AREA -
.00 SO.M1.
6.00
DISCHG
.00
.00
.00
.00
.00
.01
.01
.01
.01
.01
7.00
DISCHG
.02
.02
.02
.02
.02
.02
.02
.02
.03
.03
8.00
DISCHG
.03
.03
.03
.04
.04
.04
.05
.05
.05
.05
9.00
DISCHG
.05
.06
.06
.06
.07
.07
.07
.08
.08
.09
10.00
DISCHG
.09
.09
.10
.10
.11
.13
.13
.15
.16
.24
11.00
DISCHG
.24
.26
.29
.31
.36
.41
.41
1.57
1.95
4.11
12.00
DISCHG
5.80
5.84
2.06
.31
1.30
.17
1.02
.22
.80
.21
13.00
DISCHG
.62
.23
.52
.19
.46
.17
.42
.15
.36
.14
14.00
DISCHG
.32
.15
.29
.14
.26
.12
.25
.11
.21
.12
15.00
DISCHG
.21
.12
.20
.13
.18
.11
.17
.12
.17
.12
16.00
DISCHG
.16
.12
.16
.12
.16
.13
.16
.12
.14
.11
17.00
DISCHG
.13
.11
.13
.11
.13
.11
.13
.11
.12
.11
-18:00
DISCHG
.11
.10
.11
.10
.10
.09
.10
.09
.10
.09
9.00
DISCHG
.10
.09
.10
.09
.10
.09
.10
.09
.10
.09
'0.00
DISCHG
.08
.08
.08
.08
.08
.07
.07
.07
.07
.07
21.00
DISCHG
.07
.07
.07
.02
.07
.07
.07
.07
.07
.07
22.00
DISCHG
.07
.07
.07
.07
.07
.07
.07
.07
.07
.07
23.00
DISCHG
.07
.07
.07
.07
.07
.07
.07
.07
.07
.07
24.00
DISCHG
.06
.06
.03
.02
.02
.02
.01
.01
.01
.00
RUNOFF VOLUME ABOVE
BASEFLOW -
2.71 WATERSHED INCHES,
4.34 CFS-HRS, .36
ACRE-FEET;
BASEFLOW -
.00 CFS
OPERATION
ADOHYD CROSS SECTION
6-o
N F L U rc
AI CZ
W/ S,
GL�,_
15
J
PEAK TIME(HRS)
PEAK
DISCHARGE(CFS)
PEAK
ELEVATION(FEET)
12.11
130.28
133.57
12.60
201.14
133.85
16.55
16.55
132.57
19.76
11.17
132.47
23.76
8.52
132.35
TIME(HRS)
FIRST HYDROGRAPH POINT -
.00 HOURS
TIME INCREMENT - .10
HOURS
DRAINAGE
AREA -
.36 SQ.MI.
.00
DISCHG
.00
.00
.00
.00
.01
.02
.02
.03
.04
.05
1.00
DISCHG
.06
.06
.07
.07
.07
.07
.07
.07
.07
.07
2.00
DISCHG
.07
.07
.07
.07
.07
.06
.07
.06
.06
.06
3.00
DISCHG
.06
.06
.06
.06
.06
.06
.06
.06
.06
.06
4.00
�15.00
DISCHG
.06
.06
.06
.06
.06
.06
.06
.06
.06
.06
DISCHG
.06
.06
.06
.06
.06
.06
.06
.06
.06
.06
6.00
DISCHG
.06
.07
.08
.09
.09
.10
.12
.13
.14
.15
7.00
DISCHG
.15
.16
.17
.18
.19
.20
.21
.22
.23
.24
8.00
DISCHG
.24
.26
.29
.32
.35
.39
.40
.42
.43
.44
9.00
DISCHG
.46
.48
.53
.57
.59
.62
.65
.73
.79
.85
10.00
DISCHG
.94
1.06
1.26
1.47
1.77
2.11
2.41
2.97
3.48
4.14
11.00
DISCHG
4.84
5.47
6.55
7.52
8.91
10.47
12.88
26.44
36.37
65.00
12.00
DISCHG
106.16
130.00 115.51
130.11
171.07 188.66
201.12
190.13
177.21
154.41
13.00
DISCHG
133.77
113.49
98.92
85.86
76.52
67.36
61.10
54.40
49.83
45.26
14.00
DISCHG
42.03
38.74
36.25
33.65
31.89
29.77
28.52
26.66
25.52
24.13
15.00
DISCHG
23.28
22.17
21.57
20.72
20.22
19.43
19.19
18.67
18.44
17.91
16.00
DISCHG
17.68
17.22
17.08
16.74
16.71
16.49
16.50
16.10
16.00
15.78
17.00
DISCHG
15.66
15.31
15.10
14.73
14.56
14.27
14.19
13.99
13.98
13.70
18.00
DISCHG
13.51
13.31
13.21
12.90
12.67
12.30
12.09
11.79
11.66
11.45
19.00
DISCHG
11.41
11.28
11.28
11.19
11.21
11.14
11.18
11.13
11.16
10.96
20.00
DISCHG
10.78
10.64
10.53
10.26
10.00
9.66
9.42
9.14
8.99
8.81
21.00
DISCHG
8.74
8.63
8.61
8.53
8.53
8.47
8.49
8.45
8.48
8.44
22.00
DISCHG
8.47
8.43
8.47
8.44
8.47
8.44
8.47
8.45
8.48
8.45
23.00
DISCHG
8.49
8.46
8.50
8.47
8.50
8.48
8.51
8.48
8.50
8.33
24.00
DISCHG
8.13
7.96
7.31
6.72
6.21
5.46
4.65
3.76
2.99
2.26
25.00
DISCHG
1.72
1.26
.97
.70
.55
.39
.31
.21
.18
.11
26.00
DISCHG
.10
.05
.06
.02
.04
.00
.02
.00
.01
.00
27.00
DISCHG
.01
.00
.01
.00
.01
.00
.01
.00
.01
.00
28.00
DISCHG
.01
.00
.01
00
.01
.00
.01
.00
.01
.00
29.00
DISCHG
.01
.00
.01
.00
0
J
Tp^O XEO
BARTLETT
BROOK MODEL(1984-COND.) LATEST REV 10i8i86 FASSETS
LOTS
JOB 1 PASS 1
REV
05'02%83
CALIBRATED
BASED
ON MAY 27-28,
1985
RAINSTORM
18
OPERATION
C�A'��
OF- I&A-ZLEr
QJl w���SL��D
-vrPAGE
C FlAs1P(r1til�
REACH
CROSS SECTION
14
PEAK T1ME(HRS)
PEAK
DISCHARGE(CFS)
PEAK ELEVATION(FEET)
12.98
314.85
103.76
TIt1F(HPS)
FIRST HYDROGRAPH POINT
- .00
HOURS
TIME INCREMENT
- .10
HOURS
DRAINAGE
APEA -
1.00 SO.MI.
.00
DISCHG
.00
.00
.00
.00
.00
.00
.01
.03
.03
.05
DISCHG
.07
.08
.09
.11
.12
.13
.13
.13
.14
.14
2.00
DISCHG
.15
.15
.15
.15
.16
.16
.16
.16
.16
.16
3.00
DISCHG
.16
.16
.16
.16
.16
.16
.16
.16
.16
.16
4.00
DISCHG
.16
.16
.16
.16
.16
.16
.16
.16
.16
.16
'.00
OISCHG
.16
.16
.16
.16
.15
.15
.15
.15
.15
.15
6,00
DISCHG
.15
.15
.16
.16
.17
.18
.18
.19
.21
.22
1.00
DISCHG
.23
.24
.25
.25
.26
.27
.28
.29
.30
.31
_. O
DISCHG
.32
.32
.33
.34
.37
.40
.43
.46
.48
.50
�.00
DISCHG
.51
.53
.55
.57
.62
.67
.70
.73
.77
.83
4O.00
DISCHG
.91
.98
1.08
1.23
1.45
1.74
2.09
2.53
2.98
3.58
I.00
DISCHG
4.36
5.25
6.36
7.54
9.03
10.82
12.88
16.58
21.68
33.15
DISCHG
55.47
86.15
119.96
163.46
192.83
209.48
237.38
271.25
294.43
310.37
1'.00
DISCHG
314.57
304.74
281.96
254.10
223.83
198.36
177.54
160.26
145.04
132.60
.4.00
DISCHG
122.60
114.29
107.50
101.67
96.76
92.37
68.66
85.33
82.45
79.78
15.00
DISCHG
76.60
73.64
71.77
70.15
68.82
67.59
66.56
65.54
64.72
64.01
i6.O0
DISCHG
63.41
62.75
62.13
61.53
61.06
60.67
60.40
60.16
59.96
59.65
O:SCHG
59.24
58.86
58.50
58.05
57.53
56.98
56.50
56.OQ
55.79
55.55
i,.00
8.00
DISCHG
55.34
55.08
54.70
54.29
53.92
53.49
52.98
52.42
51.87
51.41
1�.00
DISCHG
51.04
50.76
50.55
50.40
50.28
50.20
50.13
50.08
50.04
49.98
00
DISCHG
49.67
48.86
47.64
46.32
45.06
43.78
42.37
40.86
39.32
37.72
=1.00
DISCHG
36.29
34.74
33.11
31.63
30.32
29.18
28.19
27.33
26.58
25.92
22.00
DISCHG
25.35
24.84
24.40
24.01
23.67
23.38
23.13
22.91
22.72
22.55
=3.00
DISCHG
22.41
22.29
22.19
22.10
22.02
21.96
21.90
21.85
21.82
21.77
2.00
DI=:HG
21.68
21.51
21.11
20.47
19.48
18.22
16.96
15.56
13.91
12.10
_5.00
DISCHG
10.32
8.70
7.30
6.18
5.17
4.46
3.85
3.32
2.88
2.50
_ •=0
DISCHG
2.18
1.90
1.66
1.46
1.28
1.13
1.00
.68
.79
.71
-7.00
DISCHG
.64
.57
.52
.47
.43
.39
.36
.33
.31
.29
29.00
DISCHG,
.27
.25
.24
.22
.21
.20
.19
.18
.18
.17
'_;?.00
DISCHG
.16
.16
.15
.15
.14
.14
.13
.13
.13
.12
_!taOFF k!DLUME ABODE BASEFLOW -
1.49 WATERSHED
INCHES,
964.72 CFS-HRS, 79.72
ACRE-FEET;
BASEFLOW
-
.00 CFS
State of Vermont
STATE OF VERMONT
AGENCY
OF ENVIRONMENTAL
CONSERVATION
CERTIFICATION
OF COMPLIANCE
CASE NO. 4C0339-4
LAWS/REGULATIONS
INVOLVED
APPLICANT Dale Franklin
&
Environmental Protection Rules
ADDRESS Howard
Sherman
Chapter 4 -
Public Buildings
c/o Partner
Tire & Service
Chapter 7 -
Sewage Disposal
Creek Farm
Plaza
Chapter 8 -
Water Supply
Colchester,
VT 05446
Chapter 9 -
Plumbing
This project consisting of construction of a 10,200 square foot
Partner Tire & Service building (16 employees maximum) with
municipal water and sewer services, located on Lot #3 of the
previously approved Fassetts Bakery subdivision on Shelburne Road
in the City of South Burlington, Vermont, is hereby approved
under the requirements of the regulations named above, subject to
the following conditions:
GENERAL
(1) The project must be completed as shown on the plans Sheet 1,
"Site Plan, Sewage" dated July 24, 1986, prepared by
Richard Wheeler; and Sheet Al & P1 dated April 1986 last
revised 8-6-86, prepared by Gordon Woods and which have been
stamped APPROVED by the Division of Protection. No
alteration of these plans shall be allowed except where
written application has been made to the Agency of
Environmental Conservation and approval obtained.
(2) A copy of the approved plans and the Certificate of
Compliance shall remain on the project during all phases of
construction and, upon request, shall be made available for
inspection by State or Local personnel.
WATER SUPPLY
(3) The project is approved for connection to a municipal
type water system approved by the Department of Health
provided that all construction is in accordance with the
approved plans and the Environmental Protection Rules,
Effective September 10, 1982.
SEWAGE DISPOSAL
(4) The project is approved for connection to a municipal
sewage collection system. The work shall be done in
accordance with the Environmental Protection Rules,
Effective September 10, 1982.
(5) A professional engineer, registered in the State of Vermont,
is to generally supervise the construction of the sanitary
sewer line extensions, and, upon completion of construction,
the supervising engineer is to submit to the Protection
Division a written certification stating all construction has
been completed in accordance with the stamped approved
plans. The engineer's certification is to be submitted to
the Division prior to the occupancy of any unit and the
certification shall include, but not limited to, the
numerical results of all leakage testing performed on each
section of the sanitary sewer extension and all manholes,
pumb stations and force main as described in Appendix A, of
the Environmental Protection Rules.
Certification
#4C0339-4
Page 2
of Compliance
PLUMBING
(6) The Division of Protection is to be notified prior to the
closing or covering of any waste plumbing so that we may
inspect the workmanship.
(7) The Master Plumber responsible for the interior plumbing
shall provide the owner of the project a written certifica-
tion stating that the work has been done in accordance with
the approved plans and the Environmental Protection Rules,
Effective September 10, 1982.
(8) The applicant is reminded that all plumbing material and
workmanship must meet the standards of the Environmental
Protection Rules, Chapter 9, Plumbing; the National Plumbing
Code; and the requirements of the Vermont Fire Prevention
Section of the Department of Labor and Industry.
(9) A house trap is not required to be installed on the car
clean trench drain system where an oil interceptor is
specified.
Dated in the Village of Essex Junction, Vermont, this 9th day of
September, 1986.
FOR THE DIVISION OF PROTECTION
Mary Clark
Assistant Regional Engineer
CC: Donald Robisky
Katherine Vose
Department of Health
Department of Labor & Industry
City Planning Commission
Richard Wheeler
Gordon Woods