HomeMy WebLinkAboutSP-86-0000 - Decision - 1785 Shelburne RoadPLANNING COMMISSION
13 MAY 1986
PAGE 3
shall be shown to extend to the southeast corner of lot 88..
Revised plans shall be filed with the City Planner within 30
days — — —
3. The sum of 5000 shall be paid prior to permit for the im-
provements to Ethan Allen Drive. It � bbe paid in 1000 in-
stallments upon permit for the first 5 lots in this sub-
division.
4. It is the applicants responsibility to record the revised
Final Plat with the City Clerk within 90 days or this ap-
proval shall be null and void. It must be approved by the
Planner and signed by the Chairman or Clerk of the Pljanning
Commission prior to recording.
Mrs. Hurd seconded, and the motion passed unanimously.
4. Site Plan application of Dave Desautels, agent for Partner
Tires for construction of a 10,200 sq• ft. building on lot #3
of the Fassett's 3-lot subdivision, 1785 Shelburne Rd.
Mr. Desautels explained this will be a 3-tenant building, all
automotive related. The multiple use has Zoning Board
approval. There will be a common drive between lots 2 & 3,
and this building will use that drive., Mr. Desautels said
the use is a relatively low traffic generator. They expect
16 or 17 cars maximum in a peak hour. Mrs. Lafleur said the
traffic overlay zone allows 89 cars. She noted that any
change in use would have to come back to the -Commission.
Mrs. Maher asked how developers' projections are checked.
Mrs. Lafleur said she uses ITE data. In this case, there are
no comparable businesses, but specialty retail would generate
23 cars per peak hour, hardware 53, and a service station 31.
She didn't think there would be a problem in exceeding the
traffic overlay with the proposed uses. Mr. Desautels added
he checked with the Partner Tire people and the prospective
tenants on their present figures. He noted that no gas will
be dispensed on the site.
Regarding parking, Mr. Desautels noted the brook goes through
the site. He felt the parking shown on the plan would be
enough without having to cross the brook for additional
parking. They agreed to review the situation after a year to
see if the additional parking is necessary.
Mrs. Lafleur felt the landscaping plan should be revised with
more moved up front. Mrs. Maher suggested substituting some-
thing for the flowering crab which are not doing well in many
parts of town. Mrs Lafleur also noted a Wagner, Heindel &
Noyse study will be required. Mr. Desautels advised they
PLANNING COMMISSION
13 MAY 1986 ---_"
PAGE 4
have permission to use the pond used by Peter Bouyea.
Mrs. Maher moved that the S. Burlington Planning Commission
a P P v C Gi t C pia 1-1 Cx N.+t i i. Cx �_t vii vl rCtL L_11C1 111 C Clllu oCl V -Lutz--
Inc., David Desautels, agent, for construction of a 10,200
sq. ft. building for Partner Tire Sales, an automotive
service business and a retail parts business as depicted on a
plan entitled "Partner Tire and Service, Inc., for Howard
Sherman and Dale Franklin, Shelburne Rd, South Burlington,
Vermont" prepared !?y Gordon G. Woods Associates, Architects,
Burlington, Vermont, dated April 10, 1986, and last revised
5/7/86 with the following stipulations:
1. An $8000 landscaping bond shall be posted prior to►permit.
The landscaping plan shall be revised showing the trees that
are located in the northern property to be moved to a loca-
tion approved by the City Planner.
2. The parking on the north side of the ravine shall not be
constructed unless it is determined 12y the applicant and/or
the Planning Commission after one year that it is required.
3. The developer shall contribute 1% of the cost of the Shel-
burne Rd. intersection improvement package due to the 34 trip
ends produced by this development.
r
4. The applicant shall comply with the recommendation of
Wagner, Heindel and Noyse for storm water detention. The re-
commendation shall be approved by the City Engineer prior to
permit.
5. There shall be a separation between the westerly property
line and the grave l drive to serve as a snow storage area.
6. A fire hydrant shall be installed prior to permit in a
location determined 12y the South Burlington Fire Chief to
serve these 3 lots.
7. The building permit shall be obtained within 6 months or
this approval shall be null and void.
Mr. Belter seconded the motion which passed unanimously.
Mr. Burgess arrived as the next item was discussed.
5. Sketch Plan application of Edward & Nancy Fissette for the
subdivision of property into an 11,245 sq• ft. lot with
existing house and a 33,344 sq. ft. lot located at 10
Shunpike Rd.