Loading...
HomeMy WebLinkAboutVR-80-0000 - Supplemental - 1690 Shelburne Roadr APPLICATION FOR CONDITIONAL USE SOUTH BURLINGTON CITY COU1dCIL I hereby apply to the City Council for conditional use approval under the Interim . Zoning Regulation. �ionn Yi sZ/'i cc.", ���oso�`, p�S c_ i/" Property Otimer /Y U /` �%1 t-yr ,-l�v� property location & description 9. / 3 GLc eTS a+ % jzc'.slat- cJ I�y.0 r •. sZ O Section 5 , Conditional Uses I understand the regular meetings are held tvrice a month on Monday at 9:00 p.m. at the City Hall, Conference Room. The legal advertisement must appear in the Burlington Free Press a mini , of fifteen (15) days before the hearing, I agree to pay a fee of $30.00 which fee is to off- set the costs of advertising and the hearing. Hearing Date Sicrture of AD, _ellent ---------------------------------------------------- -------------------------� SOUTH BURLINGTON ZONII'1G NOTICE In accordance with the South Burlington Interim Zoning Regulations and Section 4447, Title 2 =, V. S.A. the South Durlinctm City Council will hold a public hearing at the South Burlington City Offices, Conference Room, 1175 Road, South Burlington, Vermont on ,M, to consider . .04 (day of week) .--,n(7 datd (tim ; the following: Zip- -.lice of 0. seeking ap;.roval unCe_ ;=-)ction of the South Durlington Interi-z Zoning Regulations. Request is for p_ mission �� fir"'. r..� ,r�!b�_,L..p�g'�...c_�,�. z>�„ ,�:; .�;.I ,�'>.��',� � ✓/ � �, � ,y .. ..c..c� / G2„✓ �P'" �.J .�, f.C,.,,'k..,�e.,'" .aC%���i"2r�,-ti d"y"�✓ l ✓ -s� �'7.,, +�..G.� � "/f ....�,..yt..d�C.. �.E� r l x 9 8 L 3 tier, / CC✓✓ ,, P DW 1/4/80 SUGGESTED MOTION OF APPROVAL NORTH AMERICAN SHOPPING CENTER, INC. That the South Burlington City Council approve the conditional use application of the North American Shopping Center, Inc. to construct a shopping complex to include a supermarket of 31,525 square feet, a drug store of 6,720 square feet, a restaurant of 4,050 square feet and 10,000 square feet of satalite stores on a parcel of land containing 9.13 acres located on the easterly side of Shelburne Road at #r1690 according to the proposal of record and based on the following findings and stipulations: Findings: 1. That the proposed uses are consistent with the health, safety and welfare of the City of South Burlington and standards 2, 3 and 4 of Section 5 of the Interim Zoning Regulations. 2. That the proposed uses are consistent with standards 1 and 5 based on the evidence submitted by the applicant and recommendations by Traffic Engineering Associates. Stipulations: 1. That the main access on Shelburne Road be located directly opposite the southerly most access of Shearer Chevrolet and be controlled by an actuated traffic control signal, and that this signal be coordinated with the existing signal at Green Mountain Drive & Bartlett Bay Road. 2. That the internal parking layout be reoriented such that parked vehicles are perpendicular to the main shopping facilities and parking lot circulation is parcelled to the shopping facilities. 3. That channelization of traffic movements be established at the main access point in order to minimize traffic conflicts between inbound and outbound vehicles. 4. That left turn storage lanes be created at both intersections and if necessary an accelleration lane, the length of which shall be approved by the Planning Commission with the assistance of Traffic Engineering Associates. 5. That the main water line be tied into Shelburne Road and Green Mountain Drive, along with the installation of three fire hydrants to the shopping complex, the location to be approved by the Fire Chief. M E M O R A N D U M To: City Council From: Richard Ward, Zoning Administrative Officer Re: Conditional uses, October 8, 1979 Date: September 27, 1979 North American Shopping Center, Inc. Parcel of land in question located southerly of Racine's AMC -Jeep at Shelburne Road and Green Mountain Drive contains 9.13 acres. Proposed is the contruction of a shopping complex which will include a super- market of 31,525 square feet, a drug store of 6,720 square feet, a restaurant of 4,050 square feet and 10,000 square feet of satalite shops. The rest- aurant will be "free standing", contains a seating capacity of 90 and 45' x 90' in size. A total of 347 parking spaces are proposed. Access from Green Mountain Drive is proposed. If the use as submitted is approved, this proposal is subject to subdivision and Act 250 approval. Merchant Bank - White Street Similar request, installing a ATM teller to front of butilding, constructing a 8' x 48' greenhouse. Addition is subject to an appeal to the 75 foot set- back requirements. Traffic Engineering Associates comments of September 17, 1979 are attached. ry a Z N R .a 0 2 • c1r k 60' GREEN 3c30' �P io0' .260, S as g� 17 ti fi 18 g . �l'' V 30 3 �° 19 Iz 9 A r y fY ir65• 7 O 0 'poi 2 12 HA 3p0 �Et0.v,T I r 4 September 24, 1979 Hickok & Boardman Realty Mr. John Holmberg 346 Shelburne Street Burlington, Vermont 05401 lie: North American Shopping Centers Dear Mr. Holmberg: Be advised that the South Burlington City Council will hold a public hearinb at the City hall, Conference Room, 1175 Williston Road, South burlin&ton, Vermont on Monday, October 8, 1979 at 7:30 P.M. to consider your conditional use application. Please plan to attend. Very truly, Richard Ward, �( Zoning Administrative Officer RkI/meg SOUTH BURLINGTON ZONING NOTICE In accordance with the South Burlington Interim Zoning Regulations and Section 4447, Title 24, V.S.A. the South Burlingtn City Council will hold a public hearing at the South Burlington City Offices, Conference Room, 1175 Williston Road, South Burlington, Vermont on Monday October 1, 1979 1 7:30 P.Ni. to consider (day of week) (month and da (time) the following: Application of North American Shopping Centers, Inc. seeking approval under Section 5 Conditional uses of the South Lurlington Interim Zoning Regulations. Request is for permission to construct a shopping complex which will include a supermarket of 31,525 square feet, a drug store of 6,720 square feet, a restaurant of 4,050 square feet and 10,000 square feet of satalite stores on a parcel of land containing 9.13 acres located on the easterly side of Shelburne Road, known as 1690 i Shelburne Road.. r Richard Ward, Zoning Administrative Officer September 15, 1979 HICKOK& 130 ARDMAN REALTYINC. 346 Shelburne Street, Burlington, Vermont 05402 Phone 658-3500 September 12, 1979 Richard Ward Zoning Administrator City of South Burlington Williston Road South Burlington, Vermont 05401 RE: North American Shopping Centers, Inc. Dear Mr. Ward: Enclosed please find an application for conditional use to the City Council for the 9.13 acres of land under option to North American Shopping Centers, Inc. from Green Mountain Power Corporation. MLS[13 REALTOR` The preliminary site plan of the development will be in your hands tomorrow. Basically, the plans include a supermarket of 31,525 square feet, a drug store of 6,720 square feet, a separate restaurant of 4,050 square feet and about 10,000 square feet of satalite stores. Parking and final square footage of the satalite stores will be determined by the land area available for development, considering all necessary setbacks and environmental considerations. Thank you for your attention in this matter. Sincerely, '� JL John Holmberg REALTOR JH:bc Enc. TRAFFIC IMPACT ANALYSIS of Proposed Commercial Retail Development on Shelburne Road (Route 7) VA South Burlington, Vermont November 15, 1979 NORMAN A. ABEND TRANSPORTATION PLANNING CONSULTANT TABLE OF CONTENTS Introduction Page Local and Regional Traffic Orientation 2 Trip Generation 5 Combined Trip Generation 10 Directional Distribution 11 Site -Related Traffic Operations 11 Traffic Volumes 14 Access Design and Interior Circulation 15 Summary and Conclusions 16 LIST OF EXHIBITS M 1 Sketch of South Burlington Project 2 Trip Generation - Small Shopping Center 3 Trip Generation Summary 4 Trip Generation - Restaurant 5 Directional Distribution of Site Traffic 6 Recommended Modifications to Access Design In trod uction The purpose of this report is to evaluate the traffic impact and access design for a proposed commercial development located on Shel- burne Road, Route 7, in South Burl ington, Vermont. The site, containing approximately nine acres of land, is located on the east side of Shelburne Road, bounded on the north by an AMC automobile j dealership and on the south by a motel. Access to the site is to be provided from two points. The main driveway will be located on Route 7, roughly at the center of the property, and a second, supplementary access is to be provided via an easement from the rear of the property to Green Mountain Drive. This access road would intersect Green Mountain Drive 700 feet from Shelburne Road. The intersection of Shelburne Road and Green Moun- tain Drive is controlled by a traffic signal. The total development program calls for about 52,000 square feet I (gross) of retail floor area. Of this amount, about 48,000 square feet would be contained within a single building housing a supermarket, a drug store, and 10,000 square feet of smaller stores. In addition to a Fotomat kiosk to be located within the parking lot, there will be one free-standing commercial building containing either a restaurant I or a commercial bank. The site plan shows 347 parking spaces serving this development. This report looks at the traffic impact of the proposal in terms of its effect on existing traffic conditions and the adequacy of the access design for the site. In addition to considering existing traffic flows, the report also looks at the effect of the anticipated South Burlington Project now being planned by the Vermont Agency of Transportation and its potential effect on the site. This report considers trip generation, projects peak or design hour flows entering and leaving the site, including directional distribution, and evalu- ates the impact of this development on general street traffic. An evaluation of the site plan has also been made and recommendations are included relative to specific design details to improve the traffic operations at the access points and in the interior. NORMAN A. ABEND TRANSPORTATION PLANNING CONSULTANT -2- Local and Regional Traffic Orientation of the Site The proposed development is located on Route 7, the major north -south arterial roadway in the Burlington metropolitan area. Route 7 is a major north -south highway serving the western portion of Vermont, extending from the Massachusetts border to Burlington. A number of the state's major cities are located on this route and, as a result, Route 7 contains a significant portion of longer distance trips, including tourists in the summer. The South Burlington section of Route 7 is accessible via either surface streets or the interstate expressway system. Route 189 is a short express connector between the interstate system (Route 89) and Route 7, intersecting at about the Burlington/South Burlington boun- dary. A full interchange with Route 7 is provided at this point. The so-called South Burlington Project is intended to provide a continuation of Route 189 to the south, bypassing the most heavily developed and travelled section of Route 7. The road will be located on new right-of-way beginning at the South Burlington connector. The route will be on the west side of Route 7 and will intersect with Route 7 at an interchange just south of the study site. The northern edge of the interchange area, where Route 7 will continue as two-way, is now planned to be about 300 feet from the south property line of the development site. Exhibit 1 shows a sketch of the new highway. The effect of this project will be to divert a substantial volume of traffic from Route 7 through the study area. All traffic that does not have an origin or destination along Route 7 in South Burlington would find it more convenient and faster to use the new road. From a regional traffic pattern viewpoint, the major connection between Route 89 and Route 7 south will now avoid the development site. This bypass will substantially reduce traffic volumes on Route 7, especial- ly longer distance, faster moving vehicles. It is a well -established principle that traffic operations are improved when local and long NORMAN A. ABENO TRANSPORTATION PLANNING CONSULTANT F- U w c a z O F- ' U (_hnvrnlnt t� 1 EXHIBIT 1 green mtn. dr. AMC Dealer DEVELOPMENT SITE 1 Motel Schematic Diagram of Rt. 7 and Bypass Interchange f -4- distance flows are separated. The Vermont Agency of Transportation has estimated that if the project had been in place in 1978, the Average Daily Traffic (ADT) on Route 7 would have been 7,420. By the year 2000, volumes on the bypassed section of Route 7 are projected at 11,570, close to the existing ADT. Thus, the bypass road would permit Route 7 to grow over several years without major improvement required. Shelburne Road in South Burlington bisects the major commercial area of the city. The entire frontage of Route 7 in South Burlington I on both sides is zoned either business planned development or business retail, except for a single short distance of residentially zoned land. The site lies within an area that is zoned for planned business development on both sides of the road for several hundred feet in each direction. Most likely, one reason for locating the pro- posed development at this site is to take advantage of the existing heavy volumes on Shelburne Road that are travelling in this area for l shopping and other purposes. The site is expected to generate some f new traffic, but a majority of trips into and out of the driveway will be made by vehicles already using Route 7. From a local as well as a regional standpoint, the proposed development is well suited to take advantage of existing traffic conditions. In the future, with a bypass of Route 7, it is possible that increased retail and other business development could occur as the area is freed of heavier, generally Ifaster -moving, through traffic. I None of the traffic generated by this site is required to travel through any neighborhoods or otherwise adversely affect any residen- tial land uses. It is solidly within an area that is designated and being used for commercial purposes, and for this reason is well -situat- ed from a regional as well as local transportation aspect. i NORMAN A. ABEND TRANSPORTATION PLANNING CONSULTANT -5- Trip Generation In evaluating the trip generation features of this site, it should be kept in mind that because of its nature and location, a large proportion of the trips entering and leaving the site will come from vehicles already on the road. The site contains only 52,000 square feet of total floor area, the majority of which is occupied by a supermarket supplemented by a drug store and several small satellite stores. It is quite likely that a center of this nature -- its size and composition are oriented toward neighborhood service -- will generate trips that are made in connection with other activities such as going to the post office, the bank or in the conduct of other shopping. For example, most customers will be on trips made on the way home from work, going to or from a medical or dental appoint- ment, or will be travelling in connection with carpools, child transportation or other activities. A study made in the summer of 1979 revealed that at large shopping centers, only one-third of the traffic entering the shopping centers were trips that were on the road solely for the purpose of going to that center. Approximately one-third of the trips were by people who were on other errands and another one-third were by people who were out shopping and chose one center over another. From a practical standpoint, it is likely that for a center of this size at this location, less then 50 percent of traffic entering or leaving the site would consist of new traffic. Probably more than 75 percent would be traffic already on the road. In terms of trip generation of the site itself, the Institute of ITransportation Engineers Trip Generation Manual, published in 1976, shows that a shopping center in this size category will generate I approximately 80 trips per 1,000 square feet per day, and about 6.7 trips per 1,000 square feet in both directions during the evening rush hour. These figures and an extension of the numbers to reflect the size of this site, are shown in Exhibits 2 and 3. Exhibit 3 also allows a comparison of the isolated building shown on the site plan for use either as a restaurant or bank. INORMAN A. ABEND TRANSPORTATION PLANNING CONSULTANT SUMMARY OF TRIP GENERATION RATES Land Use/Building Type Md-�-®' —F—W- ITE Land Use Code 82 a Independent Variable --Trips per - Average Trip Rate Maximum Rate Minimum Rate Tr�f,s Number I of Studies I Averag Sizo of Independon-t Variable 'Study Average. Weekday Vehicle Trip Ends '1 1 i'o 1. 3 Z 5. Z 2-5 —_ Peak Hour of Adjacent Street Traffic A.M. Between 7 and 9 Enter —_.___•—_— Exit._ Total 1 � P.M. Between 4 and 6 Enter Z._- Exit 2-17 Total MPeak Hour of Generator � A.M. Enter -- Exit ------ Total P.M. Enter7/�_______� Exit 3.4 % --- -----� Total Saturday Vehicle Trip Ends Peak Hour of Generator Enter 4-2- Exit :5-. 6 2171 � Total __._�- .•�•-r Sunday Vehicle Trip Ends Peak Hour of Generator Enter Exit Total^`—�. ----1 IVO 7-,ES ITE Technical Committee 6A-6—Trip Generation Rates Gate; /�'� EXHIBIT.3 TRIP GENERATION SUMMARY Peak Hour Generation Rate Per 1,000 sq. ft. g.f.a. Amount of AM PM Type of Use Square Footage In Out In Out Mixed Retail Stores 52,000 2.4 2.7 3.3 3.4 Oncl. entire development) Restaurant 4,000 8.0 6.0 9.9 4.0 Bank 4,000 7.0 6.0 10.0 9.0 A bank at this location would probably not be as big as the proposed restaurant. Thus, while the generation on a square foot basis may be comparable, the bank will probably be smaller and produce fewer total trips. NORMAN A, ASENG TRANSPORTATION PLANNING CONSULTANT -8- Studies made at a shopping center of comparable size in New Hampshire showed only 3,000 daily trips generated, or 60 trips per 1,000 square feet per day. In the New Hampshire study, several shopping centers in the 50,000 to 100,000 size range generated between 45 and 60 daily trips per 1,000 square feet. It would appear that for the entire development of about 52,000 square feet, a rate of 60 trips per 1,000 square feet of gross floor area would be a good design value. Since the outbuilding is being considered for alternate uses either as a restaurant or a bank, a separate trip generation analysis follows. The ITE Manual shows that a high turnover sit-down restaurant of this size (using a high volume use) would generate about 40 inbound and 16 outbound trips during the street peak. Exhibit 4 shows rates and projected trips for a 4,000 square foot restaurant. Restaurants normally peak on the downside of the evening commuter rush hour, and at noontime when other traffic is not flowing at its maximum. If the location were used for a bank, the result would be somewhat fewer morning and evening peak hour trips. The reason for this is that banking hours generally run between 8:30 am and 4:00 pm and they are normally not busy during commuter rush hours. In recent years, however, banks have shown a tendency toward longer hours, but the peaks experienced still occur in the late afternoon on payday and on Saturday mornings. IIn dealing with banks at suburban locations, the item of most concern is the traffic back-up created by drive -up windows. Such Ifacilities require careful planning so that the reservoir space for the drive -up tellers does not interfere with on -site and especially off -site I circulation. For the purposes of this study, the site is assumed to have the restaurant as shown on the site plan dated September 19, I 1979. The substitution of a bank with a drive -up window would require a re -analysis of the interior circulation pattern and parking arrangements. Generally, a bank requires fewer parking spaces than Ia restaurant, but some parking spaces would be lost due to the space designated for the drive -up tellers' lines. NORMAN A. ABEND TRANSPORTATION •PLANNING CONSULTANT r:vwiruT A SUMMARY OF TRIP GENERATION RATES ILand Use/Building Type 141w"H 7UeA/6Y4 SIT' -DOWN 7.- ITE Land Use Code 32- ! Independent Variable —Trips per le 1: 6R66,s _ --- Average Trip Rate Maximum Rate Minimum Rate R-00rc-IC4 Trips Number of Studios Avora o.tiizo of lndopendon-1 Variahlo'Study Average Weekday Vehicle Trip Ends 164- - 55/. 2 • -1, Peak Hour Iof Adjacent Street Traffic Peak IHour of IGenerator A.M. Between 7 and 9 P.M. Between 4 and 6 A.M. Enter Exit Total Enter -7- 9 /73 7.6 I Exit 4.0 /0.3 3• Z Total Enter Exit Total P.M. Enter /3 a / 7 Exit q 2- •Z/. 2- 6.9 3 Total Saturday Vehicle Trip Ends Peak Enter I Hour of Exit 1 Generator Total i Sunday Vehicle Trip Ends Peak IHour of 4 Generator Enter Exit Total NOTES TP/ram cC00J BA FD QA/ t5SQ wMS S4-4TS (41LL I "Ducf LOW4-9 VoLUmf ITE Technical Committee 6A-6--Trip Generation Rates - i IDate: -10- Combined Trip Generation For the purposes of traffic analysis, the entire 52,000 square feet of gross floor area have been used as a basis for determining the trip generation of the site. The breakdown between a restaurant and a bank shown in the Trip Generation exhibits are merely to demonstrate the difference in trip -generating characteristics between these two facilities. In general, it appears that the only difference in the substitution of a bank for a restaurant would be the effect on the peak hour flows. When it is open during commuter hours, a bank produces about the same evening commuter rush hour trips going to and from the facility as would a restaurant. It should be noted, however, that individual facilities may not operate according to average values. The restaurant and the bank are probably compar- able development options in terms of traffic impact, with the bank having the potential for producing somewhat sharper peaking, but such peaking not occurring during the normal commuter rush hours. In summary, based on the rates published by the Institute of Transportation Engineers, the site will produce 172 inbound trips and 177 outbound trips during the critical evening peak hour. The distribution of these trips in terms of the access points that will be used and the turning movements onto Route 7 are contained in the next section on directional distribution. These volumes include the generation produced by a restaurant or bank located in the center. INORMAN A. ABEND TRANSPORTATION PLANNING CONSULTANT -11- Directional Distribution The directional distribution of traffic to and from this site is based on an assessment of the land uses within its projected service area. As a neighborhood shopping center with services that are duplicated at other locations on Route 7 itself, the facility has a limited market area and its design reflects its neighborhood orienta- tion. There is a greater amount of development north of the site, both on a local as well as a regional basis, although the latter is not a significant factor in the trips to this site. Even at locations that are at one end of a built-up area, the distribution rarely exceeds a 70-30 or 75-25 breakdown in approach volumes. The projected directional distribution is estimated as follows: 60 percent of the traffic will be oriented toward the north and 40 percent to the south. This is predicated on field observations of the same type of development within a mile or two of the site, which is expected to be the market range for this facility. Essentially, the location would serve the southern half of the Route 7 corridor through South Burlington and, to a lesser degree, the same corridor in Shelburne. I Exhibit 5 shows the evening peak hour flows based on the trip generation rates developed in the previous section and the directional distribution, using a 60-40 north -south split. Site -Related Traffic Operations While most traffic to and from the site is expected to use the main entrance on Route 7, some component will use the access road connecting to Green Mountain Drive to take advantage of the traffic signal on Route 7 at Green Mountain Drive. This signal could be used by site traffic to enter the traffic stream on Route 7 under full traffic signal control when volumes are heavy. Some traffic to and from the north served by Green Mountain Drive has been shown using this access. However, traffic to and from the south is expected to use the main entrance exclusively because there will be sufficient gaps to INORMAN A, ABEND TRANSPORTATION PLANNING CONSULTANT 0 Directional Distribution of Site Generated Traffic EXHIBIT 5 k ,� -13- allow turns in and out. The existing signal creates gaps in the flow of traffic in front of this site that will allow left turns to occur in and out. The access design is such that left turns out can store on -site without interfering with Route 7 traffic and still allow right turns headed north to move. The traffic light at Green Mountain Drive could be used by left -turning vehicles if sufficient gaps are not present on Route 7, but it does not seem likely that this will be necessary. As noted in the section on traffic volumes, Route 7 has distinct commuter traffic characteristics. Most shopping trips occur during off-peak hours, particularly during the middle part of the day and on Saturdays. Under these conditions, the lower volumes experienced on Route 7 during typical shopper periods will contain sufficient gaps for left turns. In addition, the artificial gaps created by the traffic light will also assist outbound left turns. In an inbound direction, a left turn should pose no problem because of gap availability in a single direction, even for the peak volumes now experienced on Route 7. Should it be considered desir- able, it would be possible almost within the existing pavement width — of nearly 40 feet to designate a short section of left turn lane with a bypass lane on the shoulder. A number of other facilities on Route 7 of higher generation do not include such a design feature and were observed to operate satisfactorily. However, if experience shows that it is a desirable feature, it could be introduced at a later date since nothing is being done to preclude this option. NORMAN A, ABEND TRANSPORTATION PLANNING CONSULTANT -14- Traffic Volumes The site is located on Route 7, which is a heavily travelled major arterial route within the Burlington metropolitan area. Traffic volume counts done by the state show ADT's in the 10,000 to 14,000 vehicle range, reflecting the seasonal variation between January and August. The August volumes are no doubt impacted by tourist traffic within Vermont. In addition to the impact of tourists during the summer, there are also summer residents adding to the traffic volumes. The traffic volume figures also indicate that Route 7 is more of a commuter route than a shopper access road, although both con- tribute to the traffic volumes on this highway. The automatic traffic recorder reports prepared by the Vermont Agency for Transportation show consistently lower volumes on Saturdays than on weekdays. Higher weekday use during the summer as well as in January indicates that the major traffic element on Route 7 is commuter traffic. Shopping centers tend to generate at a fairly low rate during commuter hours. The New Hampshire shopping center study referred to earlier shows that for centers in the size range of the proposed development, no peak hours occurred during the morning or evening hours. The busiest time of a neighborhood shopping center occurs during the mid to late afternoon. Most shopping centers are quiet during the rush hours, since most homemakers are at home preparing evening meals. On Saturdays, shopping centers tend to produce the peak hours, which normally comes between noon and 4 pm. It should be noted that during the morning rush hour, this site will not generate any significant volume of traffic. Assuming a restaurant on the site, it would be the only generator during the morning commuter hours, since most other stores open after 9 am. Shopping center activity that does occur during the commuter hours tends to come from people who are already on the road such as people who stop to buy something on their way home from work. NORMAN A. ABEND I TRANSPORTATION PLANNING CONSULTANT -15- I Shopping trips are not time -restrained to the same degree that Imost other trips are. A shopper does have flexibility in planning a trip and such trips are usually made in connection with other trip I purposes or are made at times that avoid any potential traffic congestion delays. Since the site will offer comparable facilities to those already served by Route 7, it is not expected to increase traffic volumes materially. The traffic impact will be very local, mostly in terms of traffic movements into and out of the site. Trips generated by this site are expected to be diverted from other locations more distant from the local market. The net effect on overall traffic would be to distribute traffic volumes more uniformly on Route 7 in South Burling- ton by keeping local trips more confined than at present. For example, the supermarket, the largest single generator on this site, will attract trips that now are made to shopping centers closer to the Burlington line. It may also intercept some trips south of the site that are now travelling to facilities north of the site. Thus, the impact of a single small development such as this on overall Route 7 traffic volumes and patterns will be imperceptible to the average driver. Access Design and Interior Circulation Design of the main driveway on Route 7 should conform to the commercial driveway standards established by the Vermont Department of Highways. These standards call for corner radii of 30 feet minus the shoulder width or a minimum of 20 feet. The site plan shows an undimensioned access and it is recommended that corner radii of 20 feet be constructed. This would be comparable to the 30 feet since there is an eight to ten foot shoulder along this section of Route 7. Both inbound and outbound roadways should be 24 feet wide. In the interior, it is recommended that 90 degree parking be placed alongside the front planting area at least on the northern half of the site. The main reason for doing this is to increase the depth of the access and egress roadways so that there is a longer NORMAN A. ABEND TRANSPORTATION PLANNING CONSULTANT -16- section of access control. If right-angle parking is provided along the front of the site, it would increase the no access distance to about 80 feet, an excellent design for a site of this nature. This change would actually increase the number of parking spaces. It would also move the proposed Fotomat location a little further away from the entrance, thereby preventing any potential back-up. Exhibit 6 is a sketch showing how this change could be implemented. In terms of access location on Route 7, it would be advisable to site the entrance to the property opposite the south driveway to the Chevrolet dealership directly across the street. This would facilitate local movements. It would also be fully adaptable to signal control should it be made a condition of the approval by the city. If signal ization is determined to be desirable, the entire intersection should be designed in terms of providing a fully integrated instal- lation so that all aspects of design conform to good traffic engineer- ing practise. It is also recommended that a few spaces for the handicapped be designated near the supermarket/drug store frontage. These spaces should be 12 feet wide and should be placed closest to the building. It might also be appropriate to provide one or two spaces for the handicapped at the restaurant. These could be provided at the ends of the parking rows to take advantage of the width offered by the aisles so that the basic parking pattern is not disturbed. Except for these items, the site plan is straightforward and should pose no problems for on -site or off -site traffic. Summary and Conclusions The proposed development of 52,000 square feet of retail space at the site constitutes a fairly small d�,velopment with respect to local impacts. The projected use of the site as a neighborhood shopping center dictates the kind of traffic volumes and traffic pattern that will be produced. NORMAN A. ABEND TRANSPORTATION PLANNING CONSULTANT 0 cc w z cc D w x V) EXHIBIT 6 Recommended Modifications to Access Design Relocated Fotomat 00 rest. or bank L -18- Route 7, the major access to this site, is now heavily travelled and will continue to experience heavy volumes. There will be a significant reduction in total traffic volumes upon completion of the South Burlington project, which offers a direct bypass for this section of Route 7. A reduction in total traffic volumes will make Shelburne Road more attractive as a local access and shopping street and will also provide additional capacity for expanded development in South Burlington. With or without the South Burlington project, the site is small enough so that it will operate without creating any serious problems for Route 7 traffic. Except for the proposed changes to the site plan to improve the access design at Route 7, no other changes are proposed either on - or off -site. Insofar as use of the outbuilding as a restaurant or a bank is concerned, these facilities will be comparable from a peak hour trip -generating standpoint, the only difference being in the morning when a restaurant would generate more traffic than a bank. If a decision is made to install a traffic light at the access drive, it should be interconnected with the existing signal at Green Moun- tain Drive so that both signals operate to eliminate the potential impact on Route 7 of causing through traffic to stop more than once. INORMAN A. ABEND TRANSPORTATION PLANNING CONSULTANT GRrtpg-, a 4f- 'rye, *41 seam so so 13A L I Ma7-6" Atg Tr, �AtI3-- - r. le fir' R a -s c 1<-,/ rj�j't,-t, L I W 7 k A�, 4kc7, I pNfqz,,t, I k.,PP, Om S'O CO J ACCCSS 'rV 14W I c' - N w e. -to r, r.-p- m r 0& LLS ru7 cc-;-; SOUTH BURLINGTON ZONING NOTICE In accordance with the South Bur- linoton Interim Zoning Regulations and Section 4417, Title 24, V.S.A. the South Burlington City Council will hold a public hearing of the South Burlington City Offices, Conference Room, 1175 Williston Road, South Burlington, Vermont on Monday, Oc- itober S. 1979, 7:30 p.m. to consider the following: No., 1 Application of North American Shopping Centers Inc. seeking ap- lvroval under Section 5, Conditional uses of the South Burlington Interim Zoning Regulations. Request is for permission to construct a shopping complex which will Include a super- market of 31,525 square feet, a drug store of 6,720, a restaurant of 4,050 square feet and 10,000 square feet of sotalite stores on a parcel of land containing 9.13 acres located on the easterly side of Shelburne Road, known as 1690 Shelburne Road. No. 2 Application of The Merchants Bank, seeking approval finder Sec- tion 5, Conditional uses of The South Burlington Interim Zoning Regu- lations. Request is for permission to construct on 8' x 48' gloss enclosed lover to the front portion of the building and Install an ATM teller system, at the branch bank located of 50 White Street. Richard Word, Zoning Administrative Offer September 22, 1979. ���l1t 1 f/y6/Z/LfieL__ DP �6—�E TRAFFCON SYSTEMS, INC. joe SHEET No. oF_______ 152 Bank Street .� ra BURLINGTON, VT 05401 CALCULATED By ___ 1.EN�1..+ _ DATE (802) 864-7464 CHECKED BY _.A_____ —_.._.__ DATE SCALE I ORM 2041 Available Irom (nRrssj Inc , Grolon, Maas 01450 TRAFFCON SYSTEMS, INC. 152 Bank Street BURLINGTON, VT 05401 (802) 864-7464 JOB Al SHEET NO CALCULATED BY _ tj.;1 C0 — OF — _ DATE _LY1Bo CHECKED BY.. _. __ DATE SCALE _. —_--._ - .. P IQT _-%_..__ SHdt N(� SHEAaEK'S -Jew '�"' L EnrTEi2 n I W 'Y 0 C��G/� Mo�MAIN j�2 i3A2TL.ETt i�►y iad, I OHM 204 1 A✓.ulshlo hum (Nrrc:%Inc, Groton, Most, 01450 R. ALLAN PAUL JOSEPH E. FRANK PETER M. COLLINS JOHN T. SARTORE B. MICHAEL FRYE ANTHONY B. LAMB ALAN D. PORT PATTY ANN MURPHY ROBERT G. CAIN PAUL, FRANK & COLLINS, INC. ATTORNEYS AT LAW FAIRCHILD SQUARE 110 MAIN STREET BURLINGTON, VERMONT 05402 October 18, 1979 Mr. William Szymanski, Manager City of South Burlington 1175 Williston Road �.�. South Burlington., VT Re: North American Shopping Centers, Inc./ Shelburne Road Dear Bill: RECEIVED OCT 2 4 19/9 MANAGER'S OFFICE CITY SQeL1pMg6MWNII AREA CODE 802 REPLY TO: P. O. BOX 527 As you know, in our presentation to the City Council on Monday the 8th, we indicated that our traffic consultant would be doing his study within the next several weeks. We would like to have our Traffic Engineer send his report directly to Bruce Houghton prior to the November 19th meeting so that Bruce will have an opportunity to make certain recommendations or comments at the meeting. With this in mind, I'd appreciate it if you or the Council would retain Bruce Houghton for this project as soon as possible. I await your advice. Cordially yours, PAULy-FAA &-"-COLLINS , INC. Z Peter M. Collins PMC:lmr SOUTH BURLINGTON ZONING NOTICE In accordance with the South Burlington Interim Zoning Regulations and Section 4447, Title 24, V.S.A. the South Burlingtrn City Council will hold a public hearing at the South Burlington City Offices, Conference Room, 1175 Williston Road, South Burlington, Vermont on Monday October 8, 1979 , 7:30 P.M. to consider (day of week) (month and dat6 (time) y // the following: / iO 47 #1 Application of North American Shopping Centers Inc. seeking approval under Section 5 Conditional uses of the South Burlington Interim Zoning Regulations. Request is for permission to construct a shopping complex which will include a supermarket of 31,525 square feet, a drug store of 6,720 square feet, a restaurant of 4,050 square feet and 10,000 square feet of satalite stores on a parcel of land containing 9.13 acres located on the easterly side of Shelburne Road, known as 1690 Shelburne Road.. / ti /i%�i a •� GVN�P 152 BANK STREET TRAFFIC ENGINEERING ASSOCIATES Division of Traffcon Systems, Inc. BURLINGTON, VERMONT 05401 MEMORANDUM TO: SOUTH BURLINGTON CITY COUNCIL TELEPHONE 802-864-7463 gyp{/.°,--�-,►�' ,�..,�,�,.,,�_.,,�' . DEC 21 19/9 FROM: BRUCE E. HOUGHTON, P.E. MArvA�;k>5 a► ryc:r: CHIEF ENGINEER G'TY so. 8UHL►Na-ror4 DATE: DECEMBER 19, 1979, SUBJECT: TRAFFIC REVIEW OF PROPOSED DEVELOPMENTS PROJECT #7933 1. PROJECT: North American Shopping Center, Inc. Proposed Shelburne Road Shopping Complex I have reviewed the proposed shopping complex for Shelburne Rd. and offer the following comments: 1. The main access on Shelburne Road should be directly opposite the southerly most access of Shearer Chevrolet and be controlled by an actuated traffic control signal. 2. The internal parking layout should be reoriented such that parked vehicles are perpendicular to the main shopping facilities and parking lot circulation is parallel to the shopping facilities., 3. Channelization of traffic movements should be established at the main access point to minimize traffic conflicts between inbound and outbound vehicles. 4. With the above recommendations, the necessity of the proposed access to Green Mountain Drive may be eliminated. 5. The new traffic control signal at the shopping complex main access should be interconnected and coordinated with the existing traffic control signal at Shelburne Road and Bartletts Bay Road. In addition, left turn storage - lanes should be created for both intersections. *M4 igurlingtun fire Repartment 575 Barnet Optreet #sut4 igurlingtan, lRermant 05401 December 30979 Dr. Paul Farrar Chairman South Burlington City Council 1175 Williston Road South Burlington2 Vermont 05401 Dear Dr. Farrar, OFFICE OF JAMES W. GODDETTE, SR. CHIEF Today a set of plans were reviewed by this department for the new shopping center to be built on Shelburne Road. If we are to give proper fire protection the following should be done. 1. A main water line to be tied into Shelburne Road and Green Mt. Drive. There should be at least three (3) fire hydrants in the complex. 2. The parking spaces by the main stores should have a grass area to seperate the parking from the main road and fire lane. 3. Restaurant parking spaces removed from in.front of exit doors . If you have any questions please feel free to call me at 863-6455. Sincerely es W. Goddette Sr. Chief