HomeMy WebLinkAboutAgenda 05_SP-21-001_20 Gregory Dr_The Granite Group 575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburl.com TO: South Burlington Development Review Board FROM: Marla Keene, Development Review Planner SUBJECT: SP-21-001 20 Gregory Drive Site Plan Application DATE: March 3, 2021 Development Review Board meeting The Granite Group has submitted site plan application #SP-21-001 to amend a previously approved plan for a 16,272 sf wholesale use building. The amendment consists of expanding the fenced outdoor storage area, 20 Gregory Drive. The Board reviewed the application on January 20, 2021 and continued the hearing to allow the applicant time to address outstanding issues pertaining to stormwater and wetlands. The applicant provided a comprehensive memo entitled “Hearing Response Narrative,” dated 2/4/2021, addressing the outstanding issues. The memo was accompanied by a revised site plan. The City Stormwater Section reviewed the memo and revised plan, and considers the responses acceptable. Staff has incorporated the responses into a draft decision, attached to this memo. Staff has incorporated into the draft decision a condition that the applicant record a notice of conditions reflecting their proposed maintenance procedure for the pervious gravel storage area. Staff notes it may be simpler to incorporate this procedure into the plan sheet rather than as a separate notice, and recommends the Board ask the applicant which condition they would prefer. Recommendation Staff recommends the Board discuss the project with the applicant and close the hearing. Respectfully submitted, Marla Keene, Development Review Planner #SP-21-001 1 CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING AND ZONING THE GRANITE GROUP – 20 GREGORY DRIVE SITE PLAN APPLICATION #SP-21-001 FINDINGS OF FACT AND DECISION Site plan application #SP-21-01 of The Granite Group to amend a previously approved plan for a 16,272 sq. ft. wholesale use building. The amendment consists of expanding the fenced outdoor storage area, 20 Gregory Drive. The Development Review Board held a public hearing on January 20 and March 3, 2021. The applicant was represented by Daniel Cotter and Peter Mazurak. Based on the plans and materials contained in the document file for this application, the Development Review Board finds, concludes, and decides the following: FINDINGS OF FACT 1. The applicant, The Granite Group seeks to amend a previously approved plan for a 16,272 sq. ft. wholesale use building. The amendment consists of expanding the fenced outdoor storage area, 20 Gregory Drive. 2. The owner of record of the subject property is 20 Gregory Dr South Burlington VT LLC 3. The application was received on December 8, 2020. 4. The property lies within the Mixed Industrial & Commercial Zoning District. 5. The plan submitted consists of the following: Description Prepared By Last Revised Date C2-01 Site Plan The Granite Group 2/3/2021 6. The Project is located in mixed industrial commercial zoning district. It is located just west of Muddy Brook and the Town of Williston. It most recently received site plan approval #SP-17-57 to add the existing outdoor storage area and minor related site improvements. There have been no other development review applications for the property since its initial approval for construction in 1989. 7. Outdoor storage is only allowed in non-residential districts upon approval of the DRB in conjunction with a site plan, conditional use and/or PUD application (see LDR 13.05). The applicant has accordingly submitted an application for site plan review. 8. The property is included in a stormwater management permit which encompasses the majority of the Gregory Drive business park. The applicant is proposing to minimize the addition of impervious surfaces to avoid the need to amend their permit and provide stormwater treatment and control for the proposed expansion. Stormwater management standards are addressed in LDR 12.03. A) ZONING DISTRICT & DIMENSIONAL REQUIREMENTS No new building is proposed. #SP-21-001 2 AIR and AIR-I District Required Proposed Min. Lot Size 40,000 sf 119,354 sf Max. Building Coverage 40% 13.6%, no change Max. Overall Coverage 70% 29.4% Max. Front Setback Coverage 30% 15.4%, no change Min. Front Setback 30 ft 45 ft, no change Min. Side Setback 10 ft. 30 ft, no change Min. Rear Setback 30 ft. 184 ft. Height, flat roof 40 ft. 40 ft., no change  zoning compliance B) 12.02 WETLAND PROTECTION There is an existing Class III wetland and associated 50-foot wetland buffer located on the site. The applicant notes on their plan “The Class Three wetland depicted is not the result of an onsite wetland delineation. The location is based upon field observations and information obtained from the Vermont Wetlands Department, including notes from a 2016 visit to the site by Tina Heath, Chittenden County District Wetlands Ecologist.” Based on the assumed wetland boundary, the applicant is proposing 1,520 sf of permanent wetland buffer impacts and 3,100 sf of temporary wetland buffer impacts. E. Standards for Wetlands Protection (3) Encroachment into Class II wetland buffers, Class III wetlands and Class III wetland buffers, may be permitted by the DRB upon finding that the proposed project’s overall development, erosion control, stormwater treatment system, provisions for stream buffering, and landscaping plan achieve the following standards for wetland protection: (a) The encroachment(s) will not adversely affect the ability of the property to carry or store flood waters adequately; On February 4, the applicant provided the following narrative in support of this criterion: Currently the site of the proposed improvements has a continuous gradual slope away from the building towards the wetland. Due to the slope of the ground, there is no detainment of stormwater. Further down slope toward [but outside the] wetlands, there is an existing stormwater detainment area in place. The Board finds this criterion met. (b) The encroachment(s) will not adversely affect the ability of the proposed stormwater treatment system to reduce sedimentation according to state standards; As noted above, the property is included in a State Stormwater Management Permit covering multiple parcels. The applicant has proposed to make certain modifications to the on-site stormwater management system to offset the proposed wetland and wetland buffer impacts. The applicant’s description of the proposed improvement follows. No extra sediment is expected, since all areas are either covered in grass, riprap, pervious hard-scape, or pavement. The existing stone lined trench leading to the storm-water detainment area will be made larger to allow for more water to settle out before reaching the detainment area. Additionally, a modification to the outlet of the stormwater detainment area will be made which will allow additional pollutants to settle out of the #SP-21-001 3 stormwater. Please refer to the detail on Site Plan sheet C2-01, last revised 2/03/2021. Before the construction at the site commences, silt fence will be installed. The silt fence will be removed after the grass is established and all the surfaces are stabilized. The City Stormwater Section reviewed the proposed improvements on 2/15/2021 and offers the following comments. 1. The applicant has proposed improvements to the existing stormwater detention basin in order to mitigate the minor impacts to the Class III wetland buffer. This offset is acceptable. 2. The DRB should include a condition requiring the applicant to regularly maintain all stormwater treatment and conveyance infrastructure, including maintaining the pervious surface in accordance with the “Pervious Surface Maintenance Procedure” included on page 3 of the applicant’s Hearing Response document. The Board finds this criterion met. (c) The impact of the encroachment(s) on the specific wetland functions and values identified in the field delineation and wetland report is minimized and/or offset by appropriate landscaping, stormwater treatment, stream buffering, and/or other mitigation measures. The provided classification letter, dated 6/10/2016 and valid for five years, indicates that the wetland does not provide function or value that is significant enough to merit protection under the Vermont Wetland Rules at this time. This is because the State does not regulate Class III wetlands. However, the City has chosen to apply the wetland protection standards to Class III wetlands and buffers, as noted in the provided wetland classification letter. The applicant provided the following narrative to address the potential impacts to wetland functions and values. Mitigation measures are described above. While the state does not regulate this wetland, proper construction practices and continued maintenance of the storm-water system at the site will protect the wetland area. The following is a list of the functions and values of wetlands along with the associated mitigation or avoidance measures as applicable: Water Storage: The wetland area on the site likely has some capacity to temporarily store floodwaters. No reduction of the wetland’s storage capacity as a result of this project is foreseen. The proposed upgrade to the outlet of the detention basin on the site will allow the stormwater runoff that enters the basin to be released at a slower rate. Water Quality Protection: No reduction of the wetland’s ability to settle out pollutants from surface runoff are anticipated as a result of this project. Upslope of the wetland, grass areas, riprap areas and the detention basin will help to settle out pollutants before they reach the wetland. Fish Habitat: The wetland area on the site consists of an overgrown meadow, which would not support fish. Fish may be present within the nearby Muddy Brook, which is over 200 feet from the proposed storage are expansion. Wildlife Habitat: No changes within the wetland area are proposed, therefore the area will be available as a habitat for wildlife. Sensitive Species: Based upon a review of the State’s Natural Resource Atlas, no sensitive species or rare, threatened, or endangered species were noted near the project site. #SP-21-001 4 Exemplary Communities: Based upon a review of the State’s Natural Resource Atlas, no exemplary communities were noted near the project site. Education and Research: Based upon the location of the wetland, it likely will not be used for education and research. Recreation: Pathways are not present within the wetland area, so this wetland does not have much potential for recreation. Open Space: No changes within the wetland area are proposed, therefore the area will remain as open space. Erosion Control: No changes within the wetland area are proposed, therefore the area will be available to settle out sediment. Although with the erosion control practices during construction, additional sediment is not anticipated. The Board finds this criterion met. C) 13.05 OUTDOOR STORAGE AND DISPLAY A. Outdoor storage. Outdoor storage of goods, materials, vehicles for other than daily use, and equipment shall be subject to the following provisions. (1) Any outdoor storage shall be appurtenant to the primary use of the property and shall be allowed only in nonresidential districts and upon approval of the DRB in conjunction with a site plan, conditional use and/or PUD application The storage area will be used by the principal tenant of the building. The Board finds this criterion met. (2) The Development Review Board may require that outdoor storage areas in connection with commercial or industrial uses be enclosed and/or screened where the storage area may comprise an attractive nuisance, where the proposed use of the storage areas present opportunities for theft, or where the Board finds that said storage areas are in view of residentially-zoned parcels. The applicant has stated that the existing storage area is enclosed by a chain link fence with slats, which will be reused around the perimeter of the expanded storage area. It appears the storage area is proposed to be only partially enclosed. The Board finds the southern and western facing portions of the fence must be equipped with slats to provide screening in order to maintain an attractive appearance to the site. D) SITE PLAN REVIEW STANDARDS Section 14.06 of the South Burlington Land Development Regulations establishes the following general review standards for all site plan applications: A. Relationship of Proposed Development to the City of South Burlington Comprehensive Plan. Due attention by the applicant should be given to the goals and objectives and the stated land use policies for the City of South Burlington as set forth in the Comprehensive Plan. The project is located in the Northwest Quadrant in the Comprehensive Plan. The Board finds the proposed expansion of the current use is consistent with the established uses in the area. #SP-21-001 5 B. Relationship of Proposed Structures to the Site. (1) The site shall be planned to accomplish a desirable transition from structure to site, from structure to structure, and to provide for adequate planting, safe pedestrian movement, and adequate parking areas. The only proposed change to structures is the addition of a retaining wall along the proposed ramp from the existing rear building door to the outdoor storage area. No changes to parking, planting areas, pedestrian movement are proposed. The Board finds this criterion met. (2) Parking: (a) Parking shall be located to the rear or sides of buildings. Any side of a building facing a public street shall be considered a front side of a building for the purposes of this subsection. No changes to parking are proposed. While there appears to be one non-compliant parking space, the Board finds proposed site modifications do not warrant rectifying this non- compliance. (3) Without restricting the permissible limits of the applicable zoning district, the height and scale of each building shall be compatible with its site and existing or anticipated adjoining buildings. No changes to the building are proposed. The Board finds this criterion met. C. Relationship of Structures and Site to Adjoining Area. (1) The Development Review Board shall encourage the use of a combination of common materials and architectural characteristics (e.g., rhythm, color, texture, form or detailing), landscaping, buffers, screens and visual interruptions to create attractive transitions between buildings of different architectural styles. (2) Proposed structures shall be related harmoniously to themselves, the terrain and to existing buildings and roads in the vicinity that have a visual relationship to the proposed structures. No changes to the building are proposed. The applicant is proposing to modify the existing fence around the existing outdoor storage area to encompass the proposed outdoor storage area, as shown on the “Partial Site Plan” inset on Sheet C2-01. Screening of the outdoor storage area is discussed under 13.05 above. The Board finds these criteria met. In addition to the above general review standards, site plan applications shall meet the following specific standards as set forth in Section 14.07 of the Land Development Regulations: A. Access to Abutting Properties. The reservation of land may be required on any lot for provision of access to abutting properties whenever such access is deemed necessary to reduce curb cuts onto an arterial or collector street, to provide additional access for emergency or other purposes, or to improve general access and circulation in the area. #SP-21-001 6 No changes to access are proposed. The Board finds this criterion met. B. Utility Services. Electric, telephone and other wire-served utility lines and service connections shall be underground. Any utility installations remaining above ground shall be located so as to have a harmonious relation to neighboring properties and to the site. No changes are proposed to the existing wire served utilities. The Board finds this criterion met. C. Disposal of Wastes. All dumpsters and other facilities to handle solid waste, including compliance with any recycling or other requirements, shall be accessible, secure and properly screened with opaque fencing to ensure that trash and debris do not escape the enclosure(s). The existing dumpsters are enclosed within the outdoor storage area and are proposed to remain within this area. The Board finds this criterion met. D. Landscaping and Screening Requirements. (See Article 13, Section 13.06) Pursuant to Section 13.06(A) of the proposed Land Development Regulations, landscaping and screening shall be required for all projects subject to site plan review. The applicant is not proposing any building improvements therefore no landscaping is required. The Board finds this criterion met. F. Low Impact Development. The use of low impact site design strategies that minimize site disturbance, and that integrate structures, landscaping, natural hydrologic functions, and various other techniques to minimize runoff from impervious surfaces and to infiltrate precipitation into underlying soils and groundwater as close as is reasonable practicable to where it hits the ground, is required pursuant to the standards contained within Article 12. As noted above, this project is subject to an existing state stormwater permit and includes more than ½ acre of impervious. Projects already subject to stormwater management which add more than 5,000 sf of new impervious are required to meet the standards of 12.03 Stormwater Management Standards for the new impervious. The project proposes 1,945 sf of new impervious in the form of a ramp from a new overhead door to the expanded outdoor storage area. The expanded outdoor storage area is intended to be pervious. If it were impervious, it would be subject to 12.03 Stormwater Management Standards. On January 20, the applicant testified that they will be using uniformly graded gravel, consisting of 12-inches of 1 – 1 ½ inch clean drainage stone. The gravel will be topped with a 4-inch “geocell ground grid” product to provide stability. The gravel gradation and depth has been selected to remain pervious over time. The Board finds the applicant must follow the “Pervious Surface Maintenance Procedure,” included as Page 3 of the submitted Hearing Response document. G. Standards for Roadways, Parking and Circulation. Standards of Section 15.12 Standards for Roadways, Parking, and Circulation shall be met. No changes to roadways, parking and circulation are proposed. The Board finds this criterion met. E) OTHER Lighting Section 13.07 of the Land Development Regulations addresses exterior lighting as follows. A. General Requirements. All exterior lighting for all uses in all districts except for one-family and two-family uses shall be of such a type and location and shall have such shielding as will direct the light downward and will prevent the source of light from being visible from any adjacent residential property or street. Light fixtures that are generally acceptable are #SP-21-001 7 illustrated in Appendix D. “Source of light” shall be deemed to include any transparent or translucent lighting that is an integral part of the lighting fixture(s). Site illumination for uncovered areas shall be evenly distributed. Where feasible, energy efficient lighting is encouraged. The applicant provided verbal testimony that they would like to add one building mounted lighting fixture over the new overhead door, mounted 13-feet from the ground, downcast and shielded. The Board finds such lighting to be acceptable provided it meets the maximum lighting levels of Appendix A. DECISION Motion by ___, seconded by ___, to approve site plan application #SP-21-001 of The Granite Group, subject to the following conditions: 1. All previous approvals and stipulations which are not changed by this decision, will remain in full effect. 2. Prior to issuance of a zoning permit, the applicant must make the following modifications to the plans and submit to the Administrative Officer a revised plan as approved in digital (PDF) format. a. include slats on the southern and western sides of the fence enclosing the material storage area 3. The applicant shall regularly maintain all stormwater treatment and conveyance infrastructure, 4. The applicant shall record a notice of conditions incorporating the “Pervious Surface Maintenance Procedure” included as page 3 of the applicant’s Hearing Response document. 5. All exterior lighting must be installed or shielded in such a manner as to conceal light sources and reflector surfaces from view beyond the perimeter of the area to be illuminated. 6. The applicant must obtain a Certificate of Occupancy from the Administrative Officer prior to use of the expanded storage area. 7. This project must be completed as shown on the plans submitted by the applicant, and on file in the South Burlington Department of Planning and Zoning. 8. The applicant must obtain a zoning permit within six (6) months pursuant to Section 17.04 of the Land Development Regulations or this approval is null and void. 9. Any change to the approved plan will require approval by the South Burlington Development Review Board or the Administrative Officer. Mark Behr Yea Nay Abstain Not Present Matt Cota Yea Nay Abstain Not Present Elissa Eiring Yea Nay Abstain Not Present James Langan Yea Nay Abstain Not Present Dawn Philibert Yea Nay Abstain Not Present Brian Sullivan Yea Nay Abstain Not Present Stephanie Wyman Yes Nay Abstain Not Present Motion carried by a vote of _ – _ – _. #SP-21-001 8 Signed this ____ day of __________________ 2021, by _____________________________________ Matt Cota, Chair Please note: An appeal of this decision may be taken by filing, within 30 days of the date of this decision, a notice of appeal and the required fee by certified mail to the Superior Court, Environmental Division. See V.R.E.C.P. 5(b). A copy of the notice of appeal must also be mailed to the City of South Burlington Planning and Zoning Department at 575 Dorset Street, South Burlington, VT 05403. See V.R.E.C.P. 5(b) (4)(A). Please contact the Environmental Division at 802-828-1660 or http://vermontjudiciary.org/GTC/environmental/default.aspx for more information on filing requirements, deadlines, fees and mailing address. The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state permits for this project. Call 802.477.2241 to speak with the regional Permit Specialist. Page 1 of 3 February 4, 2021 Hearing Response Narrative - Site Plan Application #SPǦǦ21Ǧ001 Prepared by: Peter Mazurak, P.E. Comment (a/1): The encroachment(s) will not adversely affect the ability of the property to carry or store flood waters adequately. The buffer proposed to be impacted is directly connected to Potash Brook, therefore Staff considers it to be potentially a flood storage area. The applicant is proposing as much as four feet of fill in this buffer area, though the volume of fill has not been quantified. Staff considers more information is needed to d etermine whether the proposed encroachment has an adverse effect on flood storage. Response: Currently the site of the proposed improvements has a continuous gradual slope away from the building towards the wetland. Due to the slope of the ground, there is no detainment of stormwater. Further down slope toward wetlands, there is an existing stormwater detainment area in place. Comment (b/2): The encroachment(s) will not adversely affect the ability of the proposed stormwater treatment system to reduce sedimentation according to state standards; Staff recommends the Board require the applicant to provide testimony on this criterion prior to approval. Response: No extra sediment is expected, since all areas are either covered in grass, riprap, pervious hard-scape, or pavement. The existing stone lined trench leading to the storm-water detainment area will be made larger to allow for more water to settle out before reaching the detainment area. Additionally, a modification to the outlet of the stormwater detainment area will be made which will allow additional pollutants to settle out of the stormwater. Please refer to the detail on Site Plan sheet C2-01, last revised 2/03/2021. Before the construction at the site commences, silt fence will be installed. The silt fence will be removed after the grass is established and all the surfaces are stabilized. Comment (c/3): The impact of the encroachment(s) on the specific wetland functions and values identified in the field delineation and wetland report is minimized and/or offset by appropriate landscaping, stormwater treat ment, stream buffering, and/or other mitigation measures. Staff considers the applicant should prepare a written response demonstrating compliance with this and other criteria of this section and, based on the identified functions and values, propose mitigation or avoidance measures to offset the impacts. Response: While the state does not regulate this wetland, proper construction practices and continued maintenance of the storm-water system at the site will protect the wetland area. The following is a list of the functions and values of wetlands along with the associated mitigation or avoidance measures as applicable: x Water Storage: The wetland area on the site likely has some capacity to temporarily store flood waters. No reduction of the wetland’s storage capacity as a result of this project is foreseen. The proposed upgrade to the outlet of the detention basin on the site will allow the stormwater runoff that enters the basin to be released at a slower rate. x Water Quality Protection: No reduction of the wetland’s ability to settle out pollutants from surface runoff are anticipated as a result of this project. Upslope of the wetland, grass areas, Page 2 of 3 riprap areas and the detention basin will help to settle out pollutants before they reach the wetland. x Fish Habitat: The wetland area on the site consists of an overgrown meadow, which would not support fish. Fish may be present within the nearby Muddy Brook, which is over 200 feet from the proposed storage are expansion. x Wildlife Habitat: No changes within the wetland area are proposed, therefore the area will be available as a habitat for wildlife. x Sensitive Species: Based upon a review of the State’s Natural Resource Atlas, no sensitive species or rare, threatened, or endangered species were noted near the project site. x Exemplary Communities: Based upon a review of the State’s Natural Resource Atlas, no exemplary communities were noted near the project site. x Education and Research: Based upon the location of the wetland, it likely will not be used for education and research. x Recreation: Pathways are not present within the wetland area, so this wetland does not have much potential for recreation. x Open Space: No changes within the wetland area are proposed, therefore the area will remain as open space. x Erosion Control: No changes within the wetland area are proposed, therefore the area will be available to settle out sediment. Although with the erosion control practices during construction, additional sediment is not anticipated. Page 3 of 3 Pervious Surface Maintenance Procedure If the pervious surface is not periodically cleaned, the void structure system will become clogged with debris over time. The following is a maintenance schedule is to be followed. Maintenance Task Frequency of Task Routine Maintenance: Remove any accumulated trash or debris from pervious surface. Also remove any trash or debris from within outlets of the pervious area that are directed overland or to stormwater conveyance systems. Visually inspect the pervious surface during or immediately following a rain event. Ponding or puddles are signs that it is time to clean the surface more thoroughly. Monthly or more often as needed. Periodic Maintenance: It is a good practice to perform periodic maintenance just before winter to ensure that the pervious surface voids are clean and free of noncompressible materials that may inhibit draining and therefore could contribute to freeze-thaw damage. Proper cleaning procedures would include vacuuming the area with either a dry vacuum or a regenerative vacuum sweeper. Once per year, late fall, before freezing conditions. Deep Cleaning/Unclogging: Over time, deep cleaning/unclogging of pervious surface may become necessary, particularly if routine and periodic maintenance is not performed. Replacement of the stone layer within the geogrid may become necessary. As needed. Winter Maintenance Notes: x The pervious surface should never be used as a storage area to pile snow from other areas. The snow that has been plowed from other surfaces may be full of debris that will clog the pervious concrete voids. Additionally, the plowed snow may have a high salt content. x Snow removal should be performed by hand shoveling or with small equipment to prevent removal of the pervious stone surface. Lawn Care Note: x Avoid blowing leaves, grass trimmings and other debris across pervious surface. Landscape contractors should be advised of the special precautions required to avoid debris buildup on the pervious surface. CLASS IIIWETLAND(SEE NOTES)12 675($0%8))(5 :(7/$1'%8))(5 :(7/ $ 1 ' % 8 ))( 5352-(&7,1)250$7,21 2:1(52)5(&25'  3+<6,&$/$''5(66 *5(*25<'5,9(6287+%85/,1*72197385326(2)'(6,*17+(6(3/$16$5(%(,1*68%0,77('72$&48,5(6,7(3/$1$33529$/)25$352326('352326(',1&5($6(,17+((;,67,1*287'2256725$*($5($)257+,63523(57<(;,67,1*&21',7,216127(6 7+,63/$1'(3,&767+(3(57,1(17(;,67,1*&21',7,216$62)129(0%(5 7+,63/$1,61277+(5(68/72)$%281'$5<6859(<7+(%281'$5<,1)250$7,21'(3,&7(':$62%7$,1(')520$66(66256 65(&25'6)25%281'$5<,1)250$7,216((3/$7(17,7/('68%',9,6,213/$72)*5((175((3$5.6+813,.(52$'6287+%85/,1*72197'$7('35(3$5('%<%<758'(//&2168/7,1*(1*,1((56,1& 9(57,&$/'$780,6%$6('211$9' *(,2'  &225',1$7(6<67(0,6%$6('219(5021767$7(3/$1( 866859(<)((7  7+(&/$667+5((:(7/$1''(3,&7(',61277+(5(68/72)$1216,7(:(7/$1''(/,1($7,217+(/2&$7,21,6%$6('8321),(/'2%6(59$7,216$1',1)250$7,212%7$,1(')5207+(9(50217:(7/$1'6'(3$570(17,1&/8',1*127(6)520$9,6,7727+(6,7(%<7,1$+($7+&+,77(1'(1&2817<',675,&7:(7/$1'6(&2/2*,67 7+(/2&$7,212)(;,67,1*81'(5*5281'87,/,7,(6$1',03529(0(1766+2:1$5(%$6('215(6($5&+87,/,7<3/$163529,'('%<27+(56$1'25685)$&((9,'(1&((1&2817(5('$1':(5(2%7$,1(',1$0$11(5&216,67(17:,7+7+(25',1$5<67$1'$5'2)352)(66,21$/&$5($1'+$9(127%((1,1'(3(1'(17/<9(5,),('%<7+(2:1(5257+('(6,*1(1*,1((5$'',7,21$/87,/,7,(61276+2:10$<(;,67(1*,1((56+$//%(127,),(',)$1<',6&5(3$1&,(6$5((1&2817(5('$&78$//2&$7,212)81'(5*5281'87,/,7,(60$<9$5<',*6$)(0867%(&217$&7('35,2572$1<(;&$9$7,21&$//',*6$)(  =21,1*127(6=21,1*',675,&70,;(',1'8675,$/ &200(5&,$/,&0$;,0806,7(&29(5$*(%8,/',1*621/<%8,/',1*63$5.,1*$1'$//27+(5,03(59,286685)$&(66(7%$&.6)5217)((76,'()((75($5)((7/(*(1'3523(57</,1(6(7%$&.6%8))(5)(1&(&+$,1/,1.87,/,7<32/(%(1&+0$5.3$9(''5,9(2552$'&217285(;,67,1*/,*+7),;785(:(7/$1'('*(&217285352326('62,/67(673,7:(7/$1'%8))(5',6785%$1&(127(67(0325$5<,03$&7 &216,'(5('72%(7+($5($2)%8))(5=21(%(7:((17+(352326('7(0325$5<6,/7)(1&($1'7+(352326('&+$,1/,1.)(1&(648$5()((73(50$1(17,03$&7 &216,'(5('72%(7+($5($2)%8))(5=21(2&&83,('%<7+(352326('6725$*($5($(;3$16,21648$5()((76:$/(3 STORMWATER OUTLET DETAIL 02/03/20212 ADDITIONAL ITEMS FOR DRB 12/08/20201 ADDED BIKE RACK & DUMPSTERS 12/02/2020