HomeMy WebLinkAboutSP-92-0000 - Decision - 1475 Shelburne RoadFINDINGS OF FACT & DECISION
STATE OF VERMONT
COUNTY OF CHITTENDEN
CITY OF SOUTH BURLINGTON
Re: Findings of Fact, application of William & Timothy O'Brien for
a 6,000 square foot addition for vocational training use to the
O'Brien's Training Center, 1475 Shelburne Road.
On the 12th of May, 1992 the South Burlington Planning Commission
approved the request of William & Timothy O'Brien for site plan
review under Section 19.10 of the South Burlington Zoning
Regulations based on the following findings:
1. This project consists of the construction of a 6,000 square
foot 2 1/2 story addition to an existing 2 1/2 story 4550 square
foot building for vocational training use. The existing building
is a noncomplying structure and the proposed addition will exceed
the 25% limit under Section 19.002 of the zoning regulations. The
applicant was granted a variance by the Zoning Board of Adjustment
on April 27, 1992.
2. This property is located at 1475 Shelburne Road and is within
the C2 District. It is bounded on the north by Densmore Monuments,
on the east by Shelburne Road, on the south by Goss Dodge and on
the west by undeveloped property.
3. Access/circulation: Access will be via an existing 22 foot
curb cut. No changes are proposed to this access.
Circulation is acceptable.
4. Parking: The parking requirement for this project is 41 spaces
and 45 spaces are being provided including two (2) handicapped
spaces. All parking stall dimensions and aisle width requirements
are being met.
5. Landscaping: The landscaping requirement for this project is
$7700. Plantings proposed have a value of $6,450 which is $1250
short. The applicant is requesting a credit for existing plantings
to make-up the shortfall.
Plantings will include Sugar Maple, Ash, Willow, Barberry, Juniper,
Lilac and Arborvitae. Planting plan shows new plantings within the
Shelburne Road r.o.w.
6. Building Height: The addition, which is a pitched roof
structure, will have a height of 37 feet to the ridge. Section
18.112 of the zoning regulations would allow this type of structure
to rise 40 feet.
7. Traffic: The I.T.E. Generation manual does not have a land use
category for this type of land use. Staff requested and received
traffic generation counts taken by the applicant on three (3) days
taken between the hours of 4 and 6 P.M. On average, the property
generates 32 trip ends during the peak hour between 4 - 6 P.M.
From this information staff determined existing trip generation
based on square footage, operator stations and number of students.
This property is in Traffic Overlay Zone 5 which would limit this
property to 45 vehicle trip ends (vte's) during the P.M. peak hour.
Utilizing square footage to determine trip generation staff
estimates that this project would generate 74.2 vte's and if the
number of students (50 students proposed) is used staff estimates
45.7 vte's.
The applicant will be required to contribute $352 to the Shelburne
Road Intersection Impact Fund based on the estimated 13.7
additional P.M. peak hour trips to be generated by this expansion.
8. Sewer: Staff has calculated that additional sewer allocation
needed for this project is 342 gpd. This is based on past water
usage for the current 42 occupants applied to the additional 18
occupants proposed. The applicant would have to pay the $2.50 per
gallon fee prior to permit. According to City records, there is
sufficient reserve capacity to handle this additional demand.
9. Coverage/setbacks: Building coverage will be 14% (maximum
allowed is 30%). Overall coverage will be 60% (maximum allowed is
70%). The existing front yard coverage is 45% (maximum allowed is
30%). The removal of three (3) parking spaces closest to Shelburne
Road and the area converted to grass/landscaped area would bring
this property closer to front yard coverage requirement (38%).
Parking standards will still be met and the appearance of the
property would be improved.
The new addition and the relocated garage will be meeting the
setback requirements.
10. Other:
--- a dumpster is proposed
arborvitae hedge.
--- no exterior parking lot
which will be screened by an
lighting is proposed.
DECISION & CONDITIONS
Based on the above Findings of Fact, the Planning Commission
approves the site plan application of William and Timothy O'Brien
for a 6,000 square foot addition for vocational training use to the
O'Brien's Training Center as depicted on a two (2) page set of
plans, page one entitled, "O'Brien's Training Center", prepared by
Truex, Degroot, Cullins Architects and dated 4/6/92 with the
following stipulations:
1. The applicant shall post a $7700, 3-year landscaping bond prior
to issuance of a zoning/building permit. The planting plan shall
be revised to show: 1) an additional $1250 worth of new plantings
or larger plantings as approved by the City Planner, and 2 ) all
proposed plantings currently shown within the Shelburne Road r.o.w.
moved onto the O'Brien property. The plan shall be revised and
approved by the City Planner prior to issuance of a zoning/building
permit.
2. The property currently exceeds front yard coverage requirements
by 15%. In an effort to bring the property closer to meeting front
yard coverage standards and improve the appearance of the property,
the 3 parking spaces closest to Shelburne Road shall be removed and
the area replaced with lawn and landscaping. The plans shall be
revised prior to permit to show this improvement.
3. This property is located in Traffic Overlay Zone 5 which allows
a maximum of 45 vehicle trip ends (vte's) to be generated during
the peak hour. Based on trip generation count data submitted by
the applicant, it is estimated that 50 students would generate 45.7
vte's during the peak hour. In an effort to assure compliance with
the provisions of the Traffic Overlay Zone, the maximum number of
students shall be limited to 50. Because this restriction in the
number of students is essential to the approval of this project,
violation of this condition shall constitute sufficient grounds for
revocation of the approval of this project, and shall entitle the
City of South Burlington to a permanent injunction enjoining any
use of the proposed facility.
4. The applicant shall contribute prior to permit $352 to the
Shelburne Road Improvement Fund based on the 14 additional peak
hour trip ends estimated to be generated by the expansion.
5. A sewer allocation of 342 gpd is granted for this project. The
applicant shall pay the required sewer allocation fee prior to
permit.
6. Any additional on -site lighting shall be downcasting, shielded
luminare and shall be approved by the City Planner prior to
instillation.
7. The applicant shall construct a sidewalk along the frontage of
the property. A bond in an amount sufficient to cover the cost of
the sidewalk shall be posted prior to issuance of a zoning/building
permit. The plan shall be revised prior to permit to show the
proposed sidewalk.
8. The site shall be graded so that storm water runoff is to the
rear(west) of the site where a drainage Swale exists.
9. A zoning/building permit shall be obtained within 6 months or
this approval is null and void.
Chairman(or Clerk
South Burlington Planning Commission
V431,7 Z-
Date