Loading...
HomeMy WebLinkAboutSP-15-24 - Decision - 0104 Bowdoin Street#SP-15-24 CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING AND ZONING SUPER -TEMP REALTY COMPANY, INC. — 104 BOWDOIN STREET SITE PLAN APPLICATION #SP-15-24 FINDINGS OF FACT AND DECISION The applicant, Super -Temp Realty Company, Inc., is seeking approval to amend a previously approved plan for a 27,500 sq. ft. light manufacturing facility. The amendment consists of: 1) adding two (2) doorway landings, and 2) adding additional concrete sidewalks, 104 Bowdoin Street. Based on the plans and materials contained in the document file for this application, the Administrative Officer finds, concludes, and decides the following: FINDINGS OF FACT 1. Super -Temp Realty Company, Inc., is seeking approval to amend a previously approved plan for a 27,500 sq. ft. light manufacturing facility. The amendment consists of: 1) adding two (2) doorway landings, and 2) adding additional concrete sidewalks, 104 Bowdoin Street. 2. The owner of record of the subject property is Super -Temp Realty Company, Inc. 3. The subject property is located in the Industrial & Open Space Zoning District. 4. The application was received on May 6, 2015. 5. The plan submitted consists of a nine (9) page set of plans, page one (1) entitled, "New Manufacturing Facility Bowdoin Street South Burlington Vermont Site Location Plan", prepared by Civil Engineering Associates, and dated November 2013, and last revised on 4/28/15. Zoning District & Dimensional Requirements Table 1, Dimensional Requirements Industrial & Open Space Zoning District Required Proposed �l Min. Lot Size 3 acres 3.29 acres �l Max. Building Coverage 30 % 19.2 % �l Max. Overall Coverage 50 % 42.2 % �l Max. Front Yard Coverage 30 % 11.1 0/0 4 Zoning compliance Pursuant to Sections 14.06 and 14.07 of the Land Development Regulations, the following review standards shall apply to site plan applications: I #SP-15-24 (a) The relationship of the proposed development to goals and objectives set forth in the City of South Burlington Comprehensive Plan, This criterion will continue to be met following the proposed site plan amendments. (b) The site shall be planned to accomplish a desirable transition from structure to site, from structure to structure, and to provide for adequate planting, safe pedestrian movement, and adequate parking areas This criterion will continue to be met following the proposed site plan amendments. (c) Parking shall be located to the rear or sides of buildings All existing parking is located to the rear or side of the building. No changes proposed. Section 13.01 of the Land Development Regulations requires that bicycle parking or storage facilities be provided for employees, residents, and visitors to the site. A bike rack is shown on the plans. (d) Without restricting the permissible limits of the applicable zoning district, the height and scale of each building shall be compatible with its site and existing or adjoining buildings. No changes to buildings or structures are proposed. This criterion will continue to be met. (e) Newly installed utility service modifications necessitated by exterior alterations or building expansions shall, to the extent feasible, be underground. No changes are proposed. This criterion will continue to be met. (t) The combination of common materials and architectural characteristics, landscaping, buffers, screens, and visual interruptions to create attractive transitions between buildings or different architectural styles shall be encouraged. No changes to buildings are proposed. This criterion will continue to be met. (9)Proposed structures shall be related harmoniously to themselves, the terrain and to existing buildings and roads in the vicinity that have a visual relationship to the proposed structures No new structures proposed. This criterion will continue to be met. In addition to the above Qeneral review standards, site plan applications shall meet the fol%win o specific standards set forth in Section 14.07 of the Land Development Regulations: 2 #SP-15-24 (a) The reservation of land may be required on any lot for provision of access to abutting properties whenever such access is deemed necessary to reduce curb cuts onto an arterial or collector street, to provide additional access for emergency or other purposes, or to improve general access and circulation in the area. The reservation of land is not necessary; no adjacent lots require connections at this time. This criterion will continue to be met. (b) Electrir, telephone, and other wire -served utility lines and service connections shall be underground, Any utility installations remaining above ground shall be located so as to have a harmonious relation to neighboring properties and to the site. No new utility lines are proposed. This criterion will continue to be met. (c) All dumpsters and other facilities to handle solid waste, including compliance with any recycling or other requirements, shall be accessible, secure, and properly screened with opaque fencing to ensure that trash and debris do not escape the enclosure(s). The dumpster is enclosed. This criterion will be met. (d) Landscaping and screening requirements No new landscaping required or proposed. Pursuant to Section 13.06(B) of the Land Development Regulations, snow storage areas must be specified and located in an area that will minimize the potential for run-off. The plans depict adequate snow storage areas. Lighting Pursuant to Section 13.07(A) of the Land Development Regulations, all exterior lighting shall be shielded and downcasting to prevent light from spilling onto adjacent properties and rights -of - way. No new lighting proposed. This criterion will be met. Access/Circulation No changes to access or circulation proposed. Traffic No changes are proposed that will result in any increase in traffic volumes. Parking No changes to parking proposed. #SP-15-24 r DECISION Based on the above Findings of Fact, the Administrative Officer hereby approves site plan application #SP-15-24 of Super -Temp Realty Company, Inc., subject to the following stipulations: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. This project shall be completed as shown on the plan and shall be on file in the South Burlington Department of Planning and Zoning. 3. The applicant shall obtain a zoning permit within six (6) months pursuant to Section 17.04 of the Land Development Regulations or this approval is null and void. 4. The applicant shall obtain a Certificate of Occupancy from the Administrative Officer prior to use of the site improvements noted on the plan. 5. Any change to the site plan shall require approval by the South Burlington Development Review Board or the Administrative Officer. Signed this day of ' I 2015, by 'Kaomond J. Belair, Administrative Officer PLEASE NOTE: Pursuant to 24 VSA §4465, an interested person may appeal this decision by filing a Notice of Appeal with the secretary of the Development Review Board. This Notice of Appeal must be accompanied with a $233 filing fee and be filed within 15 days of the date of this decision. The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state permits for this project. Call 802.879.5676 to speak with the regional Permit Specialist. 11