PLANNING & ZONING
October 23, 2014
Re: #MS-14-08 — 39 Bowdoin Street
Dear Applicant:
Enclosed, please find a copy of the Findings of Fact and Decision rendered by the
Development Review Board concerning your recent application. Please note the
conditions of approval including that a zoning permit must be obtained prior to
commencement of your project.
If you have any questions, please contact me.
1lyJ. Belair
Administrative Officer
Encl.
CERTIFIED MAIL -Return Receipt Requested # 7010 0290 0000 2215 6331
575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101
www.sburf.com
�l�/l! �l I�1! I��;tl! I� r���Jrlr�i��. INC,
10 Mansfield View Lane
South Burlington, VT 05403
August 20, 2013
Mr. Raymond Belair, Administrative Officer
City of South Burlington
575 Dorset Street
South Burlington, Vermont 05403
Phone: 802-864-2323
Fax: 802-864-2271
E-Mail: mail@cea-vt.com
Re: Grandview Farm, Inc.
Miscellaneous Permit Application for Fill Placement on Lot 7
Dear Mr. Belair:
Please find attached an application form for the proposed placement of fill on Lot
7 as a result of excess fill from other construction sites located within in the
Meadowland Business Park.
The application package includes a site plan of the proposed fill areas, proposed
grading and EPSC measures to be employed.
If you should have any questions, please feel free to contact me at 864-2323
x310.
Project Engineer
Attachments:
Application Fee $184.50 ($123 x 150% after the fact multiplier)
Miscellaneous Permit Application
Design Plans (Overall Site Plan, Lot 3 Site Plan, EPSC Details and Narrative)
cc: M. Neagley (w/ enclosures, 11x17 plans)
CEA File 13102.00 (w/ enclosure)
PAAutoCADD Projects\2013\13102\3-Permitting\1-Local Applications\Misc Fill\Belair -Lot 7 Misc Fill Applic Cover Letter.doc
CITY OF SOUTH BURLINGTON CERTIFICATE OF SERVICE
I hereby certify that on this 25th day of Septemfr, 20 14, a copy of the foregoing public
notice for Northeast TerritoriE[type of application] # MS-14-08 [application number], was
sent by U.S. mail, postage prepaid to the owners of all properties adjoining the subject property
to development, without regard to any public right-of-way, and including the description of the
property and accompanying information provided by the City of South Burlington. I further
certify that this notification was provided to the following parties in accordance with 24 V.S.A.
§4464(a) and Section 17.06(B) of the South Burlington Land Development Regulations:
List of recipients:
(full names and addresses)
see attached list
Dated at So. Burling[town/city], Vermont, this 25th day of September_, 2014
Printed Name: Amy T. Marks
Phone number and email: 802-864-232 30,1 amy cea-vt.com
Signature:
Date:
Remit to: City of South Burlington
Department of Planning & Zoning
575 Dorset Street
South Burlington, VT 05403
South Burlington Sample Certificate of Service Form. Rev. 1-2012
Northeast Territories, Inc.
39 Bowdoin Street & 596 Meadowland Dr. - Abutters List
39 BOWDOIN STREET
NORTHEAST TERRITORIES INC
46 BOWDOIN STREET
CHASE PROPERTIES & DEVELOPEMENT LTD
65 BOWDOIN STREET
GPT PROPERTIES TRUST
66 BOWDOIN STREET
NEAGLEY MARK R
35 THOMPSON ST
GREENFIELD CAPITAL LLC
630 HINESBURG RD
IRELAND SCOTT D & STEPHEN D
1375 HINESBURG RD
GARDNER BRADLEY C OVERVIEW INC
317 MEADOWLAND DR
GRANDVIEW FARM INC
472 MEADOWLAND DR
O'BRIEN MEADOWLANDS LLC
596 MEADOWLAND DR
GRANDVIEW FARM INC
20 SOUTH CREST DR
BURLINGTON
VT
05401 0257-00039
P 0 BOX 2283
S BURLINGTON
VT
05407 0257-00046
9 GALEN ST SUITE 240
WATERTOWN
MA
02472 0257-00065
113 HERITAGE LN
SHELBURNE
VT
05482
35 THOMPSON ST
S BURLINGTON
VT
05403 1715-00035
P 0 BOX 2286
S BURLINGTON
VT
05407 0860-00630
PO BOX 21
COLCHESTER
VT
05446
P 0 BOX 1304
BURLINGTON
VT
05402-130-1155-00317
P 0 BOX 2184
S BURLINGTON
VT
05407 1155-0047. 4
P 0 BOX 1304
BURLINGTON
VT
05402-130, 0860-01150
Miscellaneous Fill Application
fly'/
A
i I
southburlington
PLANNING & ZONING
Permit # urn -L� -09
(office use only)
CONDITIONAL USE / VARIANCE / MISCELLANEOUS FILL
APPLICATION FOR THE DEVELOPMENT REVIEW BOARD
All information requested on this application must be completed in full. Failure to provide the requested
information either on this application form or on the site plan will result in your application being
rejected and a delay in the review before the Development Review Board.
I understand the presentation procedures required by State Law (Section 4468 of the Planning &
Development Act). Also that hearings are held twice a month. That a legal advertisement must appear a
minimum of fifteen (15) days prior to the hearing. I agree to pay a hearing fee which is to off -set the
cost of the hearing.
Type of application (check one):
( ) Request for a conditional use
( ) Request for a variance
(X) Other (Miscellaneous Fill)
OWNER OF RECORD (Name as shown on deed, mailing address, phone and fax #):
NORTHEAST TERRITORIES, INC.,
20 SOUTH CREST DRIVE
BURLINGTON, VERMONT
Phone: 8021658-6320, Ext. 118;Fax: 8021658-0349; Cell: 8021316-9534,
mnea ileyOlnea_gleychase.com
2. LOCATION OF LAST RECORDED DEED (Book and page #): Book 800 Page 565
3. APPLICANT (Name, mailing address, phone and fax #):
NORTHEAST TERRITORIES, INC.,
20 SOUTH CREST DRIVE
BURLINGTON, VERMONT
Phone: 6021658-6320, Ext. 118;Fax: 8021658-0349; Cell: 8021316-9534,
mnea_ i1ey(cD-nea_cileychase. com
f
Miscellaneous Fill Application
4. CONTACT PERSON (person who will receive all correspondence from Staff. Include name,
address, phone & fax #):
David S. Marshall
Civil Engineering Associates, 10 Mansfield View Lane,
South Burlington, Vermont 05403
Ph 864-2323 x310 F 864-2271 Email: dmarshall@cea-vt.com
5. PROJECT STREET ADDRESS: 39 Bowdoin Street
6. TAX PARCEL ID # (can be obtained at Assessor's Office): 0257-00039
7. PROJECT DESCRIPTION
a. General project description: Placement of 5,800 CY of fill.
b. Existing Uses on Property (including description and size of each separate use):
None
c. Proposed Uses on property (include description and size of each new use and existing
uses to remain): No new uses are proposed as par tof this application. The site is to
remain open.
d. Total building square footage on property (proposed buildings and existing buildings to
remain): 0 SF Existing and proposed.
e. Height of building & number of floors (proposed buildings and existing buildings to remain,
specify if basement and mezzanine): None.
f. Number of residential units (if applicable, new units and existing units to remain): None
g. Number of employees & company vehicles (existing and proposed, note office versus non -
office employees): Not applicable.
h. Other (list any other information pertinent to this application not specifically requested
above, please note if Overlay Districts are applicable): The property is subject to the
Hinesburg Road North View Protection Zone Overlay.
8. LOT COVERAGE (ALL information MUST be provided here, even if no change is
proposed)
a. Size of Parcel: Lot 3 - 4.0 Acres
b. Building Coverage:
Existing: 0 square feet: 0 %
Proposed: 0 square feet: 0 %
2
F
Miscellaneous Fill Application
c. Overall Coverage (building, parking, outside storage, etc):
Existing: 0 square feet: 0 %
Proposed: 0 square feet 0.00 %
a. Size of Parcel: Proposed Lot 3 - 4.0 Acres
d. Front Yard Coverage(s) (commercial projects only): NA
Existing: 0 square feet: 0.0 %
Proposed: 0 square feet 0
e. Total area to be disturbed during construction (sq. ft.) 0.8 Acres
* Projects disturbing more than one-half acre of land must follow the City's specifications for
erosion control in Article 16 of the Land Development Regulations. Projects disturbing more
than one acre require a permit from the Vermont Department of Environmental Conservation.
9. COST ESTIMATES
a. Building (including interior renovations): $0
b. Landscaping: $0
c. Other site improvements (please list with cost): $3,500 (Placement, grading & Site
Restoration)
10. ESTIMATED TRAFFIC (off -site values)
a. Average daily traffic for entire property (in and out): 0 VPD
b. A.M. Peak hour for entire property (in and out): O WE
c. P.M. Peak hour for entire property (In and out): 0 VPH
11. PEAK HOURS OF OPERATION: NA
12. PEAK DAYS OF OPERATION: NA
13. ESTIMATED PROJECT COMPLETION DATE: Late Summer, 2014
14. ABUTTERS (please list all abutting landowner. Include mailing address. Also include those
across a street or right-of-way. You may use a separate sheet if necessary) Please see
attached list.
3
Miscellaneous Fill Application
15. SITE PLAN AND FEE
A site plan shall be submitted which shows the information listed on Exhibit A attached. Five (5)
regular size copies, one reduced copy (11" x 17"), and one digital (PDF-format) copy of the site
plan must be submitted A site plan application fee shall be paid to the City at the time of
submitting the site plan application in accordance with the city's fee schedule.
I hereby certify that all the information requested as part of this application has been submitted
and is accurate to the best of my knowledge.
%S-C� LUC
SIGNATU O PPLICANT
SIGNATURE OF PROPERtN) OWNER
Do not write below this line
PRINT N
DATE OF SUBMISSION: >4� /
REVIEW AUTHORITY: Development Review Board ❑ Administrative Officer
I have reviewed this site plan application and find it to be:
P Complete„ ❑ Incomplete
T
r of Planning & Zoning or Designee Date
E
4
I
DYNAPOWER
r �
Irk �1
I SP A7-
TIES, L C �"� 10l\ \ \ \
_ _11 I \ 1 BUALINOTOy PAOPERFIES
{� LIMIIEDP TNERSHM � \'.� .
t Li\�_�--
\ / 1
T II l �� --�--
• \ �� I y r
> _
SITE ENGINEER:
io-
CIVIL ENGIMENUIIG ASSOCIATES, IIIC,
10 UMISFIEL0 V1EWlANE, SOUM BUAUNGTON, VT 0503
,ma�•�m FAR �mae.an ••e •,.,.u..r.cmm
OIYIm
JDL
rncan
DSM
�wm
DSM
OWNER
NORTHEAST
TERRITORIES, INC.
20 SOUTH CREST
BURLINGTON, VERMONT
PROJECT:
NEAGLEY & CHASE
CONSTRUCTION
OFFICE FACILITY
LOT
MEADOWLAND
BUSINESS PARK
66 BOWDOIN STREET
CEAP c �� � : J \ \ \ _ — —" -• - —� �'''''-' �':•:•:•;' SOUTH NGTON
INLEY
VERMO
VERMONT
\ i'.:..'...... .
FILL LOCAROAL .... - .....� r e
dp`t;�.r j••.•.•.•.•.•.•.•.•.•.•.•.•.-.•.•.•.'.•.'.' IRELANDS— O8
Lr . ' { f L......•.'.....•.•.•.•.•.•.•...•.•.•.•.•-:: PRQER
Z .. .`. I I 110N
f I ( 1 r:.'............. .
.}'. MUNSON I I l , a.• ....•.•.....:.•.....•.•.•.....•.•.•.•.•
EARTH MOVING CORP •.-. t' �.'.'.'.'.'.'.'.'.'.'.'.•.'.•. •;.. .
1 _ III T.:.:.:.{.��...........
'`. `pry-1 4 -� l/ 1•' ' ' ��° LOCATION MAP
o0jO°°°
_
1 I �y- Yes.•- BONG SHEAHAN P TON a \ I •._/ 1 1 t
5 1 EXIS77NG N£7LAND AREA \� _
h STREAM CHANNEL GARDNER Z KNOLL CYRC�E� ✓ t 1 DUEba y OF AIRPORT APPROCH CONE
SOUTHERL�IpGE S /
LOT 7 -
I10( / ; ! ` ► r:.::::'.�::::= OVERALL
SITE PLAN
GRAPHIC SCALE /'. .'...'.:.:.:.'.:.:-:.:.:.:.:.: un mWImG mmo
/ / trD ..........:......... AUG. 20, 2014
IN :1•=150' C1.0
1
I i..h Ie0 n. �.-. y,.�.-.=:•:-::::::::y:.
13102
,1 11 SITE
3.06 AC.
I -
I \\ \ W W W W W W W \ \\ - '•
\ W W W W W W\
\ W FNYA4MENiv CFEIE 1• r�
1
1 I W W W W W W\
I 1 W 11 1 W W W W I
1 � W- T•• W mV W W I —I
— 1 �•.'�1� W W W W W I
_—i----f
_ I
L A SS
(I I I
I1I W W W W W W •� I O
G 1 Y W W W W W V I
I � 1 I W G PROPERTI �
W W W W W
I D
I ' It
W W W W W ✓ /
I
I\ ( II
m
❑ —
❑ � I
n 1
1 ° 111111 ' Li
1 1 I I
I I III {` 1 it
I
� I°
SITE ENGINEER-
G
CIVIL ENGINEEEING ASSOCIATES. INC.
f0 UWRELD NEW LAN& SOUIH DIAM MN, VT OW
FAX 101J/4a1l wp..RxvRw aw-vi com
.m-
ACL
D M
D.�.m
SM
OWNER
NORTHEAST
TERRITORIES, INC.
20 SOUTH CREST
BURLINGTON, VERMONT
-
1 /�' l "'""'��•".v�r.La,'� }_ PROJECT:
W W W W W / / ( _ — — —�I 11 ■ • �" NEAGLEY & CHASE
II w IIIIIy CONSTRUCTION
OFFICE FACILITY
II II— _ ►_ =� �- \\\ 3 +a= I 1 DROP LOT 5
- _ � - -, ► `•� W W W W\ - :" .4.;;' I I I 1 1 MEADOWLAND
BUSINESS PARK
I '� W W W W � I :-.sir--•'
1 I II IW 1� W W W W I r •'.-,�t.•:.�n„1:�.����. ��M�h. {.vr �. .
- I
W W W W � ' �"5 .t•.v ..�i�. •�.•+�.�.,:.�=y'� '• ��''t ' I
I I I I r 111144...{^ :.• Y�ly'��; ,._�.".�" fv' I I I II I I
I 1L , W W W W W W I I �% • : Tv : `•.r STREET
SOUTH
'`' �+� `< •• `" "' :�• • •'^ ''"•: I I I �" I I SOUTHUTH6613OBURLDOIN BURLINGTON
I wi W W W W I I'`.`�"`i•",,;��=•:•'•'�_.��`•,.:,..:' '"'M � VERM NT
W W W W W `� ;�. Y Ai•\ `i i�.lif r �" . .y .h�:� • f:.i••.:e V' I I
I W W W I Rr�''.'.. t1"i>•-ti ��i'�:h1 I I I I rI
W W W W W ^Y-
I INSTALL SILT FENCIN ;„';: ' :`.S:;" •=" `` '' ^'" I I y�y e
W W W W /DOWNHILL Ff�OM STOCKPILE ���•:w '•� " a I
1 I W W W / / `4'fY<�. J �.1" �;.> ±: � l.,' _� �.5..?�v�• •-fit; a w^ J I % v- � � � � I 11` I I .Y W W W / -�`��•-iy �.i`�1�.��.;'i�,...�� l' j:�;, •r!: �`?�;ii -rat. ' .?`• / I 1 � I I I � / � �
I I / {.;;�; i'• tis:.�-t t_ a t. `i.Sr.u'L:y� Sf P."':' ��M
XAi: > F' vh W � Z W W W •Y W
, I I y '� W W W / �.'tt. �Y e.' :.rf1'•.� .+ y\'r`i.'� � - - %iOJECf
e 1 I W 11 W W / / •r r`t P.� �T.i✓� ^. f"'. _-i•�a ..�.T, 4.' • _.'ICE = - I W W W _ =`i•-• �' �-- mil% LOGTIQ/
SEED k MULCH ;�': �`..r',-::: ',_4-••;;`. •.,,,,.:,rc� � i'=-: ;,K•': � � _ �_ W
STOCKPILE _ ,..F�- ,t�?iS:: s�;,y �:" ••a3 r
LEGSN}D-
I I I /` / � •Y W W W 1 ' —' � �/ I I 'I W W W W W W W ` j W n\
EXISF�
UJG CONTOUR
P*OPOSE'D CON rkuR_ - LOCATION MAP
7• - 20C
_ —
APPROXIMATE PROP2RTY LINE
z Z --y, W APPRPXIMAlTk SETBACK LINE
/
// Y W W W W W W W W 1 i --�-- / 1 1 I"—•�•—SSA---'I'— GrtAVITY•�SEWERi LINE
W W W W W W
WATER LINE
-;;UE —. UNDE5GROUtjD\ELECTRIC
/W W W W �W / _ — _ — _ l—W '�• W l 1 WI W —�— T� TBLEPHOME LINIP\
G W W GAS LJINE
.5 _ �� •1• W W W W W W + W W W I `l \ W W— W ST--•--- STORM DRAINAGE LINE W
W W W W W W W W W W W W W W W W W W W W W W W W W W W W LI •L
/ I
1 W W W W W W W W W W W W W W W W W W W W W W W I I I W W W W W SFL.WER MANHOLE W W
STORM MAMITOLE 'Y W
W I W W W W W W W W . W •Y . . . W W W W W W W W VVlC/'
W W W W W W W W W W W `/ 11 \ /W W W W W W W W W W W W W W W W W W W W W W W LOT 7 -SOIL
HYDRANT
W IW W W W W W W ".4 'W •Y W 1 W W W W W W W W W W I I� 1 \ W W W W <L W S4UT-OEy .y . W STOCKPILE
W W CATCH BASIN W W
° LOCATIONS AND
IW L W W W W .•� W W W W W LI&T POLE W 1 QUANTITIES
SI�(; W W W W
N W W W/
DECI QUOUS •1SREE W W
CCJNIFER&S TFtE W \ D•R IWw01G ^°�
IW W W W W W W \ /W WT IW� I W W / w \ W W W W W
W �W J( WI I \I���I{/��l W IW W W W JI/ I o GRAPHIC SCALE � I I 1 I � /`W \ / V V V V V, EDGE OFVBRUSW/WOODS � AUG. 20. 2014
W W W W W W WL / \W �JW W VVV V" JJIW W; W W •L W ) / I I �. IJ \ �. W _ "�'� W FENC•T&, W W W 1" = 40'
W I W W W W W II��J� (��'�\� I��'"�'/I, W W I W W W W I l W W W f�lr- �1� �1� DRAINAGE SWANE W •� C2. O
W 0 `W�� W W W1 W W W W mmoll 1 w= I // II I IW I �/ .�• W W W W ,y PROZCT BACHMA�2K W 3102
1 1¢ch = ♦0 I �Ty}
W W W W W W W ' W W W W � W� W W W W W W W W W W
{
Introduction
This project terms
Is subject to the and conditions of the authorization
from the State of Vertnerm to discharge construction related arm water
runoff.
Covaag. under the State Construction General GeneralPermitor3-9020
required ter any construction activity that disturbs 1 or nor. man of
land. or Is part of a larger development plan that will disWrb 1 or more
oree
This project has been doomed to qualify No a Low Risk Ste. which Is
subject to to erosion provantlon and sediment control (EPSC)
standards set for, In the State of Vermam'•
Loss Risk Ske Handbook for Erosion Preertlon and Sedhnrrt
Control
The following narrative and Implementation requirements represent the
minimum oti ndrd for which this an. re required to be me nWned oo
regulated by the State of Vwmant
Any best nunagaman pratcw (BMP.) depicted on the project. EPSC
Sir. plan which go beyond the Handbook requnn n" re rnmdered
to be Integral to the management of the art. and represent oemponern
of the municipal EPSC approval for the project whit shall be
Implemented
The EPSC plan depicts one onp shot In time at tins ste NI
construton atse ars fluid in that day to day rupaures and risks as a
elates to minimizing sediment lose from the sits It Is the
mponrMlky d to Contractor to Instillment the necessity BMPs
to amply with the Low Rlsk H. Wb..k wtru4rd. sulned on this
wheat based on the Interim aft dlshrtrna conditions which may or
may not be shown m the EPSC She Plan.
Spodflc BMPa whit as critical to allowing the project to be considered
Low risk till• Include the name chocked below
• Umt the mount of disturbed earth to two acres or less a my on.
tim.
• Them shall be a maximum of 7 consecutive days of disturbed earth
wnposure In my location before temporary or Mal stabilization u
Impler,..led
• Th. projec 1. to disturb was than two acres at son with an
wodlblllty hlgar thm K-0 17
• Limit the project soil dlsturbsn- to less than two ores with slopes
greater than 5%
This project Is authonzed to disturb up to 16 sras
1 Mark Sto Boundaries
Purpose:
Mark the aft boundaries to Identify the Ilmft of anwruton D.linsating
your site will help to Ilmt the area of disturbance, preserve existing
vegetation and Ilmfl •salon potential on the site
How to —ply:
Before beginning construction, walk to aft boundaries and flag trees,
pat signs, ornhoW I orange salety, fence Fence Is required on any
boundary wthlc 60 toss of a shown, lake. pond or vaidand, unlessthe
arse Is alm ready developed (existing roads, building., etc)
2 Umtt Dlswhana Area
Purposes'
Unit the mount of moll ouposed m one time to reduce the potential
erosion on one
Requlrrrherms:
Th. permitted dlMurbarna urea Is specified on rim storm written
ouhoriza5m to discharge Only the screage listed on the authorization
form may be exposed at any given tints
How to comply:
Plan ahead and phase the construction activities to ensure that no mom
than the pmnNed ma mge Is disturbed at one time Be sum to property
stabilize epoved will whit seed and mulch a erasion control matting
w before beginning work In a new oolon m the one
3 Stabilize Construction Entra a
Purpose,
A stabilized conmmclon •rmara help. remove mud from vmlde
wheels to prevent tracking onto str•as
Rpuln wmW
If them will be my vehicle traffic OR of the conmruiston aft., you mum
Install a stabilized construction rntrancs before construction begins
Him to Instal
11001, Sla: Use a and of 1 to 41nch stone
Depth: 9Indies minimum
Wlath: 12 fiet minimum
Langtlt: 40 Mel minimum (or length at driveway, h enmm)
GooaNN: Pta- fiber tloth under emire gravel bad
Maintenance:
Redrses with dean alone as required to keep sediment from tracking
ado the treat
4 IaWI SIR Fina
Purpose:
Sit fences nmsroepr runoff and allow suspended eadimam to soft out
"ulrsmmh:
Slt fin- must be In led
• on the downhill skis of the construction atVlhea
• between any ditch, mat•, storm •ewer Info, a wwm at the St-
and the disturbed aril
• Hay bates must not be uaod ea medimem baron due to vwb
tendency to degrade and hair pent
Ware to pleeo:
• Piece all fence m the downhill edge of bare =II. At the bottom of
slopes, place fend log M downhill from the tl at the slope (d
apace Is a time)
• Ensure am sift hna catches all runoff from b- will
• Maximum dralnag. arse la'1A acre for 100 fast of sift fence
• inmall rat form ares the al on p. (not up and down Nllsl)
• In eWl mumpl. rows of Wit fonts on long hills to break p flow,
• Do notInatan all fend arose tltrthss, channels, or'str•ms or In
atrsem buffers
How to Install all tun-:
• Dlg ■ tranch 6 Inches do" scroas the siape
• Unroll sit lance along fbe trench
• Eneure stakes --the downhill ado of the fence
• Join fencing by rolling the and stakes togethw
• Drive stakes In against downhill ol0e of trench
• Drive wakes until 16 inch" at fabric is in trandi
• Push lam: into trench: spread along bottom
M.Immsn-:
• Remove accumsedimentulated diment before It Is halfway up the tenor
ti • Enm the sift fin- Is trenched In pound and mere we no gaps
5 Divert Upland Runoff
Purpow:
DlvrYon berms Intercom runoff than above the construction Re and
direct tt round the disturbed area This prevents, dean water from
becoming muddied with soil from the conscuton one.
Rqulnments
If storm water we onto your beta troth upsiop. areas and your art.
meet. the following two conditions, you moat Install a diversion berm
before disturbing my soil
1 You plan to have one or mere saes at sal alOos•d at any one time
(•sduding -do).
2 Avenge lop. of the disturbed m a 2D% or steeper
How to Inrsll:
1 Compact the berm with a enoval or seft-mowng equipment
2 Seed and mulch boron or cover wish araion control mating
nmmsdutaly after mateAstion
3 Stabilize the flow tonml with seed and straw mulch or woson
comoi mating Line the durmoi with 4 inch stone d the channel
slope or greater than 20%
4 Ensure the berm drains to an oullr stabilized with riprp Ensure that
there la no salon at the outlat.
5 The diversion berm shall remain in place until the disturbed area we
completely soNlizod
6 Slow Down Channrb•d Runoff
Purpose:
Stone check dome mdu- maim In drainage channel. by slowing
down the Mom waft flow
Rmquimmmta:
Mom 1. a cacwrtrafed flow (a g In a ditch or channel) of Mons water
on your sit., than you mat Inatall cons check dams Hay bodes must
not be used a check dome.
How to Install:
H.Ight No greater than 2 fam Center of dam should be 9 inches lower
than 0. side • evWon
holds slopes: 21 or naltr
Stm. size. Use a mbdure of 2 to 9Inch more•
Width: Dame should spin the width o1 the channel and arend up to
.Idea at the bank.
Epsoll Space the done, No, that the bottom upstream
) or the upstrn d
u al the Mi veson of the top (rest) at the dowmtroun dam This
paring
Is equal to the Might of the check dm divided by the channel
lop.
Spacing (n feet) - Height of check rim (In foot)/Slopo in channel (AM)
Malntmana:
Remove sediment accumulated behind the dam ea needed to Wow
channel to drain through to Mona check dam and prevent large flows
Arm carrying eetllmem over the dam if significant ro.lon occum
between check data, a snr of tome should be Installed
7 Construct P•munam Console
Permanent Morm wrer treatment pratcee s s constructed to maintain
wow quality, meure groundwater flows, and prevent downstream
flooding Prato Include d•tmbon ponds and wetianda, Inflltro6on
boons, and storm water flhws
Roqulnmmta:
Me total Impervious- was on your at., or within the common plan of
development, will be 1 or more area, you must apply for a State Storm
wafter Discharge Permit and construct permanent alarm water treatment
PMCUM on your sit. Th.. prstose must be Installed befa. the
construction at arty Imponlous euriaces
How to campy:
Contact the Vermont Storm water Program and follow the requirements
In the Vermont Storm water Managament Manual. The Storm water
MarNgmm •• Manual 1. avals il. at
www vhvelonquality.org/ift—awr hit.
-An Impervious surface Is a hummed. surface, including, but
not limited to, paved and unpaved rode, pmdng apes,
a, roofs,
driveways, and walkways, from which prodpUUon runs off rather
than InMtrMes.
I Stabilize Exposed Son
Purport:
Sesding and mulching, applying Mom control matting, and
hydrosseding are all method. to stsblllze rpos•d scll Mulchm anti
matting protect the soil surface while gross I. establishing
Requirements:
NI areas of disturbance mum have temporary or parmment Mobilization
wtthln 7, 14, m 21 day. of Initial disturbance, as Mated In the project
authorization After this time, .ray dlmurance In the area must be
stabilized at the and of each work dry
The following esciptions apply -
Stabilization Is net required A earthwork 1. to continue In the urea
within the nabs 24 hoursand themIs no precipitation forecast for
the hen hours
• Stablluadm 1. no required A tin work in occurring in a
self-contained excavation(I.o no outlet) with a depth at glom a
greater (a g house foundmm ezcrvahon, utility trmchea)
All vase of disturbance must have permanent stabiltrabon within 49
hwure of reaching final grade.
How to cat whin
Prepare bare mail for weeding by grading the top 3 to 6Inches of son and
removing any larg. roue or dam.
Seeding Rates for Temporary Stabilization
April 15 - Sept 16 - Ry ignes (manual or perennial 20 Ibs/scm)
Sept 15 - April 15 - Winter rye 120 Ws/ace
Seeding Rates for Final Stabilization Choose
se noon
u•e•r,.,., ,Rine tar In„A«
,•uric <n... c, c „nmm _
Tat I-- - R.b.l I _
,h,•
Ric ran ,uL 14ru,luclmn ul
I-M,�_nencL of F�q,•e nnA Pm Aee krH?nn, „r H,nf.lnn,
Mulching R.I.
April 15 -Sept 15 - Hay a Straw 1 inch deep (1-2 also/1000 a 1)
Sept 15 - April 15 - Hay or Saw 21n drop (2-4aie./1000 s t )
Erosion Control Mentng
As per manuhclunr's Instructions
Hydro••ed
As per manufactures Instructions
9 Wintr Stab lizAoon
Purposes:
Managing construction arts to minimize sroslon and prevent sediment
lading of waters is a year-round challenge. In Vermont, this challenge
becomes even greater during the late fail, winter, and early spring
months
Witter conatruton' es discussed are, describes the period betwom
October 15 and April 15, when rosin prevention and sediment control
u significantly mom drMmk
Hall In late fill, thavre throughout the wlnta, and spring moil and runs
an produce stgniflcait flows over frozen and saturated ground, greatly
mcrea.Img the potential for womon
Requirements for Winter Shutdown:
For those projects that will compete waft disturbance, activities prior to
the winter period (October 15), the following requirements must be
adhered to
1 For arw to be stabilized by vegetation, wading shall be completed
no later man September 15 to onsurs adequate growth and cover
2 If esetling Is not completed by September 15, additional
r vagetmve promotion mar be used to stabilize the sit• for the
wintr pond This includes use of Erosion Control Molting w noting
of a hervy, mulch layer Seeding with winter rye Is recommended to
allow for Orly gemination during wet prang conditions
3 Whin mulch Is specified, apply roughly 2 inches with an 90,90%
corer Mulch should be tracked In or stabilized with -Mng In opwn
waste wtnerabl. to wind.
Requirements for Wlmr Construction
If construction activities Involving earth disturbance continue peat
October 15 or begin betas April 15, the following requirements moat be
adhered to:
1 EnWged access pants, stabilized to provide for onow stockpiling
2 Umft of disturbance moved or replaced to reflect boundary of vnnler
work
3 A now management plan prepared with adequate enrage and
control at motivates, requiring cleared mow to be Morod down slop.
of all anew of disturbance and out of storm watw t e rtment structure.
4 A minimum 25 foot buffer .hail be maintained from perimeter control.
such u sin fence
5 In real at dleturban- that men to a water body within 100 lost, two
rows of sit fma must be metalled Wang the amour
6 Drainage structures must be kept open and free of mow and Ice
dams
7 SIN fence and other practices requiring earth disturbance must be
Installed ahead at hozm ground
9 Mulch used for temporary stablllz.tion must be applled at double the
standard veto, or a minimum of 3 mom with an 503D% cover
9 To .hour. cover of dl turbsd will In advance of a nit tom, areas of
disturbed .oil must be Asbfib•d at the and of each work day, with iM
following eaception.
• if - precipfttia wllmn 24 horn I. forecast and work will resume
In the same disturbed area within 24 houn, daily etWAllaMon I. not
necessary
• Disturbed rags that collect and retain runoff, such as, house
foundafl ho or opm utility trench"
10 Prier to Mobilization, snow or Ice must be removed to less than 1
Inch ..s thidin
11 Use von. to stabilize areas such No the perimeter of building.
under conseuton or where anstruton vehid. traffic Is anticipated
Stour patio should be 10 to 201.9 wide to accommodate vehicular
VON.
10 Stabilize Soil at Final (]red.
Purpo e-
Sablgzkg the alto with sood and mulch or erosion control mining when
it reaches final grade Is to bass way to prevent woslon while
con.uuton comenuse
Requirements:
Within 48 houn at final grading. the exposed soil mum be wsaded and
mulched or toured with erosion control mmng
Hiss to comply:
Bring the eft or section o1 the site to final grade No soon as possible
whir construction Is compared This will reduce the need for additional
sedum- and erosion control measures and will reduce the total
disturbed -A
For seeding and mulching ruse, follow the specifications under Hui. S,
Stabilizing Exposed Soil.
11 Disordering Activities
Purpoer
Treat water pumped from dawalenng activities so that t is dw when
leaving the construction site
Raqukemems:
WMer, from dewatwing activities that flows aff at the omistruton she
mum be clew Water mat not be pumped into storm son ers, lakes, or
wmands unises the water Is dw
Now to comply:
Using wick fill- or sediment 5ter begs on dowatmng dredury. horse
or plPes, discharge water Into slit fins mdowrw Imtalk d In vgraled
ereea mmy tern waterways. Remove accumulated sediment aft* it*
amid
water has dispersed and stabilize the most with ad and mulch
12 Inspect Your Site
Purpow.
Pmorm site Insp•tom to ensure that all esdlmem and erosion control
protao we functioning property Regular hipotoho and maintenance
of practices will help to reduce besls and protect we* quality.
R•qulnmarte:
Inspect the site st least once every 7 days and mat every rail or
mow mot mot moult In a discharge from the aft Perform mrntmma
to makers that practices are functioning according to the spocMationa
aWlned In this handbook
In the event or a ntceable sediment discharge from th construction
she. you must take immediate action to impact and mountain existing
era.Ion prnmfion and Ndh- moadrd practices Any visibly
dnsuolored storm wetw ninon to waters or to State mart be reported
Forms for reporting discharges m available at
wwwvtwrerqualnty.w9tsto mwatr.hbn
PLASTIC ORANGE
CONSTRUCTION FENCE
WOOD POST
EXISTING GRADE
NATIVE MATERIAL
CONSTRUCTION FENCE DETAIL
N.T.S.
D-50
DOWNSTREAM FLOWLINE SLOPE OF STRUCTURE
OF ROCK
0.35 (L 0.25 0.20 0.15 0.10
(MM)
MAXIMUM WATER DEPTH OVER ROCK (tom)
75
15 1s 20 25 33 40
ISO
30 36 41 50 n 100
END POINTS W MUST BE HIGHER
THAN THE FLOW LINE POINT.0.
0.35 ./in OR FLATTER
Timm (3 In.) MIN. FLOW LINE SLOPE
COARSE ROCK
Goom
7 `il (2 M1 MAX) =-I -
r_- - - C' _I _ f 15an TO 45cm
- - MINIMUM DEPTH OF COARSE L ' CI 1' _ (0.5 TO 1.6 ft.)
m ROCK SET IN lO(4 In. ROCK PLACED IN CHANNEL DIFFERENCE
MIN. TRENCH
) FLOW LINE IS 15em fL
(S-S )
SIDE VIEW
FUAI
conur snow
DIVERSION RIDGE REQUIRED REA7ER - - - -
WHERE GRADE EXCEEDS 2%
4 PLACE DOWNSTREAM STRUCTURE
SUCX THAT POINT 9' IS
IIOAOWAY \\/\\/// //</\y-' APPROXIMATELY LEVEL WITH THE '
LOWEST GROUND ELEVATION OF
FILTER FABRIC B THE UPSTIIEAM STRUCTURE
SECTION A -A
117 1-
i IT,
I-
SANDRAGS OR SFILLWAY
CONTINUOUS BERM OF NOTE: STONE CHECK DAM STRUCTURE
EQUIVALENT HEIGHT USE SANDBAGS OR OTHER
/ N.T.S.
APPROVED METHODS TO
SUPPLY WATER TO WASH CHANNELIZE RUNOFF TO
WHEELS IF NECESSARY BASIN AS REQUIRED
aa�
e,i, , TEMPORARY SEEDING iMULCN
r}'_ '•�_
���'�'� OR NETTING
o k o
3 A A 2'-T (50.75mm) COURSE
�� '. AGGREGATE MIN. lr
- (150rino)THICK
SILT FENCE OR KAY
BALES INSTALLED ON
``\\ DOWN GRADIENT FIDE
` DIVERSION RIDGE
W MIN.
OI AM MC-
1. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT
iqN( OR FLOWING OF SEDIMENT ONTO PUBLIC RIONT-OF-WAYS. THIS MAY
NE NNE
TOP DRESSING, REPAIR AND/OR CLEAN OUT OF ANY MEASURES USED TO
I SEDIMENT.
2. WN�i NECESSARY, WHEELS SHALL BE CLEANED MIOR TO ENTRANCE ONTO PUBLIC
RI OF
WAY.
>ti WH9n WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WTTH
Cti ED STONE THAT DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT
STAOILIZED CONSTRUCTION ENTRANCE
N T.S.
STS - 1. SET POSTS AND 2. ATTACH SILT FENCE
EXCAVATE A 4 Xr AND EXTEND IT TO
ANGLE 10' TRENCH, SET POST SILT THE TRENCH.
UPSLOPE FOI DOWNSLOPE FENCE
STABILITY
SELF CLEANI
S. STAPLE THE SILT
COMPACTED FENCING TO TXE
SAI.KFILL END POSTS.
DACKFlLLTIIENCX.
-
I -
SILT FENCE CONSTRUCTION DETAIL
N.T.S.
TEMPORARY STOCKPILE DETAIL
N.TS
FILTER FABRIC TO BE
POST MIRAR 100X OR APPROVED
EQUAL
POST SPACING
2%X2%WOOD 2.9
METAL POST iD
4a4WOOD /D
UTER FABRIC TO BE
CUPPED, BACKFlIJFD AND
TAMPED 9' BELOW GRADE
STEEL OR WOOD STAKES
NOTES: (SEE CHART AT RIGHT)
1. INSTALL MIRIFI ENVIROFENCE, OR APPROVED EQUAL OR AS DETAILED HEREIN.
2. INSTALL SILT FENCES AT TOES OF ALL UNPROTECTED SLOPES AND AS PARALLEL TO
CONTOURS AS POSSIBLE THIS INCLUDES ALL FILLED ON UNPROTECTED SLOPES
CREATED DURING CONSTRUCTION, NOT NECESSARILY REFLECTED ON THE FINAL
PLANS . CURVE THE ENDS OF THE FENCE UP INTO THE SLOPE. REMOVE SEDIMENT
WHEN ACCUMULATED TO HALF THE HEIGHT OF THE FENCE
SILT FENCES ARE TO BE
MAINTAINED UNTIL SLOPES ARE STABS IZE^.
3. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER, THEY SHALL BE
OVERLAPPED BY S•, FOLDED AND STAPLED.
SILT FENCE DETAIL
N.T.S.
SITE ENGINEER-
rj
`J
CIVIL EIIGIMEEIUWG ASSOCIATES, IHC,
1011114WEIDVEWIANE, SOUTHRURLAUTON, Vf 05W0
8D.esF2ea3 M wi]J 11 - mwce•Mcwn
DM-
ACL
DSM
.vrwwso
DSM
OWNER
NORTHEAST
TERRITORIES, INC.
20 SOUTH CREST
BURLINGTON, VERMONT
PROJECT:
NEAGLEY & CHASE
CONSTRUCTION
OFFICE FACILITY
LOT
MEADOWLAND
BUSINESS PARK
66 BOWDOIN STREET
SOUTH BURLINGTON
VERMONT
LOCATION MAP
1' - 2o00
LOT 7-
EPSC PLAN
Oars Da.1Mc �
AUG. 20, 2014
C"f 40 3.0
- sro
13102