HomeMy WebLinkAboutAgenda 06_SP-20-035_124 Technology Park Way_ReArchCITY OF SOUTH BURLINGTON  DEVELOPMENT REVIEW BOARD  SP‐20‐035‐CU‐20‐02_124 Technology Park  Way_ReArch_2020‐12‐15.docx  DEPARTMENT OF PLANNING & ZONING   Report preparation date: December 9, 2020  Application received:  November 20, 2020  124 Technology Park Way  Site Plan Application #SP‐20‐035   Meeting date: December 15, 2020  Applicant & Owner  124 Technology Park Way, LLC  88 Technology Park Way, Suite 2  South Burlington, VT 05403  Applicant  ReArch Company, c/o Stephen Savell  88 Technology Park Way, Suite 2  South Burlington, VT 05403  Engineer  Trudell Consulting Engineers  478 Blair Park Road  Williston, VT 054495  Property Information  Tax Parcel ID  1713‐00124  Mixed Industrial and Commercial District           SP‐20‐35  Staff Comments   PROJECT DESCRIPTION  Site plan application #SP‐20‐035 of ReArch Company to amend a previously approved plan for  commercial parking and a vacant 54,459 sf building.  The amendment consists of converting the use to  general office and expanding the existing parking lot, 124 Technology Park Way.  The project was warned as follows.  Site plan application #SP‐20‐035 and Conditional use application #CU‐20‐02 of ReArch Company  to amend a previously approved plan for commercial parking and a vacant 54,459 sf building.  The  amendment consists of converting the use to general office and expanding the existing parking  lot, 124 Technology Park Way.  Upon review of the submitted materials, Staff considers there are no elements of the proposal which  require conditional use review, therefore conditional use review has excluded from these staff comments.    CONTEXT  The Project is located in what is commonly referred to as Technology Park.  The lots within Technology  Park are generally owned and managed by ReArch Company, but there is no unifying Planned Unit  Development.  At present, Technology Park consists of the buildings at 124 and 88 Technology Park Way,  the large building at 530 Community Drive, and an existing smaller building at 725 Community Drive and  the currently under construction large warehouse at 635 Community Drive.  Only the buildings at 124 and  88 Technology Park way and at 530 Community Drive are within the Community Drive “loop;” the other  two buildings are on the exterior of the loop.  The project also includes improvements to the stormwater management system.  The application is  subject to conditional use review because a portion of the work is located within a Class II wetland buffer.  This project is subject to review under the Land Development Regulation Standards covering the Mixed  Industrial Commercial District, Section 12.02 Wetland Protection Standards, Section 14.06 General Review  Standards, and Section 14.10 Conditional uses.    PERMIT HISTORY  The existing site was originally approved in #SP‐07‐67 as a 54,459 general office building.  That approval  granted certain encroachment into the Class II wetland buffer, finding that wetland criteria were being  met “to the best ability of the applicant.”  Most recently, the applicant received site plan approval #SP‐19‐14 and conditional use approval #CU‐19‐ 03 to convert the use to commercial parking and vacant for the purpose of off‐site storage of automobiles  for sale.  The applicant is now proposing to convert the existing building back to an office space and expand  the  existing  parking  lot.    The  current  application  includes  removal  of  the  conditional  approval  for  commercial parking.      COMMENTS  Development Review Planner Marla Keene and Planning and Zoning Director Paul Conner have reviewed  the plans submitted on 11/20/2020 and offer the following comments.  Numbered items for the Board’s  attention are in red.      SP‐20‐35  Staff Comments   A) ZONING DISTRICT & DIMENSIONAL REQUIREMENTS   IC Zoning District Required Existing Proposed   Min. Lot Size 40,000 sf  217,800 SF  217,800 sf   Max. Building Coverage 40 %  8.33%  8.33%   Max. Overall Coverage 70 %  44.5%  53.5%  @ Min. Front Setback  30 ft. Apprx. 400 ft.  No change   Min. Side Setback 10 ft.  Apprx. 54 ft.  No change   Min. Rear Setback 30 ft.  N/A  N/A   Max. Front Setback Coverage 30%  16.3%  16.3%   Max. Height (flat roof)1 50 ft.  50 ft.  No change  √  Zoning Compliance  @ Existing non‐conformity  1. Waiver from 35 to 50 ft granted in original approval SP‐07‐67      B) ARTICLE 12 SURFACE WATER PROTECTION STANDARDS  12.02E. Standards for Wetlands Protection  (1)   Consistent with the purposes of this Section, encroachment into wetlands and buffer areas  is generally discouraged.  (2)   Encroachment  into  Class  II wetlands  is  permitted  by  the  City  only  in  conjunction  with  issuance of a Conditional Use Determination (CUD) by the Vermont Department of Environmental  Conservation and positive findings by the DRB pursuant to the criteria in (3) below.  (3)   Encroachment into Class II wetland buffers, Class III wetlands and Class III wetland buffers,  may be permitted by the DRB upon finding that the proposed project’s overall development, erosion  control,  stormwater  treatment  system,  provisions  for  stream  buffering,  and  landscaping  plan  achieve the following standards for wetland protection:  (a)   The encroachment(s) will not adversely affect the ability of the property to carry or store  flood waters adequately;  (b)   The encroachment(s) will not adversely affect the ability of the proposed stormwater  treatment system to reduce sedimentation according to state standards;  (c)   The  impact  of  the  encroachment(s)  on  the  specific  wetland functions  and  values  identified in the field delineation and wetland report is minimized and/or offset by appropriate  landscaping, stormwater treatment, stream buffering, and/or other mitigation measures.   The project as proposed will result in approximately 1,750 sf (0.04 ac) of permanent Class II wetland  impact,  approximately  10,900  sf  (0.25  ac)  of  permanent  Class  II  wetland  buffer  impact,  and  approximately 3,050 sf (0.07 ac) of temporary wetland impact associated with landscaping.  The  applicant  is  proposing  a  4.8‐ft  max  height  concrete  block  retaining  wall  to  limit  further  encroachment into the wetland beyond that described above.  They have indicated in their  narrative that the wetland delineation has been approved by the state.  However, no state  wetland permit has been provided, nor has the applicant provided a wetland report identifying  specific wetland functions and values.  It appears that the applicant has submitted state wetland  permit 4122 and that permit application is under review.    1. Since the applicant has not provided any information to allow the Board to evaluate compliance  with these criteria, and there is no indication as to whether the State will approve the proposed  impacts, Staff considers it to be premature to make a determination the proposed impacts.  Staff  SP‐20‐35  Staff Comments   considers the Board must receive and evaluate the wetland report and state wetland permit before  making a determination on these criteria.    C) SITE PLAN REVIEW STANDARDS  14.6 General Review Standards  Section 14.06 of the South Burlington Land Development Regulations establishes the following general  review standards for all site plan applications:  A. Relationship of Proposed Development to the City of South Burlington Comprehensive Plan. Due  attention by the applicant should be given to the goals and objectives and the stated land use  policies for the City of South Burlington as set forth in the Comprehensive Plan.  The project is located in the northeast quadrant, whose objectives as stated in the comprehensive  plan are   Objective 52. Allow opportunities for employers in need of large amounts of space provided they  are compatible with the operation of the airport  Objective 53. Provide a balanced mix of recreation, resource conservation and business park  opportunities  in  the  south  end of  the  quadrant,  to  include  the conservation  of open  space  resources, including riparian corridors along the tributaries of Muddy Brook and Potash Brook.  While this application does represent a proposal to amend an existing business park, it also proposes  to have permanent Class II wetland and wetland buffer impacts, as well as temporary wetland  impacts as described above.  The watershed divide between Potash and Muddy Brooks is located on  the eastern side of the property, with the area proposed for development within a wetland which  discharges to Potash Brook on the west side of Community Drive.  As noted pertaining to Surface  Water Protection standards, the applicant has not yet demonstrated State wetlands approval for  these impacts.  2. While Staff does not consider deficiencies in compliance with this criterion alone sufficient to deny the  application, Staff recommends the Board take into consideration  this  criterion  when  making  their  determination.  B. Relationship of Proposed Structures to the Site.  (1) The site shall be planned to accomplish a desirable transition from structure to site, from  structure to structure, and to provide for adequate planting, safe pedestrian movement,  and adequate parking areas.  The proposed parking area necessitates removal of existing previously required vegetation,  discussed under 14.07D below.  Since there are no minimum parking requirements for the  proposed use, and no other elements of this criterion are affected by this application, Staff  considers this criterion met.    (2)  Parking:  (a)  Parking shall be located to the rear or sides of buildings. Any side of a building facing a  public street shall be considered a front side of a building for the purposes of this subsection.  (b) The Development Review Board may approve parking between a public street and one  or more buildings if the Board finds that one or more of the following criteria are met. The  Board shall approve only the minimum necessary to overcome the conditions below.  SP‐20‐35  Staff Comments   (i) The parking area is necessary to meet minimum requirements of the Americans with  Disabilities Act;  (ii) The parking area will serve a single or two‐family home;  (iii) The lot has unique site conditions, such as a utility easement or unstable soils, that  allow for parking, but not a building, to be located adjacent to the public street;    (iv) The lot contains one or more existing buildings that are to be re‐used and parking  needs cannot be accommodated to the rear and sides of the existing building(s);   The original approval, #SP‐07‐67, found that the power lines and related easement on the  norther portion of the property made it impractical to locate the building up front.   That  approval also considered the significant landscaping between Kimball Ave and the parking lot  in the finding on this criterion.  Staff considers the circumstances leading to the original  approval have not changed, but does question the necessity of additional parking.  In  their  application  narrative, the  applicant  indicated  that  the  future  user  of  the  site,  Government Services Administration (GSA), has requested 250 parking spaces.  They indicate  that GSA originally requested 316 parking spaces within a quarter mile of the building.  Staff  estimates the existing building at 730 Community Drive has at least 800 parking spaces, and  is located within a quarter mile of the building on the subject property.  The building at 730  Community Drive is nearly fully occupied (2,160 sf is undesignated) and there appears to be  excess parking available.  Therefore Staff considers that by the applicant’s own statement,  the  requested  additional  parking  is  above  the  “minimum  necessary  to  overcome  the  conditions” preventing the applicant from locating parking to the rear.  Parking standards provide additional exceptions for parking in the rear for properties in the  Mixed IC zoning district, if the lot is located in an approved subdivision where the parking on  each lot in the subdivision is proposed to be located between the building or buildings on  each lot and the public street so that a significant greenspace surrounded by buildings may  be  incorporated  similar  to  a  college  campus  style  “quad.”    In  order  to  qualify  for  this  exemption, the applicant must present a plan for such a quad specifically defining it’s size and  extents, and providing a high quality design of such green space.  Since the applicant has not  done so, Staff considers this exemption does not apply.  3. Staff considers that the above considerations regarding proximity of additional parking, taken  in  aggregate  with  the  extensive  wetland  impacts  necessitated  by  the  proposed  parking  expansion,  represent  too  many  obstacles  to  recommend  approval  of  the  expansion,  and  recommends the Board discuss.    (3) Without restricting the permissible limits of the applicable zoning district, the height and  scale of each building shall be compatible with its site and existing or anticipated adjoining  buildings.  No building changes are proposed.  Staff considers this criterion not applicable.  14.07 Specific Review Standards   In all Zoning Districts and the City Center Form Based Codes District, the following standards shall apply:  A. Access to Abutting Properties. The reservation of land may be required on any lot for  provision of access to abutting properties whenever such access is deemed necessary to  reduce curb cuts onto an arterial or collector street, to provide  additional  access  for  emergency or other purposes, or to improve general access and circulation in the area.  No changes to access are proposed.  Staff considers that reservation of land for reducing curb cuts is  not required, and considers this criterion met.  SP‐20‐35  Staff Comments   B.  Utility Services. Electric, telephone and other wire‐served utility lines and service connections  shall be underground insofar as feasible and subject to state public utilities regulations. Any utility  installations remaining above ground shall be located so as to have a harmonious relation to  neighboring properties and to the site. Standards of Section 15.13, Utility Services, shall also be met.  Overhead utilities traverse the site but the building itself is served by underground utilities.  Staff considers  compliance with this criterion not diminished by this application.    C.  Disposal  of  Wastes.  All  dumpsters  and  other  facilities  to  handle  solid  waste,  including  compliance with any recycling, composting, or other requirements, shall be accessible, secure and  properly screened with opaque fencing to ensure that trash and debris do not escape the enclosure(s).  Small receptacles intended for use by households or the public (ie, non‐dumpster, non‐large drum) shall  not be required to be fenced or screened.  Dumpsters are not proposed to be changed and are enclosed.   D.  Landscaping and Screening Requirements. See Article 13, Section 13.06 Landscaping, Screening,  and Street Trees.  As alluded to above, the applicant is proposing to remove some trees which were included on the  previously approved site plan.  Because no changes to the building are proposed, the only required  landscaping is that necessary to compensate for the removed landscaping.  The applicant has proposed  to compensate for the removed landscaping by planting new trees and shrubs, some of which are the  same species as those removed, and others which are different species.  For shrubs, the applicant is proposing to replace each removed shrub with one of the same kind of shrub,  installed at a 3 gallon size.    For trees, the applicant describes in their narrative that new species have been selected for specific site  conditions, including soils, water availability, salt, and sun exposure.  The applicant has calculated the  required value of new species based on a valuation of existing trees to be removed using the Purdue  University’s Department of Horticulture ad Cooperative Extension Service guidance for appraising and  calculating the monetary value of landscape plants.  Given the layout of the remainder of the site, Staff  considers the applicant’s proposal results in a well landscaped site.  The City Arborist reviewed the plans on 12/1/2020 and indicated there are no issues.  The applicant is proposing 51 new parking spaces.  Above‐noted nonconforming issues notwithstanding,  if the Board elects to allow the proposed expansion, 13.06B(2) requires all parking areas of 28 or more  parking spaces to contain 10% interior parking lot landscaping.  Staff recommends the Board require the  applicant to demonstrate compliance with this criterion.  13.06B(4) requires one major deciduous shade tree within or near the perimeter of each parking area for  every five (5) parking spaces.  Staff considers this criterion met for the affected portion of the parking lot.  E.  Modification of Standards. Except within the City Center Form Based Code District, where the  limitations of a site may cause unusual hardship in complying with any of the standards above and  waiver therefrom will not endanger the public health, safety or welfare, the Development Review Board  may modify such standards as long as the general objectives of Article 14 and the City's Comprehensive  Plan are met. However,  in no case shall the DRB permit the location of a new structure less than five  (5) feet from any property boundary and in no case shall be the DRB allow land development creating a  total site coverage exceeding the allowable limit for the applicable zoning district in the case of new  development,  or  increasing  the  coverage  on  sites  where  the  pre‐existing  condition  exceeds  the  applicable limit.  Staff considers that no modification of standards is necessary.  F   Low Impact Development. The use of low impact site design strategies that minimize site  SP‐20‐35  Staff Comments   disturbance, and that integrate structures, landscaping, natural hydrologic functions, and various other  techniques to minimize runoff from impervious surfaces and to infiltrate precipitation into underlying  soils and groundwater as close as is reasonable practicable to where it hits the ground, is required  pursuant to the standards contained within Article 12.  The Assistant Stormwater Superintendent reviewed the application on December 3, 2020 and offers the  following comments.  The Stormwater Section has reviewed the “124 Technology Park Way” sketch plan prepared by  Trudell Consulting Engineers, dated 11/04/2020. We would like to offer the following comments:  1. The proposed project will discharge to Potash Brook. This watershed is listed as stormwater  impaired by the State of Vermont Department of Environmental Conservation (DEC).    2. The applicant has acknowledged that they must comply with the 3‐9050 permit. In addition,  due to the amount of impervious being created on the entire parcel, the applicant must  comply with Section 12.03 of the LDR’s. The applicant is requested to provide the following  requirements in Section 12.03(D) of the City’s Land Development Regulations (LDRs):  a. Sub‐watershed boundaries and drainage area delineations for all stormwater  treatment practices.  b. Soil types and / or hydrologic soil group, including the results of any soil borings,  infiltration testing, or soil compaction testing.  c. A detailed maintenance plan for all proposed stormwater treatment practices  including the Stormfilter vault system and PhosphoSorb® media replacement.  3. The project proposes to disturb greater than 1 acre of land.  It will therefore require a  construction permit from the Vermont DEC Stormwater Division. Did the applicant determine  that this project is a Low Risk project  4. Sheet C5‐01 is difficult to read in terms of EPSC requirements. Please remove unnecessary  layers so that line types are distinguishable. Additionally, locations (not inclusive) such as  stabilized construction entrance, staging areas (including materials and snow), and limits of  disturbance fencing should be clearly depicted. Is dewatering anticipated for construction?  Please include EPSC narrative.  5. Applicant is requested to depict the Dry Detention Pond referenced in the narrative on the  plans. Please show pertinent details.  6. The Stormfilter vault system General Note 5 mentions the depth to SHW as well. Provide any  soil borings or test pits to confirm soil types and groundwater elevation on site.  7. The DRB should include a condition requiring the applicant to regularly maintain all  stormwater treatment and conveyance infrastructure.  4. Because the comments of the City Stormwater Section state, in effect, that the Assistant Stormwater  Superintendent can’t complete their review without further information, Staff shared the comments  with the applicant as soon as they were available.  The applicant is working with the Assistant  Stormwater Superintendent to address these comments and Staff anticipates they will have an  update at the time of the hearing.  5. Staff  recommends  the  Board  require  the  applicant  to  address  the  comments  of  the  Assistant  Stormwater Superintendent prior to closing the hearing.  G.  Standards for Roadways, Parking and Circulation. Standards of Section 15.12 Standards for  Roadways, Parking, and Circulation shall be met.  Dimensional requirements of 15.12 are met for the affected portion of the site.  No review of the unaffected  portions of the site has been undertaken.   SP‐20‐35  Staff Comments     D) OTHER  13.14 Bicycle Parking and Storage  The 54,459 sf building is required to have 11 short‐term bicycle parking spaces.  The applicant notes in  their cover letter the site was previously approved with 10 short term bicycle parking spaces.  Existing  bicycle parking is not shown on the provided plans.  Staff recommends the Board require the applicant to  demonstrate the provision of 11 short‐term bicycle parking spaces meeting the standards of 13.14,  including placement on a stabilized surface.  13.07 Exterior Lighting  Eight new lights are proposed at a mounting height of 20.5 feet.  Lights are proposed to be downcast and  shielded, and the average illumination level in the affected area is 1.8 footcandles.  Staff considers lighting  criterion met.  Traffic  The applicant estimates the proposed use will generate 63 trips during the PM peak hour.  The original  approval for the property approved 159 trips.  Staff considers no additional traffic impact fee is required.    RECOMMENDATION  Staff recommends that the applicant work with Staff and the Development Review Board to address the  issues herein.     Respectfully submitted,    ___________________________  Marla Keene, Development Review Planner  478 Blair Park Road Williston, VT 05495 802 879 6331www.tcevt.com42 Mapleville Depot Road St. Albans, VT 05478 802 528 5116 Civil Engineering Environmental Services Land Surveying Landscape Architecture November 12, 2020 Marla Keene, P.E. Development Review Planner Department of Planning & Zoning City of South Burlington 575 Dorset Street South Burlington, VT 05403 RE: 19-099 Site Plan Application for Parking Expansion – 124 Technology Park Way South Burlington, VT Dear Marla, Trudell Consulting Engineers (TCE) is submitting this Site Plan Application and Conditional Use Application on behalf of the Applicant, ReArch Company, for a proposed 59 space parking expansion for 124 Technology Park Way, herby referred to as the “project”. The project proposes this parking expansion due to a requirement of a tenant for 250 parking spaces to be located on the same property as the office building. In addition, the application proposes to remove Commercial Parking use from the property and proposes changes to stormwater treatment and landscaping, requiring Site Plan Review. As the parking lot expansion involves Class II wetland impact the project also requires Conditional Use Review. There are no proposed changes to the setbacks, existing building, site access, water supply, or wastewater disposal. Should you have any questions or concerns, please do not hesitate to contact me directly at (802) 879-6331 x107 or by email at abby.dery@tcevt.com. Sincerely, Abigail Dery, P.E. Senior Project Manager 478 Blair Park Road Williston, VT 05495 802 879 6331www.tcevt.com42 Mapleville Depot Road St. Albans, VT 05478 802 528 5116 Civil Engineering Environmental Services Land Surveying Landscape Architecture 19-099 REARCH PARKING EXPANSION124 TECHNOLOGY PARK WAY, SOUTH BURLINGTON,VTSITEPLAN AND CONDITIONAL USE REVIEWNOVEMBER2020 1 PROJECT NARRATIVE Trudell Consulting Engineers (TCE) is submitting this Site Plan Application and Conditional Use Application on behalf of the Applicant, ReArch Company, for a proposed 59 space parking expansion for 124 Technology Park Way, herby referred to as the “project”. The project proposes this parking expansion due to a requirement of a tenant for 250 parking spaces to be located on the same property as the office building. In addition, the application proposes to remove Commercial Parking use from the property and proposes changes to stormwater treatment and landscaping. There are no proposed changes to the setbacks, the existing building, site access, water supply, wastewater treatment or lighting. The project property is an existing 5.0 ac property located at 124 Technology Park Way with frontage along Kimball Avenue. The site was previously permitted for the construction of an office building, associated parking lot, stormwater treatment areas, and other utilities in 2007. In 2019, the applicant proposed to use the site for Commercial Parking while the office building sat vacant. At this time, the applicant proposes a change in use for the site back to general office use with a proposed 59 space parking expansion. The peak days and hours of operation will be Monday through Friday from 6am to 6pm. Site Plan Review (14.03) & Mixed Industrial Commercial District (6.01) Per Section 14.03 of the South Burlington Land Development Regulations, any change in use for properties outside the form-based code district as well as a parking expansion, require Site Plan Approval. Per Section 6.01 and Table C-1 Commercial and Public General Office is a permitted use within the Mixed Industrial-Commercial District (IC). The only dimensional standards listed in Table C-2 for the IC which will change as a result of the proposed project is the total site coverage which is proposed to increase from 44.5% to 53.5% with the addition of the 0.45 ac, 59 space parking expansion. This proposed coverage is well below the maximum allowed 70% lot coverage in the IC. Transit Overlay District (10.05) The project is within the Transit Overlay District, however, there is no proposed change to existing sidewalk connections or transit to and from the site. The site was previously approved for general office with 54,459 SF of gross floor area (GFA) and traffic generation numbers have not changed since that approval, however, have increased 478 Blair Park Road Williston, VT 05495 802 879 6331www.tcevt.com42 Mapleville Depot Road St. Albans, VT 05478 802 528 5116 Civil Engineering Environmental Services Land Surveying Landscape Architecture 19-099 REARCH PARKING EXPANSION124 TECHNOLOGY PARK WAY, SOUTH BURLINGTON,VTSITEPLAN AND CONDITIONAL USE REVIEWNOVEMBER2020 2 from the most recent Commercial Parking use. Peak traffic generation based on the ITE 10th Generation Manual for 54,459 GFA for general office is 63 AM trips and 63 PM trips. Off-Street Parking & Loading (13.01) & Bicycle Parking (13.14) The site had been previously approved for a General Office use with 54,459 GFA with an approved 191 parking spaces, 6 accessible parking spaces, 9 fuel efficient vehicle spaces, and 10 bicycle parking spaces. With this application, the applicant proposes only to increase the standard parking spaces by 59 for a total of 250 spaces. In Spring of 2019, 124 Technology Park Way, LLC entered into a Lease Agreement with Government Services Administration (GSA) for all the 54,408 sf of space within the office building located at 124 Technology Park Way in South Burlington for a 10 year base term. As part of the initial lease agreement GSA requested 316 parking spaces at the location or within a quarter mile of the building. There are currently 191 parking spaces on the current lot and they we were hoping to provide the additional spots within one of the parking lots at 55 Community Drive or 30 Community Drive. GSA did not accept this permanently given the distance and Tech Park did not want to encumber other buildings with additional parking requirements for 124 TPW building. They were then able to negotiate with GSA and have a Lease Amendment signed (attached) reducing the number of required parking spaces from 316 to 250, assuming they are able to construct the additional 59 on the premises. They had already been successful is pushing to reduce their initial parking requirement. GSA has an employee count that will support the additional space when up and running. The proposed parking area expansion is located between the existing building and existing parking area and will square off the existing parking lot as infill development. Due to the existing development, this is the preferred location for the parking expansion as the only other potential location would expand parking further towards Kimball Ave and have a more significant effect on the existing parking lot circulation. The parking expansion will be screened by additional plantings between the parking area and both Kimball Ave and Community Drive. Under Section 14.06B(2)(b)(iv) of the Land Development Regulations, the DRB may approve parking between a building and public street if parking cannot be provided to the rear or side of a building due to the building being existing. Additionally, the future Technology Park development plans may be considered a campus style “quad” with significant green space between buildings as per Section 14.06B(2)(b)(v). 19-099 REARCH PARKING EXPANSION124 TECHNOLOGY PARK WAY, SOUTH BURLINGTON,VTSITEPLAN AND CONDITIONAL USE REVIEWNOVEMBER2020 3 Wetland Protection Standards and Review Procedures (12.02) A class II wetland exists on the property and is proposed to be impacted by the parking expansion, requiring wetland permitting from the State and a Conditional Use Approval from the City. TCE performed a wetland delineation in late August of 2020, which has been approved by the State and is depicted, along with a 50’ buffer, on all design plans. As the project proposes to square off the existing parking area, with a minimum increase of 59 spaces, wetland and wetland buffer impact is unavoidable. In total, the project proposes 0.04 ac of wetland impact, 0.25 ac of wetland buffer impact and 0.07 ac of temporary impact associated with landscaping. All wetland and wetland buffer impact are illustrated on the attached Wetland Impact Plan (E1-01). Note that plantings within existing fill within the buffer are not considered impact. Due to the existing development and landscaping on the property, landscaping must be proposed within the wetland buffer. As described in additional narrative below, landscaping has been selected to best survive within the wetland buffer. Proposed wetland and wetland buffer impacts have been minimized through subsurface stormwater treatment and the use of a retaining wall to limit grading. Impacts to potential flood storage and stormwater treatment provided by the wetland are mitigated from the proposed stormwater treatment system described below. The applicant is applying for an Individual Wetland Impact permit concurrently with this application. Stormwater Management (12.03) Due to the expanded impervious area and the proposed removal of a stormwater treatment practice, the project proposes changes to the on-site stormwater treatment system requiring State and local review. The project site is currently permitted under State stormwater permit 1-1458.0011 which includes discharges from both 88 and 124 Technology Park Way. Under the State permit, the first inch of runoff from both properties is treated within one of two treatment wetlands on 124 Technology Park Way with detention of the larger rain events within a Detention Pond/Class II Wetland with discharge to the stormwater impaired Potash Brook. While no changes are proposed to the stormwater wetland associated with 88 Technology Park Way, the project does propose to remove the stormwater wetland which treats runoff from 124 Technology Park Way an provide upgraded treatment for the full water quality volume associated with 124 Technology Park Way. The project property, 124 Technology Park Way, is currently developed with 2.15 ac of impervious surfaces between rooftop and parking areas and the project proposes to 19-099 REARCH PARKING EXPANSION124 TECHNOLOGY PARK WAY, SOUTH BURLINGTON,VTSITEPLAN AND CONDITIONAL USE REVIEWNOVEMBER2020 4 add 0.45 ac of impervious parking for a total of 2.60 ac impervious. As this project site also falls under jurisdiction of the 3-ac (3-9050) stormwater regulations, the proposed stormwater system has been designed for full compliance with these regulations, bringing all 2.60 ac up to current regulations. The project proposes to replace the existing stormwater wetland with a stormwater treatment system developed by Contech called the StormFilter. The StormFilter is a pre-approved treatment device by the State Stormwater Program and is ranked for Tier 2 removal rates. The StormFilter is designed to treat the 1”, 24-hour rain event (WQv) from all impervious surfaces. In addition to the StormFilter the project proposes 8,950 CF of upstream detention within 42” storage pipe below the proposed parking expansion. Pre-treatment for the expanded impervious areas is provided by three deep sump catch basins. Runoff during rain events larger than the 1” storm from existing impervious will continue to bypass water quality treatment and will discharge to the existing dry detention pond for detention of the 1-year and 10-year rain events . Runoff from the proposed parking expansion will flow to the sub-surface detention and StormFilter during large rain events and will discharge to the dry detention pond for additional detention. The applicant is applying for a State stormwater permit concurrently with this permit application. The Stormwater Plan (C4-01) and subsequent detail sheets (C8-02 and C8-03) further illustrate the proposed stormwater treatment. Landscaping (13.06) The proposed parking lot expansion involves the removal of several trees and shrubs that are required to be replaced per section 13.06(I.) Landscape Maintenance in South Burlington’s Land Development Regulations (LDRs). First, the trees proposed to be removed were identified by species and their current size in Diameter at Breast Height (DBH) was documented. With this information, the trees proposed to be removed were evaluated for what replacements would be made. Per the LDRs, replacements are proposed as either (a) in kind replacement that replace trees with the same species, or (b) value replacements. Value replacements have been determined by using the Purdue University’s Department of Horticulture ad Cooperative Extension Service guidance for appraising and calculating the monetary value of landscape plants. Specifically, this methodology is outlined in Landscape Tree Appraisal by Michael N. Dana (Rev 3/00), and Tree Appraisal and the Value of Trees by Lindsey Purcell and Jeffrey Ling (2019). The Landscape Plan (LA-01) illustrates the proposed landscape planting that utilizes both in kind replacements and value replacements. A varied list of tree species is proposed to promote a diverse species make up on the site, while maintaining the 19-099 REARCH PARKING EXPANSION124 TECHNOLOGY PARK WAY, SOUTH BURLINGTON,VTSITEPLAN AND CONDITIONAL USE REVIEWNOVEMBER2020 5 current landscape aesthetic onsite. New plantings have been located around the new parking area and in areas there are currently gaps in planted areas, or where additional plantings would bolster existing plant groups. New species (i.e. plantings proposed as value replacements, not in kind replacements) have been selected for specific site conditions, including soils, water availability, salt, sun exposure, etc. Plantings in the wetland buffer areas tolerate wet soils, and plantings near the stormwater basins are appropriate for varying soil moisture levels. The LA-01 Landscape Plan represents the total replacements (using in kind and value metrics) required based on South Burlington’s LDRs. Construction & Opinion of Probable Cost The project is expected to go through local and State permitting within the 2020/2021 winter with an expected construction start in the Spring of 2021. The proposed construction involves approximately 2,500 cubic yards of fill, however, the need for imported material is significantly reduced due to the subsurface stormwater treatment areas. While the project does not require a State Construction General Permit, construction will comply with the Low Risk Handbook and silt fence will be installed down gradient from all disturbance as shown on the attached plans. Total expected construction cost is $500,000 and should be complete by Fall 2021 if not sooner. SSSSSSSSSSSD D D D D D D D D D D D D DD D D D D DDDDDD D D D D D DDDDDDD D D D DDDDD D D D D D WWWW W W W W W W W W W W W W W W W W W W W W W W W W W W FO FO FO FO FO FO FO W W W W W W WW W W W W W WFDFDFDSSSSSUPUP(2)UP(2) UP(2) UP(2) UP(2) UP(2) UP UP UP UP CTVCTVCTVCTVCTVUPUPUPUPUPUPUPUPUPUPUPUPCTV CTV CTVCTV CTV CTV CTV UP(2) UP(2) UP(2) UP(2) UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UTUTUTUTUTUTUTUTUTUT UT UPSSSSSSSSS S S S S S GGGGGGGGGGGGGGG G G G G G G G G G G G G G S(2) (2) (2 ) (2 ) (2)UP(2)UP(2)UP(2)UP(2)UP(2)UP(2)(2)(2)(2) D D D D D D D D DDDDDDDD D DSMH 3 RIM=343.3 iIN(E)(8)=339.6 iOUT=339.5 DMHRIM=339.32 iIN=335.39 iOUT=335.34SUMP=334.82 WETLAND OUTLET RIM=336.21 iIN(3 PIPES)=334.23 iOUT=334.03SUMP=331.71 CB RIM = 345.10' CLASS 2 WETLAND 50' WETL A N D BUFFER ( S T A T E & LOCA L )SHUNPIKE RDKIMBALL AV E N U E 45' SETBACK17.5'SETBACK 65' SETBACK17.5'SETBACK 124 TECHNOLOGY PARKWAY EXISTING BUILDING CONCRETE SIDEWALKSTORMWATER SYSTEM DMH #9RIM=342.94 iIN(15)=335.30 iIN(12)=335.94 iOUT(18)=335.12 18 " H D P E 15" HDPECB #5 RIM=342.61 iIN=337.0 iOUT=336.4 CB #6 RIM=343.8 iIN(12)=338.6 iIN(4)=339.2 iOUT=338.3 DMH #1RIM=347.43iIN(x2)=340.60 iIN(8)=340.50 iOUT=340.53 12" HDPE CB #10 RIM=339.89 iOUT=336.49SUMP=334.14 CB #11RIM=337.08 iIN(15)=334.03 iOUT(18SW)=333.33 iOUT(12W)=????SUMP=330.58 15" HDPE18" HDPE 12" HDP E WETLAND OUTLETRIM=334.21 iIN(3X3")=332.71 iOUT=331.41 SUMP=330.71 12" HD P E CB #4 RIM=336.26i(2)=333.68 iOUT=333.45 SUMP=330.9 2" P VC 12" HDP E DMH #8RIM=339.51 iIN(8)=334.21 iIN(12)=333.16 iOUT=332.88SUMP=332.46 12" HDPE8" PVCi=332.66 12" HDPE i=342.5912"HDPE8" PVCCB RIM = 347.0' CB RIM = 348.7' CB RIM = 345.1' CB RIM = 344.2' CBRIM = 346.25' 18" = 336.86 15"S = 336.96 15"E = 339.748" = 340 CB RIM = 350.0' YD RIM = 346.9' YDRIM = 347.2' ELECTRIC PAD CONDUIT FORTELECOM PAD 12" YARD DRAIN i=375.9 8" PVC8"PVC6" PVCL=249' s=0.004 FT/FT8" PVCL=144' s=0.004 FT/FT8" PVCL=137' s=0.0 0 3 F T / F T 8" PVC L=176' s=0. 0 0 4 F T / F T 8" PVC12"HDPEi=334.20 i=334.00 SMH 5RIM=348.26iOUT=340.91 iIN=340.83 SMH 1 (ASSUMED INV) RIM=348.51 iIN(SW)(8)=338.08iOUT=337.98 SMH 2 RIM=344.83 iIN(S)(8)=339.16iOUT=339.06 SMH 4RIM=346.20 iIN(E)(8)=340.20 iOUT=340.20 i=333.71 H V A C ELECTRIC PULLBOX TBMTCE POINT #22366"X" TOP OF BOLT ELEV.=341.63 i=333.60 8" CLASS 5 2 W A T E R M A I N APPROX. LOCATION FLAGPOLE TECHNOLO G Y P A R K W A Y 12" HDPE 12" HDPE DD 9 3 30 13 21 22 22 35 32 50' WETLAND BUFFER 35235135 1350 350 350 3 4 9 349 34 9 3493483 4 8 348347347347346346346345345345344 344344344343 343 343342 342342342 341 341 341 341341 340 340340 339 339339 338 338338338 338 337 337 33 7 337337 3363 3 6 3363363 3 5 335335 335 3 3 4 334334 334 333 333333332tax map no. 1260-00200 TECHNOLOGY PARK CAMPUS LLC v. 898 p. 210 map slide 510map slide 541 9.10 Ac. TECHNOLOGY PARK CAMPUS LLC v. 898 p. 210 map slide 510 map slide 541 7.90 Ac. tax map no. 1713-00124TECHNOLOGY PARK WAY LLC v. 812 p. 269 map slide 5105.00 Ac. TECHNOLOGY PARK CAMPUS LLC v. 898 p. 210map slide 510 map slide 541 3.98 Ac. 0 Feet Graphic Scale 30 30 60 90 120 15°±VT GridMagneticSheet Title Project Title Use of These Drawings Scale: Project Number: Date: Drawn By: Project Engineer: Approved By: No. Description Date By Revisions 478 BLAIR PARK ROAD | WILLISTON, VERMONT 05495 802 879 6331 | WWW.TCEVT.COM ENGINEERING SURVEY No. 9020CIVILABIGAIL A. D E R YSTATE O F VERM O N T PROF ESSIONAL E N G INEERLICEN S E D Field Book: For Local Permitting Only 1. Unless otherwise noted, these Drawings are intended for preliminary planning, coordination with other disciplines or utilities, and/or approval from the regulatory authorities.  They are not intended as construction drawings unless noted as such or marked approved by a regulatory authority. 2. By use of these drawings for construction of the Project, the Owner represents that they have reviewed, approved, and accepted the drawings, obtained all necessary permits, and have met with all applicable parties/disciplines, including but not limited to, the Engineer and the Architect, to insure these plans are properly coordinated including, but not limited to, contract documents, specifications, owner/contractor agreements, building and mechanical plans, private and public utilities, and other pertinent permits for construction. 3. Owner and Architect, are responsible for final design and location of buildings shown, including an area measured a minimum five (5) feet around any building and coordinating final utility connections shown on these plans. 4. Prior to using these plans for construction layout, the user shall contact TCE to ensure the plan contains the most current revisions. 5. These Drawings are specific to the Project and are not transferable. As instruments of service, these drawings, and copies thereof, furnished by TCE are its exclusive property.  Changes to the drawings may only be made by TCE. If errors or omissions are discovered, they shall be brought to the attention of TCE immediately. 6. It is the User's responsibility to ensure this copy contains the most current revisions. PLANNING ENVIRONMENTAL    NOTES: Existing Conditions Plan C1-01 11/04/2020 1" = 30' 19-099 RMP AAD      124 Technology Park Way South Burlington, Vermont2012100 1. AERIAL IMAGERY FROM VERMONT CENTER FOR GEOGRAPHIC INFORMATION (2018). 2. PLANT INVENTORY BY TRUDELL CONSULTING ENGINEERS LANDSCAPE ARCHITECT, MAY 13, 2019. 3. THE LOCATION OF EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS SHOWN ARE BASED ON RESEARCH, UTILITY PLANS PROVIDED BY OTHERS, AND/OR SURFACE EVIDENCE ENCOUNTERED AND WERE OBTAINED IN A MANNER CONSISTENT WITH THE ORDINARY STANDARD OF PROFESSIONAL CARE AND HAVENOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR THE DESIGN ENGINEER. ADDITIONAL UTILITIES NOTSHOWN MAY EXIST. ENGINEER SHALL BE NOTIFIED IF ANY DISCREPANCIES ARE ENCOUNTERED. ACTUAL LOCATION OF UNDERGROUND UTILITIES MAY VARY. DIGSAFE MUST BE CONTACTED PRIOR TO ANY EXCAVATION. CALL 1-888-DIG SAFE (344-7233).UNDERGROUND UTILITY LINES SHOWN ARE BASED ON ABOVE GROUND STRUCTURES AND PLANS OF RECORD. ACTUAL LOCATION OF UNDERGROUND LINES MAY VARY. 4. THE WETLAND DELINEATION SHOWN ON THIS PLAN WAS PERFORMED ON 08/26/2020, ACCORDING TOSTANDARDS OF THE 1987 US ARMY CORPS OF ENGINEERS AND THE 2012 REGIONAL SUPPLEMENT. THIS DELINEATION WAS PERFORMED BY BRITTANY LEBEAU OF TRUDELL CONSULTING ENGINEERS. 5. BOUNDARY BASED ON SUBDIVISION PLAT BY TRUDELL CONSULTING ENGINEERS ENTITLED "SUBDIVISION PLAT, TECHNOLOGY PARK, 55 COMMUNITY DRIVE, SO. BURLINGTON, VT" DATED 10/30/14. 6. TOPOGRAPHIC INFORMATION SHOWN IS BASED ON FIELD OBSERVATIONS CONDUCTED IN 2007, 2012, 2018,2019 AND 2020. 7. TOTAL EXISTING LOT COVERAGE = 47.43%. 2 89 PROJECT LOCATION SSSSSSSSSSSSSD D D D D D D D D D D D DD D D DDDDDD D D D D D DDDDDDD D D D DDDDD D D D D D WWWW W W W W W W W W W W W W W W W W W W W W W W W W W FO FO FO FO FO FO FO FO FO W W W W W W WW W W W W OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP FD FD FDFDFDFDFD SSSSSUP UP UP UP(2)UP(2) UP(2) UP(2) UP(2) UP(2) UP UP UP UP CTVCTVCTVCTVCTVUPUPUPUPUPUPUPUPUPUPUPUPCTVCTV CTVCTV CTV CTV CTV UP(2) UP(2) UP(2) UP(2) U T ( 2 ) UD UD UD UD UD UD UD UD UDFD FD FDUT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UTUTUTUTUTUTUTUTUTUT UPSSSSSSSSS S S S S GGGGGGGGGGGGGGG G G G G G G G G G G G S(2) (2) (2) (2 ) (2)UP(2)UP(2)UP(2)UP(2)UP(2)UP(2)(2)(2)(2)UT(2)D D D D D D D DDDDDDDD D DCLASS 2WETLAND SHUNPIKE RDKIMBALL AV E N U E 124 TECHNOLOGY PARKWAY EXISTING BUILDING CONCRETE SIDEWALKSTORMWATER SYSTEM 12"HDPEAPPROX. LOCATION FLAGPOLE TECHNOLOG Y P A R K W A Y D D 13 11 14 13 9 3 30 13 21 22 22 35 32 DDDDD D D D 50' WETLAND BUFFER FD 35135 1350 350 3 4 9 349 34 93483 4 8 348347347347346346346345345345344 344344344343 343 343342 342342342 341 341 341 341341 340 340340 339 339339339 338 338338338 338 337 337 33 7 337337337 3363363 3 6 336336336 3 3 5 335335 335 3 3 5 3343 3 4 334334 334 333333 333333332TECHNOLOGY PARK CAMPUS LLC v. 898 p. 210map slide 510 map slide 541 4.49 Ac. tax map no. 1260-00200 TECHNOLOGY PARK CAMPUS LLC v. 898 p. 210map slide 510 map slide 541 9.10 Ac. TECHNOLOGY PARK CAMPUS LLC v. 898 p. 210 map slide 510 map slide 5417.90 Ac. tax map no. 1713-00124 TECHNOLOGY PARK WAY LLC v. 812 p. 269 map slide 5105.00 Ac. TECHNOLOGY PARK CAMPUS LLCv. 898 p. 210 map slide 510 map slide 541 3.98 Ac. TBM TCE POINT #22366 "X" TOP OF BOLTELEV.=341.63 OVERLAY PROPOSED PARKING EXPANSION(SHOWN SHADED)18'9'24'D0 Feet Graphic Scale 30 30 60 90 120 15°±VT GridMagneticSheet Title Project Title Use of These Drawings Scale: Project Number: Date: Drawn By: Project Engineer: Approved By: No. Description Date By Revisions 478 BLAIR PARK ROAD | WILLISTON, VERMONT 05495 802 879 6331 | WWW.TCEVT.COM ENGINEERING SURVEY No. 9020CIVILABIGAIL A. D E R YSTATE O F VERM O N T PROF ESSIONAL E N G INEERLICEN S E D Field Book: For Local Permitting Only 1. Unless otherwise noted, these Drawings are intended for preliminary planning, coordination with other disciplines or utilities, and/or approval from the regulatory authorities.  They are not intended as construction drawings unless noted as such or marked approved by a regulatory authority. 2. By use of these drawings for construction of the Project, the Owner represents that they have reviewed, approved, and accepted the drawings, obtained all necessary permits, and have met with all applicable parties/disciplines, including but not limited to, the Engineer and the Architect, to insure these plans are properly coordinated including, but not limited to, contract documents, specifications, owner/contractor agreements, building and mechanical plans, private and public utilities, and other pertinent permits for construction. 3. Owner and Architect, are responsible for final design and location of buildings shown, including an area measured a minimum five (5) feet around any building and coordinating final utility connections shown on these plans. 4. Prior to using these plans for construction layout, the user shall contact TCE to ensure the plan contains the most current revisions. 5. These Drawings are specific to the Project and are not transferable. As instruments of service, these drawings, and copies thereof, furnished by TCE are its exclusive property.  Changes to the drawings may only be made by TCE. If errors or omissions are discovered, they shall be brought to the attention of TCE immediately. 6. It is the User's responsibility to ensure this copy contains the most current revisions. PLANNING ENVIRONMENTAL 1 XX/XX/XX XXXRevisions to Plan    Overall Site Plan C2-01 11/04/2020 1" = 30' 19-099  RMP AAD      124 Technology Park Way South Burlington, Vermont2012100 PROJECT INFORMATION OWNER: 124 TECHNOLOGY PARK WAY, LLC 88 TECHNOLOGY PARK WAY, SUITE 2 SOUTH BURLINGTON, VT 05403 PHONE: (802) 863-8727 ZONE: MIXED INDUSTRIAL/COMMERCIAL TOTAL LOT SIZE:217,800 SF 5.0 AC BUILDING FOOTPRINT: 18,153 SF BUILDING GROSS FLOOR AREA: 54,459 SF TOTAL EXISTING PARKING SPACES FOR APPROVED OFFICE: 191ACCESSIBLE SPACES: 6FUEL EFFICIENT VEHICLE SPACES: 9 BICYCLE SPACES: 10 TOTAL PROPOSED PARKING SPACES:250 LOT COVERAGE:EXISTING PROPOSED BUILDING: 8.33% 8.33%ALL IMPERVIOUS: 44.5% 53.5% FRONT YARD: 16.3% 16.3% 2 89 PROJECT LOCATION PROJECT AREA DDDDDDDDDDDDDDD D D D D D D D D D D D D WW W W W W W W W W WFDFDFDFDFDFDFDFDFDFDFDFDFDUP(2) UP(2) UP(2) UP(2) UP(2) CB #11 RIM=337.08 iIN(15)=334.03 iOUT(18SW)=333.33 iOUT(12W)=???? SUMP=330.58 15" HDPE 2" P VC 8" PVCTBM TCE POINT #22366 "X" TOP OF BOLT ELEV.=341.63 12" HDP E D 13 11 14 13 13 35 DDDDDDDDDDDDDDD D D D D D D D D D D D D CONCRETE BLOCKRETAINING WALL T.W. = 338.5B.W. = 335.0 T.W. = 337.8B.W. = 333.5 T.W. = 337.8B.W. = 333.0 T.W. = 339.0B.W. = 337.0 FD FD FD FD FD SILT FENCE (TYP.) LIMITS OF DISTURBANCE (0.60 AC) STORMFILTERRIM = 338.0 iIN (12) = 333.17iOUT (12) = 332.42 DMH #2ARIM = 338.6iIN (12N) = 334.8iIN (12S) = 333.4iIN (18NE) = 333.4iOUT (18W) = 333.37SUMP = 329.37 DEEP SUMP PRE-TREATMENTCB #2ARIM = 337.4iOUT (12) = 334.67SUMP = 330.67 DMH #1ARIM = 339.4iIN (8S) = 334.02ASSUMEDiIN (12SW) = 333.88iOUT (12N) = 333.85iOUT (12W) = 334.60SUMP = 331.85 iOUT (18SW) = 333.65iOUT (12W) = 334.65 DEEP SUMP TREATMENTCB #1ARIM = 338.2 iOUT (12) = 335.2SUMP = 331.2 CO #1 i = 334.2 341339338337336336 335 334 333tax map no. 1713-00124TECHNOLOGY PARK WAY LLC v. 812 p. 269 map slide 510 5.00 Ac. TBM TCE POINT #22366 "X" TOP OF BOLT ELEV.=341.63 12" HDPE S = 0. 0 0 518'9'24'CONCRETE CURB(TYPICAL) 12" HDPE S=0.005 SA W C U T SA W C U T12" HDPE12" HDPE S=0.005CONCRETE CURBTO BE REPLACEDIF NEEDED 18" HDPE S=0.005DDDD12" HDPE S=0.005D18" HDPE SAWCUT SAWCUT INSTALL TREEPROTECTION INSTALL TREE PROTECTION 0 Feet Graphic Scale 10 10 20 30 40 15°±VT GridMagneticSheet Title Project Title Use of These Drawings Scale: Project Number: Date: Drawn By: Project Engineer: Approved By: No. Description Date By Revisions 478 BLAIR PARK ROAD | WILLISTON, VERMONT 05495 802 879 6331 | WWW.TCEVT.COM ENGINEERING SURVEY No. 9020CIVILABIGAIL A. D E R YSTATE O F VERM O N T PROF ESSIONAL E N G INEERLICEN S E D Field Book: For Local Permitting Only 1. Unless otherwise noted, these Drawings are intended for preliminary planning, coordination with other disciplines or utilities, and/or approval from the regulatory authorities.  They are not intended as construction drawings unless noted as such or marked approved by a regulatory authority. 2. By use of these drawings for construction of the Project, the Owner represents that they have reviewed, approved, and accepted the drawings, obtained all necessary permits, and have met with all applicable parties/disciplines, including but not limited to, the Engineer and the Architect, to insure these plans are properly coordinated including, but not limited to, contract documents, specifications, owner/contractor agreements, building and mechanical plans, private and public utilities, and other pertinent permits for construction. 3. Owner and Architect, are responsible for final design and location of buildings shown, including an area measured a minimum five (5) feet around any building and coordinating final utility connections shown on these plans. 4. Prior to using these plans for construction layout, the user shall contact TCE to ensure the plan contains the most current revisions. 5. These Drawings are specific to the Project and are not transferable. As instruments of service, these drawings, and copies thereof, furnished by TCE are its exclusive property.  Changes to the drawings may only be made by TCE. If errors or omissions are discovered, they shall be brought to the attention of TCE immediately. 6. It is the User's responsibility to ensure this copy contains the most current revisions. PLANNING ENVIRONMENTAL 1 XX/XX/XX XXXRevisions to Plan    Site Plan C2-02 11/04/2020 1" = 10' 19-099 RMP AAD      124 Technology Park Way South Burlington, Vermont20121002 89 PROJECT LOCATION SSSSSSSSSSSD D D D D D D D D D D D D DD D D D D DDDDDD D D D D D DDDDDDD D D D DDDDD D D D D D WWWW W W W W W W W W W W W W W W W W W W W W W W W W W W FO FO FO FO FO FO FO W W W W W W WW W W W W W W OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP FD FD FDFDFDFDFD SSSSSUP UP(2)UP(2) UP(2) UP(2) UP(2) UP(2) UP UP UP UP CTVCTVCTVCTVCTVUPUPUPUPUPUPUPUPUPUPUPUPCTV CTV CTVCTV CTV CTV CTV UP(2) UP(2) UP(2) UP(2) U T ( 2 ) UD UD UD UD UD UD UD UD UD UD UD UD FD FD FDUT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UTUTUTUTUTUTUTUTUTUT UT UPSSSSSSSSS S S S S S GGGGGGGGGGGGGGG G G G G G G G G G G G G G S(2) (2) (2 ) (2 ) (2)UP(2)UP(2)UP(2)UP(2)UP(2)UP(2)(2)(2)(2)UT(2)D D D D D D D D DDDDDDDD D DSMH 3 RIM=343.3 iIN(E)(8)=339.6 iOUT=339.5 DMHRIM=339.32 iIN=335.39 iOUT=335.34SUMP=334.82 WETLAND OUTLET RIM=336.21 iIN(3 PIPES)=334.23 iOUT=334.03SUMP=331.71 CB RIM = 345.10' CLASS 2 WETLAND 50' WETL A N D BUFFER ( S T A T E & LOCA L )SHUNPIKE RDKIMBALL AV E N U E 45' SETBACK17.5'SETBACK 65' SETBACK17.5'SETBACK 124 TECHNOLOGY PARKWAY EXISTING BUILDING CONCRETE SIDEWALKSTORMWATER SYSTEM DMH #9RIM=342.94 iIN(15)=335.30 iIN(12)=335.94 iOUT(18)=335.12 18 " H D P E 15" HDPECB #5 RIM=342.61 iIN=337.0 iOUT=336.4 CB #6 RIM=343.8 iIN(12)=338.6 iIN(4)=339.2 iOUT=338.3 DMH #1RIM=347.43iIN(x2)=340.60 iIN(8)=340.50 iOUT=340.53 12" HDPE CB #10 RIM=339.89 iOUT=336.49SUMP=334.14 CB #11RIM=337.08 iIN(15)=334.03 iOUT(18SW)=333.33 iOUT(12W)=????SUMP=330.58 15" HDPE18" HDPE 12" HDP E WETLAND OUTLETRIM=334.21 iIN(3X3")=332.71 iOUT=331.41 SUMP=330.71 12" HD P E CB #4 RIM=336.26i(2)=333.68 iOUT=333.45 SUMP=330.9 2" P VC 12" HDP E DMH #8RIM=339.51 iIN(8)=334.21 iIN(12)=333.16 iOUT=332.88SUMP=332.46 12" HDPE8" PVCi=332.66 12" HDPE i=342.5912"HDPE8" PVCCB RIM = 347.0' CB RIM = 348.7' CB RIM = 345.1' CB RIM = 344.2' CBRIM = 346.25' 18" = 336.86 15"S = 336.96 15"E = 339.748" = 340 CB RIM = 350.0' YD RIM = 346.9' YDRIM = 347.2' ELECTRIC PAD CONDUIT FORTELECOM PAD 12" YARD DRAIN i=375.9 8" PVC8"PVC6" PVCL=249' s=0.004 FT/FT8" PVCL=144' s=0.004 FT/FT8" PVCL=137' s=0.0 0 3 F T / F T 8" PVC L=176' s=0. 0 0 4 F T / F T 8" PVC12"HDPEi=334.20 i=334.00 SMH 5RIM=348.26iOUT=340.91 iIN=340.83 SMH 1 (ASSUMED INV) RIM=348.51 iIN(SW)(8)=338.08iOUT=337.98 SMH 2 RIM=344.83 iIN(S)(8)=339.16iOUT=339.06 SMH 4RIM=346.20 iIN(E)(8)=340.20 iOUT=340.20 i=333.71 HVAC ELECTRIC PULLBOX i=333.60 8" CLASS 5 2 W A T E R M A I N APPROX. LOCATION FLAGPOLE TECHNOLO G Y P A R K W A Y 12" HDPE 12" HDPE 10" AF 6" AF 3 CR TO REMAIN 2 CR 2 IV 1 IV 1 IVJ 2 MS 3 PG 2 PS 2 AR 3 MS 3 PG 2 AC 1 AR 1 PG 3 PS 2 PN 3 PS 1 IVJ 2 IV 3 AC 1 MS 2 AC 9 PG 2 GT 5 SP 1 CS 8 CS 2 AC 2 AC 3 CR 2 AC 3 CS 8 GT 10" QP 6 SP TO REMAIN 2 GT 8 SR 3 SR 1 PG 8" FIR 6" WHITE PINE 1 PN 1 PS 1 PG 2 PN 1 PS 62 JH (3) 4" QP (4) 4" QP 81 JH 26 FR 30 FR 81 JH 1 IV 1 PG 1 PS 1 PG 5 SP 57 FR 6" PG 10" AF 8" AF 4" AF 8" AR8" AR 6" AR 6" AF 2 SP 8" AF (2) 2" AC TO REMAIN 44 FR 61 JH 3 SR 4" SR TO REMAIN 3 SP 4" 4"4" 4" QP 9 3 30 13 21 22 22 35 32 50' WETLAND BUFFER SILT FENCE (TYP.) LIMITS OF DISTURBANCE (0.60 AC)35235135 1350 350 350 3 4 9 349 34 9 3493483 4 8 348347347347346346346345345345344 344344344343 343 343342 342342342 341 341 341 341341 340 340340 339 339339 338 338338338 338 337 337 33 7 337337 3363 3 6 3363363 3 5 335335 335 3 3 4 334334 334 333 333333332tax map no. 1260-00200 TECHNOLOGY PARK CAMPUS LLC v. 898 p. 210 map slide 510map slide 541 9.10 Ac. TECHNOLOGY PARK CAMPUS LLC v. 898 p. 210 map slide 510 map slide 541 7.90 Ac. tax map no. 1713-00124TECHNOLOGY PARK WAY LLC v. 812 p. 269 map slide 5105.00 Ac. TECHNOLOGY PARK CAMPUS LLC v. 898 p. 210map slide 510 map slide 541 3.98 Ac. TO BE REMOVED TO BE REMOVED TO BE REMOVED TO BE REMOVED TO BE RE M OVED TO BE REM O V E D 12" HDPE & 6" PVCTO BE REMOVED TREE TO BE REMOVED (TYPICAL)LIGHT POLETO BE REMOVED(TYPICAL) CURBTO BE REMOVED(TYPICAL) INSTALL TREEPROTECTION INSTALL TREE PROTECTION INSTALL TREE PROTECTION 0 Feet Graphic Scale 30 30 60 90 120 15°±VT GridMagneticSheet Title Project Title Use of These Drawings Scale: Project Number: Date: Drawn By: Project Engineer: Approved By: No. Description Date By Revisions 478 BLAIR PARK ROAD | WILLISTON, VERMONT 05495 802 879 6331 | WWW.TCEVT.COM ENGINEERING SURVEY No. 9020CIVILABIGAIL A. D E R YSTATE O F VERM O N T PROF ESSIONAL E N G INEERLICEN S E D Field Book: For Local Permitting Only 1. Unless otherwise noted, these Drawings are intended for preliminary planning, coordination with other disciplines or utilities, and/or approval from the regulatory authorities.  They are not intended as construction drawings unless noted as such or marked approved by a regulatory authority. 2. By use of these drawings for construction of the Project, the Owner represents that they have reviewed, approved, and accepted the drawings, obtained all necessary permits, and have met with all applicable parties/disciplines, including but not limited to, the Engineer and the Architect, to insure these plans are properly coordinated including, but not limited to, contract documents, specifications, owner/contractor agreements, building and mechanical plans, private and public utilities, and other pertinent permits for construction. 3. Owner and Architect, are responsible for final design and location of buildings shown, including an area measured a minimum five (5) feet around any building and coordinating final utility connections shown on these plans. 4. Prior to using these plans for construction layout, the user shall contact TCE to ensure the plan contains the most current revisions. 5. These Drawings are specific to the Project and are not transferable. As instruments of service, these drawings, and copies thereof, furnished by TCE are its exclusive property.  Changes to the drawings may only be made by TCE. If errors or omissions are discovered, they shall be brought to the attention of TCE immediately. 6. It is the User's responsibility to ensure this copy contains the most current revisions. PLANNING ENVIRONMENTAL    Demolition & EPSC Plan C5-01 11/04/2020 1" = 30' 19-099 RMP AAD      124 Technology Park Way South Burlington, Vermont2012100 WETLAND NOTE: THE WETLAND DELINEATION SHOWN ON THIS PLAN WAS PERFORMED ON 08/26/2020, ACCORDING TO STANDARDS OF THE 1987 US ARMY CORPS OF ENGINEERS AND THE 2012 REGIONAL SUPPLEMENT. THISDELINEATION WAS PERFORMED BY BRITTANY LEBEAU OF TRUDELL CONSULTING ENGINEERS. PLANTS TO BE REMOVED: 2 89 PROJECT LOCATION BARRIER TAPE SILT FENCE EPSC LEGEND Sheet Title Project Title Use of These Drawings Scale: Project Number: Date: Drawn By: Project Engineer: Approved By: No. Description Date By For Permitting Only Revisions 478 BLAIR PARK ROAD | WILLISTON, VERMONT 05495 802 879 6331 | WWW.TCEVT.COM ENGINEERING SURVEY No. 9020CIVILABIGAIL A. D E RYSTATE O F VERM O N T PROFESSIONAL E N G INEERLICEN S E D Field Book: 1. Unless otherwise noted, these Drawings are intended for preliminary planning, coordination with other disciplines or utilities, and/or approval from the regulatory authorities.  They are not intended as construction drawings unless noted as such or marked approved by a regulatory authority. 2. By use of these drawings for construction of the Project, the Owner represents that they have reviewed, approved, and accepted the drawings, obtained all necessary permits, and have met with all applicable parties/disciplines, including but not limited to, the Engineer and the Architect, to insure these plans are properly coordinated including, but not limited to, contract documents, specifications, owner/contractor agreements, building and mechanical plans, private and public utilities, and other pertinent permits for construction. 3. Owner and Architect, are responsible for final design and location of buildings shown, including an area measured a minimum five (5) feet around any building and coordinating final utility connections shown on these plans. 4. Prior to using these plans for construction layout, the user shall contact TCE to ensure the plan contains the most current revisions. 5. These Drawings are specific to the Project and are not transferable. As instruments of service, these drawings, and copies thereof, furnished by TCE are its exclusive property.  Changes to the drawings may only be made by TCE. If errors or omissions are discovered, they shall be brought to the attention of TCE immediately. 6. It is the User's responsibility to ensure this copy contains the most current revisions. PLANNING ENVIRONMENTAL     Site & Erosion Details C8-01 11/04/2020 SHOWN 19-099 ALD AAD      124 Technology Park Way South Burlington, Vermont SD-001 1" = 1' LAST REVISED 11/21/2019TRUDELL CONSULTING ENGINEERS TYPICAL BITUMINOUS PAVEMENT A C B D RESIDENTIAL 6 12 2-1/2 1-1/2 6 12 2 1 PARKING LOTS THICKNESS (INCHES) ROADS PRIVATE 2 COMMERCIAL 6 18 3 2 N/A 12 4 2 1/2 18 6 1 1/2 COMMERCIALRESIDENTIAL 6 6666E NOTES: 1. SUBBASE, SAND CUSHION AND SUBGRADE SHOULD BE CONSTRUCTED AND COMPACTED TO THE DIMENSIONS SHOWN INACCORDANCE WITH VERMONT AGENCY OF TRANSPORTATION SPECIFICATIONS, STANDARD A-76. WHERE MORE STRINGENTLOCAL ORDINANCES HAVE BEEN ADOPTED RELATIVE TO ROAD DIMENSIONS AND CONSTRUCTION, THEY SHOULD GOVERN. 2. COMPACT ALL SUBBASE MATERIALS TO 95% MAXIMUM DENSITY (STANDARD PROCTOR). 3. IF GROUNDWATER OR SOFT SPOTS ARE ENCOUNTERED CONTACT THE ENGINEER TO DISCUSS ADDED MEASURES SUCH ASUNDERDRAIN. SLOPE SUBBASE TO UNDERDRAIN LOW POINTS. DRIVEWAYS SECTION WEARING COURSE (TYPE III) (VAOT 406) BASE COURSE (TYPE II) (VAOT 406) CRUSHED GRAVEL (VAOT 704.05A FINE) GRAVEL BASE (VAOT 704.04) ORCRUSHED GRAVEL (VAOT 704.05ACOARSE) MIRAFI 500X STABILIZATION FABRICINSTALLATION IN ACCORDANCE WITHMANUFACTURER'S RECOMMENDATIONS6" SAND BORROW AND CUSHION TO BEUSED IN POORLY DRAINED SOILS OROVER BEDROCK FOR ROADS ANDSIDEWALKS (VAOT 703.03) UNDISTURBED SUBGRADEOR COMPACTED FILL A B C D E SD-004 1" = 1' LAST REVISED 5/24/2018TRUDELL CONSULTING ENGINEERS TYPICAL CURB DETAIL SLOPE BITUMINOUS PAVEMENTSEE SECTION DETAIL CONCRETE CURBCLASS B CONCRETE GRAVEL BASE CRUSHED GRAVEL MIRAFI 500X FILTER FABRIC 6" R1"18"6"TOPSOIL 12" CRUSHED GRAVEL7" REVEALSAND BORROW SD-011LAST REVISED 03/20/2013TRUDELL CONSULTING ENGINEERS PAVEMENT JOINT DETAIL 30" 1" TYPE III OVERLAY 1-1/2" TYPE III 2.5" TYPE II 6" 18" EXISTING SURFACE EXISTING PAVEMENT MATCH EXISTING HIGHWAY BASE DEPTH EXISTING BASE (ASSUME 24" DEPTH) (ASSUME 5" DEPTH) COLD PLANESAW CUTFINE-GRADED CRUSHED GRAVEL DENSE-GRADED CRUSHED STONE TRUDELL CONSULTING ENGINEERS SILT FENCE16"20"MIN.MIN.(MIRAFI ENVIROFENCE, OR APPROVEDEQUAL MAY BE SUBSTITUTED.) FILTER FABRIC, OR WOVENWIRE FABRIC WOODEN OR METAL STAKE(MAX. 10' O.C.) KEY FABRIC INTO GROUND (MIN. 6") FLOW CONSTRUCTION SPECIFICATION FOR SILT FENCE 1. WOVEN WIRE FENCE TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRETIES. WIRE FENCE REINFORCEMENT REQUIRED WITHIN 100 FT UPSLOPE OFRECEIVING WATERS.2. FILTER CLOTH TO BE FASTENED SECURELY TO WOVEN WIRE FENCE WITH TIESSPACED EVERY 24" AT TOP AND MID SECTION. FENCE SHALL BE WOVEN WIRE,6" MAXIMUM MESH OPENING.3. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHALL BEOVERLAPPED BY SIX INCHES AND FOLDED. FILTER CLOTH SHALL BE EITHERFILTER X, MIRAFI 100X, STABILINKA T140N, OR APPROVED EQUIVALENT.4. PREFABRICATED UNITS SHALL BE GEOFAB, ENVIROFENCE, OR APPROVEDEQUIVALENT.5. MAINTENANCE SHALL BE PERFORMED AS NEEDED AND MATERIAL REMOVEDWHEN SEDIMENT REACHED HALF OF FABRIC HEIGHT.6"E-102LAST REVISED 2/10/2016 E-016 NTS LAST REVISED 03/22/2017TRUDELL CONSULTING ENGINEERS PROJECT DEMARCATION/TREE PROTECTION 4'TO LIMIT THE EXTENT OF DISTURBED SOILS BY CONFINING EARTH DISTURBING ACTIVITIES TO THE APPROPRIATE AREAS. TO DIRECTLY PROTECT WATERS OF THE STATE AND VEGETATED BUFFERS SURROUNDING THEM FROM NECESSARY DISTURBANCE. WHERE THE BORDER OF AUTHORIZED DISTURBANCE BORDERS AREAS OF EXISTINGVEGETATION OR WITHIN 100 FEET OF WATERS OF THE STATE. LIMITS OF DISTURBANCE (LOD'S) SHOULD BE THE FIRST CONSTRUCTION ITEM IMPLEMENTEDON A CONSTRUCTION SITE. ALL DISTURBANCE AREAS BORDERING AREAS OF EXISTINGVEGETATION SHOULD BE DEMARCATED WITH A BARRIER APPROPRIATE TO THE LOCATION. FLAGGING RIBBON/PAINT: FOR USE WHERE PROPOSED DISTURBANCE BORDERSESTABLISHED WOODED AREAS WHERE INADVERTENT DISTURBANCE BY MACHINERY IS NOTPOSSIBLE. MARK TREES ALONG LIMIT OF CLEARING WITH FLAGGING RIBBON OR PAINT CORRESPONDING TO THE CLEARING LIMITS ON EPSC PLAN. SPACING BETWEEN RIBBON ORPAINT MARKINGS SHALL BE NO MORE THAN 50 FEET. BARRIER TAPE/ROPE: FOR USE WHERE PROPOSED DISTURBANCE BORDERS NON-WOODED, VEGETATED AREAS MORE THAN 100 FEET FROM THE NEAREST WATER RESOURCE (STREAM, BROOK, LAKE, POND, WETLAND, ETC.). BARRIER TAPE SHALL BE HIGH VISIBILITY FIBERGLASSTAPE WITH A MINIMUM WIDTH OF 3 INCHES. BARRIER TAPE SHOULD BE ATTACHED TOSTAKES, AT A MINIMUM HEIGHT OF 4 FEET FROM THE GROUND. CONSTRUCTION FENCE/SNOW FENCE/BOULDERS: FOR USE WHERE THE PROPOSEDDISTURBANCE IS WITHIN 100 FEET OF A WATER RESOURCE (STREAM, BROOK, LAKE, POND,WETLAND, ETC.), UNLESS AREA IS DENSELY WOODED. FENCE SHOULD BE CONTINUOUS AND PREVENT ACCESS TO BUFFER AREAS BY MACHINERY. BOULDER SHALL BE SPACED CLOSELY TO PREVENT MACHINERY ACCESS. TEMPORARY CHAIN-LINK FENCE: FOR USE WHERE PROPOSED DISTURBANCE IS IN CLOSE PROXIMITY TO WETLANDS (AS SHOWN ON EPSC PLANS). FENCE SHALL BE INSTALLEDDIRECTLY ON DELINEATION OF WETLAND TO ENSURE THERE IS NO DISTURBANCE TO THEWETLAND. TEMPORARY CHAIN-LINK FENCE SHALL BE INSTALLED ALONG WITH SILT FENCEAPPROXIMATELY 6-INCHES ON PROJECT SIDE. PURPOSE CRITERIA CONDITION WHERE PRACTICE APPLIES 20' MAX 4'TYPICAL BARRIER TAPE DEMARCATION TYPICAL SNOW FENCE DEMARCATION STEEL T-POST OR1 3/4-INCH SQUAREHARDWOOD POST 4-FOOT BRIGHT ORANGEBARRIER/SNOW FENCE 1.5-INCH SQUAREHARDWOOD POST 3-INCH WIDE BRIGHT ORANGEPOLYPROPYLENE ORFIBERGLASS TAPE 20' MAX. E-004LAST REVISED 6/12/2013TRUDELL CONSULTING ENGINEERS STABILIZED CONSTRUCTION ENTRANCE CONSTRUCTION SPECIFICATIONS1. STONE SIZE - USE 4-8" CRUSHED STONE, OR RECLAIMEDOR RECYCLED CONCRETE EQUIVALENT.2. LENGTH - NOT LESS THAN 50' (EXCEPT ON A SINGLERESIDENCE LOT WHERE A 30' MINIMUM LENGTHAPPLIES).3. THICKNESS - NOT LESS THAN 8".4. WIDTH - TWELVE (12) FOOT MINIMUM, BUT NOT LESSTHAN THE FULL WIDTH AT POINTS WHERE INGRESS OREGRESS OCCURS. TWENTY-FOUR (24) FOOT IF SINGLEENTRANCE TO SITE.5. GEOTEXTILES MUST BE PLACED OVER THE ENTIRE AREAPRIOR TO PLACING OF STONE.6. SURFACE WATER - ALL SURFACE WATER FLOWING ORDIVERTED TOWARDS CONSTRUCTION ENTRANCES SHALLBE PIPED BENEATH THE ENTRANCE. IF PIPING ISIMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPESWILL BE PERMITTED.7. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINEDIN A CONDITION WHICH WILL PREVENT TRACKING ORFLOWING OF SEDIMENT ONTO PUBLIC RIGHTS-OF-WAY,ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKEDONTO PUBLIC RIGHTS-OF-WAY MUST BE REMOVEDIMMEDIATELY AND DISPOSED OF IN ACCORDANCEWITH THE EPSC PLANS. (i.e. PLACED IN A SOILSTOCKPILE OR AREA WHERE IT CAN BE STABILIZED PEREPSC DETAILS). IF SWEEPING IS THE CHOSEN METHODFOR REMOVAL THE SWEPT MATERIAL MUST BECOLLECTED AND DISPOSED OF AS STATED ABOVE.8. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON ANAREA STABILIZED WITH STONE AND WHICH DRAINS INTOAN APPROVED SEDIMENT TRAPPING DEVICE.9. PERIODIC INSPECTION AND NEEDED MAINTENANCESHALL BE PROVIDED ACCORDING TO PERMITREQUIREMENTS BASED ON SITE CONDITIONS, WEATHERAND FLOW OF TRAFFIC. PUBLIC ROADWAY PROFILE EXCAVATION SITE PLAN SEE CONSTRUCTIONSPECIFICATION 4 4-8" CRUSHED STONEAGGREGATE PLACED ON GEOTEXTILE FABRIC4" ABOVE EXISTING GRADE4" BELOW EXISTING GRADE 50'VARIESR=12'8"EXCAVATION SITE EXISTING GRADE GEOTEXTILE FABRIC SW-001 1" = 1' LAST REVISED 03/22/2017TRUDELL CONSULTING ENGINEERS TYPICAL STORM DRAIN TRENCH 1' FINISHED ROAD GRADE D + 8"1' NOTES ON STORM DRAIN TRENCH:A WET TRENCH SHALL BE DEWATERED PRIOR TOINSTALLING BEDDING DEPTH OF STORM DRAIN LINES VARY, REFER TOPLANS FOR DEPTH IN APPROPRIATE LOCATIONS. D FOR PAVED SURFACES VARIES(SEE PAVEMENT SECTION)FOR GRASSED AREAS REPLACE TOPSOIL, SEED, AND MULCHOVERFILL TO ALLOW FOR SETTLEMENT. THOROUGHLY COMPACTED SELECTEDBACKFILL FROM TRENCH EXCAVATION,FREE OF STONES LARGER THAN 3" INDIAMETER. COMPACT BACKFILL IN 6" LIFTS. STORM DRAIN, (SEE SITE PLAN FOR PIPE SIZE& MATERIAL) THOROUGHLY COMPACTED 3/4" CRUSHED STONEBEDDING FOR CMP, PVC, OR HDPE PIPE. UNDISTURBED SOIL SD-042LAST REVISED 11/22/2013TRUDELL CONSULTING ENGINEERS TYPICAL GRAVITY WALL WITH 41" BLOCKS TO BE FINALIZED BY MANUFACTURER GROUND LEVEL EXPOSED WALL GROUND LEVEL PERFORATED DRAIN WITH SOCK(AS SPECIFIED BY ENGINEER) CRUSHED STONE LEVELING PAD BASE ELEVATION FREE DRAINING BACKFILL TOEXTEND AT LEAST 12" BEHIND WALL NON-WOVEN GEOTEXTILE FABRIC(IF SPECIFIED) 41" MIDDLE BLOCK 41" BOTTOM BLOCK 28" TOP BLOCK LEVELING PAD BURY DEPTH 1 5/8"SB 1 5/8"SB 1 5/8"SB 1 5/8"SB SETBACK = 1.25"(4.0° BATTER ANGLE ONWALL) WALL HEIGHT NOTE:LOAD CONDITION A SHOWN (NO BACKSLOPE - NO SURCHARGE) MOVE BLOCKS FORWARD DURING INSTALLATION TO ENGAGE SHER KNOBS (TYPICAL) SD-010 3/4" = 1'-0" LAST REVISED 03/27/2013TRUDELL CONSULTING ENGINEERS PAVEMENT CUT TRENCH6' MIN. COVER6"D+2' CL SAW CUT EXISTING PAVEMENT BITUMINOUSPAVEMENT CRUSHEDGRAVEL GRAVELBASE SAND CUSHION COMPACT BACKFILLSAME MATERIAL AS REMOVEDIN 6" LIFTS SEE SITE PLAN FOR PIPE SIZEAND MATERIALD MATCH EXISTINGROAD SECTIONUNLESS INDICATEDOTHERWISE SSSSSD D D D D D D D D D D D D D D D D D D D DDDDDDDDDD D D D D D WWWWW W W W W W W W W W W W W W W W W W W W W W W W W FO FO FO FO FO W W W W W W WW W W W W OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP FD FD FDFD SSSSSUP UP UP UP(2)UP(2) UP(2) UP(2) UP(2) UP(2) UP UP UP UP CTVCTVCTVCTVCTVUPUPUPUPUPUPUPUPUPUPUPUPCTV CTV CTVCTV CTV CTV CTV UP(2) UP(2) UP(2) UP(2) UT ( 2 ) UD UD UD UD UD UD UD UD UDFD FD FDUT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UTUTUTUTUTUTUTUTUTUT UPSSSSSSSSS S S S S GGGGGGGGGGGGGGG G G G G G G G G G G G S(2) (2) (2 ) (2 ) (2)UP(2)UP(2)UP(2)UP(2)UP(2)UP(2)(2)(2)(2)UT(2)D D D D D D D DDDDDDDD D DG CLASS 2 WETLAND 50' WETL A N D BUFFER ( S T A T E & LOCA L )SHUNPIKE RDKIMBALL AVE N U E 45' SETBACK17.5'SETBACK 124 TECHNOLOGY PARKWAYEXISTING BUILDING CONCRETE SIDEWALKSTORMWATER SYSTEM 12"HDPE8" CLASS 52 W A T E R M A I N TECHNOLO G Y P A R K W A Y 5 GT 2 SR 2 SR 5 IV1 IVM 1 AF 2 AF 9 CS 5 SJS 3 AR 1 LL 3 3 9 DDDDD D D D 2 AF 3 MS 3 SA 9 QP 3 LL 5 AG 4 CS 7 CS 3 AG 2 AG 4 CS 9 CR 50' WETLAND BUFFER 3 AG 5 SJS5 IV 339338 3 3 8 338337FD 35135 1350 35 0 3 4 9 34 9 34 93483 4 8 348347347347346346346345345345344 344344344343 343343342 342342342 341 341 341 341341 340 340340 339 339339339 338 338338338 338 337 337 3 3 7 337337 3 3 6 336336335335 334334 334 333TECHNOLOGY PARK CAMPUS LLC v. 898 p. 210 map slide 510 map slide 541 7.90 Ac. tax map no. 1713-00124 TECHNOLOGY PARK WAY LLC v. 812 p. 269 map slide 510 5.00 Ac. TECHNOLOGY PARK CAMPUS LLC v. 898 p. 210 map slide 510map slide 5413.98 Ac.337D15°±VT GridMagnetic    PLANT SCHEDULE2012100 Sheet Title Project Title Use of These Drawings Scale: Project Number: Date: Drawn By: Project Engineer: Approved By: No. Description Date By Revisions 478 BLAIR PARK ROAD | WILLISTON, VERMONT 05495 802 879 6331 | WWW.TCEVT.COM ENGINEERING SURVEY Field Book: For Local Permitting Only 1. Unless otherwise noted, these Drawings are intended for preliminary planning, coordination with other disciplines or utilities, and/or approval from the regulatory authorities.  They are not intended as construction drawings unless noted as such or marked approved by a regulatory authority. 2. By use of these drawings for construction of the Project, the Owner represents that they have reviewed, approved, and accepted the drawings, obtained all necessary permits, and have met with all applicable parties/disciplines, including but not limited to, the Engineer and the Architect, to insure these plans are properly coordinated including, but not limited to, contract documents, specifications, owner/contractor agreements, building and mechanical plans, private and public utilities, and other pertinent permits for construction. 3. Owner and Architect, are responsible for final design and location of buildings shown, including an area measured a minimum five (5) feet around any building and coordinating final utility connections shown on these plans. 4. Prior to using these plans for construction layout, the user shall contact TCE to ensure the plan contains the most current revisions. 5. These Drawings are specific to the Project and are not transferable. As instruments of service, these drawings, and copies thereof, furnished by TCE are its exclusive property.  Changes to the drawings may only be made by TCE. If errors or omissions are discovered, they shall be brought to the attention of TCE immediately. 6. It is the User's responsibility to ensure this copy contains the most current revisions. PLANNING ENVIRONMENTAL Landscape Plan L1-01 11/04/2020 1" = 30' 19-099    AAD      124 Technology Park Way South Burlington, Vermont 0 Feet Graphic Scale 30 30 60 90 120 Sheet Title Project Title Use of These Drawings Scale: Project Number: Date: Drawn By: Project Engineer: Approved By: No. Description Date By Revisions 478 BLAIR PARK ROAD | WILLISTON, VERMONT 05495 802 879 6331 | WWW.TCEVT.COM ENGINEERING SURVEY Field Book: For Local Permitting Only 1. Unless otherwise noted, these Drawings are intended for preliminary planning, coordination with other disciplines or utilities, and/or approval from the regulatory authorities.  They are not intended as construction drawings unless noted as such or marked approved by a regulatory authority. 2. By use of these drawings for construction of the Project, the Owner represents that they have reviewed, approved, and accepted the drawings, obtained all necessary permits, and have met with all applicable parties/disciplines, including but not limited to, the Engineer and the Architect, to insure these plans are properly coordinated including, but not limited to, contract documents, specifications, owner/contractor agreements, building and mechanical plans, private and public utilities, and other pertinent permits for construction. 3. Owner and Architect, are responsible for final design and location of buildings shown, including an area measured a minimum five (5) feet around any building and coordinating final utility connections shown on these plans. 4. Prior to using these plans for construction layout, the user shall contact TCE to ensure the plan contains the most current revisions. 5. These Drawings are specific to the Project and are not transferable. As instruments of service, these drawings, and copies thereof, furnished by TCE are its exclusive property.  Changes to the drawings may only be made by TCE. If errors or omissions are discovered, they shall be brought to the attention of TCE immediately. 6. It is the User's responsibility to ensure this copy contains the most current revisions. PLANNING ENVIRONMENTAL     Landscape Details L1-02 11/04/2020 1" = 30' 19-099    AAD      124 Technology Park Way South Burlington, Vermont L-020 SHRUB PLANTING TRUDELL CONSULTING ENGINEERS LAST REVISED 02/10/2020 SPACING "D"ROW "A"NUMBER OFPLANTS/SQ. FT. 5' O.C. 4' O.C. 36" O.C. 30" O.C. 24" O.C. 41.52" 31.20" 26.00" 20.76" 51.96" 0.28 0.18 0.04 0.12 0.07 D A D D D A D 1'-0" MIN SEE PLANFOR SPACINGSEE SPECS.FOR DEPTHCONTINUOUS PLANTING PIT FILLED WITH PLANTING MIXREFER TO SOIL PREPARATION SPECIFICATIONS SHRUB ROOTBALL MULCH, AS SPECIFIED FINISH GRADE PLANT SPACING PLANT CENTER PLANT ROW ALL EQUAL ORAS SHOWN ONPLANTING PLAN NOTE:1. QUANTITY OF SHRUBS AND SPACING AS NOTEDIN PLANTING SCHEDULE.2. CONTINUOUS PLANTING PITS FILLED WITHPLANTING MIX PER THE DEPTH AS NOTED IN THESPECIFICATIONS IS REQUIRED. SUB GRADE L-021 PERENNIAL PLANTING LAST REVISED 02/10/2020TRUDELL CONSULTING ENGINEERS SEE PLANTING LIST FOR PLANT SPACING 2"PLANT SPACING PLANT CENTER PLANT ROW SEE PLANTING PLAN FORSPACING AND QUANTITIES SET AT ORIGINAL PLANTING DEPTH FINISH GRADE MULCH AS SPECIFIED CONTINUOUS PLANTING PITFILLED WITH PLANTING MIXREFER TO SOIL PREPARATIONSPECIFICATIONS SUB GRADE L-022 1" = 1'LAWN SEEDING LAST REVISED 02/11/20TRUDELL CONSULTING ENGINEERS NOTE: ALL DISTURBED AREAS SHALL BE LOAMEDAND SEEDED UNLESS NOTED OTHERWISE6"SEED AS SPECIFIED PLANTING SOIL MIX,(ROLLED THICKNESS) FREE DRAINING,SCARIFIEDSUBGRADE L-023 1" = 1'GROUNDCOVER LAST REVISED 03/26/2020TRUDELL CONSULTING ENGINEERS12" MIN.2" BARKGROUNDCOVER MULCH PLANTING SOIL MIX FREE DRAINING,SCARIFIED SUBGRADE L-026 1/2" = 1'EVERGREEN TREE PLANTING TRUDELL CONSULTING ENGINEERS LAST REVISED 03/26/2020 12" LENGTH SET BYHEIGHT OFROOTBALL 3 1 2" SHREDDED BARK MULCH, AS SPECIFIED(HOLD MULCH OFF ROOT FLARE) 2"X2"X10' FIR STAKES , STAINED BLACK; 3 PER TREEEQUALLY SPACED AROUND ROOT BALL; ALL POSTS SHALLBE PLUMB AND HAVE SAME HEIGHT ABOVE FINISHGRADE. GUY WIRE SHALL BE NEW PLIABLE ANNEALEDGALVANIZED SOFT STEEL WIRE OF NO. TEN(10) GAUGESIZE. ENCASE WIRE AROUND TRUNK IN TWO-PLY, BLACK,REINFORCED RUBBER GARDEN HOSE TREE SHALL BE PLANTED WITH TOP OF ROOTBALLBEARING THE SAME RELATIONSHIP TO FINISHED GRADEAS TO PREVIOUS EXISTING GRADE. TREE SHALL BEPLUMB AFTER SETTLEMENT.4'PLANTING SOIL MIX ROLL BURLAP BACK FROM TOP 1/3 OFROOTBALL BEFORE BACKFILLING. UNTIEROPE FROM TRUNK. FREE DRAINING SCARIFIED SUBGRADE L-028 SHRUB PLANTING LAST REVISED 02/29/2020TRUDELL CONSULTING ENGINEERS12" MIN.PLACE SHRUBS PERPENDICULAR TO GRADE CURB 2" BARK MULCH: PULL MULCH AWAY FROM BASE OF SHRUB,HOLD TOP OF SETTLED MULCH 1" BELOW CURB PLANTING SOIL MIX THROUGHOUTENTIRE PLANTING AREA FINISH GRADE PLACE ROOTBALLON COMPACTEDSUBGRADE FREE DRAINING SCARIFIEDUNDISTURBED SUBGRADE 1" = 1' L-029 1" = xx' LAST REVISED 02/26/2020TRUDELL CONSULTING ENGINEERS TREE PROTECTION FOR TREES TO REMAIN WITHIN LIMIT OF LANDSCAPEWORK AREA: CONTRACTOR SHALL CONTACT ARBORIST PRIOR TODEMOLITION TO PERFORM RECOMMENDED TREATMENTS(FERTILIZER, ROOT PRUNE, ETC.) ON SPECIMEN TREES TOREMAIN BEFORE BEGINNING DEMOLITION. PLAN VIEW EXISTINGTREE EXISTINGTREE 6' MIN. SECTION VIEW PRUNE PER ISA STANDARDS. REMOVE DEAD &DAMAGED BRANCHES. TIE BRANCHES UP TO AVOIDDAMAGE FROM CONSTRUCTION EQUIPMENT. EXISTING TREE (S)LIMIT OF DRIPLINE(VARIES)WOODEN OR METAL POSTS (TYPICAL) INSTALL FENCING AT EDGE OF DRIPLINE OR AS FARFROM TRUNK AS POSSIBLE. MIN. DISTANCE IS 6' FROMTRUNK. MAY BE PLASTIC SNOW FENCE OR CHAINLINK, MIN. 4' HIGH. ZONE OF CONSTRUCTION IMPACT (CUT/FILL) PRUNE DAMAGED OR EXPOSED ROOTSDAMAGED WITH A SHARP SAW.LIMIT OF FENCING(INDIVIDUAL TREE) LIMIT OF FENCING (MULTIPLE TREES) EXISTING GRADE LIMIT OF CONSTRUCTION IMPACT (REFER TO PLANS) LIMIT OF FENCE (INDIVIDUAL TREE) LIMIT OFCANOPY(VARIES) LIMIT OF FENCING(MULTIPLE TREES) WOODEN OR METAL POSTS (MAX. 8' SPACING) 2x4 DIM. LUMBER ATTACHED W/METALSTRAPPING (OPT) AT 2 LOCATIONS(MIN.). CLADDING SHALL BE 8' HIGHWITH 6" SPACING OF BOARDS. WRAPBARK W/BURLAP PRIOR TO ARMORING,OR APPROVED ALTERNATIVE METHOD NO STORAGE OF EQUIPMENT OFMATERIALS WITHIN DRIPLINE L-019 TREE PLANTING TRUDELL CONSULTING ENGINEERS LAST REVISED 03/26/2020 18"18"12"MIN.NOTE: EXAMINE ENTIRE TREE AND REMOVE ALL NURSERY TAGS, ROPE, STRING, ORSURVEYORS TAPE TO PREVENT FUTUREGIRDLING. SURROUNDING SOIL SHOULD NOT EXCEED80% COMPACTION, DRAINAGE WILL BEREQUIRED IF COMPACTED SOILS ARE PRESENT PLANTING PIT IS (3) TIMES THE DIAMETER OFTHE ROOT BALL NOTE:1. ALL TREE PLANTING BEDS ARE TO BE CONTINUOUS,COMPLETELY DUG OUT AND BACKFILLED WITH THEPROPER PLANTING BED BACKFILL MATERIAL. NYLON STRAP WITH 3/4" GROMMETS FASTEN WIRE BELOW POINT OF MAJOR BRANCHING OR TO MAJOROUTSIDE TRUNK. 2 12" HARDWOOD STAKES. ALIGNSTAKES PARALLEL W/ ROAD/ WALKS OR PARALLEL W/ DIRECTION OFPREVAILING WIND TEMPORARY WATERING BASIN BREAK APART EDGE OF EXCAVATIONW/ SHOVEL AND BLEND PLANT MIX W/ EXISTING SOIL TO PROVIDETRANSITION TO UNDISTURBED GRADE UNDISTURBED GRADE EXCAVATEONLY TO SPECIFIED PLANTINGDEPTH TO ENSURE STABLE BASE FINISH GRADE BACKFILL MIX FOR TREE PLANTING BEDS REMOVE TOP HALF OF WIRE CAGECUT AND REMOVE BURLAP FROM ROOTBALL 2" HEMLOCK BARK MULCH, KEPT 3" MIN AWAY FROM TRUNK TOP OF ROOTBALL, ROOT FLARE SHOULDBE EVIDENT. IF ROOT FLARE IS NOT EVIDENT,THEN SCRAPE OFF THE TOP LAYER OF SOILBUILD UP ON TOP OF ROOTBALL FROM NURSERY. DECIDUOUS TREE Tree Replacement Schedule SYM QTY SCIENTIFIC NAME COMMON NAME TREE TO BE REMOVEDSIZE in DBH (IN) TOTAL DBH2 MAX. TOTAL IN KIND Replacements Req'd3 IN KIND ReplacementQTY IN KINDReplacements SIZE VALUE ReplacementsReq'd VALUE OF TREE(S) TO BE REPLACED4 TOTAL REPLACEMENT VALUE Req'd5 TREES Acer rubrum AR 1 Acer rubrum 'Red Sunset'Red Sunset Red Maple 6 6 2.4 3 No -- AR 2 Acer rubrum 'Red Sunset'Red Sunset Red Maple 8 16 6.4 -2.5" Cal Yes $3,055 $6,110 Acer rubrum Replacement Summary 22 9 3 2.5" Cal Yes -$6,110 Acer x freemanii AF 1 Acer x freemanii 'Autumn Blaze'Autumn Blaze Freeman Maple 4 4 1.6 --Yes $819 $819 AF 2 Acer x freemanii 'Autumn Blaze'Autumn Blaze Freeman Maple 6 12 4.8 5 2.5" Cal No -- AF 2 Acer x freemanii 'Autumn Blaze'Autumn Blaze Freeman Maple 8 16 6.4 --Yes $3,351 $6,701 AF 2 Acer x freemanii 'Autumn Blaze'Autumn Blaze Freeman Maple 10 20 8.0 --Yes $5,229 $10,458 Acer x freemanii Replacement Summary 52 21 5 2.5" Cal Yes -$17,979 Quercus palustris QP 1 Quercus palustris Pin Oak 4 4 1.6 --Yes $819 $819 QP 2 Quercus palustris Pin Oak 6 12 4.8 5 2.5" Cal No -- QP 1 Quercus palustris Pin Oak 10 10 4.0 4 2.5" Cal No -- Quercus palustris Replacement Summary 26 10 9 2.5" Cal Yes -$819 SHRUBS CR 7 Cornus racemosa Gray Dogwood --7 7 3 Gal. Cont.No -- CS 2 Cornus sericea 'Isanti'Redosier Dogwood --2 2 3 Gal. Cont.No -- IV 2 Ilex verticillata 'Winter Red'Winter Red Winterberry --2 2 3 Gal. Cont.No -- SJS 4 Spirea japonica 'Shirobana'Shirobana Spirea --4 4 3 Gal. Cont.No -- TOTAL REQ'D LANDSCAPE REPLACEMENT VALUE:$24,908 1 IN KIND Replacements refer a tree replacement of the same species will be removed. All IN KIND Replacements will be a minimum of 2.5" CAL. at installation. 2 The TOTAL DBH is calcuated by mulitplying the QTY of trees in each DBH size group by the DBH size (in inches) to get a total/cumulative DBH of each species group. 3 The MAX TOTAL IN KIND Replacements Req'd is calculated dividing the TOTAL DBH by the base caliper install replacement size, 2.5" to get the total number of replacements per species group 4 VALUE Replacements have been cacluated from methodology developed by Purdue University Department of Horticulture and Cooperative Extension Services as outlined in documents titled Landscape Tree Appraisal by Michael N. Dana and Tree Appraisal and the Value of Trees by Lindsey Purcell and Jeffery Ling 5 TOTAL REPLACEMENT VALUE is cacluated by multipying the VALUE OF TREE(S) TO BE REPLACED for indivudual trees/sizes by the QTY of specific trees that are proposed to be replaced with a monetary value, rather than an IN KIND replacement 10/5/2020 PROPOSED REPLACEMENT TYPE IN KIND Replacements1 VALUE Replacements Req'd Tree Replacement Schedule 30 Community Drive 19-099 Prepared by TCE SYM QTY IN KIND VALUE SCIENTIFIC NAME COMMON NAME INSTALL SIZE CONDITION COMMENTS COST PER PLANT (installed)TOTAL TREES AR 3 X -Acer rubrum 'Red Sunset'Red Sunset Red Maple 2.5" Cal B&B -- AF 5 X -Acer x freemanii 'Autumn Blaze'Autumn Blaze Freeman Maple 2.5" Cal B&B -- AG 13 -X Amelachier x grandiflora 'Autumn Brilliance'Autumn Brilliance Serviceberry 7-8' HT B&B Multistemmed, 3 min.$540.00 $7,020 GT 5 -X Gleditsia triacanthos var. inermis 'Halka'Halka Thornless Honeylocust 2.5-3" Cal B&B Branches limbed to 7' HT $890.00 $4,450 LL 4 -X Larix laricina Tamarack 8-10' HT B&B Full $850.00 $3,400 MS 3 -X Malus sutzam 'Sugar Tyme"Sugar Tyme Crabapple 2.5" Cal B&B $690.00 $2,070 QP 9 X -Quercus palustris Pin Oak 2.5" Cal B&B -- SA 3 -X Salix alba 'Tristis'Golden Weeping Willow 3" Cal B&B $700.00 $2,100 SR 4 -X Syringa reticulata 'Snowdance'Japanese Tree Lilac 2.5-3" Cal B&B $850.00 $3,400 SHRUBS CR 9 7 2 Cornus racemosa Gray Dogwood #3 Cont.Mulitstemmed, 4 canes min.$60.00 $120 CS 24 2 22 Cornus sericea 'Isanti'Redosier Dogwood #3 Cont.Mulitstemmed, 4 canes min.$65.00 $1,430 IV 10 2 8 Ilex verticillata 'Winter Red'Winter Red Winterberry #3 Cont.Female $65.00 $520 IVM 1 -1 Ilex verticillata 'Winter Red'Winter Red Winterberry #3 Cont.Female $65.00 $65 SJS 10 4 6 Spirea japonica 'Shirobana'Shirobana Spirea #3 Cont.$60.00 $360 Site Planting COST:$24,935 REQUIRED LANDSCAPE REPLACEMENT VALUE $24,908 REPLACEMENT TYPE Opinion of Landscape Costs 30 Community Drive 19-099 Prepared by TCE 10/12/2020 View #3 124 Technology Park Way - Parking Lot Extension Designer Date 10/19/2020 Scale Not to Scale Drawing No. Summary 1 of 1 Statistics Description Symbol Avg Max Min Max/Min Avg/Min Parking Lot Extension 1.8 fc 3.3 fc 0.3 fc 11.0:1 6.0:1 Schedule Symbol Label QTY Catalog Number NumberLamps Filename LumenMultiplier LLF Wattage Polar Plot LumensperLamp Manufacturer Notes N4 6 EMM-E03-LED- E1-T4 63 EMM-E03-LED-E1-T4.ies 1 0.9 75.2 137 COOPERLIGHTING SOLUTIONS -INVUE(FORMERLY EATON) Schedule Symbol Label QTY Catalog Number Description Lamp Lumens per Lamp LLF Wattage N4 6 EMM-E03-LED-E1-T4 EPIC MODERN MEDIUM DECORATIVE LED LUMINAIRE (3) LIGHTBARS WITH AccuLEDOPTICS - TYPE 4 (63) 4000K CCT, 70 CRI LEDs 137 0.9 75.2 N3 2 EMM-E03-LED-E1-T3 EPIC MODERN MEDIUM DECORATIVE LED LUMINAIRE (3) LIGHTBARS WITH AccuLEDOPTICS - TYPE 3 (63) 4000K CCT, 70 CRI LEDs 140 0.9 75.2 ECM/EMM EPIC MEDIUM LED 1 - 4 LightBARs Solid State LED DECORATIVE AREA LUMINAIRE Invue SPECIFICATION FEATURES Construction TOP: Cast aluminum top housing attaches to cast aluminum mounting arm hub with four stainless steel fasteners. One-piece silicone gasket between mounting hub and top casting seals out moisture and contaminants. (See the mounting accessories section for a full selection of mounting arms. (Only these arms are compatible with the Epic luminaire). MIDSECTION: Continuous silicone gaskets seal lens to top casting and shade. The mid section features cast aluminum construction and stainless steel assembly. SHADES: Heavy gauge precision spun aluminum shades offer superior surface finish and consistency in form. DOORFRAME: Die-cast aluminum 1/8” thick door and doorframe seal to underside of shade with a thick wall continuous silicone gasket. Mounting hub ships attached to mounting arm. Optics Choice of twelve patented, high- efficiency AccuLED Optic™ technology manufactured from injection-molded acrylic. Optics are precisely designed to shape the optics, maximizing efficiency and application spacing. AccuLED Optic technology, creates consistent distributions with the scalability to meet customized application requirements. Offered Standard in 4000K (+/- 275K) CCT and nominal 70 CRI. Optional 3000K CCT and 5000K CC. For the ultimate level of spill light control, an optional house-side shield accessory can be field or factory installed. The house-side shield is designed to seamlessly integrate with the SL2, SL3 or SL4 optics. Electrical LED drivers mount to die-cast aluminum back housing for optimal heat sinking, operation efficacy, and prolonged life. Standard drivers feature electronic universal voltage (120-277V 50/60Hz), 347V 60Hz or 480V 60Hz operation, greater than 0.9 power factor, less that 20% harmonic distortion, and is suitable for operation in -40°C to 40°C ambient environments. All fixtures are shipped standard with 10kV/10kA common – and differential – mode surge protection. LightBARs feature and IP66 enclosure rating and maintain greater than 95% lumen maintenance at 60,000 hours per IESNA TM-21. Occupancy sensor and dimming options available. Finish Housing is finished in five-stage super TGIC polyester powder coat paint, 2.5 mil nominal thickness for superior protection against fade and wear. LightBAR™ cover plates are standard white and may be specified to match finish of luminaire housing. Standard colors include black, bronze, grey, white, dark platinum and graphite metallic. RAL and custom color matches available. Consult Outdoor Architectural Colors brochure for a complete selection. Warranty Five-year warranty. TD500028EN 2017-03-29 10:21:56 The EPIC Collection delivers custom luminaire flexibility with high quality, yet availability expectations of standard specification grade product. The EPIC Collection can be dressed to suit any application. Recognizing evolving environmental and legislative trends, the EPIC Collection delivers world class LED optical and performance solutions to the decorative luminaire marketplace. DESCRIPTION SY STEM S CERTIFI E DCERTIFICATION DATA UL/cUL Listed IP66 LIghtBARs LM79 / LM80 Compliant 2G Vibration Tested ISO 9001 ENERGY DATA Electronic LED Driver >0.9 Power Factor <20% Total Harmonic Distortion 120-277V 50/60Hz, 347V/60Hz, 480V/60Hz -40°C Minimum Temperature 40°C Ambient Temperature Rating EPA Effective Projected Area: (Sq. Ft.) 0.94 SHIPPING DATA Approximate Net Weight: 45 lbs. [20 kgs.] Catalog # Type Date Project Comments Prepared by Maximum Width 24-1/16" [611mm] Maximum Height 21"[533mm] See configurations for more detailed information. Maximum Width 24-1/16" [611mm] ECM ClassicalEMM Modern Maximum Height20" [508mm] DIMENSIONS