Loading...
HomeMy WebLinkAboutSD-20-16 - Supplemental - 0255 Kennedy Drive (57)MEMORANDUM To: Marla Keene From: Jay Nadeau Date: April 28, 2020 Re: Technical Review, Hillside Preliminary Plat Plans, Lots 10-15 Please find comments from the South Burlington Water Department regarding the above referenced project: General: “All water lines and appurtenances shall be installed in accordance with the Champlain Water District Specifications and Details for the Installation of Water Lines and Appurtenances, current edition, henceforth CWD Specifications.” All Ductile Iron pipe, hydrant barrel, and fittings for new water lines and appurtenances shall be installed with V-Bio Enhanced Polyethylene Pipe encasement. See CWD Specifications for details. The project shall be constructed, completed, maintained, and operated in accordance with the approved plans. No changes shall be made in the project without the written approval of the appropriate CWD Division. When a pipe material is specifically noted on the approved project drawings, the contractor/developer shall not have the option of utilizing any other pipe material. Sheet C-4 All individual building fire service lines shall be tapped directly into the water main. Multiple building fire services shall not be shared from a single tap. All building fire services shall have a separate domestic water service shut off outside the building, with the outside shut off placed in an accessible location. The domestic water service line may be tapped off the fire service line. The domestic service line shall be sized according to usage demands.