HomeMy WebLinkAboutSD-20-17 - Supplemental - 0550 Park Road (16)
SBWD Technical Review Comments: Wheeler Parcel
The SBWD would like to see the water line “teed” at the western entrance and the line extended down Park Road then tied back into the circle at the eastern entrance to create a loop
for this development, in accordance with the City of South Burlington Water Ordinance. Add a second valve on the new line at the tee, and at the eastern entrance.
Add a main line valve between station 5+00 and 6+00.
Add this correct language regarding the water specifications: “All water lines and appurtenances shall be installed in accordance with the Champlain Water District Specifications and
Details for the Installation of Water Lines and Appurtenances, current edition, henceforth CWD Specifications.”
Correct all water details to be the same as those found in the CWD Specifications.
The SBWD shall be notified no less than 7 days before the project starts for a pre-construction meeting with the site contractor to ensure water line installation work is conducted in
accordance with the CWD Specifications.
Site plans indicate that the preconstruction grades of the proposed homes range between 400’ and 429’. The SBET low operating level is 515’, and the highest elevation in the City that
can still provide 35psi is 435’. The upper floors of some homes are likely to experience lower water pressures than what customers are accustomed to. This information is provided for
information purposes.