Loading...
HomeMy WebLinkAboutSP-99-13 - Decision - 1116 Shelburne Road#SP-99-13 FINDINGS OF FACT AND DECISION Re: Findings of Fact, application of Chip Spillane/Pacific Gas for site plan review of a service station with convenience store and auto rental use. On the 25' day of May 1999, the South Burlington Planning Commission approved the site plan application of Chip Spillane/Pacific Gas, under Section 26.10 of the South Burlington Zoning Regulations, to amend a previously approved plan for a service station with convenience store and auto rental use based on the following findings: 1. This project consists of amending a previously approved plan for a service station with convenience store and auto rental use. The amendment consists of altering the landscaping at the rear of the property. 2. This property located at 1116 Shelburne Road lies within the C 1 District. It is bounded on the north by a restaurant, on the south by a motel, on the west by Shelburne Road, and on the east by residences. 3. The owner of record of this property is Sue Spillane. 4. Access/circulation: Access is provided by two (2) curb cuts on Shelburne Road. No changes proposed. Circulation on the site is adequate. 5. Coverage/setbacks: No changes 6. Parking: The plan should be revised to add a bike rack as required under Section 26.253(b) of the zoning regulations and to eliminate parking spaces #25 and 27. 7. Landscaping: The January ice storm caused extensive damage to the trees located behind the storage building that had to be cut down. The area where the trees were located will be planted with lawn and a row of shrubs. The plan should be revised to indicate the type, size and quantity of shrubs proposed. 8. Lighting_ The two (2) pole mounted floodlights should be replaced with downcasting shielded fixtures approved by the Director of Planning & Zoning. 9. Dumpster: The dumpster storage area should be noted on the plan. 10. Other: The plan should be revised to show: the ice machine, coke machine and propane tank storage rack which is currently located at north west corner of the lot and was never approved by the City. Staff recommended that this equipment/storage be moved inside the building or at least to a less conspicuous location, such as along the north side of the building. — the planter on the north side of the service station building that there is no ramp north of parking space #8 that the east property boundary is the zoning boundary between the R4 District to the east and the C 1 District to the west. DECISION AND CONDITIONS Based on the above Findings of Fact, the South Burlington Planning Commission approves the site plan application of Chip Spillane to amend a previously approved plan for a service station with convenience store and auto rental use. The amendment consists of altering the landscaping at the rear of the property, 1116 Shelburne Road, as depicted on a untitled plan with a received date of March 31, 1999, with the following stipulations: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. The plan shall be revised to show the changes below and shall require approval of the Director of Planning & Zoning (hereinafter Director). Three (3) copies of the approved revised plan shall be submitted to the Director prior to issuance. a) The site plan shall be revised to add a bike rack as required under Section 26.253(b) of the zoning regulations. b) The site plan shall be revised to eliminate parking spaces #25 and 27. c) The site plan shall be revised to indicate the type, size and quantity of shrubs proposed. d) The site plan shall be revised to note the location of the dumpster storage area. e) The site plan shall be revised to remove the propane tanks and relocate the ice machine and coke machine to the south side of the building. 0 The site plan shall be revised to show the planter on the north side of the service station building. g) The site plan shall be revised to show that there is no ramp north of parking space #8. h) The site plan shall be revised to show that the east property boundary is the zoning boundary between the R4 District to the east and the C 1 District to the west. i) The site plan shall be revised to show the storm drainage system serving the site. 3. Any new exterior lighting shall consist of downcasting shielded fixtures. Any change to approved lights shall require approval of the Director prior to installation. The two (2) pole mounted floodlights shall be replaced with downcasting shielded fixtures approved by the Director. 4. Prior to issuance of a zoning permit, the applicant shall post a landscape bond in an amount to be determined by the Director. The bond shall remain in effect for three (3) years to assure that the landscaping takes root and has a good chance of surviving. S. The applicant shall obtain a zoning permit within six (6) months pursuant to Section 27.302 of the zoning regulations or this approval is null and void. 6. The applicant shall obtain a Certificate of Occupancy/Compliance from the Administrative Officer prior to the use of the building. 7. Any change to the site plan shall require approval by the South Burlington Planning Commission. / .r.4 :4 Chairman or Clerk South Burlington Planning Commission Z Date