Loading...
HomeMy WebLinkAboutAgenda 05_SD-20-39_1150 Airport Dr_Beta_SK#SD‐20‐39  Staff Comments 1 1 of 4  CITY OF SOUTH BURLINGTON  DEVELOPMENT REVIEW BOARD  DEPARTMENT OF PLANNING & ZONING   SD‐20‐39_1150 Airport Dr_Beta_SK_2020‐11‐17.docx  Report preparation date: November 10, 2020  Plans received: October 20, 2020  1150 Airport Drive  Sketch Plan Application #SD‐20‐39  Meeting date: November 17, 2020  Owner  City of Burlington/Burlington International Airport   1200 Airport Drive, Box 1   So. Burlington, VT 05403  Applicant  Beta Air, LLC  1150 Airport Drive  South Burlington, VT 05403  Property Information  Tax Parcel 2000‐0000_C  Airport‐Industrial (AIR‐I) District  Transit Overlay District  777.84 acres   Engineer  Stantec  55 Green Mountain Drive  South Burlington, VT 05403  Location Map    #SD‐20‐39  Staff Comments 2 2 of 4        PROJECT DESCRIPTION  Sketch plan application #SD‐20‐39 of Beta Air, LLC to amend a previously approved plan for an airport  complex.  The amendment consists of constructing a 762 sf second‐story addition to an approved 60,300  sf three‐story hangar/office building, 1150 Airport Drive.     PERMIT HISTORY  The Project is located in the Airport‐Industrial (AIR‐I) district and the transit overlay district.  The project  received approval to construct an addition on the west, street‐facing facade in September of 2020 (#SD‐ 20‐21).  No work has yet begun on that approved addition.  This application is to construct an addition on  the south façade which the applicant indicates is their intent to construct prior to the west addition.     COMMENTS  Development Review Planner Marla Keene and Planning and Zoning Director Paul Conner (“Staff”) have  reviewed the plans submitted on 10/20/2020 and offer the following comments. Numbered items for  the Board’s attention are in red.    CONTEXT  The Project is located in the Airport‐Industrial District (AIR‐I) and the Transit Overlay District. All  applications for development within the AIR‐I district must be reviewed pursuant to the PUD provisions  of the LDR.    ZONING DISTRICT & DIMENSIONAL REQUIREMENTS  Dimensional Requirements  The applicant has represented that the proposed facility will result in no change to lot coverage and a slight  increase to building coverage for the airport PUD as a whole, which the applicant estimates to be below the  maximum allowable coverage of 30%.  The maximum allowable lot coverage for this district is 50%.  Historically, the Board has allowed the airport to provide estimated coverage calculations as long as it is  demonstrably well within the allowable maximums due to the overall size of the property.  Staff  recommends the Board continue to allow this approach.    Other dimensional requirements appear to be met.  Airport‐Industrial (AIR‐I) District Standards  The district’s standards relate to electrical interference, light and glare, physical obstruction to airport  approaches and compliance with Federal Aviation Administration and other federal and state regulations  pertaining to airports.    Staff considers that the applicant will need to provide documentation of compliance from the applicable  regulatory entities responsible for airport approach cones as part of their final plat application.    #SD‐20‐39  Staff Comments 3 3 of 4  SITE PLAN REVIEW STANDARDS  General site plan review standards relate to relationship to the Comprehensive Plan, relationship of  structures to the site (including location and adequacy of parking), compatibility with adjoining buildings  and the adjoining area.  Specific standards speak to access, utilities, roadways, and site features.  Relationship of Proposed Structures to the Site  1. The applicant submitted floor plans showing impacts to the existing pavers at ground level, an elevation  showing the proposed building (but not the site context), and described in narrative form that the addition is  proposed to be a second‐floor overhang situated on columns.  Staff is unclear of the proposed configuration  and recommends the Board ask the applicant to clarify their statement that the addition will be over existing  mechanical equipment and an outdoor patio space, while in the aerial imagery it appears there are marked  parking spaces in the location of the proposed addition.  The Board should provide feedback on the  compatibility of the proposed addition with adjacent structures and site.  It does not appear there are any entrances proposed to the building addition therefore safe pedestrian  movement should not be an issue.    These criteria also relate to adequacy of parking.  As noted above, the proposed addition appears to be  located over existing striped parking.  2. The Board should ask the applicant to clarify both verbally (and in their plans at the next phase of review)  what elements of the existing site plan will be modified to accommodate this addition and provide feedback  on whether this is acceptable.  Disposal of Wastes  3. The applicant as part of the previous (not constructed) amendment received approval for an enclosed  dumpster.  Since this dumpster is not proposed as part of the current application, Staff recommends the  Board ask the applicant how they propose to handle their waste in this phase.  Landscaping and Screening  The project will require landscaping based on the building construction cost.  In their cover letter, the  applicant estimates the required minimum landscaping value is $2,500 and indicated they intend to install  decorative planters beneath the building addition.    4. If not already discussed in response to the above criteria, Staff recommends the Board ask the applicant for  more information on this proposed landscaping concept and provide feedback on whether it will be allowed  as contributing to the required minimum landscaping value.  Staff notes the Board may allow elements other  than woody vegetation when it contributes to the overall appearance of the site. Low Impact Development  The Stormwater Section has reviewed the plans on November 11, 2020 and indicated there are no  comments at this stage of review. PLANNED UNIT DEVELOPMENT STANDARDS  PUD standards pertain to water and wastewater capacity, natural resource protection, compatibility with  the surrounding area, open space, fire protection, and public infrastructure.  Staff  considers  there  are  no  comments  on  these  criteria  at  this  early  stage  of  review,  though  Fire  Department review and review of the layout of utility lines and any proposed modifications to lighting will  be necessary at the preliminary plat stage.  Standards pertaining to erosion control, visual compatibility,  and stormwater are addressed as part of site plan review.    #SD‐20‐39  Staff Comments 4 4 of 4    RECOMMENDATION  Staff recommends that the Board discuss the Project with the applicant and close the meeting.     Respectfully submitted,    Marla Keene, Development Review Planner  Stantec Consulting Services Inc. 55 Green Mountain Drive, South Burlington VT 05403-7824 October 20, 2020 File: 195311293 Attention: South Burlington Development Review Board c/o City of South Burlington Planning and Zoning 575 Dorset Street, South Burlington, Vermont 05403 Dear Members of the Board, Reference: BETA Hangar – South: Sketch Plan Application Narrative In support of the attached sketch plan application, we are submitting the following narrative: The project, located at 1150 Airport Drive, South Burlington, VT, is a proposed second story addition to an existing hangar for additional office space. This proposed addition is being located at the Southern End of the Existing BETA Hangar. Scott and Partners was selected as the architect, Stantec Consulting Services Inc. was selected as the engineer, Wagner Hodgson was selected as the Landscape Architect. Burlington International Airport are the landowners and lease the building to the applicant, BETA Technologies (BETA). PROJECT DESCRIPTION BETA proposes to construct 762 sf of new office space to support BETA Technologies growing need for office space. This addition will be a second-floor overhang situated on columns located on the south side of the existing hangar and associated site improvements. Recently, BETA was approved by the City of South Burlington for a larger Northern Addition that included site improvements. BETA plans to construct this smaller southern addition ahead of that project. LANDSCAPING This projects landscape budget is approximately $2,500. To meet this budget, the applicant proposes installing decorative planters to help enhance the outdoor patio space located beneath the building addition. SITE IMPROVEMENTS Site improvements for this project are limited and include upgraded building entrances to the south side entryways, relocation of vehicle charging stations, updated parking layout, bollards, and paving. UTILITIES No impacts to utilities anticipated at this time. October 20, 2020 South Burlington Development Review Board Page 2 of 2 Reference: BETA Hangar – South: Sketch Plan Application Narrative WASTE DISPOSAL An existing dumpster is located off the southwest corner of the building. STORMWATER The building will overhang an existing paved parking area, therefore this project will not increase the impervious area on site. The existing roof drains for the building will be reconfigured to accommodate the new addition. They will continue to drain to an existing “dry-well” with outlet located in the parking area south of the hangar where it will drain to an existing infiltration system and eventually to an underground sand filter constructed by the future “RON Apron Project”. PARKING BETA does not anticipate additional occupancy as part of this additional and will use the existing parking on site. Although, Bike parking is not required as part of this addition, it will be provided under the future Northern Addition project and existing bike parking is available within the hangar. BUILDING ARCHITECTURE The BETA Technologies building is an existing prefabricated metal building housing BETA’s research and development department. The building consists of an airplane hangar building and three additions including a single-story addition on the North side of the building and two - two story additions one on the West (just recently renovated) and one on the South. On the South end the second floor will be renovated as part of this project. The first floor was renovated previously. The proposed addition is composed of a structural steel frame and platform that extends the second floor over existing mechanical equipment and first floor access openings. On top of the platform mechanical equipment for the second-floor renovation and shipping containers fit up to become offices will be installed. The shipping container look carries over the existing theme on the site. BETA modifies shipping containers as part of their recharge platform product line and shipping containers are used on site to house R&D. The proposed addition should complement what is currently on site and will clean up the look of the existing prefabricated metal building. The shipping containers will be fit up to meet current code requirements. Regards, Stantec Consulting Services Inc. Christopher Gendron, PE Project Manager, Civil Engineer Phone: 802 497 6402 ::::::::::::::::::::87878787878787878787878787878787878787878787878787878787878787878787878787878787****************************************************87 87 ********:::::::::876' 6 ' 6';;;;;;;;;;;;;6666;;;;;;;;;;;;;;;;;;;;;;;; *;6'6'6'6'6'6'6'6'6'::6'6'6'6'6'6'6'6'6'6'6'6'6'6'6'6'6'6'6'878787878787:****6'6'6'6'6'6'6'6'6'6'6'6'6'6'6'**6'6'6'6'6'6'6'6'6'6'6'6'6'6'6'66666666666666666'6'6'6'96(5(%$596(&21752/&$31((/96(0$*1$,/1((/96(',6.$%1((/96(0$*+8%1((/96(0$*+8%1((/96(0$*1$,/1((/&0&7&035&35&3&03&&,739&7,('2:1$1&+25&3(3&3(3*$7( ',$&21&3$'7,('2:1+22. ',$&21&3$'7,('2:1+22. ',$&21&7,('2:1+22%%%7*,19%277*,19,1,19287%277*,19,1,19287%275,05,05,05,0''';:$/.6,*1$/;3267/$1(',5&21&%/2&.:$//67(/3('67((/,,19&03'3$9(0(17-2,173$9(0(17-2,17%790$,17(1$1&(3$5.,1*21/<;&21& $*8*7(/;&21& $*8*7(/%79$,532576+2577(50&(//3+21(/27;32670$,/%2;7*%27&28/'1276((3,3(6 72 2):$7(57*,19%27  2):$7(5 7*,196%277*,19%277*,19%27'''''''5,0,773,77(673,70$,/%2;%,$0$,17(1$1&(7*,19,196,191%2787,/&$%,1(7&&,77(673,7,77367((/7*,196%277*,19,196,191%275,0,19,1,192879&39&3,7737(673,77787,5:**75;*&*87 2127217(/ (*$6. $1$%((:67((7(,5,5%%12%%7,1,1112$/..6,*:$55(&&(/&(1/37777777776,7(3/$1&1&*(1'521*0(5./(9??$&7,9(??75$163257$7,21?'5$:,1*?(;+,%,76?6.B6,7(/$<2873/$1':*SURMHFWQDPHVKHHWWLWOHVKHHWQRVFDOHSURMHFWQRFKHFNHGE\GUDZQE\GDWH30$,167(66(;-81&7,21976&2773$571(56&20)SURMHFWDGGUHVVVKHHWGDWH%(7$7HFKQRORJLHV2&72%(56.(7&+3/$1127)25&216758&7,21$,53257'5,9(6287+%85/,1*72197'DWH 5HYLVLRQV  8383$,5 3 2 5 7 '5 ,9 ($,5),(/'3/$11257+$,5),(/'.(<3/$16287+:,1*$%&'()*+,%5(/2&$7('+($'6(7&8%%,(61(:02%,/(:25.%(1&+21:+((/60,1,07*(/(&75,&$/&20321(176+$//6)9,%7+(506)'<126)'35,17:&:&-$16),521%,5'6)67$,5,1),//52:&08720$7&+(;,67,1*3$,17720$7&+1(:0236,1.6((3/80%,1*5(3/$&((;,67:,1'2::1(:),5(5$7(':,1'2:$1')5$0(5(;,67,1*&2/80166)+$1*$5(;,67,1*:,1'2:6352326('6,'(:$/.83*5$'(6(;,67,1*(48,30(17352326('1(:&2/80167<3,&$/(;,67,1*%8,/',1*),1,6+(6725(0$,1(;,67,1*3$9(5672%(5(3/$&('$%&'()*+,%'1'1(;,67,1*+5*/$661(:+5*/$66 [VI 6)  [ 35(6(17$7,216&5((1/,1(2)62)),7$%29(1(:67$,5&21)6).,7&+(16)6+2:(5:&:&6)&21)+9$&0(==$1,1(6)&21)6)&21)6)&21)6)&21)6)&21)6)',1,1*6)23(12)),&(,70(&+6)67$,5:'6+(/9(6:'6+(/9(6(;,67,1*6&23(2)1(::25.(;,67,1*$5($ 6)&21)$'',7,21 6)727$/$5($ 6)(;,67,1*67$,5$1'67$,5(1&/2685(,1),//)/225:+(5(67$,5:$65(029('6((6758&785$/6)0,1,&21)6)35,9$&<':5()5())5((=(50(&+$1,&$/&+$6(0(&+&+$6((;,67,1*$'',7,211(::,1'2::$//+,*+%(1&+    &$50,&+$(/67(66(;976&2773$571(56&203)%(7$7HFKQRORJLHV6287+:,1*)/2253/$16)25=21,1*$33529$/      3/$11257+  6287+:,1* ),567)/2253/$1  6287+:,1* 6(&21')/2253/$1 ),567)/225&'()*+,%0(== 1(:(;7(5,25:$//$76(&21')/2250(7$/6+,33,1*&217$,1(5&2/25:+,7((;,67,1*(48,30(176,',1*720$7&+(;,67,1*&217$,1(5$'',7,21&2/25:+,7((;,67,1*'2256(;,67,1*:,1'2:6(;,67,1*29(5+($''225(;,67,1*:,1'2:6(;,67,1*'2256(;,67,1*(48,30(17(;,67,1*(/(&75,&$/(;,67,1*:,1'2:6(;,67,1*522)67((/%($06$1'&2/8016,168/$7(':,1'2:6),567)/2250(== 0(7$/6+,33,1*&217$,1(5&2/25:+,7((;,67,1*522)1(:,168/$7(':,1'2::$//(;,67,1*'225(;,67,1*:,1'2:667((/%($06$1'&2/8016),567)/2250(== 0(0%5$1(522),1*211(:,168/$7(')5$0,1*6<67(0,168/$7('522)6<67(0%(/2:&217$,1(5522),168/$7(':,1'2:0(7$/6+,33,1*&217$,1(5(;,67,1*522)(;,67,1*6758&785(,168/$7(')/2256<67(067((/&2/8016$1'%($060(7$//,1(53$1(/$,5 3 2 5 7 '5 ,9 ($,5),(/'3/$11257+$,5),(/'.(<3/$16287+:,1*&$50,&+$(/67(66(;976&2773$571(56&203)%(7$7HFKQRORJLHV6287+:,1*(/(9$7,216$1'%8,/',1*6(&7,21)25=21,1*$33529$/  6287+:,1* 6287+(/(9$7,21  6287+:,1* ($67(/(9$7,21  6287+:,1* %8,/',1*6(&7,21