Loading...
HomeMy WebLinkAboutSD-94-0000 - Decision - 1175 Shelburne RoadFINDINGS OF FACT & DECISION STATE OF VERMONT COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of L&M Partnership to amend an approved planned unit development consisting of 150 residential units, a 61 room hotel, a 20, 000 square foot movie theater (1000 seats), a 22,500 square foot restaurant/retail/indoor recreation building, a 3,500 square foot restaurant with drive -through service, and a bank with drive -through service, Shelburne Road. On the 27th of September, 1994, the South Burlington Planning Commission approved the request of L&M Partnership for revised final plat approval under Section 204 of the South Burlington Subdivision Regulations based on the following findings: 1. This project consists of amending the 150 unit residential portion of the L&M Park PCD project by relocating a 30 unit multi -family building (#5) . The sketch plan was reviewed on 8/23/94. The applicant must obtain a conditional use permit from the Zoning Board of Adjustment to relocate building #5. 2. Access/circulation: Access to this portion of the development is via a curb cut on Fayette Road. This access will not change. Access to building #5 on the approved plan is via a shared driveway with building #4. The proposed plan shows building #5 as having its own driveway. Circulation is adequate. 3. Coverage/setbacks: Residential portion of PCD: Building coverage is 42,560 square feet (maximum allowed is 191,054 square feet). Overall coverage is 152,968 square feet (maximum allowed is 382,108 square feet). Setbacks requirements are being met. 4. Parking: A total of 338 parking spaces are required for the residential portion and the plan shows 339 spaces including 18 handicapped spaces. 5. Landscaping: Landscaping associated with building #5 will be relocated along with the building. The new building location will result in the removal of several large apple trees. Any trees lost should be made up by increasing the landscaping on the site by an equal dollar value. 6. Dumpsters : The two (2) existing dumpsters are not located in the approved locations and they are not screened as required. DECISION & CONDITIONS Based on the above Findings of Fact, the South Burlington Planning Commission approves the revised final plat application of L&M Partnership to amend an approved planned unit development consisting of 150 residential units, a 61 room hotel, a 20,000 square foot movie theater (1000 seats), a 22,500 square foot restaurant/retail/indoor recreation building, a 3,500 square foot restaurant with drive -through service, and a bank with drive -through service, located on Shelburne Road. The amendment consists of relocating a 30 unit multi -family building (#5) and associated parking as depicted on a four (4) page set of plans, page 1 entitled "L&M Park, South Burlington, Vermont, Overall Site Plan" prepared by Fitzpatrick - Llewellyn, Inc. and dated June, 1990 with a last revision date of 9 / 20 / 94 , with the following stipulations: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. The two (2) existing dumpsters which are not located in their approved locations must be relocated to their approved locations and screened prior to issuance of a zoning/building permit for any building in the development. 3. The final plat plans shall be recorded in the South Burlington land records within 90 days or this approval is null and void. The plans shall be signed by the Planning Commission Chair or Clerk prior to recording. 4. The landscape plan shall be revised to show all existing apple trees and identify those which will be relocated. If the relocated apple trees do not survive, or it is determined by a landscape expert that the trees are unlikely to survive, the applicant shall plant additional landscaping of a species, number and location approved by the City Planner. Chairmen o South Burlington Planning Commission _A�M�Z I / �� (/_ Date E