HomeMy WebLinkAboutSP-91-0000 - Supplemental - 1090 Shelburne Road('45
GJ pe� 0 �• LN/G(/J�%��
Our�. .
i v
FA
sag rjrA
KJOO r r in
LAWRENCE ATKIN ARCHITECT, INC.
63 Central Avenue, South Burlington, Vermont 05403
802-862-6323
PLANNER
658-7955
City of South Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT 05403
FAX 658-4748
April 22, 1991
63 Cental Avenue
South Burlington, Vermont. 05403
Re: Perry's Fish House, Parking Lot Expansion
Dear Mr. Atkin:
ZONING ADMINISTRATOR
658-7958
Enclsoed, please find some preliminary comments on the above
referenced project from City Engineer, Bill Szymanski, Fire Chief
Goddette and myself. Please submit any revised drawings by
April 30, 1991.
If you have any questions, please give me a call.
Sincerely,
U4��
oe Weith,
City Planner
Encls
JW/mcp
M E M O R A N D U M
To: Project Files
From: Joe Weith, City Planner
Re: Preliminary Comments, May 7, 1991 Agenda items
Date: April 18, 1991
PERRY'S FISH HOUSE, PARKING LOT EXPANSION.SHELBURNE ROAD
Additional information required:
Distance along property lines.
Recommended changes:
Move the 7 spaces along Shelburne Road to the east so that
they are entirely on the applicant's property.
Close the westerly curb cut on Baldwin Avenue.
All angled parking spaces must be large enough to accommodate
a 9'x18' rectangle and all other parking spaces must be at
least 9'x18'.
Parking aisles serving single row of parking must be 22
feet in width and serving double row of parking must be
24 feet in width.
Other:
On the plan approved by the Planning Commission on October
8, 1985 for development of this site, the overall coverage
was approved at 69.3%, since the applicant wishes to in-
crease the overall coverage 1.5% above the maximum allowed,
either a variance would have to be obtained or more green
spaces added so that the overall coverage limit is not
exceeded.
WITHERS 2 LOT SUBDIVISION. 265 KIRBY ROAD, SKETCH PLAN
Access to both lots should be via a shared access to reduce
the number of curb cuts.
The 1985 South Burlington Comprehensive Plan shows a proposed
street connecting the end of Airport Drive with Airport
Parkway and this proposed street appears to cross a portion
of this property. Prior to Final Plat the City will decide
on its location relative to this property and whether it
wishes to acquire the property.
The house at #261 Kirby Road is quite close to the proposed
access drive to lot #2. The applicant should consider
planting a row of evergreen trees between the access drive
and the westerly boundary of lot #1 to screen the access
drive from the house at #261
M E M O R A N D U M
To: Project files
From: William J. Szymanski, City Engineer
Re: May 12, 1991 agenda items
Date: April 22, 1991
GARLAND AND WITHERS PROPERTY, KIRBY ROAD
Two inlets should be installed approximately as shown on sketch
and piped to the drainage way to the south. The lots shall be
graded to drain into these inlets.
PERRY'S FISH HOUSE, SHELBURNE ROAD
1. One of the curb cuts on Baldwin Avenue should be eliminated.
2. Existing sidewalk shall remain in place. Plan shows it re-
moved.
3. It is the intent of the City to increase the radius of the
curb at the Baldwin Avenue intersection to accommodate school
busses. This radius will increase to approximately 40 feet. Any
planting or signs should be placed at a location that will not
conflict with these improvments.
4. Plantings within the street r.o.w. should be limited to a few
trees especially along Shelburne Road where there is a good
possibility the street will be widened and plantings will have to
be removed.
5. Parking spaces should be at least 9'x18'. Plan shows them at
9'x15'.
TO:
FROM:
RE:
DATE:
�outb iS urlingtun Y irr D Epttrtmrnt ;
�3nittl� +�urlingt�Yt�, liaermant ll54[13 : � �` `�
(802) 658-i960
SO. BURLINGTON PLANNING COMMISSION
CHIEF GODDETTE SR.
TUESDAY MAY 7,1991 AGENDA ITEMS
MONDAY APRIL 15,1991
PERRY'S FISH HOUSE
PROJECT #834
SHELBURNE ROAD
DATED 3/25/91
PLANS HAVE BEEN REVIEWED BY THE DEPARTMENT AND
AT THIS TIME I AM PLEASED TO INFORM YOU THAT I
DO NOT SEE A PROBLEM FOR THE FIRE DEPARTMENT IN
GIVEN EMERGENCY PROTECTION IF NEEDED.
2. #265 KIRBY ROAD TWO LOT SUBDIVISION
PLANS WERE REVIEWED BY THE FIRE DEPARTMENT AND AT
THIS TIME THE ONLY PROBLEM I SEE AT THIS TIME IS
THE DRIVE WAY SHOULD BE AT LEAST 15' WIDE TO ALLOW
EMERGENCY EQUIPMENT IN IF NEEDED FOR AN EMERGENCY.
CITY OF SOUTH BURLINGTON
SITE PLAN APPLICATION
1) OWNER OF RECORD (name, address, phone #)
'�.r S074
2) APPLICANT (name, address,
907 -
3) CONTACT PERSON (name, address, phone # ) z41e
4) PROJECT STREET ADDRESS:
5) LOT NUMBER (if applicable)
6) PROPOSED USE(S)
0
7) SIZE OF PROJECT (i.e. total building square footage, # units,
maximum height and t floors, square feet per floor)
8) NUMBER OF EMPLOYEES
9) LOT COVERAGE: building _ %; landscaped areas %
building, parking, outside storage %
1 U ) COST ESTIMATES: Buildings $ , Landscaping $
Other Site Improvements (please list with cost) $
11) ESTIMATED PROJECT COMPLETION DATE:
12) ESTIMATED AVERAGE DAILY TRAFFIC (in and out)-/j
Estimated trip ends (in and out) during the following hours:
Monday through Friday 'I/t/' '
11-12 noon 12-1p.m. 1-2 p.m. 2-3 p.m.
3-4 p.m. 4-5 p.m. 5-6 p.m. 6-7 p.m.
13) PEAK HOURS OF OPERATION:
14) PEAK DAYS OF OPERATIO
DATE OF SUBMIS O 117
DATE OF EAR I NG
PLEASE SUBMIT FIVE COPIES AND ONE REDUCED COPY (11 X 17) OF THE
SITE PLAN WITH THE FOLLOWING INFORMATION:
Lot drawn to scale (20 foot scale if possible.)
Location of streets, abutting properties, fire hydrants, existing
buildings, existing landscaping.
Existing and proposed curb cuts, pavement, walkways.
Proposed landscaping plan (number, variety and size) equal to of
greater than the required amount in the Zoning Regulations.
Number and location of Parking Spaces: (9' x 18') with 22 or 24
foot aisles as required.
Number and location of compact car spaces. (This requires sepa-
rate Planning Commission approval).
Number and location of handicapped spaces as required. (13 feet
by 20 feet in size, one per every fifty spaces).
Location of septic tanks (if applicable).
Location of any easements.
Lot coverage information: Building footprint, building, parking
and outside storage, and landscaped areas.
Location of site (Street # and lot U .
North arrow
Name of person or firm preparing site plan and date.
2
/
D
l'F IFi
SIRLOIN___.
FINE DINING
--BEST, 1963-.
SHELBURNE, RUTLAND
8 MANCHESTER, VT
July 2, 1991
Mr. Joe Weith
South Burlington Planning Administrator
City of South Burlington
575 Dorset Street
South Burlington, VT 05403
RE: "Perry's Market" (Former Claussen's Florist
Dear Joe:
- �¢t�a#n
BURLINGTON, of
• DAKOTA•.
PI`1SF-IELO MA
F15H-HOU,gf.
s
S. BURLINGTON. VT
This letter is to follow up our discussions last week regarding the
change in retail operations at the building now occupied by
Claussen's Florist on the corner of Shelburne Road and Baldwin
Avenue. Currently, the building has been used by Claussen's
Florist as a specialty retail outlet selling plants, flowers, dried
flower arrangements, vases, balloons, cards, garden equipment
(plant containers, small garden tools, fertilizers, weed and pest
control products, etc.), and items related to the foregoing.
Claussen's has 3,100 square feet dedicated to retail use which
includes the outdoor sales area and the temporary greenhouse
structure.
We are proposing a specialty retail market which sells a limited
array of food products. The market will specialize in the sale of
fish and fish products similar to those sold at Perry's Fish House,
and will also sell meat products, particularly, bison grown on the
Perry Farms. In addition, the store will sell specialty gourmet
products related to the fish and meat, such as sauces and
condiments and breads. The array of food products that will be
available at the market will be quite limited in comparison to a
convenience store or small grocery store which usually carries
hundreds of items -- from food to medicines to magazines, take-
out sodas and beers, coffees, cigarettes, and lottery tickets --
and will be minuscule in comparison to a super market which has
hundreds of thousands of products.
We feel that there is no change in use from the florist to the
market. Both are specialty retail outlets with limited amount of
retail products being sold. Our proposed Perry Market will be open
for substantially the same hours as Claussen's, and the use of the
retail space in the market will mirror what is currently being used
now by Claussen's. We do not expect that the traffic will be any
different in its amount or generation patterns.
PERRY RESTAURANT GROUP
1908 SHELBURNE ROAD, SHELBURNE, VERMONT 05482 • (802) 985-8074
Page 2
It is our understanding that "retail businesses", such as
Claussen's or the Perry's Market, are a permitted use of the South
Burlington Zoning Ordinance within this district under Section
11.20, and since there is no change in the use of the building, we
do not believe that site plan approval under Section 19.10 is
required. We certainly recognize that the building is a non-
complying structure since it is a second structure on a single lot.
However, the structure is a pre-existing non -complying structure
and under Vermont law is entitled to continue to be used.
Furthermore, we recognize that we are limited to twenty-five (25%)
percent of the value of the building in structural changes.
However, we are not undertaking any significant structural changes
to the building and only undertaking facade changes which are not
subject to the limitations of Section 19.002.
The way we look at the change from Claussen's to Perry's is that
it is similar to a change of one tenant to another with similar
uses, and we do not believe that a zoning permit would be required
for such a change of tenant. We do understand, of course, that a
building permit would be necessary for any physical changes that
we might undertake in remodeling.
If you do not concur with me that the use is not a change in use
or that we have to go through site plan review in order to get
approval for Perry's Market, please let me know as soon as
possible. I will be glad to provide you with additional
information. I will also be glad to visit with the Planning
Commission in order to let them know all of our plans and to
provide them additional information.
Very truly yours,
David J. Melincoff
Director of Operations
DJM/lgg
City of South Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT 05403
PLANNER
658-7955
July 26, 1991
Mr. David Melincoff
Perry Restaurant Group
1908 Shelburne Road
Shelburne, Vermont 05482
Re: Perry's Restaurant Group
Dear Mr. Melincoff:
ZONING ADMINISTRATOR
658-7958
Enclosed is the agenda for next Tuesday's Planning Commission
meeting and my comments to the Planning Commission. Please be
sure someone is present on Tuesday, July 30, 1991 at 7:30 P.M. to
represent your request.
erely,
oe Weith,
City Planner
Encls
JW/mcp
Memorandum - Planning
July 30, 1991 agenda items
July 26, 1991
Page 4
Circulation: The existing circulation pattern will not change.
This existing pattern results in traffic exiting the drive
through and re-entering the flow of traffic in close proximity to
a busy four-way intersection (O'Dell Parkway). The proposed
modifications do not improve this situation. This situation will
get even worse if and when O'Dell Parkway is connected through to
Farrell Drive.
Traffic: Counts taken indicate that during the peak hour of the
generator, which is the noon hour, the trip generation equals 138
vte/hour. During the P.M. peak hour of the adjacent street
parking which is 4:00 - 5:00 P.M. the trip generators equals 106
vte/hour. This study also indicates that converting from a
drive-in bank to a walk-in bank will reduce the trip generation
by approximately 25% during peak periods and by 35% over an
entire weekday period.
The study references a recent LOS study prepared for the Ben
Franklin store to the north. The study indicates that the inter-
sections are currently operating at an acceptable LOS with the
existing drive -through bank. Therefore, the bank is not adverse-
ly impacting LOS. Staff concurs.
Landscaping: The proposed modifications will result in the loss
of 160 square feet of landscaped area and the addition of 468
square feet of landscaped area for a net increase of 308 square
feet.
Recommendation: It is staff's recommendations that there is
sufficient new evidence which addresses several of the Commis-
sion's earlier concerns and therefore warrants reconsideration of
the application. However, the concern regarding circulation
impacts still remains and should be addressed by the applicant.
5) DISCUSSION. PERRY RESTAURANT GROUP
ti L Ali _ j ui y i y i r�u e iti�; , ll�idr� "0 �IiCY Business " , I asked the
Commission's determination on whether Perry Group's proposal to
change the Claussen's Flower Shop building to a specialty market
of fish and other gourmet food items constituted a change or
expansion of use. The Commission decided that site plan review
was necessary. As described in the enclosed letter from the
appiicant, it is the applicant's opinion that the proposal does
not constitute a change or expansion of use. The applicant would
like the Commission to clarify its position.
4
Memorandum - Planning
July 30, 1991 agenda items
July 26, 1991
Page 5
The Planning Commission has ruled in the past that a change of
use occurs when a new proposed use falls within a different
permitted or conditional use category than that which the current
use is defined. Sections 11.10 and 11.20 list the permitted and
conditional uses for the C1 district. The existing flower shop
use and proposed speciality market use both fall within subsec-
tion 11.102, "Retail businesses". Therefore, the proposal does
not constitute a change in use.
The Planning Commission has also ruled that changes of specific
businesses within a use category which results in a use that
generates more traffic, more sewer allocation or more parking
constitute an expansion of use and therefore requires site plan
approval.
Traffic: I.T.E. lists various use categories and provides trip
generation rates for those categories. The existing use fits
within the "retail -general merchandise" use category. The pro-
posed use is somewhat unique and is difficult to apply to a
certain I.T.E. use category. The proposed use might fit within
one of the following categories: retail general merchandise,
supermarket, or convenience market. Based on the definitions
provided by I.T.E., it is staff's opinion that the proposed
specialty market best fits within the retail -general merchandise
category. If the Commission feels one of the other categories is
more appropriate, then an expansion of use will be .justified
since trip rates for supermarkets and convenience stores are
greater than retail -general merchandise.
Another option would be for the applicant to count trip genera-
tion of similar uses in the area to that of the proposed use
(e.g. Net Result) and compare to the existing use to estimate
whether or not there will be an increase in traffic.
Parking: Table I of the zoning regulations lists parking stand-
ards for various uses including 1) retail establishment -
individual business, 2) supermarkets, 3) convenience stores, and
4) shopping centers. As stated above, the existing use fits
7,7i t}':i n the retail establishment categoryy. Convenience stores
require more parking per square foot than "retail". Therefore,
if the Planning Commission determines the proposed use falls
within convenience store use, then more parking will be necessary
which constitutes an expansion of use. Supermarkets and shopping
centers require less parking per square foot than "retail".
Sewer: It is staff's opinion that the proposed use will not
require any more water use than the existing flower shop.
5
Memorandum - Planning
July 30, 1991 agenda items
July 26, 1991
Page 6
Summary: Based on the Commission's rulings, the proposal does
not constitute a change in use, however, it may constitute an
expansion of use which requires site plan review and approval.
It is staff's opinion that no additional parking or sewer alloca-
tion will result. In addition, staff feels that the new use best
fits within the ITE use category of retail -general merchandise.
If Planning Commission is concerned with potential increase in
traffic, I suggest the applicant conduct counts of a similar use
to that proposed and compare to counts of the existing use. If
greater traffic will result, an expansion of use is constituted,
which requires site plan review. If no increase in traffic will
result, there will be no expansion of use and therefore site plan
review is not required.
6) QUARRY HILL CLUB
This item was continued to this meeting.
indicated that he would like to withdraw his
not yet received a letter of withdrawal, but
Tuesday's meeting.
The applicant has
application. I have
should have it by
ti