Loading...
HomeMy WebLinkAboutSP-90-0000 - Decision - 1025 Shelburne RoadFINDINGS OF FACT & DECISION STATE OF VERMONT COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of General Mills Restaurant, Inc. for construction of a 3,714 square foot addition to a 4,786 square foot building (8,500 square feet total) for restaurant use, 1025 Shelburne Road. On the 13th of November 1990, the South Burlington Planning Commission approved the request of General Mills Restaurant, Inc. for site plan review under Section 19.10 of the South Burlington Zoning Regulations based upon the following findings: 1) General Mills, Inc. proposes to construct a 3,714 square foot addition to the Bob's Big Boy restaurant at 1025 Shelburne Road and covert it from a fast food restaurant (Bob's Big Boy) to a quality restaurant (Red Lobster). 2) The property is zoned Commercial 1 and is bounded on the north and west by undeveloped land, on the east by Shelburne Road and to the south by Champlain Farms and a cemetery. 3) Access/Circulation: the property is presently being served by two (2) accesses, one onto Shelburne Road and one onto the rear of the Champlain Farms property. The curb cut on Shelburne Road is proposed to be reduced in width from 34' to 26'. The curb cut onto the Champlain Farms property is presently 19 feet in width and is proposed to be widened to 20 feet. The access drive to the Champlain Farms property was required by the Planning Commission when it approved the site plan for the then Gulf Oil on March 9, 1976. The Commission also required this connection when it approved the subdivision for this lot and when it approved the site plan for Sambols Restaurant on October 19, 1976. This connection should continue to be maintained. Section 19.103(a) requires that there be only one driveway per lot. This lot has two (2) driveways, but only one of them di- rectly accesses a public street. This requirements is being met. Circulation of on -site traffic appears to be adequate. Both accesses to the property will be for both ingress and egress and the parking aisles meet the minimum requirements. 4) Seating: The existing restaurant has 168 seats and the proposed restaurant would have a total of 280 seats (255 dining and 25 lounge) 93 parking spaces are required for the seats and 21 spaces are required for the floor area used by patrons but having no seats for a total of 114 required spaces. The plan shows 122 parking spaces, including 3 handicapped spaces. Park- ing spaces and aisles widths meet the minimum requirements. 5) Coverage/Setbacks: Building coverage is 10.9'% (maximum allowed is 30%). Total lot coverage will be 69% (maximum allowed is 70%). All setback requirements will be met. 6) Sewer: The current sewer allocation for this property is 8,400 gallons per day. The proposed quality restaurant requires 30 gpd per seat for a total of 280 seats allowed under the present sewer allocation. 7) Traffic: This property is located in Traffic Overlay Zone 2. Based on I.T.E., Bob's Big Boy presently generates 213 trips during the P.M. peak hour and the Red Lobster will generate 82 trips during the P.M. peak hour. Traffic Overlay Zone 2 allows a lot of this size (1.79 acres) to generate a maximum of 39 trips per peak hour. Since the proposed trip generation exceeds the normal standard, Section 17.50 would apply. Improvements which will produce a net benefit for traffic flow is the reduction in size of the curb cut on Shelburne Road and a 61.5% reduction in the number of P.M. peak trips generated. 8) Landscaping: This project requires $12,500 in landscaping and the applicant will be meeting this requirement. 22 species of plant material will be used including juniper, pine, cypress, arborvitae, hemlock, crabapple, red maple and sugar maple. Due to the extent of new work proposed, the nature of existing land- scaping, and requirements of the applicant for extensive improve- ment of the landscaping, none of the existing plant materials are scheduled to remain. There is presently healthy and mature landscaping along the northerly side of the access drive to the Champlain Farm property which should not be removed. This landscaping consists of a pin oak and some large bushes. Maintaining this landscaping would enhance the appearance of the property. 9) Lighting: Both awning lighting and parking lot lighting will be downcast. ( DECISION & CONDITIONS Based upon the above findings of fact the Planning Commission approves the Site Plan application of General Mills Restaurant, Inc. for construction of a 3,714 square foot addition to a 4,786 square foot building (8,500 square feet total) for restaurant use as depicted on a plan entitled, "Red Lobster, Route 7, Shelburne Road, South Burlington, Vermont", last revised 10/30/90 with the following stipulations: 1) The applicant shall post a 3-year bond in an amount equal to the value of the plantings and installation ($50,000) included on the landscaping plan. 2) This approval is contingent upon a maximum of 280 seats (both restaurant and bar). Any increase in seats will require approval by the Planning Commission. 3) The subject property is located in Traffic Overlay District 2 which allows a maximum peak hour trip generation of 39 trip ends. The proposed use is expected to generate 82 peak hour trip ends. Section 17.504 of the South Burlington Zoning Regulations allows the Planning Commission to approve a use which exceeds the trip generation limit if it finds that certain factors produce a net benefit for traffic flow in the vicinity of the site. It is the Commission's opinion that the proposed use will generate less trips during the peak hour than the existing use and, therefore, rules that the requirements of Section 17.504 are satisfied. 4) The expanded parking lot shall be graded so that it drains to the west. 5) Prior to issuance of a building permit, the applicant shall submit a letter from VAOT approving the driveway modifications on Route 7. 6) The staff shall identify the existing landscaping that should be retained and included in the landscaping plan. 7. The zoning permit shall be obtained within 6 months or this approval is null and void. Chairma oi-/Clerf,, South Burlington Planning Commission