Loading...
HomeMy WebLinkAboutSD-94-0000 - Decision - 0981 Shelburne Road (4)FINDINGS OF FACT & DECISION STATE OF VERMONT COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of Hannaford Brothers Company for: 1) subdivision of 41.9 acres of land on Shelburne Road into three (3) lots of 1.8 acres (existing Red Lobster Restaurant), 1.6 acres (existing Burger King Restaurant) and 38.5 acres and 2) construction of a ten (10) building planned unit development on the 38.5 acre lot consisting of 202,546 square feet of shopping center use, a 55,000 square foot supermarket, a 95 room hotel, and a 2,500 square foot bank with drive -through service, 981 Shelburne Road. On the 15th of November, 1994, the South Burlington Planning Commission approved the request of Hannaford Brothers Company for final plat approval under Section 204 of the South Burlington Zoning Regulations based on the following findings: 1. This project consists of the following: 1) subdivision of 41.9 acres of land into three (3) lots of 1.8 acres (existing Red Lobster Restaurant), 1.6 acres (existing Burger King Restaurant) and 35.8 acres, and 2) construction of a ten (10) building planned unit development on the 38.5 acre lot consisting of 202,546 square feet of shopping center use, a 55,000 square foot supermarket, a 95 room hotel and a 2,500 square foot bank with drive -through service. Preliminary plat was approved on 9/14/93 and amended on 8/30/94 and 10/25/94. 2. This property at 981 Shelburne Road is located in the Cl District. It is bounded on the north by a gas station/mini-mart, K-Mart Plaza, undeveloped property along Queen City Park Road and Champlain Water District offices, on the east by Shelburne Road, on the south by a gas station/mini-mart, a cemetery, an auto dealership and the residential portion of L&M Park and on the west by a railroad r.o.w. 3. Access/circulation: Access to the development will be provided by a new street (to remain private) opposite Laurel Hill Drive to be known as Martin's Drive. This new street will intersect with a new north -south street connecting with Fayette Road to the south and the K-Mart property to the north. In addition to the north - south street connection with the K-Mart property, the applicant is reserving a 60 foot r.o.w. to the west of Burger King to connect with the adjacent Jolley Associates property as recommended by City staff. The applicant does not currently have a r.o.w. across the Jolley Associates property at this location. The Burger King curb -cut on Shelburne Road will be eliminated and a new curb cut on the proposed Martin's Drive opposite the curb -cut for the proposed bank will be constructed. 1 4. Coverage: Area Description Building % Overall % Project area (not including Red Lobster/Burger King 16.7 61.3 Burger King (as proposed) 8.8 64.8 Red Lobster (as proposed) 7.6 66.9 Total parcel (includes Red Lobster/Burger King) 16.0 61.7 Front Yard Area Description Coverage Red Lobster 14.8 Burger King along Shelburne Road 14.8 Bank and hotel "parcel" along Shelburne Road 0 South of Martin's Drive 48.1 North of Martin's Drive to 60' r.o.w. 65.1 North of Martin's Drive, 60' r.o.w. to Fayette Road 59.7 North of Martin's Drive, Shelburne Road to Fayette Road 58.8 East of Fayette Road "hotel parcel" 51.8 East of Fayette Road between Martin's Drive and K-Mart 62.8 West of Fayette Road 75.9 Along east side of 60' r.o.w. to Jolley Associates 70.1 Along west side of 60' r.o.w. to Jolley Associates 92.1 5. The table above shows that building and overall coverage will be met for the entire development. Front yard coverage will be met along Shelburne Road. Front yard coverage will not be met along the proposed streets (i.e., Martin's Drive and Fayette Road). The Planning Commission may modify the front yard coverage requirements under Section 12.406(b) of the zoning regulations. 6. Setbacks: Buildings A, B, C and J will meet the setback requirements. Building D, E, F, G and H do not meet setback requirements as these buildings will be directly fronting the Fayette Road r.o.w. Building I (hotel) does not meet the setback from Martin's Drive. The Planning Commission may modify the setback requirements under Section 12.406(b) of the zoning regulations. 7. Parking: The Burger King lot requires 77 spaces and 79 spaces are available. The Red Lobster lot requires 93 spaces and 122 spaces are available. The Southland PUD lot requires 1,325 spaces and 1401 spaces are available including 56 handicapped spaces. This total includes 53 reserve spaces. Bicycle parking and storage 2 facilities are being provided in accordance with Section 26.253(b) of the zoning regulations. 8. Landscaping: The minimum landscaping requirement, based on building costs, is $87,500 which is being met. The street trees have an estimated value of $20,220. The landscaping bond required for this project is therefore $107,720. A wide variety of plantings are proposed including Norway Maple, Green Ash, Ginkgo, Honeylocust, Norway Spruce, White Pine, Littleleaf Linden, Dogwood, Burning Bush and Viburnum. 9. Wetlands: The applicant has worked with the Natural Resources Committee with regards to storm water runoff and wetland impacts. The plans submitted incorporate their recommendations. These plans identify Class II and Class III wetlands. 10. Recreation path: The plat shows a 20 foot easement along the westerly boundary along the railroad tracks without a connection to the north side of building B. The preliminary plat plans showed a connection to building B. The exact location of the easement is to be determined at a later date. Comments from the Recreation Path Committee which recommends a recreation path easement connecting to Shelburne Road was submitted. 11. Sewer: The Planning Commission granted a sewer allocation of 32,255 g.p.d. at preliminary plat approval. The applicant will be required to pay the per gallon fee prior to the issuance of a zoning/building permit for each building. 12. Traffic: A letter from the VAOT granting preliminary approval of the proposed improvements to Shelburne Road was submitted. The VAOT agrees with the conclusion that traffic generated by the Southland Project can be accommodated within the corridor without significant adverse impact to the system. Table 1 of the updated traffic study indicates that the southbound thru movement at the Route 7/Brewer/Burlington Plaza intersection will operate at LOS E. All intersections between Holmes Road and Home Avenue will operate at LOS D or better. Improvements will be made to the Route 7/Southland/Laurel Hill intersection, although this intersection will not allow westbound and eastbound thru movements. "Short term" improvements to the Route 7 intersections with Green Mountain Drive and Allen Road will be implemented. These intersections currently operate at LOS F will continue to operate at LOS F after the impact but it will be a more improved LOS F. Other impact proposed include: 1) implementing the proposed signal operation changes at the Shelburne Road/Fayette Road intersection and the proposed corridor signal timing program recommended in the VHB traffic impact analysis, 2) completing the portion of Fayette Road on L&M Park property, 3) contribute $7,943 to the Shelburne Road Intersection Improvement Fund, 4) working with CCTA to construct a bus transfer station within the 3 development, 5) become a formal participating member of the Shelburne Road Corridor Transportation Management Association, and 6) phasing of eastbound left -turn lanes. Other: --- on sheet S-1 the access to Orchard School is incorrectly shown. --- the proposed plat does not show the recreation path r.o.w. to building B. --- on sheet S-3 building #5 in L&M Park is not shown in its correct location. --- the plan should also be revised to show the correct front yard coverage information for the Red Lobster lot. --- the proposed subdivision plat should change the lease line designation around the Burger King and Red Lobster lots to property lines. --- street r.o.w.'s should not be shown as property line. DECISION & CONDITIONS Based on the above Findings of Fact, the South Burlington Planning Commission approves the final plat application of Hannaford Brothers Company for: 1) subdivision of 41.9 acres of land into three (3) lots of 1.8 acres (existing Red Lobster Restaurant), 1.6 acres (existing Burger King Restaurant) and 38.5 acres, and 2) construction of a ten (10) building planned unit development on the 38.5 acre lot consisting of 202,546 square feet of shopping center use, a 55,000 square foot supermarket, a 95 room hotel, and a 2,500 square foot bank with drive -through service, 981 Shelburne road, as depicted on a 27 page set of plans, page one (1) entitled "Southland, South Burlington, Vermont", prepared by FitzPatrick- Llewellyn, Inc. and Dunn Associates, Inc., dated November 3, 1994, with the following stipulations: 1. Any previous approvals and stipulations affecting the subject property which are not superseded by this approval shall remain in effect. 2. All lighting to be installed on private property shall be downcasting and shielded so as not to cast light beyond the property line. Any change in lighting shall be approved by the City Planner prior to installation. 3. Prior to issuance of a zoning/building permit, the applicant shall post a $107,720 landscape bond to cover the installation cost and value of proposed street trees and site landscaping. The bond shall remain in effect for three (3) years to assure that the planted landscaping has taken root and has a good chance of surviving. 4 4. In order for the Commission to find that the proposed development will not cause unreasonable highway congestion or unsafe conditions with respect to use of the highways, the applicant shall be responsible for the following: a) Install signal and construct improvements to the project access with Route 7 as shown on the plans, except as provided in subsection (i) below. The signal shall include a pedestrian phase. b) Construct "short term" improvements to the Route 7 intersections with Green Mountain Drive and Allen Road as shown on sheets 1 and 2 of plans prepared by Webster -Martin, Inc. entitled "South Burlington Shelburne Road Study", dated April, 1991. Final plans showing these improvements shall be submitted to the City Engineer for approval prior to issuance of a zoning/building permit. c) Implement the proposed signal operation changes at the Shelburne road/Fayette road intersection and the proposed corridor signal timing program recommended on page 16-17 of the Vanasse Hangen Brustlin, Inc. traffic impact analysis dated 10/26/94. d) Prior to the start of construction or issuance of a zoning/building permit, the applicant shall submit to the City a letter from VAOT approving the improvements referenced in a) and c) above. Such improvements shall be completed prior to occupancy of the first building. e) The portion of Fayette Drive on L&M Park property as shown on Sheet #7 of the plans shall be complete prior to occupancy of the first building. f) Contribute $7,943 to the Shelburne Road Intersection Improvement Fund prior to issuance of a zoning/building permit for the first building. g) Work with CCTA to construct a bus transfer station within the development. h) Become a formal participating member of the Shelburne Road Corridor Transportation Management Association, if the organization still exists. The applicant shall submit evidence to the City prior to issuance of a zoning/building permit which shows compliance with this requirement. i) Until such time as 60% of the development is constructed, there shall be only one eastbound left turn lane at the Southland/Laurel Hill/Route 7 intersection. The signal shall be phased to allow eastbound and westbound thru's. When 60% of the development is constructed, two eastbound left turns 61 shall be provided and thru movements shall be prohibited as recommended in the traffic impact study, unless otherwise approved by the Planning Commission. This stipulation is contingent on approval by the VAOT. If VAOT does not approve this condition, then the applicant shall construct as part of Phase I the eastbound left turns as proposed. 5. Prior to issuance of a zoning/building permit or start of roadway or utility construction, all appropriate legal documents including easements (e.g., utility, sewer, drainage, water, recreation path, etc) shall be submitted to the City Attorney for approval and recorded in the South Burlington land records. 6. The final plat plans shall be revised as follows: a) The access to Orchard School shall be correctly shown on sheet S-1. b) The proposed plat shall show the recreation path easement connecting to the parking area near building B. c) The proposed plat shall be revised to show the lease line designation around the Burger King and Red Lobster lots to property lines. d) Building #5 in L&M Park shall be shown in its correct location on sheet S-3. e) The correct front yard coverage information for the Red Lobster shall be shown on sheet S-3. f) The proposed plat shall show water and sewer easements in a location approved by the City Engineer. 7. Prior to issuance of a zoning/building permit or start of roadway or utility construction, bonds to cover the costs of roadway, utility, and sidewalk construction shall be posted. The amount of the bond shall be approved by the City Engineer. 8. A sewer allocation of 32,255 gpd is granted. The applicant shall pay the per gallon fee prior to issuance of a zoning/building permit for each building in the development. 9. The developer shall furnish to the City, at least 7 days prior to beginning of road construction, the name of the contractors doing the street and utility work and the architect and/or engineer who will stake out and supervise the work . 10. In accordance with Section 301.5 of the subdivision regulations, within 14 days of completion of required improvements (e.g., streets, water mains, sanitary sewers, storm drains, etc) the developer shall submit to the City Engineer "as -built" 2 construction drawings certified by a registered engineer. 11. In accordance with Section 12.406(b) of the zoning regulations, the Planning Commission modifies the front yard coverage to exceed the 30% limitation as follows: South of Martin's Drive 48.1 North of Martin's, Shelburne Road to 60' r.o.w 65.1 North of Martin's Drive, 60 ' r.o.w. to Fayette Road 59.7 North of Martin's Drive, Shelburne Road to Fayette Road 58.8 East of Fayette Road "hotel parcel" 51.8 East of Fayette Road between Martin's Drive and K-Mart 62.8 West of Fayette Road 75.9 Along east side of 60' r.o.w. to Jolley Associates 70.1 Along west side of 60' r.o.w. to Jolley Associates 92.1 12. In accordance with Section 12.406(b) the Planning Commission modifies the setbacks for buildings D, E. F, G, H and I as shown on the approved plans. 13. Prior to recording the final plat plans, the applicant shall record a "Notice of Conditions of Subdivision Approval" which describes the management of the private streets in the development. This document shall be approved by the City Attorney and recorded in the South Burlington land records prior to recording the final plat plans. 4. The final plat plans shall be recorded in the land records within 90 days or this approval is null and void. The plans shall be signed by the Planning Commission Chair or Clerk prior to recording. 15. The entire project shall be completed within 10 years. Any portions of the project which are not completed within 10 years shall no longer be approved unless reapproved by the Planning Commission. Chairman or Clerk South Burlington Planning Commission Date 7