Loading...
HomeMy WebLinkAboutSP-98-0000 - Decision - 0029 Berard DriveFINDINGS OF FACT & DECISION C - s STATE OF VERMONT COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of Mike Barry and Tom Chase to amend a previously approved plan for a 20,800 square foot building with 17,800 square feet used for auto repair and service and 3,000 square feet for warehouse use. The amendment consists of: 1) increasing the size of the building by 1338 square feet, 2) adding multiple uses, and 3) revising the parking layout, 29 Berard Drive. On the Pday of March, 1998, the South Burlington Planning Commission approved the request of Mike Barry and Tom Chase for site plan review under Section 26. 10 of the South Burlington Zoning Regulations based on the following findings: 1. This project consists of amending a previously approved plan for a 20,800 square foot building with 17,800 square feet used for auto repair and service and 3,000 square feet for warehouse use. The amendment consists of 1) increasing the size of the building by 1338 square feet, 2) adding multiple uses, and 3) revising the parking layout. This property was last reviewed on 5/10/88 . The ZBA on 2/23/98 approved a request from applicant for the multiple uses. 2. This property located at 29 Berard Drive lies within the IC District and C.O. District. It is bounded on the north and west by the Winooski River, on the south by an industrial building, and on the east by Berard Drive and undeveloped land. 3. This property is currently approved for the following uses which are permitted in the IC District. Permitted Uses: 15.107 Warehousing, storage and distribution facilities Conditional Uses 15.205 Automobile repair and service 4. The applicant is requesting to also use the building for any of the permitted uses listed below. This request is being made with the provision that all the uses would not require more than 115 parking spaces and would not generate more than 96.9 vehicle trip ends (vte's) during the P.M. peak hour. Permitted Uses 15.101 General offices 15.103 Light manufacturing 15.104 Research and testing laboratories 15.106 Wholesale establishments 15.111 Equipment service and repair shops not including retail 15.113 Accessory uses to uses listed above 5. The reason for this type of request is so the applicant can have the flexibility of changing tenants whose uses fall within the approved traffic and parking limits without having to return to the Planning Commission each time. When a use is to be changed, the applicant would contact the City Planner and he/she would review the existing and proposed use to make certain it does not exceed the upper limits approved by the Planning Commission. 6. The following is an example of how this would work: Use Square feet Parking required P.M. Peak Tdps Auto Repair 7338 13 39.26 Light Manufacturing 900 1 0.68 Warehouse 2100 7 1.19 Wholesale 3900 5 11.8 Warehouse 6500 53 3.7 Vacant 1200 — — 22,138 79 56.63 7. Access/circulation:, Access is provided by a 30 foot curb cut on Berard Drive. This access primarily serves the southerly portion of the building. The northerly portion of the building is served by a curb cut on Berard Drive with an access drive on the adjacent property to the east. The applicant does not have legal access to use this r.o.w. which is also used by GMP. The owner of the r.o.w. does not mind the applicant using it but can not give an easement because the property is under contract. Circulation on the site is adequate. 8. Coverage/setbacks: Building coverage is 14.8% (maximum allowed is 30%). Overall coverage is 54.5% (maximum allowed is 70%). Front yard coverage is 40.8% (maximum allowed is 30%). This is an existing situation which will not be made worse by this application. Setbacks are being met. 9. Landscaping: The minimum landscaping requirement, based on building costs, is $450 which is not being met. Plan should be revised to add the required amount of additional landscaping. 10. Parking: A total of 75 spaces are required and 115 spaces including four (4) handicapped spaces K and a bike rack are being provided. Parking space #115 should be lengthened to 22 feet to meet the parking standards. The parking aisle to the east of spaces #57-75 and #99-111 does not meet the 22 foot width requirement. The plan should be revised to meet this requirement. The paved area should be striped as shown on the approved plan. 11. Traffic: Staff estimates that the current facility generates 96.9 vehicle trip ends (vte's) during the P.M. peak hour. Any combination of uses can not exceed 96.9 vte's without approval from the Planning Commission. 12. Sewer: This property is served by an on -site septic system. 13. Lightina: Exterior lighting consists of seven (7) building mounted lights with downcasting shielded fixtures. The existing floodlight should be removed or replaced with a downcasting shielded fixture approved by the City Planner. 14. Building connection: There currently exists two (2) buildings on this property which is a violation of Section 26.651 of the zoning regulations. The 1988 approval showed that these two (2) buildings would be connected to form one (1) building. This connection was never built. This connection must be built and completed along with all the site modifications by June 15, 1998. 15. Storage trailers: The three (3) storage trailers on the site will be moved to the rear of the building. 16. Dumpsters: All dumpsters on the property will be screened by placing them behind the building. DECISION & CONDITIONS Based on the above Findings of Fact, the South Burlington Planning Commission approves the application of Mike Barry and Tom Chase to amend a previously approved plan for a 20,800 square foot building with 17,800 square feet used for auto repair and service and 3,000 square feet for warehouse use. The amendment consists of, 1) increasing the size of the building by 1338 square feet, 2) adding multiple uses, and 3) revising the parking layout, 29 Berard Drive, as depicted on a plan entitled "Quarry Point Condominiums 29 Berard Drive South Burlington, Vermont," prepared by Michael Dugan, Architect, dated 11/23/83, last revised on 2/6/98, with the following stipulations: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. The plan shall be revised to show the changes below and shall require approval of the City Planner. Three (3) copies of the approved revised plan shall be submitted to the City Planner prior to permit. — The site plan shall be revised to add the required amount of additional landscaping. — The site plan shall be revised to lengthen parking space #115 to 22 feet. 3 The site plan shall be revised to widen the parking aisle east of spaces #57-75 and #99-111 to 22 feet. 3. This approval includes the following uses which are currently permitted in the IC District: general offices; light manufacturing; research and testing laboratories; wholesale establishments; warehousing, storage and distribution facilities; equipment service and repair shops not including retail; automobile repair service; and accessory uses to uses listed above. If the zoning regulations change so that any of the above uses are no longer permitted, then those uses which are no longer permitted shall no longer be approved. 4. This approval is conditioned on a maximum of 115 parking spaces and 96.9 vehicle trip ends (vte's) during the P.M. peak hour. 5. The applicant shall obtain approval from the City Planner prior to the change of any tenant in the building. The City Planner shall approve the proposed new tenant only if the proposed combination of uses fits within the limitations established in the stipulation #4 above. In making his determination, the City Planner shall utilize the parking standards contained in Appendix A in the Zoning Regulations, and trip generation rates contained in the I.T.E. Trip Generation Manual. If a use is proposed which does not fit clearly within any of these standards, or if a shared parking concept is proposed in order to meet the parking limit, the applicant shall obtain approval from the Planning Commission for the proposed use. 6. All exterior lighting shall consists of downcasting shielded fixtures. Any change to approved lights shall require approval of the City Planner prior to installation. The existing flood light shall be removed or replaced with a downcasting shielded fixture approved by the City Planner. 7. The paved parking area shall be striped as shown on the approved plan. 8. Prior to issuance of a zoning permit, the applicant shall post a $450 landscape bond. The bond shall remain in effect for three (3) years to assure that the landscaping takes root and has a good chance of surviving. 9. The building connection shall be built and completed along with all the site modification by June 15, 1998. 10. The applicant shall obtain a zoning permit within six (6) months pursuant to Section 27.302 of the zoning regulations or this approval is null and void. 11. The applicant shall obtain a Certificate of Occupancy/Compliance from the Administrative Officer after the site modifications are complete. 4 12. Any change to the site plan shall require approval by the South Burlington Planning Commission. C air'; -'I 0 hi "mAn 'r'Cfe—rk South Burlington Planning Commission 21�� C,/�� f1l Date