Loading...
HomeMy WebLinkAboutSD-00-27 - Decision - 0981 Shelburne Road#SD-00-27 FINDINGS OF FACT AND DECISION STATE OF VERMONT COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, final plat application of Lowe's Companies, Inc. to amend a 10 building planned unit development on a 38.9 acre lot consisting of 201,461 square feet of shopping center use, a 55,000 square foot supermarket, a 95 room hotel, and a 3585 square foot bank with drive -through service. The amendment consists of. 1) eliminating building, B, (28,715 square feet), 2) increasing the size of building C from 107,806 square feet to 121,292 square feet, and 3) modifications to the parking layout for building C. The applicant also seeks a five year extension to the previously approved completion date of January 17, 2005. On the 20th of June, 2000, the South Burlington Development Review Board approved the final plat application of Lowe's Companies, Inc. under Section 204 of the South Burlington Subdivision Regulations based on the following findings: 1. This property at 981 Shelburne Road is located in the Cl District. It is bounded on the north by a gas station/mini-mart, K-Mart Plaza, undeveloped property along Queen City Park Road and Champlain Water District offices, on the east by Shelburne Road and on the south by a gas station/mini-mart, a cemetery, an auto dealership and the residential portion of the L&M Park and on the west by a railroad r.o.w. 2. The owner of record is Southland Enterprises, Inc. 3. Access/circulation: No changes to access proposed. Access to the development is provided by a street (to remain private) opposite Laurel Hill Drive known as Hannaford Drive. This street intersects with a new north -south street connecting with Fayette Road to the south and the K-Mart property to the north. In addition to the north -south street connection with the K-Mart property, the developer has reserved a 60 foot r.o.w. to the west of Burger King to connect with the adjacent Jolley Associates property as recommended by City staff. The City currently has an Irrevocable Offer of Dedication for a 60 foot now. across the Jolley Associates property at this location. A pedestrian crossway is provided from access drive B to building C. 4. Coverage/setbacks: All coverages and setbacks, as depicted on page five entitled "Amended Overall Site Plan" of a 37 page set of plans entitled "Site Plan for Lowe's Home Center, Inc. South Burlington, Vermont, Shelburne Road — Route 7" with a stamped received date of May 16, 2000, are acceptable taking into account the front yard coverage waivers granted by the Planning Commission in previous approvals. Setback requirements are met. 5. Parking: This project requires a total of 1253 parking spaces and 1281 spaces are available including 40 handicapped spaces. A bike rack is provided adjacent to building C. Staff suggests that the applicant has provided a parking summary addressing the parking requirements in relation to the proposed uses of the buildings. 6. Landscaping The minimum landscaping requirement, based on building costs, is $57,500. This requirement is being met. The proposed landscaping includes 25 Autumn Blaze Maples, 31 Green Ash, 79 White Spruce, 400 Rugosa Rose, and 228 Common European Cranberrybush. 7. Sewer: No additional sewer allocation is requested. 8. Traffic: No additional traffic is anticipated since the overall development will be reduced in size by 15,229 square feet. Condition 4(i) of the 11/15/94 approval is as follows: "Until such time as 60% of the development is constructed, there shall be only one eastbound left turn lane at the Southland/Laurel Hill/Route 7 intersection. The signal shall be phased to allow eastbound and westbound throughs. When 60% of the development is constructed, two eastbound left turns shall be provided and through movements shall be prohibited as recommended in the traffic impact study, unless otherwise approved by the Planning Commission. This stipulation is contingent on approval by the VAOT. If VAOT does not approve this condition, then the applicant shall construct as part of phase I the eastbound left turns as proposed." The construction of building C will result in 70% of the development being constructed. Lamoureux and Dickinson were contracted to evaluate if any additional improvements were necessary. This report recommends that a connection be provided to the adjacent K-Mart plaza and the requirement for a double left -turn lane exiting Hannaford Drive onto Shelburne Road be deleted. The applicant is willing to comply with these recommendations. Staff recommended that the K-Mart connection not be opened until the K-Mart property has been amended to allow this new access. A Certificate of Occupancy should not be issued for the Lowe's building until this connection has been made. Staff requested that the applicant address the necessity of the double left -turn lane exiting Hannaford Drive to accommodate further build -out of the project site. The applicant should specifically address at what build -out level this turn lane may be necessary. 9. Lighting Lighting details (cut -sheets) for the exterior lighting have been provided and are subject to approval by the Director of Planning & Zoning. The locations of all exterior lights have been noted on the plans. The proposed lights include several pole mounted 250 watt high pressure sodium fixtures, one building mounted 400 watt high pressure sodium fixture, one building mounted 100 watt high pressure sodium fixture, and one pole mounted 400 watt high pressure sodium fixture. 10. Recreation Path: The applicant has meet with the Recreation Path Committee on January 3, 2000. The Committee recommended maintaining a flexible easement running north to south across the property. 11. Condition 14: The applicant is seeking relief from Condition 14 of the Planning Commission approval dated January 17, 1995. The condition states: "The entire project shall be completed within 10 years. Any portions of the project which are not completed within 10 years shall no longer be approved unless reapproved by the Planning Commission." The project must be completed by January 17, 2005. The applicant requested a five year extension that would require project completion by January 17, 2010. Staff had no problem with granting this extension. DECISION AND CONDITIONS Based on the above Findings of Fact, the South Burlington Development Review Board approves the final plat application #SD-00-27 of Lowe's Companies, Inc. to amend a ten building planned unit development on a 38.9 acre lot consisting of 201,461 sq. ft. of shopping center use, a 55,000 sq. ft. supermarket, a 95 room hotel, and a 3585 sq. ft. bank with drive -through service. The amendment consists of: 1) eliminating building B (28,715 sq. ft.), 2) increasing the size of building C from 107,806 sq. ft. to 121,292 sq. ft, and 3) modifications to the parking lot layout for building C, Hanaford Drive, as depicted on a 34 page set of plans, page one entitled "Lowe's of South Burlington, Vermont," prepared by DeLuca -Hoffman Associates, Inc, dated 5/12/00 with the following stipulations: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. The plat plans shall be revised to show the changes below and shall require approval of the Director of Planning & Zoning. Four copies of the approved revised plans shall be submitted to the Director of Planning & zoning prior to recording: a. The final plat plan (sheet 14 of 37) shall be revised to reduce the height of the pole lights designated a `B" on the plan to a maximum of 20 feet. b. The final plat plans shall be revised to provide a loading only zone along the east side of the building clearly marked "No Parking." There shall be no storage of materials in the loading zone. c. The survey plat shall be revised to show the revised water and sewer easements which will be dedicated to the City. 3. Prior to issuance of a zoning permit for each phase of this development, the applicant shall post a landscape bond to cover the cost of all landscaping associated with the phase under consideration. The amount of the bond shall be determined by the Administrative Officer. The bond shall remain in effect for three years to assure that the landscaping takes root and has a good chance of surviving. 4. Prior to permit issuance, the applicant shall provide a parking summary for the entire development addressing the parking requirements in relation to the proposed uses of the buildings. 5. The access to the property to the north (K-Mart) shall not be opened until the Development Review Board amends the play for the property to the north. A Certificate of Occupancy/Compliance for the applicant's building shall not be issued until this connection is open to the public. 6. All exterior lighting shall consist of downcasting shielded fixtures. Any change to approved lights shall require approval by the Director of Planning & Zoning prior to installation. 7. Condition 414 of the 1/17/95 approval shall be revised to read as follows: "The entire project shall be completed within 15 years. Any portions of the project which are not completed within 15 years shall no longer be approved unless reapproved by the Development Review Board." 8. Condition #41 of the 11/15/94 approval which requires the construction of two eastbound left turn lanes when 60% of the development is constructed is hereby eliminated. 9. The 20 foot sewer force main easement along the southerly boundary shall be accessible to maintenance equipment. Large trees shall not be planted within this easement. 10. Where material is being removed (cut) from sewer force main easement, the depth of cover shall be at least 5 feet. 11. Recycled crushed concrete and asphalt may be used for road and parking area base course. 12. Permanent structures including concrete slabs and footings shall not infringe upon sewer and water easements. 13. Prior to permit issuance, the applicant shall record amended legal documents approved by the City Attorney for the revised water and sewer line easements to be dedicated to the City_ 14. Any change to the final plat plans shall require approval of the South Burlington Development Review Board. 15. The final plat plans (sheets 3 of 37, 4 of 37 and 8A of 37) shall be recorded in the South Burlington land records within 90 days or this approval is null and void. The plans shall be signed by the Development Review Board Chair or Clerk prior to recording. Prior to recording the final plat plan, the applicant shall submit a copy of the plans to be recorded in digital format. The format of the digital information shall require approval of the Director of Planning & Zoning. 16. Sheet 8A shall be amended to show a 20 foot wall in the material staging area and a 20 foot chain link fence around the material staging area. 17. Sheet 5 will be amended to show a sidewalk between Building D and the K-Mart property. 6 /C air or Clerk Date South Burlington Development Review Board