Loading...
HomeMy WebLinkAboutZB-90-0000 - Decision - 0907 Shelburne RoadFINDINGS OF FACT & DECISION STATE OF VERMONT COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of Richard Lucia for construc- tion of a 2 story, 4 room addition (826 square foot building footprint), 907 Shelburne Road. On the 18th of April 1990 the South Burlington Planning Commis- sion approved the above referenced site plan under Section 19.10 of the South Burlington Zoning Regulations and under Section 204 of the South Burlington Subdivision Regulations based upon the following findings: 1. Mr. Richard Lucia proposes to construct a 1728 square foot two-story addition (863 square foot building footprint), housing 4 new motel units, to the existing rear building of the Maple Leaf Motel. Mr. Lucia proposes to modify access entering and exiting the motel complex. The property is located in Zone 1 of the Traffic Overlay District and is zoned C-1. 2. The South Burlington subdivision regulations include commer- cial complexes in the definition of subdivision. Commercial complexes are defined as two or more buildings under one owner- ship for one user such as a motel. Therefore, this project is required to go through the subdivision review process. 3. The plan incorrectly indicates the size of the lot. The lot includes the right-of-way and therefore is 1401 x 1801 or 25,900 square feet. This is important when calculating allowable trips and coverage. The plan should be revised to correctly show this. 4. Access: Access will be at the eastern section of the lot through a combined entrance (16' wide) and exit (12' wide) drive off Shelburne Road. Currently, this access road is neither marked nor divided. A raised island will be installed to sepa- rate exiting and entering traffic. Exiting traffic on to Shel- burne Road will be limited to southbound travelers, guided by signage indicating "right -turn -only". Northbound traffic will be diverted northwesterly through the property to the north via a shared right-of-way to Queen City Park Road. Signs will be installed to direct northbound traffic. Currently, all ingress and egress for all turning movement is via the access drive off Shelburne Road. 5. Circulation: Primary circulation on the site is provided by a 251 x 291 foot wide access drive along the north property line. A parking area extends to the south off the access drive between the front and rear buildings. r 6. Parking: 19 spaces are required to accommodate the proposed 18 units and 1 employee. 20 spaces are proposed, one of which is a handicapped space. 7. Landscaping: The project requires $2,100 worth of new land- scaping. 8. Traffic: The property is in Traffic Overlay Zone 1. The estimated trip ends at peak P.M. hour is 24 (based on ITE Trip Generation Manual). The permitted trip ends are 10. It should be noted that the existing 14 unit motel generates 18 peak hour trip ends (based on ITE). Therefore, the addition generates 6 additional peak hour trips. The revised access plan is an im- provement and outweighs the 6 additional trip ends. 9. Setbacks/Coverage: Side and rear yard setbacks meet zoning requirements. Building A, the front building to which no reno- vation will be done, has a front yard setback of 1' rather than the required 50'. It is the opinion of the Zoning Administrator that restrictions on alterations in this complex would apply only to Building A, not. Building B (rear), (see Section 19.002, South Burlington Zoning Regulations). The addition is proposed on Building B. 10. Coverage: Proposed building coverage is 26% (30% maximum allowed) and proposed total lot coverage is 70%, the maximum allowed. DECISION & CONDITIONS Based upon the above findings of fact, the South Burlington Planning Commission hereby approves the site plan and Final Plat amendment application of Richard Lucia for construction of a 2 story, 4 room addition (826 square foot building footprint) as depicted on the plan titled "Maple Leaf Motel, 907 Shelburne Road, South Burlington, Vermont," prepared by Graphic/Construc- tion Management Services, Inc. and dated 11/3/88, last revised 3/31/89 subject to the following stipulations: 1. A $2100, 3-year landscaping bond shall be posted prior to permit. The landscaping plan shall be revised to show the pro- posed Norway Maples along the north property line. Also, the plan shall show the proposed location of the trees indicated as to be relocated. 2. The plan shall be revised to show the following: a) Sidewalk to be constructed along Shelburne Road, b) the location of the Champlain Water District main and easement, and; c.) a note indicating that the raised island will be a mountable, concrete island, 6 inches high and will have reflectors mounted on it. 3. All work proposed within the water main easement including landscaping shall be reviewed and approved by the Champlain Water District. 4. A sewer allocation of 800 gpd is granted. The applicant shall pay the $2.50 gpd fee prior to permit. 5. The applicant shall contribute $154 to the Shelburne Road Intersection Improvement Fund based on the 6 additional peak hour trips to be generated by the addition. 6. The applicant shall submit a revised plan addressing stipula- tions 1 and 2 to the City Planner and City Engineer for approval prior to recording of the Final Plat. 7. The Final Plat must be recorded within 90 days or this ap- proval is null and void. South Burlington Planning Commission